Job shop scheduling by pheromone approach in a dynamic environment

Published: 01 May 2010 Publication History

Abstract

Job shop scheduling problem is a NP-hard problem; therefore the objective is to create a schedule that satisfies all the constraints while taking as little overall time as possible. The paper concerns the job shop scheduling problem in cellular manufacturing systems; the schedule is created by a pheromone-based approach. The proposed approach is carried out by a Multi-agent Architecture and it is compared with a coordination approach proposed in literature used as a benchmark. A simulation environment developed in ARENA® package was used to implement the approaches and evaluate the performance measures. The performance measures investigated are: throughput time, throughput, Work In Process, machines average utilisation and tardiness. Several scenarios are considered: from static to very dynamic conditions for internal and external exceptions of the manufacturing system. The simulation results highlighted that the performance of the proposed approach are comparable with the benchmark when the customer demand has a high fluctuation and the manufacturing system is less dynamic.

Cited By

View all
  • (2018)A cloud based improved method for multi-objective flexible job-shop scheduling problemJournal of Intelligent & Fuzzy Systems: Applications in Engineering and Technology10.3233/JIFS-17139135:1(823-829)Online publication date: 1-Jan-2018
  • (2015)An improved shuffled complex evolution algorithm with sequence mapping mechanism for job shop scheduling problemsExpert Systems with Applications: An International Journal10.1016/j.eswa.2015.01.00742:8(3953-3966)Online publication date: 15-May-2015
  • (2013)Dynamic parts scheduling in multiple job shop cells considering intercell moves and flexible routesComputers and Operations Research10.1016/j.cor.2012.11.02440:5(1207-1223)Online publication date: 1-May-2013
  • Show More Cited By

Recommendations

Comments

Please enable JavaScript to view thecomments powered by Disqus.

Information & Contributors

Information

Published In

cover image International Journal of Computer Integrated Manufacturing
International Journal of Computer Integrated Manufacturing  Volume 23, Issue 5
May 2010
95 pages
ISSN:0951-192X
EISSN:1362-3052
Issue’s Table of Contents

Publisher

Taylor & Francis, Inc.

United States

Publication History

Published: 01 May 2010

Author Tags

  1. ant colony intelligence
  2. discrete event simulation
  3. dynamic scheduling
  4. multi-agent systems
  5. pheromone

Qualifiers

  • Article

Contributors

Other Metrics

Bibliometrics & Citations

Bibliometrics

Article Metrics

  • Downloads (Last 12 months)0
  • Downloads (Last 6 weeks)0
Reflects downloads up to 05 Jan 2025

Other Metrics

Citations

Cited By

View all
  • (2018)A cloud based improved method for multi-objective flexible job-shop scheduling problemJournal of Intelligent & Fuzzy Systems: Applications in Engineering and Technology10.3233/JIFS-17139135:1(823-829)Online publication date: 1-Jan-2018
  • (2015)An improved shuffled complex evolution algorithm with sequence mapping mechanism for job shop scheduling problemsExpert Systems with Applications: An International Journal10.1016/j.eswa.2015.01.00742:8(3953-3966)Online publication date: 15-May-2015
  • (2013)Dynamic parts scheduling in multiple job shop cells considering intercell moves and flexible routesComputers and Operations Research10.1016/j.cor.2012.11.02440:5(1207-1223)Online publication date: 1-May-2013
  • (2012)Evolutionary algorithm for stochastic job shop scheduling with random processing timeExpert Systems with Applications: An International Journal10.1016/j.eswa.2011.09.05039:3(3603-3610)Online publication date: 1-Feb-2012

View Options

View options

Media

Figures

Other

Tables

Share

Share

Share this Publication link

Share on social media