[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

Green Park tube station

Green Park is a London Underground station located on the edge of Green Park, with entrances on both sides of Piccadilly. The station is served by three lines: Jubilee, Piccadilly and Victoria. On the Jubilee line the station is between Bond Street and Westminster stations, on the Piccadilly line it is between Hyde Park Corner and Piccadilly Circus stations, and on the Victoria line it is between Victoria and Oxford Circus stations. It is in fare zone 1.

Green Park London Underground
The entrance inside Green Park
Green Park is located in Central London
Green Park
Green Park
Location of Green Park in Central London
LocationGreen Park
Local authorityCity of Westminster
Managed byLondon Underground
Number of platforms6
AccessibleYes[1]
Fare zone1
Cycle parkingNo
Toilet facilitiesYes
London Underground annual entry and exit
2019Increase 39.06 million[2]
2020Decrease 9.45 million[3]
2021Increase 15.94 million[4]
2022Increase 28.42 million[5]
2023Decrease 28.25 million[6]
Key dates
15 December 1906Opened (GNP&BR)
7 March 1969Opened (Victoria line)
1 May 1979Opened (Jubilee line)
Listed status
Listed featureEntrance within Devonshire House
Listing gradeII
Entry number1226746[7]
Added to list30 May 1972; 52 years ago (1972-05-30)
Other information
External links
Coordinates51°30′24″N 0°08′34″W / 51.5067°N 0.1428°W / 51.5067; -0.1428
London transport portal

The station was opened in 1906 by the Great Northern, Piccadilly and Brompton Railway (GNP&BR) and was originally named Dover Street due to its location in that street. It was modernised in the 1930s when lifts were replaced with escalators and extended in the 1960s and 1970s when the Victoria and Jubilee lines were constructed.

The station is near The Ritz Hotel, the Royal Academy of Arts, St James's Palace, Berkeley Square, Bond Street, the Burlington Arcade and Fortnum & Mason, and is one of two serving Buckingham Palace (the other being St James's Park).

History

edit

Piccadilly line

edit

Rival schemes

edit

During the final years of the 19th century and the early years of the 20th century numerous competing schemes for underground railways through central London were proposed.[8] A number of the schemes submitted to parliament for approval as private bills included proposals for lines running under Piccadilly with stations in the area of the current Green Park station.

map showing locations of proposed stations 
Location of original entrance to Dover Street station, approximate locations of stations proposed by rival companies and current Green Park station entrances

The first two proposals came before parliament in 1897. The Brompton and Piccadilly Circus Railway (B&PCR) proposed a line between South Kensington and Piccadilly Circus and the City and West End Railway (C&WER) proposed a line between Hammersmith and Cannon Street. The B&PCR proposed a station on the north side at Dover Street and the C&WER proposed a station on the south side at Arlington Street.[9] Following review by parliament, the C&WER bill was rejected and the B&PCR bill was approved and received royal assent in August 1897.[10]

In 1902, the Charing Cross, Hammersmith and District Railway (CCH&DR) proposed a line between Charing Cross and Barnes with a parallel shuttle line running between Hyde Park Corner and Charing Cross. A station was planned at Walsingham House on the north-east corner of Green Park. This scheme was rejected by parliament.[11]

The same year, the Central London Railway (CLR, now the central section of the Central line) submitted a bill that aimed to turn its line running between Shepherd's Bush and Bank into a loop by constructing a second roughly parallel line to the south. This would have run along Piccadilly with a station at St James's Street just to the east of Dover Street.[12] Delayed while a royal commission considered general principles of underground railways in London, the scheme was never fully considered and although it was re-presented in 1903,[13] it was dropped two years later.[14]

A third scheme for 1902 was the Piccadilly, City and North East London Railway (PC&NELR) which proposed a route between Hammersmith and Southgate. It planned a station at Albemarle Street, just to the east of Dover Street.[15] Although favoured in parliament and likely to be approved, this scheme failed due to a falling-out between the backers and the sale of part of the proposals to a rival.[16][a]

