Engineering project control of comprehensive unit price fluctuation-time limit fluctuation-process adjustment

Published: 01 January 2022 Publication History

Abstract

When an engineering project requires a lot of time and the construction environment is complex, the unit price of materials and personnel will change, the project construction will be hindered, and the construction plan of the project should be adjusted. These uncertain interference factors will cause the earned value analysis results are quite different from or even contrary to the actual situation, so there will not be enough impartial data to help managers to control project. To this end, this paper analyzes how the price fluctuations, process adjustment and the abnormal construction period will affect the construction schedule and cost effect respectively, and further studies the corresponding methods of earned value correction. Based on case analysis, this paper studies the comprehensive correction method of earned value when cost unit price changes, working procedure is adjusted and construction period fluctuates in an abnormal manner. The method improves the theory of earned value and provides reference for engineering practices on project management.

References

[1]
C.M. Alvarado, Assessing the performance of construction projects: Implementing eared value management at the General Services Administration, Journal of Facilities Management 3(1) (2005), 92–105.
[2]
M. Bagherpour, A. Zareei, S. Noori and M. Heydari, Designing a control mechanism using earned value analysis: An application to production environment, International Journal of Advanced Manufacturing Technology 49(1) (2010), 419–429.
[3]
X.P. Kang, Dynamic cost control of construction project based on modern control theory, Hydropower Generation 39(5) (2013), 75–77.
[4]
NASA, Office of the Secretary of Defense and National Aeronautic and Space Administration, DOD and NASA Guide PERT/COST, Washington DC, 1962.
[5]
W. Lipke, Earned schedule – an emergency enhancement to EVM, 2007 International Metrics Congress.
[6]
W. Lipke, O. Zwikael and K. Henderson, Prediction of project outcome – The application of statistical methods to earned value management and earned schedule performance indexes, International Journal of Project Management 27 (2009), 400–407.
[7]
K. Byung-Cheol and F. Kenneth, Probabilistic forecasting of project duration using Kalman filter and the earned value method, Journal of Construction Engineering and Management 136(8) (2010), 834–843.
[8]
K. Yong-Woo and B. Glenn, Management thinking in the earned value method system and the last planner system, Journal of Management in Engineering 26(4) (2010), 223–228.
[9]
H. Khamooshi and H. Golafshani, EDM: Earned Duration Management, a new approach to schedule performance management and measurement, International Journal of Project Management 32(6) (2013), 1019–1041.
[10]
K. Byung-Cheol, Probabilistic evaluation of cost performance stability in earned value management, Journal of Management in Engineering (1) (2016).
[11]
D.Y. Hu, Applying the earned value evaluation principle to implement the comprehensive control of project cost/schedule, Chemical Engineering Design (2) (1994), 46–51.
[12]
A. Qi, Research on multi-factor project integration management method, Nankai Management Review 5(6) (2002), 70–75.
[13]
Q. Chang, Improvement and application research on cost-scheduled earned value method of engineering construction projects, Tianjin University, 2007.
[14]
T.Z. Lu, Research and application of engineering project cost control based on improved earned value method, Chongqing University, 2010.
[15]
J.Y. Liu, Research on multi-factor performance evaluation model and method of engineering project, Nankai University, 2012.
[16]
Y.J. Liu, Research on cost/schedule integrated control of large-scale water conservancy projects, Tianjin University, 2012.
[17]
K. Eun Hong, G.W. William and R.D. Michael, A model for effective implementation of earned value management methodology, International Journal of Project Management 21(5) (2003), 375–382.
[18]
W. Lipke, Statistical measurable applied to EVM – The Next Frontier, Means News, Winter 2006, 18–26.
[19]
X.P. Yang and J.J. Hao, The development of project performance index and dynamic prediction, Value Engineering 34(9) (2015), 12–15.
[20]
M. He, Research on multi-objective integrated control of engineering projects based on earned value management, Sichuan University, 2007.
[21]
X. Yu, Research on earned value management based project time limit forecasting method, Statistics and Decision-making (2) (2009), 168–170.
[22]
Q. Zhang, Fully discrete convergence analysis of non-linear hyperbolic equations based on finite element analysis, Applied Mathematics and Nonlinear Sciences 4 (2019), 433–444.
[23]
S. Vandevoorde and M. Vanhoucke, A comparison of different project duration forecasting methods using earned value metrics, International Journal of Project Management 24(4) (2006), 289–302.
[24]
J.P. Ruiz-Fernandez, J. Benlloch, M.A. Lopez and N. Valverde-Gascuena, Influence of seasonal factors in the earned value of construction, Applied Mathematics and Nonlinear Sciences 4 (2019), 21–34.

Index Terms

  1. Engineering project control of comprehensive unit price fluctuation-time limit fluctuation-process adjustment
          Index terms have been assigned to the content through auto-classification.

          Recommendations

          Comments

          Please enable JavaScript to view thecomments powered by Disqus.

          Information & Contributors

          Information

          Published In

          cover image Journal of Computational Methods in Sciences and Engineering
          Journal of Computational Methods in Sciences and Engineering  Volume 22, Issue 1
          2022
          342 pages

          Publisher

          IOS Press

          Netherlands

          Publication History

          Published: 01 January 2022

          Author Tags

          1. Engineering project
          2. multifactor interference
          3. modified earned value
          4. project control

          Qualifiers

          • Research-article

          Contributors

          Other Metrics

          Bibliometrics & Citations

          Bibliometrics

          Article Metrics

          • 0
            Total Citations
          • 0
            Total Downloads
          • Downloads (Last 12 months)0
          • Downloads (Last 6 weeks)0
          Reflects downloads up to 18 Jan 2025

          Other Metrics

          Citations

          View Options

          View options

          Media

          Figures

          Other

          Tables

          Share

          Share

          Share this Publication link

          Share on social media