[go: up one dir, main page]
More Web Proxy on the site http://driver.im/ skip to main content
10.1145/1234772.1234791acmconferencesArticle/Chapter ViewAbstractPublication PageschimitConference Proceedingsconference-collections
Article

Managing collaborative activities in project management

Published: 30 March 2007 Publication History

Abstract

People working with current ad-hoc collaboration tools suffer from information overload and information scattered. Our five-month study of project managers found their work was comprised of fragmented activities implicitly organized by activity threads. Most of these activities were communicative to track and report project status, which introduced frequent interruptions and low efficiency. Accordingly, we explored an activity centered approach to help them manage work information. In our Activity Centric Project Management prototype, solutions like integrating activity with project task, providing timely activity awareness based on RSS, utilizing activity data to generate status report, and allowing third-party easily to update task status were introduced.

References

[1]
Bannon, L., Cypher, A., Greenspan, S., and Monty, M. Evaluation and analysis of users' activity organization. Transcript of talk delivered at CHI '83, San Franciso, December, 1983.
[2]
González, V., & Mark, G. "Constant, constant, multi-tasking craziness": Managing Multiple work spheres. Proceedings. of CHI'04. ACM Press, 2004. pp. 113--120.
[3]
Millen, D. R., Muller, M. J., Geyer, W., Wilcox, E., Brownholtz, B. Patterns of media use in an activity-centric collaborative environment. Proceedings of CHI 2005 Conference, ACM Press, New York, pp. 879--888.
[4]
Seshadri, S. Shapira, Z. Managerial Allocation of Time and Effort: the Effects of Interruptions, Management Science, v.47 n.5, 2001, 647--662.

Cited By

View all
  • (2020)How do Data Science Workers Collaborate? Roles, Workflows, and ToolsProceedings of the ACM on Human-Computer Interaction10.1145/33928264:CSCW1(1-23)Online publication date: 29-May-2020
  • (2013)A Study on the Effect of Traceability Links in Software MaintenanceIEEE Access10.1109/ACCESS.2013.22868221(726-741)Online publication date: 2013
  • (2008)The iterative design of a project charter for interdisciplinary researchProceedings of the 7th ACM conference on Designing interactive systems10.1145/1394445.1394476(288-294)Online publication date: 25-Feb-2008

Index Terms

  1. Managing collaborative activities in project management

      Recommendations

      Comments

      Please enable JavaScript to view thecomments powered by Disqus.

      Information & Contributors

      Information

      Published In

      cover image ACM Conferences
      CHIMIT '07: Proceedings of the 2007 symposium on Computer human interaction for the management of information technology
      March 2007
      124 pages
      ISBN:9781595936356
      DOI:10.1145/1234772
      Permission to make digital or hard copies of all or part of this work for personal or classroom use is granted without fee provided that copies are not made or distributed for profit or commercial advantage and that copies bear this notice and the full citation on the first page. Copyrights for components of this work owned by others than ACM must be honored. Abstracting with credit is permitted. To copy otherwise, or republish, to post on servers or to redistribute to lists, requires prior specific permission and/or a fee. Request permissions from [email protected]

      Sponsors

      Publisher

      Association for Computing Machinery

      New York, NY, United States

      Publication History

      Published: 30 March 2007

      Permissions

      Request permissions for this article.

      Check for updates

      Author Tags

      1. activity centric computing
      2. project management
      3. prototype

      Qualifiers

      • Article

      Conference

      CHiMiT07
      Sponsor:

      Acceptance Rates

      CHIMIT '07 Paper Acceptance Rate 11 of 34 submissions, 32%;
      Overall Acceptance Rate 15 of 43 submissions, 35%

      Contributors

      Other Metrics

      Bibliometrics & Citations

      Bibliometrics

      Article Metrics

      • Downloads (Last 12 months)11
      • Downloads (Last 6 weeks)0
      Reflects downloads up to 21 Dec 2024

      Other Metrics

      Citations

      Cited By

      View all
      • (2020)How do Data Science Workers Collaborate? Roles, Workflows, and ToolsProceedings of the ACM on Human-Computer Interaction10.1145/33928264:CSCW1(1-23)Online publication date: 29-May-2020
      • (2013)A Study on the Effect of Traceability Links in Software MaintenanceIEEE Access10.1109/ACCESS.2013.22868221(726-741)Online publication date: 2013
      • (2008)The iterative design of a project charter for interdisciplinary researchProceedings of the 7th ACM conference on Designing interactive systems10.1145/1394445.1394476(288-294)Online publication date: 25-Feb-2008

      View Options

      Login options

      View options

      PDF

      View or Download as a PDF file.

      PDF

      eReader

      View online with eReader.

      eReader

      Media

      Figures

      Other

      Tables

      Share

      Share

      Share this Publication link

      Share on social media