In 1905, some of the promoters of the PC&NELR regrouped and submitted a proposal for the Hammersmith, City and North East London Railway. As the CLR had done previously, the company proposed a station at St James's Street.[17] Owing to failures in the application process, this scheme was also rejected.[18]

Construction and opening

edit

While the various rival schemes were unsuccessful in obtaining parliamentary approval,[19] the B&PCR was unsuccessful in raising the funds needed to construct its line. It was not until after the B&PCR had been taken over by Charles Yerkes's Metropolitan District Electric Traction Company that the money became available.[20] Tunnelling began in 1902 shortly before the B&PCR was merged with the Great Northern and Strand Railway to create the Great Northern, Piccadilly and Brompton Railway (GNP&BR, the predecessor of the Piccadilly line).[19][21][b]

The GNP&BR opened the station on 15 December 1906 as Dover Street.[25] As with most of the other GNP&BR stations, the station building, on the east side of Dover Street, was designed by Leslie Green.[26] It featured the company's standard red glazed terracotta facade with wide semi-circular arches at first-floor level. Platform and passageway walls were decorated in glazed cream tiles in Green's standard arrangement with margins, patterning and station names in mid-blue.[27][c] When it opened, the station to the west was Down Street.[25][d] The station was provided with four Otis electric lifts paired in two 23-foot (7.0 m) diameter shafts and a spiral stair in a smaller shaft. The platforms are 27.4 metres (90 ft) below the level of Piccadilly.

Reconstruction

edit

The station was busy and unsuccessful attempts to control crowds with gates at platform level were made in 1918. In the 1930s, the station was included amongst those modernised in conjunction with the northern and western extensions of the Piccadilly line. A new sub-surface ticket hall was opened on 18 September 1933 with a pair of Otis escalators provided to replace the lifts.[30] The new ticket hall was accessed from subway entrances in Piccadilly. On the north side, an entrance was provided in Devonshire House on the corner with Stratton Street; on the south side an entrance was constructed on a piece of land taken from the park.[27] The shelter for the southern entrance was designed by Charles Holden.[31][e] The original station building, the lifts and the redundant below-ground passages were closed and the station was renamed Green Park. Part of the ground floor was used as a tea shop until the 1960s.[27] In 1955, a third escalator was added to help deal with increased passenger numbers.[33]

Victoria line

edit
A view along a wide passage with a semi-circular ceiling 
Interchange passage between Victoria and Piccadilly lines

Proposals for an underground line linking Victoria to Finsbury Park date from 1937 when planning by the London Passenger Transport Board (LPTB) for future services considered a variety of new routes and extensions to existing lines.[34][f] Parliament approved the line in 1955,[37] but a shortage of funds meant that work did not start until after government loans were approved in 1962.[38][g]

A five-storey brick building with a shop on the ground floor and flats above 
The current building at 5–7 Dover Street, site of the original station entrance

Construction works began in 1962.[39] The 1930s ticket hall under the roadway of Piccadilly was enlarged to provide space for new Victoria line escalators and a long interchange passageway was provided between the Victoria line and Piccadilly line platforms.[40] In 1965 a collapse of soft ground during the excavation of one of the tunnels near Green Park station meant that the ground had to be chemically stabilised before work could continue.[41] The disused station building in Dover Street was demolished the following year in conjunction with the works for the new line. A vent shaft was constructed and an electrical sub-station was built in the basement of the new building.[27][h] The 1930s entrance on the south side of Piccadilly was also reconstructed.

