Abstract
We consider an integrated production and distribution scheduling problem in a make-to-order business scenario. A product with a short lifespan (e.g., perishable or seasonal) is produced at a single production facility with a limited production rate. This means that the product expires in a constant time after its production is finished. Orders are received from a set of geographically dispersed customers, where a demand for the product and a time window for the delivery is associated with each customer for the planning period. A single vehicle with non-negligible traveling times between the locations is responsible for the deliveries. Due to the limited production and distribution resources, possibly not all customers may be supplied within their time windows or the lifespan. The problem consists in finding a selection of customers to be supplied such that the total satisfied demand is maximized. We extend the work by Armstrong et al. (Annals of Operations Research 159(1):395–414, 2008) on the problem for fixed delivery sequences by pointing out an error in their branch and bound algorithm and presenting a corrected variant. Furthermore, we introduce model extensions for handling delays of the production start as well as for variable production and distribution sequences. Efficient heuristic solution algorithms and computational results for randomly generated instances are presented.
Similar content being viewed by others
References
Armstrong, R., Gao, S., & Lei, L. (2008). A zero-inventory production and distribution problem with a fixed customer sequence. Annals of Operations Research, 159(1), 395–414.
Azi, N., Gendreau, M., & Potvin, J. Y. (2007). An exact algorithm for a single-vehicle routing problem with time windows and multiple routes. European Journal of Operational Research, 178(3), 755–766.
Chen, Z. L. (2010). Integrated production and outbound distribution scheduling: review and extensions. Operations Research, 58(1), 130–148.
Clarke, G., & Wright, J. W. (1964). Scheduling of vehicles from a central depot to a number of delivery points. Operations Research, 12(4), 568–581.
Garcia, J. M., & Lozano, S. (2005). Production and delivery scheduling problem with time windows. Computers & Industrial Engineering, 48(4), 733–742.
Garey, M. R., & Johnson, D. S. (1979). Computers and intractability: a guide to the theory of NP-completeness. San Francisco: Freeman.
Geismar, H. N., Laporte, G., Lei, L., & Sriskandarajah, C. (2008). The integrated production and transportation scheduling problem for a product with a short lifespan. INFORMS Journal on Computing, 20(1), 21–33.
Glover, F., & Laguna, M. (1997). Tabu search. Dordrecht: Kluwer Academic.
Lourenço, H., Martin, O., & Stützle, T. (2003). Iterated local search. In F. Glover & G. A. Kochenberger (Eds.), Handbook of metaheuristics (pp. 321–353). Dordrecht: Kluwer Academic.
Savelsbergh, M. W. P. (1985). Local search in routing problems with time windows. Annals of Operations Research, 4(1), 285–305.
Solomon, M. M. (1987). Algorithms for the vehicle routing and scheduling problems with time window constraints. Operations Research, 35(2), 254–265.
Stecke, K. E., & Zhao, X. (2007). Production and transportation integration for a make-to-order manufacturing company with a commit-to-delivery business mode. Manufacturing Service Operations Management, 9(2), 206–224.
Tarantilis, C. D., & Kiranoudis, C. T. (2001). A meta-heuristic algorithm for the efficient distribution of perishable foods. Journal of Food Engineering, 50(1), 1–9.
Tsirimpas, P., Tatarakis, A., Minis, I., & Kyriakidis, E. G. (2008). Single vehicle routing with a predefined customer sequence and multiple depot returns. European Journal of Operational Research, 187(2), 483–495.
Van Buer, M. G., Woodruff, D. L., & Olson, R. T. (1999). Solving the medium newspaper production/distribution problem. European Journal of Operational Research, 115(2), 237–253.
Viergutz, C. (2011). Integrated production and distribution scheduling. PhD thesis, University of Osnabrück, Department of Mathematics and Computer Science.
Acknowledgements
We gratefully acknowledge the constructive comments of two anonymous referees.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Viergutz, C., Knust, S. Integrated production and distribution scheduling with lifespan constraints. Ann Oper Res 213, 293–318 (2014). https://doi.org/10.1007/s10479-012-1197-z
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10479-012-1197-z