[go: up one dir, main page]
More Web Proxy on the site http://driver.im/ skip to main content
article

Virtual Laser Target Board for Alignment Control and Machine Guidance in Tunnel-Boring Operations

Published: 01 August 2015 Publication History

Abstract

Construction engineering and management research takes advantage of proven technologies and turns them into cost-effective solutions in the construction field. This paper describes our efforts in the development of a new alignment control and machine guidance system for tunnel-boring operations. Steering a tunnel boring machine (TBM) in tunnel projects normally relies on a laser station which projects a laser beam onto a laser target board mounted on the TBM. However, current practice lacks accuracy and requires tedious, time-consuming calibrations, thus potentially leading to quality defects, schedule delay, and cost overrun in tunnel construction. This research has developed an automated system called "virtual laser target board (VLTB)" in order to facilitate field construction. Through automation and technology integration, a commonly available survey tool -namely the robotic total station is transformed into a construction control robot, which is capable of precisely positioning and tracking the TBM in the underground space. By applying innovative computing algorithms, the exact coordinates of the cutter head center on the working TBM can be derived in millimeter-level accuracy. Thus, the invisible cutter head center can be visualized in a tablet interface in relation to the as-designed alignment. The VLTB system was field tested on a 1,000 m long sewage tunneling project in the city of Edmonton, Alberta, Canada. The tunnel test bed showcases the future of technology integration and automation in construction.

References

[1]
Bickel, J., Kuesel, T., King, E.: Tunnel Engineering Handbook, 2nd edn. Springer, New York (2011)
[2]
Maidl, B., Herrenknecht, M., Maidl, U., Wehrmeyer, G.: Mechanised Shield Tunnelling, 2nd edn. Ernst & Sohn, Berlin (2012)
[3]
Megaw, T., Bartlett, J.: Tunnels: Planning, Design, vol. 1. Ellis Horwood, Wiley, Chichester (1981)
[4]
Megaw, T., Bartlett, J.: Tunnels: Planning, Design, Construction, vol. 2. Ellis Horwood, Wiley, Chichester (1982)
[5]
Kavanagh, B.: Surveying with Construction Application, 7th edn. Prentice Hall, Upper Saddle River (2010)
[6]
Shen, X., Lu, M., Chen, W.: Tunnel-boring machine positioning during microtunneling operations through integrating automated data collection with real-time computing. ASCE J. Constr. Eng. Manag. 137(1), 72---85 (2011)
[7]
Shen, X., Lu, M.: Development of virtual laser target board to tunnel boring machine guidance control. In: Proceedings of the 2012 ASCE International Conference on Computing in Civil Engineering, pp. 413---420 (2012)
[8]
VMT GmbH: Large Diameter Tunnelling. http://vmt-gmbh.de/en/products-services/navigate-tunnelling/large-diameter-tunneling/ (2014). Retrieved 31 March 2014
[9]
ZED Tunnel Guidance Ltd: Minimised System. http://www.zed-tg.co.uk/products/minimised-system.html (2014). Retrieved 31 March 2014
[10]
tacs GmbH: Summary of the acs Guidance System. http://www.tacsgmbh.de/en/tacs_prod_acs_overview.htm (2014). Retrieved 31 March 2014
[11]
GEODATA Group: TAUROS TBM Guidance System. http://www.geodata.at/eng/_underground/kompetenz/_detail.php?we_objectID=52&navid=06&pulldown=1&parent=01&cid=19&headline=Expertise+%26+Performance+Spectrum (2014). Retrieved 31 March 2014
[12]
PPS GmbH: POLTINGER Precision Systems High-Performance Guidance. http://www.pps-muc.com/index.php/en/curvedpipejacking (2014). Retrieved 31 March 2014
[13]
Herrenknecht AG: Navigation and Monitoring. http://www.herrenknecht.com/en/products/additional-equipment/navigation-monitoring-systems/navigation-monitoring.html (2014). Retrieved 31 March 2014
[14]
Shen, X., Lu, M., Chen, W.: Computing three-axis orientations of a tunnel-boring machine through surveying observation points. ASCE J. Comput. Civ. Eng. 25(3), 232---241 (2011)
[15]
Liang, X., Lu, M.: 3D visualization for tunnel boring machine steering and alignment control in microtunneling. In: Proceedings of the 2010 Construction Research Congress (CRC2010), pp. 1---10 (2010)
[16]
Mao, S., Shen, X., Lu, M., Wu, X.: Real-time tablet-based virtual reality implementation to facilitate tunnel boring machine steering control in tunnel construction. In: Proceedings of the 13th International Conference on Construction Applications of Virtual Reality (CONVR2013), London, UK (2013)
[17]
Wu, X., Lu, M., Shen, X., Mao, M.: As-built modelling and visual simulation of tunnels using real-time TBM positioning data. In: Proceedings of the 2013 Winter Simulation Conference, Washington DC (2013)
[18]
Chandra, A.: Higher Surveying. New Age International, New Delhi (2007)
[19]
Baronti, P., Pillai, P., Chook, V.: Wireless sensor networks: a survey on the state of the art and the 802.15.4 ZigBee standards. Comput. Commun. 30(7), 1655---1695 (2007)
[20]
Goodenough, J.: Exception handling: issues and a proposed notation. Commun. ACM 18, 683---696 (1975)

Recommendations

Comments

Please enable JavaScript to view thecomments powered by Disqus.

Information & Contributors

Information

Published In

cover image Journal of Intelligent and Robotic Systems
Journal of Intelligent and Robotic Systems  Volume 79, Issue 3-4
August 2015
275 pages

Publisher

Kluwer Academic Publishers

United States

Publication History

Published: 01 August 2015

Author Tags

  1. Machine control and guidance
  2. Mobile computing
  3. Robotic total station
  4. Tunnel boring machine
  5. Tunnel construction

Qualifiers

  • Article

Contributors

Other Metrics

Bibliometrics & Citations

Bibliometrics

Article Metrics

  • 0
    Total Citations
  • 0
    Total Downloads
  • Downloads (Last 12 months)0
  • Downloads (Last 6 weeks)0
Reflects downloads up to 30 Dec 2024

Other Metrics

Citations

View Options

View options

Media

Figures

Other

Tables

Share

Share

Share this Publication link

Share on social media