Run a climatological set-up of MPTRAC/CLaMS/MESSy with ERA5
Past due by 10 months
66% complete
Implementing the required components (Library, Interface and access points) to run MPTRAC linked to CLaMS in MESSy using the climatological run with ERA5, so that the results can be compared with former CLaMS/MESSy runs.