[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

Wang et al., 2024 - Google Patents

Scheduling ASC and AGV considering direct, buffer, and hybrid modes for transferring containers

Wang et al., 2024

View PDF
Document ID
5083706306530857187
Author
Wang Y
Hu Z
Tian X
Publication year
Publication venue
Computers & Operations Research

External Links

Snippet

At automated container terminals (ACTs), automated stacking cranes (ASCs) and automated guided vehicles (AGVs) perform yard vertical loading/unloading and horizontal transport operations, respectively. The two operating devices transfer containers at the seaside. This …
Continue reading at papers.ssrn.com (PDF) (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"

Similar Documents

Publication Publication Date Title
Yang et al. An integrated scheduling method for AGV routing in automated container terminals
Xu et al. Integrated scheduling optimization of U-shaped automated container terminal under loading and unloading mode
Zhou et al. Integrated optimization on yard crane scheduling and vehicle positioning at container yards
Hu et al. Sequencing twin automated stacking cranes in a block at automated container terminal
Wang et al. A branch-and-bound approach for AGV dispatching and routing problems in automated container terminals
Zhang et al. Cooperative scheduling of AGV and ASC in automation container terminal relay operation mode
Wang et al. Scheduling ASC and AGV considering direct, buffer, and hybrid modes for transferring containers
Zhao et al. Research on cooperative scheduling of automated quayside cranes and automatic guided vehicles in automated container terminal
Aized Modelling and performance maximization of an integrated automated guided vehicle system using coloured Petri net and response surface methods
CN114021885B (en) Elevator scheduling method and device of tray four-way shuttle system
CN107678433A (en) A kind of handling facilities dispatching method of consideration AGV collision avoidances
Niu et al. Multi-equipment coordinated scheduling strategy of U-shaped automated container terminal considering energy consumption
Zhao et al. Model and heuristic solutions for the multiple double-load crane scheduling problem in slab yards
Liu et al. Optimization approach for yard crane scheduling problem with uncertain parameters in container terminals
Cao et al. AGV dispatching and bidirectional conflict-free routing problem in automated container terminal
Yin et al. Scheduling quay cranes and shuttle vehicles simultaneously with limited apron buffer capacity
Jiang et al. Optimization of integrated scheduling of restricted channels, berths, and yards in bulk cargo ports considering carbon emissions
Kim Models and methods for operations in port container terminals
Yuan et al. Quantum behaved particle swarm optimization of inbound process in an automated warehouse
Hu et al. Performance analysis on transfer platforms in frame bridge based automated container terminals
Gong et al. Real-time AGV scheduling optimisation method with deep reinforcement learning for energy-efficiency in the container terminal yard
Fibrianto et al. A job sequencing problem of an overhead shuttle crane in a rail-based automated container terminal
Ezzahra et al. Optimizing Port Operations: Synchronization, Collision Avoidance, and Efficient Loading and Unloading Processes
Ding et al. Decision support based automatic container sequencing system using heuristic rules
Ding et al. Research on Scheduling Optimization of Multi-layer Four-way Shuttle System Based on Composite Tasks