Cui et al., 2011 - Google Patents
Multi-scale simulation in railway planning and operationCui et al., 2011
View PDF- Document ID
- 4603509235031649607
- Author
- Cui Y
- Martin U
- Publication year
- Publication venue
- Promet-Traffic&Transportation
External Links
Snippet
Sažetak Simulation methods are widely used in railway planning and operation. However, at the moment there are no applicable solutions in the process simulation for a smooth transition among different infrastructure levels on the basis of a unified structure with …
- 238000004088 simulation 0 title abstract description 128
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for programme control, e.g. control unit
- G06F9/06—Arrangements for programme control, e.g. control unit using stored programme, i.e. using internal store of processing equipment to receive and retain programme
- G06F9/46—Multiprogramming arrangements
- G06F9/48—Programme initiating; Programme switching, e.g. by interrupt
- G06F9/4806—Task transfer initiation or dispatching
- G06F9/4843—Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
- G06F9/4881—Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F2217/00—Indexing scheme relating to computer aided design [CAD]
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Salido et al. | Robustness for a single railway line: Analytical and simulation methods | |
Vromans et al. | Reliability and heterogeneity of railway services | |
Liu et al. | Scheduling trains as a blocking parallel-machine job shop scheduling problem | |
Mu et al. | Scheduling freight trains traveling on complex networks | |
Corman et al. | Closing the loop in real-time railway control: Framework design and impacts on operations | |
Cheng | Hybrid simulation for resolving resource conflicts in train traffic rescheduling | |
Marinov et al. | A simulation modelling methodology for evaluating flat-shunted yard operations | |
He et al. | An integrated dispatching model for rail yards operations | |
Yang et al. | Rescheduling trains with scenario-based fuzzy recovery time representation on two-way double-track railways | |
KR20120074060A (en) | Apparatus for simulating train operation and system for simulating train operation comprising that apparatus | |
Cui et al. | Multi-scale simulation in railway planning and operation | |
Zhuang et al. | High-speed railway train timetable conflict prediction based on fuzzy temporal knowledge reasoning | |
Javadian et al. | Using simulated annealing for determination of the capacity of yard stations in a railway industry | |
KR101352216B1 (en) | Apparatus for Simulating Train Operation Based on Pattern and System for Simulating Train Operation Including That Apparatus | |
CN109447327A (en) | Subway train track prediction method | |
CN106938655A (en) | Subway traffic conflict early warning method | |
Marković et al. | A threshold policy for dispatching vehicles in demand-responsive transit systems | |
Lordieck et al. | Microscopic railway capacity assessment of heterogeneous traffic under real-life operational conditions | |
Liang et al. | Increasing performance of railway systems by exploitation of the relationship between capacity and operation quality | |
Ait-Ali et al. | A disaggregate bundle method for train timetabling problems | |
D'Acierno et al. | An analytical approach for determining reserve times on metro systems | |
JP2013010388A (en) | Vehicle operation plan preparation device | |
Gille et al. | Applying multiscaling analysis to detect capacity resources in railway networks | |
Cui et al. | Searching feasible resources to reduce false-positive situations for resolving deadlocks with the Banker's algorithm in railway simulation | |
Yao et al. | Modeling on Dynamic Passenger Flow Distribution in Urban Mass Transit Network |