[go: up one dir, main page]
More Web Proxy on the site http://driver.im/ skip to main content
article

Scheduling Crash Tests at Ford Motor Company

Published: 01 October 2016 Publication History

Abstract

We consider the problem of scheduling crash tests for new vehicle programs at Ford. We describe the development of a comprehensive web-based system that automates time-consuming scheduling analyses through mathematical optimization, while also institutionalizing expert knowledge about the engineering complexities of crash testing. We present a novel integer programming model and a corresponding solution algorithm that quickly generates efficient schedules. The system's user interface enables engineers to specify key program data and consider multiple scheduling scenarios, while using the underlying optimization model and solution algorithms as a black box.

References

[1]
Barnhart C, Johnson EL, Nemhauser GL, Savelsbergh MWP, Vance PH (1998) Branch-and-price: Column generation for solving huge integer programs. Oper. Res. 46(3):316-329.
[2]
Bartels J-H, Zimmermann J (2009) Scheduling tests in automotive R&D projects. Eur. J. Oper. Res. 193(3):805-819.
[3]
Chelst K, Sidelko J, Przebienda A, Lockledge J, Mihailidis D (2001) Rightsizing and management of prototype vehicle testing at Ford Motor Company. Interfaces 31(1):91-107.
[4]
Chen Z-L, Powell WB (1999) Solving parallel machine scheduling problems by column generation. INFORMS J. Comput. 11(1): 78-94.
[5]
Cheng TCE, Sin CCS (1990) A state-of-the-art review of parallel-machine scheduling research. Eur. J. Oper. Res. 47(3):271-292.
[6]
Coffman EG Jr, Garey MR, Johnson DS (1996) Approximation algorithms for bin packing: A survey. Hochbaum DS, ed. Approximation Algorithms for NP-Hard Problems (PWS Publishing Co., Boston), 46-93.
[7]
Elhedhli S, Li L, Gzara M, Naoum-Sawaya J (2011) A branch-andprice algorithm for the bin packing problem with conflicts. INFORMS J. Comput. 23(3):404-415.
[8]
Limtanyakul K, Schwiegelshohn U (2012) Improvements of constraint programming and hybrid methods for scheduling of tests on vehicle prototypes. Constraints 17(2):172-203.
[9]
Pinto JM, Grossmann IE (1995) A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants. Indust. Engrg. Chemistry Res. 34(9): 3037-3051.
[10]
Potts CN, Strusevich VA (2009) Fifty years of scheduling: A survey of milestones. J. Oper. Res. Soc. 60(1):S41-S68.
[11]
Shi Y, Reich D, Epelman M, Klampfl E, Cohn A (2016) An analytical approach to prototype vehicle test scheduling. Omega, ePub ahead of print May 18,
[12]
Zhu Z, Heady RB (2000) Minimizing the sum of earliness/tardiness in multi-machine scheduling: A mixed integer programming approach. Comput. Indust. Engrg. 38(2):297-305.

Cited By

View all
  • (2021)Chance-Constrained Multiple Bin Packing Problem with an Application to Operating Room PlanningINFORMS Journal on Computing10.1287/ijoc.2020.101033:4(1661-1677)Online publication date: 9-Mar-2021
  • (2020)The Volkswagen Pre-Production Center Applies Operations Research to Optimize Capacity SchedulingInterfaces10.1287/inte.2020.102950:2(119-136)Online publication date: 11-Mar-2020

Recommendations

Comments

Please enable JavaScript to view thecomments powered by Disqus.

Information & Contributors

Information

Published In

cover image Interfaces
Interfaces  Volume 46, Issue 5
October 2016
99 pages
ISSN:0092-2102
EISSN:1526-551X
Issue’s Table of Contents

Publisher

INFORMS

Linthicum, MD, United States

Publication History

Published: 01 October 2016

Author Tags

  1. automotive
  2. decision support system
  3. integer programming
  4. scheduling

Qualifiers

  • Article

Contributors

Other Metrics

Bibliometrics & Citations

Bibliometrics

Article Metrics

  • Downloads (Last 12 months)0
  • Downloads (Last 6 weeks)0
Reflects downloads up to 06 Jan 2025

Other Metrics

Citations

Cited By

View all
  • (2021)Chance-Constrained Multiple Bin Packing Problem with an Application to Operating Room PlanningINFORMS Journal on Computing10.1287/ijoc.2020.101033:4(1661-1677)Online publication date: 9-Mar-2021
  • (2020)The Volkswagen Pre-Production Center Applies Operations Research to Optimize Capacity SchedulingInterfaces10.1287/inte.2020.102950:2(119-136)Online publication date: 11-Mar-2020

View Options

View options

Media

Figures

Other

Tables

Share

Share

Share this Publication link

Share on social media