Antoniucci et al., 2024 - Google Patents
First Successful Shaped Memory Polymer (SMP) Open Hole Sand Control Application in an Extended Reach WellAntoniucci et al., 2024
- Document ID
- 437485392745162196
- Author
- Antoniucci C
- Di Altobrando C
- Gioia V
- Ferrara G
- Sportelli M
- Mingozzi M
- Derni D
- Di Giampaolo P
- Fusilli A
- Publication year
- Publication venue
- Abu Dhabi International Petroleum Exhibition and Conference
External Links
Snippet
Abstract Shaped Memory Polymer (SMP) technology represents nowadays one of the more innovative sand control techniques available on the market for layered reservoir with water zones associated or characterized by different pressure regimes. Even though the well …
- 229920000642 polymer 0 title abstract description 17
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/10—Setting of casings, screens, liners or the like in wells
- E21B43/103—Setting of casings, screens, liners or the like in wells of expandable casings, screens, liners, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices, or the like
- E21B33/14—Methods or devices for cementing, for plugging holes, crevices, or the like for cementing casings into boreholes
- E21B33/143—Methods or devices for cementing, for plugging holes, crevices, or the like for cementing casings into boreholes for underwater installations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/04—Gravelling of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/08—Screens or liners
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
- E21B34/10—Valve arrangements for boreholes or wells in wells operated by control fluid supplied from above ground
- E21B34/101—Valve arrangements for boreholes or wells in wells operated by control fluid supplied from above ground with means for equalizing fluid pressure above and below the valve
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
- E21B43/119—Details, e.g. for locating perforating place or direction
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B37/00—Methods or apparatus for cleaning boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Kleverlaan et al. | Deployment of swelling elastomer packers in Shell E&P | |
Gavioli et al. | The evolution of the role of openhole packers in advanced horizontal completions: From novel technology to a critical key to success | |
Weirich et al. | Frac-Packing: Best Practices and Lessons Learned from over 600 Operations | |
Koloda et al. | The First Application of Premium Port Technology to Conduct Zonal Stimulation and the Ability to Control the Well Injectivity Profile on a Unique Offshore Field in the Arctic | |
Hecker et al. | Reducing Well Cost by Gravel Packing in Nonaqueous Fluid | |
Rodrigues et al. | Horizontal well completion and stimulation techniques—A review with emphasis on low-permeability carbonates | |
Schnitzler et al. | 100th Intelligent Completion Installation: A Milestone in Brazilian Pre-Salt Development | |
Markham et al. | Multizone Openhole Gravel Packing with Enhanced Shunt Screens and Zonal Isolation in High-Rate Gas Wells | |
Hecker et al. | First Installation of Alternate Path Openhole Packer Providing True Zonal Isolation in Openhole Gravel Packs | |
Schnitzler et al. | Buzios Presalt Wells: Delivering Intelligent Completion In Ultra-Deepwater Carbonate Reservoirs | |
Sugiyama et al. | The optimal application of multi-lateral/multi-branch completions | |
Antoniucci et al. | First Successful Shaped Memory Polymer (SMP) Open Hole Sand Control Application in an Extended Reach Well | |
Madan et al. | Milestones, Lessons Learned and Best Practices in the designing, deployment and installation of ICDs in Saudi Arabia | |
Casero et al. | Multiple Transverse Fracturing in Horizontal Open Hole Allows Development of a Low-Permeability Reservoir in the Foukanda Field, Offshore Congo | |
Agnew et al. | The leaking liner top | |
Kamaruddin et al. | Malaysia's first successful implementation of sand consolidation technology as a primary sand control method executed during the drilling phase: success story and lessons learned | |
Aidoo et al. | Installation of longest openhole solid expandable tubular technology on a deepening well in western Kazakhstan | |
Gavioli et al. | The evolution of the role of openhole packers in advanced horizontal completions: From optional accessory to critical key of success | |
Van Kranenburg et al. | Sand Control Completions for Ormen Lange Big-Bore, High-Rate Gas Development, Evaluation of Concept Selection, Qualification, Execution and Well Performance | |
Simancas et al. | Completion Standardization Utilizing Conformable Sand Screen Technology in Multilayered Ultrafine Sand Reservoir | |
Saikia et al. | Well Abandonment and Subsequent Elimination of Sustained B-Annulus Pressure: A Case Study | |
Ojeh-Oziegbe et al. | Successful Installation of the First Deep Water Single Trip Stand-Alone-Screens Completion in the Industry Saves rig Time | |
Al-Ibrahim et al. | Uncemented Liner Completion in an Unconventional Fractured Reservoir Eliminates Formation Damage and Improves Productivity-Field Case Study on Exploratory Well | |
Songa et al. | Successful Coiled Tubing Catenary Cement Packer and SAS Installation in a Horizontal Well for Developing Bypassed Reserves: Offshore Niger Delta | |
Bårdsen et al. | Evolution of a Well Annular Barrier for Mitigation of SCP |