The enlarged ticket hall, new platforms and passageways were decorated in grey tiles. Platforms are approximately 23.4 metres (77 ft) below street level. Platform roundel signs were on backlit illuminated panels. Seat recesses on the Victoria line platforms were tiled in an abstract pattern by Hans Unger of coloured circles representing a bird's-eye view of trees in Green Park.[42]

After trial running of empty trains from 24 February 1969, the Victoria line platforms opened on 7 March 1969 with the opening of the third stage of the line between Warren Street and Victoria.[43] The same day, Queen Elizabeth II officially opened the line by riding a train from Green Park to Oxford Circus.[43][i]

Jubilee line

edit
An underground station platform with curving red tiled walls and a white panelled ceiling arching over the track 
Jubilee line platform with leaf design by June Fraser

The origins of the Jubilee line are less clearly defined than those of the Victoria line. During World War II and throughout the 1950s and early 1960s consideration was given to various routes connecting north-west and south-east London via the West End and the City of London. Planning of the Victoria line had the greater priority and it was not until after construction of that line started that detailed planning began for the new line, first called the Fleet line in 1965 as it was planned to run in an east–west direction along Fleet Street.[45] Lack of funding meant that only the first stage of the proposed line, from Baker Street to Charing Cross, received royal assent in July 1969; funding was agreed in August 1971.[46][j]

Tunnelling began in February 1972 and was completed by the end of 1974.[48] In 1977, during construction of the stations, the name of the line was changed to the Jubilee line, to mark the Queen's Silver Jubilee that year.[49][k] A construction shaft in Hays Mews north of the station was used for an electrical substation and ventilation shaft.[51] At Green Park, the ticket hall was enlarged slightly to provide space for escalators for the new line which connect to an intermediate concourse providing interchange between the Jubilee and Victoria lines. A second flight of escalators descends to the Jubilee line platforms,[52] which are 31.1 metres (102 ft) below street level, the deepest of the three sets. Interchange between the Jubilee and Piccadilly lines was via the ticket hall.[53] Platform walls were tiled in a deep red with black leaf patterns by June Fraser.[54][55] Trial running of trains began in August 1978 and the Jubilee line opened on 1 May the next year.[25][51] The line had been officially opened by Prince Charles the previous day, starting with a train journey from Green Park to Charing Cross.[51] In 1993, to alleviate congestion, a third escalator was installed in the lower flight to replace a fixed staircase.[52]

A view along a passage with curved walls covered in mosaic tiling and a semi-circular ceiling 
Interchange passage between the Jubilee and Piccadilly lines

Work on the Fleet line's stages 2 and 3 did not proceed and it was not until 1992 that an alternative route was approved.[l] The Jubilee line extension took the line south of the River Thames via Waterloo, which was impractical to reach from the line's existing terminus at Charing Cross. New tunnels branching from the original route south of Green Park were to be constructed, and the line to Charing Cross was to be closed.[58] Tunnelling began in May 1994, and improvements were carried out at Green Park to provide a direct passageway connection between the Jubilee and Piccadilly lines, including lifts to the platforms at each end.[53] A new ventilation shaft and an emergency exit to Arlington Street were built.[53] The new extension opened in stages starting at Stratford in the east, with services to Charing Cross ending on 19 November 1999 and the final section between Green Park and Waterloo opening the following day.[25]

Recent changes

edit
An underground station platform with white tiled walls, a white panelled ceiling arching over the track. The tiled a recess behind a platform seat features a design of twelve coloured circles arranged in a 4 by three grid; mostly dark green, but with three yellow, two black and one blue circles. 
Refurbished Victoria line platform with reinstated Hans Unger tile design in seat recesses (close-up)

In 2008, Transport for London (TfL) announced a project to provide step-free access to all three lines in advance of the 2012 London Olympics.[59][m] The project also included the construction of a new entrance on the south side of Piccadilly with ramped access directly from Green Park[59] designed by Capita Symonds and Alacanthus LW architects. Work commenced in May 2009 to install two lifts from the ticket hall to the Victoria line platforms and the interchange passageway to the Piccadilly line. This work and a third lift in the new park-side entrance between the street level and the ticket hall were completed ahead of schedule in 2011.[62][n] At the same time, Green Park station underwent a major improvement programme which saw the tiling on the Victoria and Piccadilly line platforms and the interchange passageways replaced.[o] When the Jubilee line opened, the Hans Unger tiling in the seat recesses of the Victoria line platforms was replaced with a design using the leaf patterns used on the Jubilee line platforms;[63] the Unger design was reinstated during the restoration.

