[go: up one dir, main page]
More Web Proxy on the site http://driver.im/Jump to content

STS-99

From Wikipedia, the free encyclopedia

STS-99
The SRTM radar boom in Endeavour's payload bay, extending 60 meters off the vehicle's port side
NamesSpace Transportation System-99
Mission typeRadar imaging
OperatorNASA
COSPAR ID2000-010A Edit this at Wikidata
SATCAT no.26088
Mission duration11 days, 5 hours, 39 minutes, 41 seconds
Distance travelled6,540,000 kilometers (4,060,000 mi)
Spacecraft properties
SpacecraftSpace Shuttle Endeavour
Launch mass116,376 kilograms (256,565 lb)
Landing mass102,363 kilograms (225,672 lb)
Payload mass13,154 kilograms (29,000 lb)
Crew
Crew size6
Members
Start of mission
Launch date11 February 2000, 17:43 (2000-02-11UTC17:43Z) UTC
Launch siteKennedy, LC-39A
End of mission
Landing date22 February 2000, 23:23 (2000-02-22UTC23:24Z) UTC
Landing siteKennedy, SLF Runway 33
Orbital parameters
Reference systemGeocentric
RegimeLow Earth
Perigee altitude224 kilometres (139 mi)
Apogee altitude242 kilometres (150 mi)
Inclination57.0 degrees
Period89.2 minutes

STS-99 mission patch

Left to right - Front: Mohri, Thiele; Back: Voss, Kregel, Gorie, Kavandi
← STS-103 (96)
STS-101 (98) →

STS-99 was a Space Shuttle mission using Endeavour, that launched on 11 February 2000 from Kennedy Space Center, Florida. The primary objective of the mission was the Shuttle Radar Topography Mission (SRTM) project. This was also the last solo flight of Endeavour; all future flights for Endeavour became devoted to the International Space Station. STS-99 was also the first Shuttle mission of the 2000s.

Crew

[edit]
Position Astronaut[1]
Commander United States Kevin R. Kregel
Fourth and last spaceflight
Pilot United States Dominic L. Pudwill Gorie
Second spaceflight
Mission Specialist 1 Germany Gerhard P.J. Thiele
Only spaceflight
Mission Specialist 2
Flight Engineer
United States Janet L. Kavandi
Second spaceflight
Mission Specialist 3 United States Janice E. Voss
Fifth and last spaceflight
Mission Specialist 4 Japan Mamoru Mohri , NASDA
Second and last spaceflight

Crew seat assignments

[edit]
Seat[2] Launch Landing
Seats 1–4 are on the flight deck.
Seats 5–7 are on the mid-deck.
1 Kregel
2 Gorie
3 Thiele Mohri
4 Kavandi
5 Voss
6 Unused
7 Mohri Thiele

Mission highlights

[edit]
STS-99 launches from Kennedy Space Center, 11 February 2000.

The Shuttle Radar Topography Mission (SRTM) was an international project spearheaded by the National Imagery and Mapping Agency (now the National Geospatial-Intelligence Agency), an agency within the U.S. Department of Defense, and NASA, with participation of the German Aerospace Center DLR. Its objective was to obtain the most complete high-resolution digital topographic database of the Earth. SRTM consisted of a specially modified radar system that flew onboard Endeavour during its 11-day mission. This radar system gathered around 8 terabytes of data to produce high-quality 3-D images of the Earth's surface.

SRTM used C-band and X-band interferometric synthetic aperture radar (IFSAR) to acquire topographic data of Earth's land mass (between 60°N and 56°S). It produced digital topographic map products which met Interferometric Terrain Height Data (ITHD)-2 specifications (30 meter x 30 meter spatial sampling with 16 meter absolute vertical height accuracy, 10 meter relative vertical height accuracy and 20 meter absolute horizontal circular accuracy). The result of the Shuttle Radar Topography Mission was close to 1 trillion measurements of the Earth's topography. Besides contributing to the production of better maps, these measurements could lead to improved water drainage modeling, more realistic flight simulators, better locations for cell phone towers, and enhanced navigation safety.

The Shuttle Radar Topography Mission mast was deployed successfully to its full length, and the antenna was turned to its operation position. After a successful checkout of the radar systems, mapping began at 00:31 EST, less than 12 hours after launch. Crewmembers split into two shifts so they could work around the clock, and began mapping an area from 60 degrees north to 56 degrees south. Data was sent to the Jet Propulsion Laboratory for analysis, and early indications showed the data to be of excellent quality.

STS-99 ends as Space Shuttle Endeavour lands at the Shuttle Landing Facility, 22 February 2000.

Mapping proceeded fairly smoothly, but during an attitude-hold period for payload mapping during the second day of flight, it was determined that orbiter propellant usage had doubled from 0.07 to 0.15% an hour. The increase was caused by a failure of the payload cold-gas thrust system that was used to offset the gravity gradient torque of the mast. As a result of this failure, orbiter propellant was being used at a higher-than-planned rate to maintain the attitude of the vehicle. Measures to reduce the expenditure were evaluated and based on the analysis, enough propellant could be saved to complete the planned 9-day plus science mission.

The first of a series of "flycast" maneuvers during the mission was also made on the second day of flight. The flycast maneuver was designed to reduce strain on the almost 200 foot (61 m) mast extending from Endeavour's payload bay when adjustments to Endeavour's orbit were needed.

