Export Citations
Save this search
Please login to be able to save your searches and receive alerts for new content matching your search criteria.
- research-articleJuly 2024
Finding robust and influential nodes from networks under cascading failures using a memetic algorithm
AbstractIn the research of complex networks, how to find a set of nodes in the network with the most extensive range in the propagation process, i.e., the Influence Maximization (IM) problem, is one of the focal topics. Existing studies mainly consider ...
- ArticleJune 2024
A Memetic Algorithm for Large-Scale Real-World Vehicle Routing Problems with Simultaneous Pickup and Delivery with Time Windows
AbstractThe vehicle routing problem with simultaneous pickup and delivery with time windows (VRPSPDTW) is an important variant of the vehicle routing problem which has received considerable attention among researchers in the last decade. The vast majority ...
- research-articleMay 2024
An effective memetic algorithm for distributed flexible job shop scheduling problem considering integrated sequencing flexibility
Expert Systems with Applications: An International Journal (EXWA), Volume 242, Issue Chttps://doi.org/10.1016/j.eswa.2023.122734AbstractThus far, the available works on sequencing flexibility in shop floor scheduling only consider the sequencing flexibility with serial operation constraint. However, the sequencing flexibility with discrete and hybrid operation constraints are ...
- research-articleApril 2024
Collaborative scheduling of energy-saving spare parts manufacturing and equipment operation strategy using a self-adaptive two-stage memetic algorithm
Robotics and Computer-Integrated Manufacturing (RCIM), Volume 87, Issue Chttps://doi.org/10.1016/j.rcim.2023.102707Highlights- Study collaborative optimization of spare parts production and equipment operation.
- Formulate a mixed-integer linear programming model for the problem.
- Develop a self-adaptive two-stage memetic algorithm to solve the problem.
- ...
Previous studies on production scheduling predominantly focus on developing optimal production plans in the context of deterministic customer requirements, achieving certain optimization goals related to the manufacturer. However, little research ...
- research-articleJuly 2024
An enhanced memetic algorithm with hierarchical heuristic neighborhood search for type-2 green fuzzy flexible job shop scheduling
Engineering Applications of Artificial Intelligence (EAAI), Volume 130, Issue Chttps://doi.org/10.1016/j.engappai.2023.107762AbstractThe green flexible job shop has received increasing attention due to the development of modern industry and the improvement of environmental protection awareness. Meanwhile, in customized manufacturing, the processing time cannot be exactly ...
Highlights- The bi-objective green type-2 fuzzy FJSP is studied.
- An enhanced MA with hierarchical heuristic neighborhood search is proposed.
- A cooperative heuristic initialization is designed.
- A hierarchical heuristic neighborhood search ...
-
- research-articleApril 2024
A new representation in 3D VLSI floorplan: 3D O-Tree
Genetic Programming and Evolvable Machines (KLU-GENP), Volume 25, Issue 1https://doi.org/10.1007/s10710-024-09485-3AbstractThe size of the implemented circuit plays a vital role in maximizing the performance of the chip. Hence, researchers are looking to utilize the extra dimension to improve performance, which requires the development of new methods and techniques ...
- research-articleJuly 2024
Deep reinforcement learning-based memetic algorithm for energy-aware flexible job shop scheduling with multi-AGV
Computers and Industrial Engineering (CINE), Volume 189, Issue Chttps://doi.org/10.1016/j.cie.2024.109917AbstractThe integration of manufacturing and logistics scheduling issues in shop operations has garnered considerable attention. Concurrently, escalating concerns about global warming have propelled the emergence of green manufacturing as a critical ...
Highlights- The energy-aware FJSP with finite transportation resources is first considered.
- The critical block in EFJS-AGV is first defined.
- Four neighborhood structures based on critical paths and blocks are proposed.
- The deep ...
- research-articleFebruary 2024
An effective reformative memetic algorithm for distributed flexible job-shop scheduling problem with order cancellation
Expert Systems with Applications: An International Journal (EXWA), Volume 237, Issue PAhttps://doi.org/10.1016/j.eswa.2023.121205AbstractOrder cancellation, due to such as customer plan adjustments or market changes, usually occurs in the real production environment of distributed flexible job shop scheduling problem (DFJSP). However, thus far, all exiting researches about DFJSP ...
- research-articleFebruary 2024
A linear ordering problem with weighted rank
Journal of Combinatorial Optimization (SPJCO), Volume 47, Issue 2https://doi.org/10.1007/s10878-024-01109-xAbstractThis paper introduces an integer linear program for a variant of the linear ordering problem. This considers, besides the pairwise preferences in the objective function as the linear ordering problem, positional preferences (weighted rank) in the ...
- research-articleFebruary 2024
A Hybrid-SFLA-Based Hyper-Parameter Tuning Algorithm in SVR for Exchange Rate Prediction
AbstractThis paper proposes a hybrid machine learning-based approach to forecast the exchange rate between the Indian Rupee and the US dollar. The prediction of the exchange rate is carried out by support vector regression (SVR) and a hybrid-shuffled frog ...