Entrance and shelter on Piccadilly
Entrance from Green Park
Southern entrance

The new park entrance and street level shelter feature artwork within the Portland stone cladding titled Sea Strata designed by John Maine RA.[62][64] The Diana Fountain was relocated from its original site in the centre of the park to form the centrepiece of the new entrance.[62][65][66]

To help moderate temperatures in the station, a system using cool ground water extracted from boreholes sunk 130 metres (430 ft) into the chalk aquifer below London was installed. The extracted water passes through a heat exchanger connected to the cast-iron tunnel lining and the warmed water is returned to the aquifer through a second set of boreholes 200 metres (660 ft) away.[67]

Proposal for new connection

edit

In July 2005, a report, DLR Horizon 2020 Study, for the Docklands Light Railway (DLR) examined "pragmatic development schemes" to expand and improve the DLR network between 2012 and 2020. One of the proposals was an extension of the DLR from Bank to Charing Cross. Unused tunnels under Strand constructed as part of Stage 1 of the Fleet line would be enlarged to accommodate the larger DLR trains.[68] In 2011, the DLR published a proposal to continue the extension to Victoria via Green Park.[69] No further work has been done on these proposals.

Piccadilly bombing

edit

At around 9:00 pm on 9 October 1975, members of the Provisional IRA's Balcombe Street Gang detonated a bomb at a bus stop outside Green Park station, killing 23-year-old Graham Ronald Tuck and injuring 20 others. The attack was part of a bombing campaign carried out by the gang and in addition to the death and injuries caused damage to the Ritz Hotel and neighbouring buildings.[70]

Services and connections

edit

Services

edit

The station is in Travelcard Zone 1, between Bond Street and Westminster on the Jubilee line, Hyde Park Corner and Piccadilly Circus on the Piccadilly line and Victoria and Oxford Circus on the Victoria line.[71] On weekdays Jubilee line trains typically run every 2–212 minutes between 05:38 and 00:34 northbound and 05:26 and 00:45 southbound;[72][73] on the Piccadilly line trains typically run every 2½–3½ minutes between 05:48 and 00:34 westbound and 00:32 eastbound,[74][75] and on the Victoria line trains typically run every 100–135 seconds between 05:36 and 00:39 northbound and 05:36 and 00:31 southbound.[76][77]

As of 2023 it is the 15th busiest station on the London Underground with 28.25 million passengers using it per year.[4]

Connections

edit

London Buses day and night routes serve the station.[78][79]

edit

The opening scene of the 1997 film version of Henry James's The Wings of the Dove was set on the eastbound platforms at both Dover Street and Knightsbridge stations, both represented by the same studio mock-up, complete with a working recreation of a 1906 Stock train.[80]

