[go: up one dir, main page]
More Web Proxy on the site http://driver.im/ skip to main content
10.1145/302405.302645acmconferencesArticle/Chapter ViewAbstractPublication PagesicseConference Proceedingsconference-collections
Article
Free access

Explaining the cost of European space and military projects

Published: 16 May 1999 Publication History
First page of PDF

References

[1]
Banker, R., Kemerer, C. Scale Economies in New Sotware Development. IEEE Transactions on Software Engineering, vol. IS, no. IO (1989), 1199- 1205.
[2]
Banker, R., Kemerer, C. The Evidence on Economies of Scale in Software Development. Information and Technology, vol. 36, no. 5 (1994), 275-282.
[3]
Bailey, J.W., Basili V.R. A Meta-Model for Software Development Resource Expenditures. In: Proceedings of the 7'h International Conference on Software Engineering (1981).
[4]
Basili, V.R., Freburger, K. Programming Measurement and Estimation in the Software Engineering Laboratory. Journal of Systems and Software, no. 2 (1981), 47-57.
[5]
Boehm, B., Software Engineering Economics. Prentice Hall(1981).
[6]
Boehm, B., Clark B., Horowitz, E., Westland, C. Cost models for future software life cycle processes: COCOMO 2.0. Annals of Software Engineering, I (1995), 57-94.
[7]
Brooks, F.P. The Mythical Man Month. Addision- Wesley Publishing Company (1975).
[8]
Conte, S., Dunsmore, H., Shen, V. Software Engineering Metrics and Models. Benjamin/ Cummings, Menlo Park CA, (1986)
[9]
Cook, R.D. Detection of Influential Observations in Linear Regression. Technometrics, vol. 19 (1977), 15-
[10]
Davidson, R., McKimron, J., Several Tests for Model Specification in the Presence of Alternative Hypotheses. Econometrica, vol. 49, no. 3 (198 I), 781- 93.
[11]
Dunteman, G.,H. Principal Component Analysis. Sage University paper series on Quantitative Applications in the Social Sciences (1989).
[12]
Hu, Q. Evaluating Alternative Software Production Functions. IEEE Transactions on Software Engineering, vol. 23, no. 6 (1997), 379-87.
[13]
Kemerer, C.F. An Empirical Validation of Software Cost Estimation. Communications of the ACM, vol. 30, no. 5 (1987), 417-29.
[14]
Jones, C. Programming Productivity. New York, McGraw-Hill (1986).
[15]
Johnston, J., DiNardo, J. Econometric Methods. New York: McGraw-Hill ( 1997).
[16]
Kitchenham, B. Software Development Cost Models. In: Software Reliability Handbook, P. Rook (Ed.) Elsevier Applied Science, New York (1990).
[17]
Kitchenham, B. Empirical Studies of Assumptions That Underlie Software Cost-Estimation Models. Information and Software Technology, vol. 34, no. 4 (1992), 21 I-18.
[18]
Matson, J.E. Barrett, B.E., Mellichamp, J.M. Software Development Cost Estimation Using Function Points. IEEE Transactions on Software Engineering, vol. 20, no. 4 (1994), 275-87.
[19]
Maxwell, K., Van Wassenhove, L., Dutta, S. Software Development Productivity of European Space, Military, and Industrial Applications. IEEE Transactions on Sojtware Engineering, vol. 22, no. IO (1996), 706-18.
[20]
Putnam, L.H. A General Empirical Solution to the Macro Software Sizing and Estimating Problem. IEEE Transactions on Software Engineering, vol. SE-4, no. 4, (1978), 345-61.
[21]
Ryan, T.P. Modem Regression Methods. John Wiley & Sons, Inc., New York (1997).
[22]
Simmons, D.B. Communications: a sofiware group productivity dominator, Software Engineering Journal, November, ( 199 1 ), 454-462.
[23]
Subramanian, G.H., Breslawski, S. Effort Estimation Dimensionality Reduction Journal of Systems and Software, vol. 22 (1993), 187-196.
[24]
Walston C.E., Felix C.P. A method of plrogramming measurement and estimation. IBM Systems Journal, vol. 16,. no. I (1977), 54-73.

