[go: up one dir, main page]
More Web Proxy on the site http://driver.im/Jump to content

Kameng Hydro Electric Project

From Wikipedia, the free encyclopedia
(Redirected from Kameng HEP)

Kameng Hydro Electric Project is a run-of-the river based project situated on Bichom and Tenga Rivers, both tributaries of the Kameng River in West Kameng district of Arunachal Pradesh. Total installed capacity of project is 600 (4×150) MW. Two units were commissioned in 2020–21 and remain two units are ongoing.[1][2][3]

References

[edit]
  1. ^ "KAMENG HYDRO ELECTRIC PLANT (Ongoing) | North Eastern Electric Power Corporation Limited". neepco.co.in.
  2. ^ "KAMENG HYDRO ELECTRIC PLANT (Commissioned) | North Eastern Electric Power Corporation Limited". neepco.co.in.
  3. ^ "Hydro Based Power Projects | NTPC".