Notes and references

edit

Notes

edit
  1. ^ The PC&NELR proposal was the result of a combination of several earlier schemes and it duplicated much of the B&PCR's route. Following a falling-out between the company's backers over the division of ownership, Speyer Brothers, the bank funding the B&PCR, were able to buy out the disgruntled backers of one of the schemes and the bank then withdrew its bill from consideration. This left the rest of the plans unable to proceed.[16]
  2. ^ Yerkes business arrangements were complex and sometimes dubious.[22] The B&PCR had been bought by the District Railway (DR) in 1898.[23] The DR became a subsidiary of Yerkes' Metropolitan District Electric Traction Company (MDETC) in July 1901 and transferred the B&PCR to the MDETC in September 1901. In the same month, the B&PCR then took over the Great Northern and Strand Railway. In April 1902, the Underground Electric Railways Company of London was established by Yerkes. It, in turn, took over and replaced the MDETC in June 1902 and was the parent company of the GNP&BR from its formation in August 1902.[24]
  3. ^ The platform tiling was replaced around 1985, but rings of tiles reaching over the arch of the tunnels remained.[27] A further re-tiling scheme around 2008 removed these so that nothing of Green's design remains.
  4. ^ Contemporary maps and later planning documents indicate that the station building occupied 5–7 Dover Street.[28][29]
  5. ^ The rebuilding of the station and similar works at Hyde Park Corner would bring the entrances of these stations closer together enabling the little-used station between them at Down Street to be closed on Saturday 21 May 1932 with the new escalators at Hyde Park coming into use on Monday 23 May.[25][27][32]
  6. ^ Developments of the initial proposal continued during and after World War II through the Railway (London Plan) Committee's Route 8 in 1946 and the LPTB's Scheme D in 1947, the latter being the first to plan an interchange at Green Park.[35] Following nationalisation of public transport in 1948, the London Transport Executive produced a report in 1949 containing a Route C which made modifications to Scheme D at each end, but retained the central section between Victoria and King's Cross St. Pancras unaltered.[36]
  7. ^ Before funding to construct the whole line was approved, London Transport tested new tunnelling techniques by constructing 1 mile (1.6 km) of twin experimental tunnels along the planned route from Finsbury Park to South Tottenham between January 1960 and July 1961.[38]
  8. ^ Planning permission was granted in 1965 for a new building and in 1968 for a ventilation shaft for the Victoria line and an electrical sub-station.[28][29] Although painted-over, remnants of Green's tiling from the left and right sides of the building's facade remain attached to retained sections of the flank walls each side of the current building (see photograph of existing building).
  9. ^ The Victoria line opened in stages: Walthamstow Central to Highbury & Islington (1 September 1968), Highbury & Islington to Warren Street (1 December 1968), Warren Street to Victoria (7 March 1969) and Victoria to Brixton (23 July 1971).[25] Construction of the final stage was only approved in 1966 after the works on the rest of the line had started.[44]
  10. ^ Funding for Stage 1 of the line was to come from the Greater London Council and central government in the ratio 1:3.[47]
  11. ^ The decision to change the name of the line was made by the Greater London Council, although the line was not expected to open until 1978. Subsequent delays in the installation of escalators and fitting-out of stations pushed the opening date into 1979.[50]
  12. ^ Although London Transport obtained permission for Stage 2 (Charing Cross to Fenchurch Street via Ludgate Circus and Cannon Street in 1971 and Stage 3 (Fenchurch Street to Lewisham via New Cross) in 1972,[56] uncertainty as to the appropriate eastern destination of the line and shortage of funds meant that the works were never begun.[57] A variety of alternative routes were considered during the 1970s and 1980s until a final route taking the line to Stratford was approved in 1992.[58]
  13. ^ The project was a TfL-funded games-enabling project in its investment programme, though not a project specifically funded as a result of the success of the London 2012 Games bid.[60] It was included in the strategy on accessible transport published by the London 2012 Olympic Delivery Authority and the London Organising Committee of the Olympic and Paralympic Games.[61] The other stations where games-enabling step-free access projects were carried-out were Baker Street (sub-surface lines) and Southfields.[59]
  14. ^ With the two low-level lifts installed when the new interchange passage was opened in 1999, interchange for wheelchair users between all platforms is possible.[1]
  15. ^ The original platform tiling on many of the Victoria line stations was poorly fixed and a number of stations had patches of missing tiles, which led to wholesale replacement at some stations.[63]