- research-articleMarch 2024
Memetic segmentation based on variable lag aware for multivariate time series
Information Sciences: an International Journal (ISCI), Volume 657, Issue Chttps://doi.org/10.1016/j.ins.2023.120003AbstractThe memetic segmentation algorithm has been proposed to obtain precise segmentation results through efficient local refinement. However, this algorithm overlooks the consideration of time lags among variables or spatial locations in multivariate ...
Highlights- A memetic segmentation algorithm based on the variable time lag aware for multivariate time series is proposed to perceive the time lag in the multivariate time series to obtain the optimal segmentation positions synchronously.
- To ...
- research-articleMarch 2024
Pareto and decomposition based approaches for the multi-objective home health care routing and scheduling problem with lunch breaks
Engineering Applications of Artificial Intelligence (EAAI), Volume 128, Issue Chttps://doi.org/10.1016/j.engappai.2023.107502AbstractHome health care (HHC) is a fast-growing area of research that has received increasing attention in recent years due to the rise in life expectancy and the fall in birth rates. It is expected to reduce length of stay in hospital as well as to ...
- research-articleFebruary 2024
A multiobjective memetic algorithm with particle swarm optimization and Q-learning-based local search for energy-efficient distributed heterogeneous hybrid flow-shop scheduling problem
Expert Systems with Applications: An International Journal (EXWA), Volume 237, Issue PChttps://doi.org/10.1016/j.eswa.2023.121570AbstractMost existing distributed hybrid flow-shop scheduling problems (DHFSPs) assume identical shops and lack consideration of heterogeneous shops. This study focuses on energy-efficient heterogeneous DHFSP. A multiobjective memetic algorithm with ...
Highlights- Multi-group PSO as global search enhances multi-direction convergence of PF.
- Two local search strategies cooperate with particle swarm optimization.
- Inter-factory local search with insert and swap between critical factories.
- ...
- research-articleMarch 2024
A memetic algorithm with fuzzy-based population control for the joint order batching and picker routing problem
Information Sciences: an International Journal (ISCI), Volume 656, Issue Chttps://doi.org/10.1016/j.ins.2023.119913AbstractThe joint order batching and picker routing problem (JOBPRP) is a combinatorial optimization problem that occurs during in the order-picking operation of warehouse management. It consists of simultaneous assignment of customer orders to batches ...
- research-articleJanuary 2024
A novel robust memetic algorithm for dynamic community structures detection in complex networks
AbstractNetworks in the real world are dynamic and evolving. The most critical process in networks is to determine the structure of the community, based on which we can detect hidden communities in a complex network. The design of strong network ...
- research-articleJanuary 2024
Knowledge-driven two-stage memetic algorithm for energy-efficient flexible job shop scheduling with machine breakdowns
Expert Systems with Applications: An International Journal (EXWA), Volume 235, Issue Chttps://doi.org/10.1016/j.eswa.2023.121149AbstractThis paper focuses on the multi-objective energy-efficient flexible job shop scheduling problem with machine breakdowns. To mitigate the impact of machine breakdowns, a rescheduling strategy is implemented in the scheduling process. In addition ...
Highlights- A two-stage evolution framework is proposed for EMBFJSP.
- A rescheduling strategy is applied for machine breakdowns.
- The population is initialized by three problem-specific heuristics.
- Four knowledge-driven variable neighborhood ...
- research-articleDecember 2023
Methods to balance the exploration and exploitation in Differential Evolution from different scales: A survey
AbstractInspired by the evolutionary process in nature, Differential Evolution (DE) has been widely concerned and used as a numerical global optimizer for decades of years, since its emerging in 1997. However, the performance of DE essentially depends on ...
Highlights- Recent works on Differential Evolution algorithm, especially from 2019 to 2023.
- Balance of the exploration and exploitation from different scales.
- Hybrid Differential Evolution from the algorithm level.
- Enhanced Differential ...
- research-articleDecember 2023
Solving dynamic satellite image data downlink scheduling problem via an adaptive bi-objective optimization algorithm
Computers and Operations Research (CORS), Volume 160, Issue Chttps://doi.org/10.1016/j.cor.2023.106388AbstractThe satellite image data downlink scheduling problem (SIDSP) plays a critical role in the mission planning operation of earth observation satellites. However, with recent developments in satellite technology, the traditional SIDSP is ...
Highlights- Model: To transmit an increased quantity of image data and balance the service rate of all earth observation satellites (EOSs) ...
- research-articleNovember 2023
Energy aware semi-automatic assembly line balancing problem considering ergonomic risk and uncertain processing time
Expert Systems with Applications: An International Journal (EXWA), Volume 231, Issue Chttps://doi.org/10.1016/j.eswa.2023.120737AbstractThe semiautomated assembly line balancing problem (SAALBP) is a complex planning problem in which the production process comprises human workers, robots, and human-robot collaboration. With increasing awareness of sustainable practices in the ...
- research-articleSeptember 2023
A decomposition-based memetic algorithm to solve the biobjective green flexible job shop scheduling problem with interval type-2 fuzzy processing time
Computers and Industrial Engineering (CINE), Volume 183, Issue Chttps://doi.org/10.1016/j.cie.2023.109513AbstractWith increasing environmental awareness, energy consumption of industries is becoming a popular research topic. In industrial manufacturing, processing time is highly uncertain. This study investigates a green flexible job shop ...
Highlights- The IT2GFJSP model is proposed.
- Five initialization rules are designed.