Cited By

View all
  • (2021)Forecasting the Budget Required for Software under Development2021 8th International Conference on Signal Processing and Integrated Networks (SPIN)10.1109/SPIN52536.2021.9566089(36-40)Online publication date: 26-Aug-2021
  • (2014)Effect of Variations in Measurement Process for Software Development EffortsProceedings of the 2014 6th International Conference on Multimedia, Computer Graphics and Broadcasting10.1109/MulGraB.2014.8(3-8)Online publication date: 20-Dec-2014
  • (2014)Estimating development size and effort of business process service-oriented architecture applicationsThe 2014 2nd International Conference on Systems and Informatics (ICSAI 2014)10.1109/ICSAI.2014.7009432(1006-1011)Online publication date: Nov-2014
  • Show More Cited By

Recommendations

Comments

Please enable JavaScript to view thecomments powered by Disqus.

Information & Contributors

Information

Published In

cover image ACM Conferences
ICSE '99: Proceedings of the 21st international conference on Software engineering
May 1999
741 pages
ISBN:1581130740
DOI:10.1145/302405
Permission to make digital or hard copies of all or part of this work for personal or classroom use is granted without fee provided that copies are not made or distributed for profit or commercial advantage and that copies bear this notice and the full citation on the first page. Copyrights for components of this work owned by others than ACM must be honored. Abstracting with credit is permitted. To copy otherwise, or republish, to post on servers or to redistribute to lists, requires prior specific permission and/or a fee. Request permissions from [email protected]

Sponsors

Publisher

Association for Computing Machinery

New York, NY, United States

Publication History

Published: 16 May 1999

Permissions

Request permissions for this article.

Check for updates

Author Tags

  1. economies of scale
  2. model specification
  3. software cost estimation

Qualifiers

  • Article

Conference

ICSE99
Sponsor:
ICSE99: 1999 International Conference on Software Engineering
May 16 - 22, 1999
California, Los Angeles, USA

Acceptance Rates

Overall Acceptance Rate 276 of 1,856 submissions, 15%

Upcoming Conference

ICSE 2025

Contributors

Other Metrics

Bibliometrics & Citations

Bibliometrics

Article Metrics

  • Downloads (Last 12 months)63
  • Downloads (Last 6 weeks)5
Reflects downloads up to 14 Dec 2024

Other Metrics

Citations

Cited By

View all
  • (2021)Forecasting the Budget Required for Software under Development2021 8th International Conference on Signal Processing and Integrated Networks (SPIN)10.1109/SPIN52536.2021.9566089(36-40)Online publication date: 26-Aug-2021
  • (2014)Effect of Variations in Measurement Process for Software Development EffortsProceedings of the 2014 6th International Conference on Multimedia, Computer Graphics and Broadcasting10.1109/MulGraB.2014.8(3-8)Online publication date: 20-Dec-2014
  • (2014)Estimating development size and effort of business process service-oriented architecture applicationsThe 2014 2nd International Conference on Systems and Informatics (ICSAI 2014)10.1109/ICSAI.2014.7009432(1006-1011)Online publication date: Nov-2014
  • (2013)Tuning of cost drivers by significance occurrences and their calibration with novel software effort estimation methodAdvances in Software Engineering10.1155/2013/3519132013(6-6)Online publication date: 1-Jan-2013
  • (2013)Finding the Most Suitable Estimation MethodSoftware Project Effort Estimation10.1007/978-3-319-03629-8_7(209-260)Online publication date: 12-Dec-2013
  • (2010)Evaluating software cost estimation models using particle swarm optimisation and fuzzy logic for NASA projects: a comparative studyInternational Journal of Bio-Inspired Computation10.1504/IJBIC.2010.0370162:6(365-373)Online publication date: 1-Nov-2010
  • (2008)Development of software effort and schedule estimation models using Soft Computing Techniques2008 IEEE Congress on Evolutionary Computation (IEEE World Congress on Computational Intelligence)10.1109/CEC.2008.4630961(1283-1289)Online publication date: Jun-2008
  • (2008)Can k-NN imputation improve the performance of C4.5 with small software project data sets? A comparative evaluationJournal of Systems and Software10.1016/j.jss.2008.05.00881:12(2361-2370)Online publication date: 1-Dec-2008
  • (2007)Outlier elimination in construction of software metric modelsProceedings of the 2007 ACM symposium on Applied computing10.1145/1244002.1244319(1484-1488)Online publication date: 11-Mar-2007
  • (2007)Lessons Learned and Results from Applying Data-Driven Cost Estimation to Industrial Data SetsProceedings of the 6th International Conference on Quality of Information and Communications Technology10.1109/QUATIC.2007.16(177-186)Online publication date: 12-Sep-2007
  • Show More Cited By

View Options

View options

PDF

View or Download as a PDF file.

PDF

eReader

View online with eReader.

eReader

Login options

Media

Figures

Other

Tables

Share

Share

Share this Publication link

Share on social media