Kuc, 2020 - Google Patents
A Computational Framework for Optimization-based Interdependent Infrastructure Analysis and VulnerabilityKuc, 2020
View PDF- Document ID
- 4702082342333290297
- Author
- Kuc M
- Publication year
External Links
Snippet
Civilian communities and military installations operate numerous critical infrastructure systems to deliver services like power, water, mobility, and communications to people and missions. The vulnerability of these systems can be measured by considering the …
- 238000005457 optimization 0 title abstract description 3
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/30—Transportation; Communications
- G06Q50/32—Post and telecommunications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N5/00—Computer systems utilising knowledge based models
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Bhusal et al. | Power system resilience: Current practices, challenges, and future directions | |
Kandaperumal et al. | Resilience of the electric distribution systems: concepts, classification, assessment, challenges, and research needs | |
Alderson et al. | Assessing and improving operational resilience of critical infrastructures and other systems | |
Berkeley et al. | A framework for establishing critical infrastructure resilience goals | |
Loggins et al. | CRISIS: Modeling the restoration of interdependent civil and social infrastructure systems following an extreme event | |
Pederson et al. | Critical infrastructure interdependency modeling: a survey of US and international research | |
Ouyang | Review on modeling and simulation of interdependent critical infrastructure systems | |
Alderson et al. | Solving defender-attacker-defender models for infrastructure defense | |
Zimmerman et al. | Conceptual modeling framework to integrate resilient and interdependent infrastructure in extreme weather | |
Häring et al. | Towards a generic resilience management, quantification and development process: general definitions, requirements, methods, techniques and measures, and case studies | |
Ouyang et al. | Critical infrastructure vulnerability to spatially localized failures with applications to Chinese railway system | |
Xu et al. | Improving repair sequence scheduling methods for postdisaster critical infrastructure systems | |
Kandaperumal et al. | AWR: Anticipate, withstand, and recover resilience metric for operational and planning decision support in electric distribution system | |
Duan et al. | Assessment methods of network resilience for cyber-human-physical systems | |
Jiang et al. | Resilient service restoration for distribution systems with mobile resources using Floyd‐based network simplification method: Resilient service restoration for DS with mobile resources using Floyd‐based network simplification method | |
Balakrishnan et al. | InfraRisk: An open-source simulation platform for resilience analysis in interconnected power–water–transport networks | |
Dunn et al. | Development of a hierarchical approach to analyse interdependent infrastructure system failures | |
Noorazar et al. | Data‐driven operation of the resilient electric grid: A case of COVID‐19 | |
Kwasinski et al. | Generalized integrated framework for modelling communications and electric power infrastructure resilience | |
Cooke | The resilience of the electric power delivery system in response to terrorism and natural disasters: summary of a workshop | |
Kuc | A Computational Framework for Optimization-based Interdependent Infrastructure Analysis and Vulnerability | |
Permann | Genetic algorithms for agent-based infrastructure interdependency modeling and analysis | |
Baycik et al. | Interdiction-based approaches to identify damage in disrupted critical infrastructures with dependencies | |
Wachtel et al. | Sandia's Integrated Methodology for Energy and Infrastructure Resilience Analysis | |
Dixon | Assessing vulnerabilities in interdependent infrastructures using attacker-defender models |