Jiang et al., 2020 - Google Patents
UAV-based 3D reconstruction for hoist site mapping and layout planning in petrochemical constructionJiang et al., 2020
- Document ID
- 4963449047099223470
- Author
- Jiang W
- Zhou Y
- Ding L
- Zhou C
- Ning X
- Publication year
- Publication venue
- Automation in Construction
External Links
Snippet
Hoisting operations are an essential part of petrochemical plant construction. The pre-layout planning of hoisting facilities, including hoisted objects and cranes, is the key to ensuring the success of the entire construction. However, most current site layout planning methods …
- 238000010276 construction 0 title abstract description 103
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
- G06T17/05—Geographic models
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Jiang et al. | UAV-based 3D reconstruction for hoist site mapping and layout planning in petrochemical construction | |
Kamari et al. | AI-based risk assessment for construction site disaster preparedness through deep learning-based digital twinning | |
Lehtola et al. | Digital twin of a city: Review of technology serving city needs | |
US11741703B2 (en) | In data acquisition, processing, and output generation for use in analysis of one or a collection of physical assets of interest | |
CN111199066B (en) | Construction site virtual construction restoration method based on BIM+GIS | |
Álvares et al. | Exploratory study of using unmanned aerial system imagery for construction site 3D mapping | |
CN110880200A (en) | Intelligent checking and accepting method for GIM model engineering based on three-dimensional reconstruction technology | |
CA3099443A1 (en) | Methods and apparatus for automatically defining computer-aided design files using machine learning, image analytics, and/or computer vision | |
Qin et al. | Automated reconstruction of parametric bim for bridge based on terrestrial laser scanning data | |
CN115563680A (en) | Digital twin object processing method and system | |
Tian et al. | Crane lifting optimization and construction monitoring in steel bridge construction project based on BIM and UAV | |
CN104899922A (en) | Three-dimensional holographic generation method for intelligent power grid visualization application | |
CN114092537A (en) | Automatic inspection method and device for electric unmanned aerial vehicle of transformer substation | |
CN110309618A (en) | Modeling method, model building device and the modeling of Building Information Model | |
CN110660125B (en) | Three-dimensional modeling device for power distribution network system | |
CN108491649A (en) | A kind of design method and processing equipment of wind power plant digital Platform | |
Ibrahim et al. | Metrics and methods for evaluating model‐driven reality capture plans | |
Chen et al. | 3D model-based terrestrial laser scanning (TLS) observation network planning for large-scale building facades | |
Wang et al. | Digital twin-based framework for green building maintenance system | |
Taubenböck et al. | Remote sensing—An effective data source for urban monitoring | |
Xie et al. | Reality capture: Photography, videos, laser scanning and drones | |
Liu et al. | Study on digital twin technologies for watershed information modeling (WIM): a systematic literature review and bibliometric analysis | |
Borisov et al. | An automated process of creating 3D city model for monitoring urban infrastructures | |
Liu et al. | Integration of Building Information Modelling (BIM) and sensor technology: a review of current developments and future outlooks | |
Adeel et al. | Building information modeling and artificial intelligence based smart construction management: Materials and electrical |