Kueh et al., 2018 - Google Patents
Small Field Rejuvenation: Challenges, Lessons Learnt & Redevelopment ConceptKueh et al., 2018
- Document ID
- 5010298038964139810
- Author
- Kueh J
- M Dimyati U
- Wan Mat S
- Michael K
- M Fadhil M
- Dolah K
- Publication year
- Publication venue
- SPE Annual Technical Conference and Exhibition?
External Links
Snippet
Field D is located in offshore Sarawak, Malaysia. It was discovered in 1980s, and achieved first oil in 2012. Field D is categorized as small field, due to small reserves. In order to minimize development cost, Field D development utilized refurbished platform, tied back to …
- 230000003716 rejuvenation 0 title description 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/017—Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/006—Production of coal-bed methane
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B2043/0115—Drilling for or production of natural gas hydrate reservoirs; Drilling through or monitoring of formations containing gas hydrates
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS
- G01V99/00—Subject matter not provided for in other groups of this subclass
- G01V99/005—Geomodels or geomodelling, not related to particular measurements
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Al-Mutairi et al. | EOR potential in the middle east: current and future trends | |
Thomas et al. | Understanding water flood response in tight oil formations: A case study of the Lower Shaunavon | |
Talukdar et al. | Reservoir management of the Gullfaks main field | |
Kittrell et al. | Locating the remaining oil (LTRO) in a mature field in the Tertiary Baram Delta, Malaysia | |
Haugen et al. | Lessons learned from further development of the peregrino heavy oil field offshore brazil | |
Kueh et al. | Small Field Rejuvenation: Challenges, Lessons Learnt & Redevelopment Concept | |
Leonard et al. | Lessons learned from the management of basin floor submarine fan reservoirs in the UKCS | |
Zulkipli et al. | The Guiding Principle of Well Placement to Maximise Hydrocarbon Recovery through Enhanced Reservoir Characterisation and Prolific Seismic-Driven Approaches | |
Guest et al. | Korolev waterflood pilot completion design for water supply and injection wells | |
Schneider et al. | A miscible WAG project using horizontal wells in a mature, offshore, carbonate middle east reservoir | |
Cakici et al. | Well, Reservoir and Facilities Management (WRFM) and Surveillance Planning in a Multi-Stacked Mature Oil and Gas Field in Baram Delta | |
Fritz et al. | Geological aspects of horizontal drilling | |
Pyle et al. | The Maule field: An economic small field development | |
Chetri et al. | Integrated Reservoir Management Approach Beats the Impact of Reservoir Heterogeneity, Injectivity Challenges, and Delayed Water Flood in Upper Burgan Reservoir in North Kuwait—A Case History | |
Ramos et al. | Using Completion Diagnostics in Uinta Basin Vertical Wells to Reduce Completion Costs and Identify Horizontal Well Targets | |
Jeboda et al. | Reservoir Management Best Practices and Lessons Learned from the Agbami Field | |
Hill et al. | Development of the Stybarrow Field, Western Australia | |
Prochnow et al. | Pennsylvanian and Wolfcampian Sequence Stratigraphy Using FMI and Log Analysis on the Western Edge of the Midland Basin: A Tool for Guiding Well Completions | |
Ma et al. | Meeting the Challenge of Reservoir Simulation in the World's Largest Clastic Oil Field-The Greater Burgan Field Complex, Kuwait | |
Clark et al. | Case study: redevelopment of the Ebughu field | |
Ho et al. | Value Creation from the Reservoir, Well and Facilities Management RWFM Planning in Multi-Stacked Mature Oil Rim Reservoirs, Offshore Sarawak Malaysia | |
Salimov et al. | Successful Application of Through Casing Logging Technology to Increase Oil Production in a Brown Field Well | |
Udoinyang et al. | Integration of 4D Monitor to Enhance Reservoir Management: A Case Study of Egina Field | |
Pakdeesirote et al. | Pilot In-Situ Inflow Control Device ICD Waterflood Injector Transformation-A Case Study from Platong | |
Orman et al. | Reservoir Management of Skjold: A Mature, Waterflooded, Fractured Chalk Field in the North Sea |