References

edit
  1. ^ a b "Step free Tube Guide" (PDF). Transport for London. April 2021. Archived (PDF) from the original on 15 May 2021.
  2. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2019. Transport for London. 23 September 2020. Archived from the original on 9 November 2020. Retrieved 9 November 2020.
  3. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2020. Transport for London. 16 April 2021. Retrieved 1 January 2022.
  4. ^ a b "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2021. Transport for London. 12 July 2022. Retrieved 7 September 2022.
  5. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2022. Transport for London. 4 October 2023. Retrieved 10 October 2023.
  6. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2023. Transport for London. 8 August 2024. Retrieved 16 September 2024.
  7. ^ Historic England. "Devonshire House (1226746)". National Heritage List for England. Retrieved 3 April 2015.
  8. ^ Badsey-Ellis 2005, pp. 36, 53, 91.
  9. ^ Badsey-Ellis 2005, pp. 71–72.
  10. ^ Badsey-Ellis 2005, p. 74.
  11. ^ Badsey-Ellis 2005, pp. 144–147.
  12. ^ Badsey-Ellis 2005, pp. 148–149.
  13. ^ Badsey-Ellis 2005, p. 212.
  14. ^ Bruce & Croome 2006, p. 19.
  15. ^ Badsey-Ellis 2005, pp. 166–168.
  16. ^ a b Badsey-Ellis 2005, pp. 185–199.
  17. ^ Badsey-Ellis 2005, p. 243.
  18. ^ Badsey-Ellis 2005, pp. 246–247.
  19. ^ a b Wolmar 2005, p. 181.
  20. ^ Day & Reed 2010, pp. 177–178.
  21. ^ Day & Reed 2010, p. 72.
  22. ^ Badsey-Ellis 2005, p. 116.
  23. ^ Badsey-Ellis 2005, p. 85.
  24. ^ Badsey-Ellis 2005, p. 118.
  25. ^ a b c d e f Rose 2016.
  26. ^ Paterson 2013.
  27. ^ a b c d e f Connor 2006, p. 106.
  28. ^ a b London County Council Architect's Department (18 March 1965). "Permission Granted on an Outline Application" (PDF). Archived from the original (PDF) on 17 August 2018. Retrieved 16 August 2018.
  29. ^ a b City of Westminster Department of Architecture and Planning (6 August 1968). "Permission for Development" (PDF). Archived from the original (PDF) on 17 August 2018. Retrieved 16 August 2018.
  30. ^ Badsey-Ellis 2016, p. 212.
  31. ^ Karol 2007, pp. 481–484.
  32. ^ Badsey-Ellis 2016, p. 211.
  33. ^ "New Green Park Escalator". News in Brief. The Times. No. 53136. London. 11 January 1955. p. 5.
  34. ^ Horne 2004, p. 6.
  35. ^ Horne 2004, p. 10.
  36. ^ Horne 2004, p. 12.
  37. ^ Horne 2004, p. 18.
  38. ^ a b Horne 2004, p. 23.
  39. ^ Horne 2004, p. 30.
  40. ^ Horne 2004, p. 29.
  41. ^ Badsey-Ellis 2016, p. 260.
  42. ^ Horne 2004, pp. 58 & 62.
  43. ^ a b Horne 2004, p. 56.
  44. ^ Horne 2004, p. 65.
  45. ^ Horne 2000, pp. 28–34.
  46. ^ Horne 2000, pp. 34–35.
  47. ^ Horne 2000, p. 35.
  48. ^ Horne 2000, p. 38.
  49. ^ Horne 2000, p. 44.
  50. ^ Horne 2000, pp. 44–45.
  51. ^ a b c Horne 2000, p. 45.
  52. ^ a b Horne 2000, p. 40.
  53. ^ a b c Horne 2000, p. 64.
  54. ^ Horne 2000, p. 46.
  55. ^ Bownes, Green & Mullins 2012, p. 203.
  56. ^ Horne 2000, p. 36.
  57. ^ Horne 2000, pp. 50–52.
  58. ^ a b Horne 2000, p. 57.
  59. ^ a b c "Green Park Tube station to be upgraded ahead of London 2012 Games". Transport for London. 18 August 2008. Retrieved 17 July 2018.