The orbiter, which flew tail-first during mapping operations, was moved to a nose-first attitude with the mast extending upward. A brief reaction control system pulse began the maneuver. This caused the mast to deflect slightly backwards then rebound forward. As it reached vertical, a stronger thrust was applied, arresting the mast's motion and increasing the orbiter's speed.

Radar data gathering concluded at 06:54 EST on the tenth day of flight after a final sweep across Australia. During 222 hours and 23 minutes of mapping, Endeavour's radar images filled 332 high density tapes and covered 99.98% of the planned mapping area – land between 60 degrees north latitude and 56 degrees south latitude – at least once and 94.6% of it twice. Only about 80,000 square miles (210,000 km2) in scattered areas remained unimaged, most of them in North America and most already well mapped by other methods. Enough data was gathered to fill the equivalent of 20,000 CDs.

Also aboard Endeavour was a student experiment called EarthKAM, which took 2,715 digital photos during the mission through an overhead flight-deck window. The NASA-sponsored program allowed middle school students to select photo targets and receive the images via the Internet. The pictures were used in classroom projects on Earth science, geography, mathematics and space science. More than 75 middle schools around the world participated in the experiment, which set a record. On four previous flights combined, EarthKAM sent down a total of 2,018 images.

STS-99 also saw the recommissioning of the Spacelab pallet system, despite the Spacelab system being discontinued almost two years prior.

The 2007 Smithsonian Networks documentary Oasis Earth was made about the mission, containing HD video from inside Endeavour, including many views looking at the Earth below. One highlight of the documentary features Mamoru Mohri shooting video of the Moon and Mount Fuji.

This was the last mission to fly with the original Space Shuttle cockpit layout in 18 straight years. Although the next mission (STS-101) featured the "glass cockpit" on Atlantis, Endeavour and sister orbiter Discovery continued flying with the original cockpit layout until after the Columbia disaster.[a]

Attempt Planned Result Turnaround Reason Decision point Weather go (%) Notes
1 31 Jan 2000, 12:47:00 pm Scrubbed Technical 31 Jan 2000, 2:08 pm ​(T−00:09:00 hold) 60% Avionics problem.[3]
2 1 Feb 2000, 12:44:00 pm Scrubbed 0 days 23 hours 57 minutes Technical 1 Feb 2000, 3:30 am Avionics problem.[4]
3 11 Feb 2000, 12:30:00 pm Success 9 days 23 hours 46 minutes 90%

Wake-up calls

[edit]

NASA began a tradition of playing music to astronauts during the Gemini program, which was first used to wake up a flight crew during Apollo 10.[5]: 4  Each track is specially chosen, often by their families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities.[5]: 44 [6]

Flight Day Team Song Artist/Performer Played for Link[6]
Day 1 Blue Team "Time for Me to Fly" REO Speedwagon WAV
Day 2 Red Team
Blue Team
"Some Guys Have All The Luck"
"Eye in the Sky"
Robert Palmer
Alan Parsons Project
WAV
WAV
Day 3 Red Team
Blue Team
"Jumpin' Jive"
"Linus and Lucy"
Cab Calloway/Joe Jackson
Vince Guaraldi
WAV
WAV
Day 4 Red Team
Blue Team
"Radar Love"
"Journey to the Stars"
Golden Earring
Godiego
WAV
WAV
Day 5 Red Team
Blue Team
"New York, New York"
"Canon in D"
Frank Sinatra
Johann Pachebel / George Winston
Kevin Kregel[b] WAV
WAV
Day 6 Red Team
Blue Team
"Smack Dab in the Middle"
"We Saw the Sea"
Ray Charles
U.S. Naval Academy Glee Club
WAV
WAV
Day 7 Red Team
Blue Team
"Die Moldau"
"Take a Little Less"
Boston Symphony Orchestra
Barton and Sweeney
WAV
WAV
Day 8 Red Team
Blue Team
"Magic Carpet Ride"
"Rawhide"
Steppenwolf
Frankie Laine
WAV
WAV
Day 9 Red Team
Blue Team
"Catch the Moments As They Fly (Shannon River Dance)"
"One After 909"
Traditional Celtic Music / Jeff Victor
The Beatles
Kevin Kregel WAV
WAV
Day 10 Red Team "Walk Don't Run" California Guitar Trio WAV
Day 11 Blue Team "Stay" Frankie Valli and the Four Seasons Not listed

See also

[edit]

Notes

[edit]
  1. ^ Columbia flew with the "glass cockpit" for the first time on STS-109, its final successful mission, in 2002.
  2. ^ For all the "New York natives" onboard, including Kregel.[6]

References

[edit]

Public Domain This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration.

  1. ^ Dumoulin, Jim (29 June 2001). "STS-99 Day 1 Highlights". NASA. Archived from the original on 1 April 2021. Retrieved 25 January 2024.
  2. ^ "Spaceflight mission report: STS-99". www.spacefacts.de. Retrieved 25 April 2024.
  3. ^ "Shuttle Endeavour grounded by weather, avionics problem". CBS News. Retrieved 30 August 2009.
  4. ^ "MEC replacement ordered; launch postponed to at least Feb. 9". CBS News. Retrieved 30 August 2009.
  5. ^ a b Fries, Colin (13 March 2015). "Chronology of Wakeup Calls" (PDF). NASA. Archived from the original (PDF) on 20 December 2023. Retrieved 24 January 2024.
  6. ^ a b c NASA (9 April 2002). "STS-99 Wakeup Calls". NASA Human Spaceflight. Archived from the original on 26 January 2021. Retrieved 24 January 2024.
[edit]