Anchor recovery under extreme conditions in downtown Leipzig, GermanyBabendererde et al., 2007
- Document ID
- 5045625879725999070
- Author
- Babendererde L
- Elsner P
- Publication year
- Publication venue
- Underground Space-the 4th Dimension of Metropolises
External Links
Snippet
In the inner city of Leipzig, Germany, the London, UK based AMEC group, an international infrastructure specialist, faced the problem that old cable anchors from the construction pit of a multiplex shopping centre built by AMEC in 1999/2000 had to be recovered from under …
- 238000011084 recovery 0 title description 17
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/20—Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/26—Placing by using several means simultaneously
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/08—Wrecking of buildings
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zhang et al. | Key techniques for the largest curved pipe jacking roof to date: A case study of Gongbei tunnel | |
KR101834847B1 (en) | Echo-environmental construction method of tunnel portal area using mini pipe-roof | |
CN102748040B (en) | Main structure for metro long-span station and pillar arching construction method thereof | |
CN110344400A (en) | The hard rock pore-forming construction technology of churning driven opportunity | |
JP2023113780A (en) | Method and system for constructing underground tunnel | |
Sandene et al. | A case study on the effects of anchor drilling in soft, low sensitive clay and sandy, silty soils | |
Babendererde et al. | Anchor recovery under extreme conditions in downtown Leipzig, Germany | |
Atzl | Challenges and Solutions for large scale Tunnelling in Urban Environment | |
JPWO2020193960A5 (en) | ||
Boon et al. | Protection of buildings and structures within the influence of tunnelling works | |
RU2152473C1 (en) | Method for erection of vehicular traffic tunnel of urban ring highway of megapolis | |
Cassani et al. | Auxiliary methods technology: Ground reinforcing, ground improving and pre-support technology | |
Bezrodny et al. | Preservation of urban historic centers | |
Jameson et al. | North American trends and developments of complex support of excavation systems | |
Khokhar et al. | Cross Passage Construction Methods for Twin-Tube Tunnel Projects in Urban Areas | |
Giurgola et al. | Construction of the First Street Connector Tunnel as part of the Northeast Boundary Tunnel Project in Washington DC | |
CN208137965U (en) | Realize the inclined shaft fore shaft section suspension device of rapid construction | |
Okumusoglu et al. | Support of 30-m-Deep Excavation | |
Motallebi et al. | Permanent secant pile wall for underground transit station | |
Perčić et al. | Construction of underground structures in urban areas | |
D’Angelis et al. | Pavoncelli Bis water tunnel: Tunnel boring machine selection and safety standards for excavating in presence of methane | |
Sato et al. | Development of a micro-tunnel boring machine (MTBM) in pipe-roofing considering ground conditions | |
RU2152470C1 (en) | Method for erection of urban ring highway section megapolis | |
Palmstrom | Engineering geology and rock engineering applied in the design of Norwegian tunnels | |
Parmantier et al. | Case study: Cement-bentonite pre-trenching and cutter soil mixing (CSM) for temporary shoring and groundwater cutoff |