  60. ^ "London 2012 Olympic Games and Paralympic Games – Quarter 2 2007/08" (PDF). Transport Portfolio Executive Report. Transport for London. 2008. Archived (PDF) from the original on 25 April 2012.
  61. ^ "Accessible Transport Strategy for the London 2012 Olympic and Paralympic Games" (PDF). London 2012. May 2008. p. 31. Archived from the original (PDF) on 15 December 2011.
  62. ^ a b c "Transformation of Green Park station nears completion". Transport for London. 6 September 2011. Retrieved 17 July 2018.
  63. ^ a b Horne 2004, p. 75.
  64. ^ "Sea Strata". Art on the Underground. Transport for London. 19 October 2011. Retrieved 6 September 2018.
  65. ^ "Green Park station". Acanthus Architects LW. Retrieved 27 August 2018.
  66. ^ Berthoud, Peter (1 September 2011). "London's Most Beautiful Shelter?". www.peterberthoud.co.uk. Retrieved 15 July 2018.
  67. ^ Badsey-Ellis 2016, p. 304.
  68. ^ Ove Arup & Partners (July 2005). DLR Horizon 2020 Study (PDF). pp. 34–38 & 66. Archived (PDF) from the original on 8 November 2011.
  69. ^ "Potential DLR extensions" (PDF). Transport for London. 21 September 2010. Archived from the original (PDF) on 15 May 2011. Retrieved 17 July 2018.
  70. ^ "On the Day: 9th October 1975". BBC. 9 October 1975. Archived from the original on 13 February 2003. Retrieved 17 July 2018.
  71. ^ Standard Tube Map (PDF) (Map). Not to scale. Transport for London. April 2024. Archived (PDF) from the original on 28 May 2024. Retrieved 3 June 2024.
  72. ^ "Jubilee line: First and Last Trains" (PDF). Transport for London. 19 February 2020. Retrieved 3 May 2020.
  73. ^ "Jubilee line: Working Timetable 15" (PDF). Transport for London. 20 May 2018. Archived from the original (PDF) on 21 July 2018. Retrieved 20 July 2018.
  74. ^ "Piccadilly line: First and Last Trains" (PDF). Transport for London. 21 May 2017. Retrieved 19 July 2018.
  75. ^ "Piccadilly line: Working Timetable 58" (PDF). Transport for London. 22 May 2017. Archived from the original (PDF) on 5 December 2018. Retrieved 20 July 2018.
  76. ^ "Victoria line: First and Last Trains" (PDF). Transport for London. 4 November 2019. Retrieved 3 May 2020.
  77. ^ "Victoria line: Working Timetable 41" (PDF). Transport for London. 22 May 2017. Archived from the original (PDF) on 13 December 2018. Retrieved 20 July 2018.
  78. ^ "Buses from Green Park and Berkeley Square" (PDF). TfL. 29 April 2023. Retrieved 5 May 2023.
  79. ^ "Night buses from Green Park and Berkeley Square" (PDF). TfL. 29 April 2023. Retrieved 5 May 2023.
  80. ^ "Wings of the Dove [1997 feature film]". The London Underground in Films and Television. Nick Cooper. 22 October 2017. Retrieved 19 July 2018.

Bibliography

edit
edit
Preceding station   London Underground Following station
Bond Street
towards Stanmore
Jubilee line Westminster
towards Stratford
Hyde Park Corner Piccadilly line Piccadilly Circus
Victoria
towards Brixton
Victoria line Oxford Circus
Former services
Preceding station   London Underground Following station
Bond Street
towards Stanmore
Jubilee line
1979–99
Charing Cross
Terminus
Down Street
towards Hammersmith
Piccadilly line
1907–32
Piccadilly Circus