Abstract
This paper considers single machine scheduling problems with group technology (GT) and deteriorating jobs. A sequence independent setup is required to process a job from a different group and jobs in each group are processed together. We consider the case of jobs whose processing times are a decreasing function of their starting time. The objectives of scheduling problems are to minimize the makespan and the total completion time, respectively. We also provide polynomial time algorithms to solve these problems.
Similar content being viewed by others
References
B. Alidaee and N. K. Womer,Scheduling with time dependent processing processing times: review and extensions, Journal of the Operational Research Society50 (1999), 711–720.
A. Bachman, T. C. E.Cheng, A. Janiak and C. T. Ng,Scheduling start time dependent jobs to minimize the total weighted completion time, Journal of the Operational Research Society53 (2002), 688–693.
S. Browne and U. Yechiali,Scheduling deteriorating jobs on a single processor, Operations Research38 (1990), 495–498.
Z.-L. Chen,Parallel machine scheduling with time dependent processing times Discrete Applied Mathematics70 (1996), 81–94.
T. C. E. Cheng, Q. Ding and B. M. T. Lin,A concise survey of scheduling with timedependent processing times, European Journal of Operational Research152 (2004), 1–13.
R. L. Graham, E. L. Lawler, J. K. Lenstra and A. H. G. Rinnooy Kan,Optimization and approximation in deterministic sequencing and scheduling: a survey, Annals of Discrete Mathematics5 (1979), 287–326.
K. I.-J. Ho, J. Y.-T. Leung and W.-D. Wei,Complexity of scheduling tasks with timedependent execution times, Information Processing Letters48 (1993), 315–320.
Y. C. Hsieh and D. L. Bricker,Scheduling linearly deteriorating jobs on multiple machines, Computers and Industrial Engineering32 (1997), 727–734.
A. Kononov and S. Gawiejnowicz,NP-hard cases in scheduling deteriorating jobs on dedicated machines, Journal of the Operational Research Society52 (2001), 708–717.
G. Mosheiov,V-shaped policies for scheduling deteriorating jobs, Operations Research39 (1991), 979–991.
G. Mosheiov,Scheduling jobs under simple linear deterioration, Computers and Operations Research21 (1994), 653–659.
G. Mosheiov,Multi-machine scheduling with linear deterioration, INFOR36 (1998), 205–214.
G. Mosheiov,Complexity analysis of job-shop scheduling with deteriorating jobs, Discrete Applied Mathematics117 (2002), 195–209.
C. T. Ng, T. C. E. Cheng, A. Bachman and A. Janiak,Three scheduling problems with deteriorating jobs to minimize the total completion time, Information Processing Letters81 (2002), 327–333.
C. N. Potts and L. N. Van Wassenhove,Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity, Journal of the Operational Research Society43 (1992), 395–406.
P. S. Sundararaghavan and A. S. Kunnathur,Single machine scheduling with start time dependent processing times: some solvable cases, European Journal of Operational Research78 (1994), 394–403.
J.-B. Wang and Z.-Q. Xia,Scheduling jobs under decreasing linear deterioration, Information Processing Letters94 (2005), 63–69.
J.-B. Wang and Z.-Q. Xia,Flow shop scheduling problems with deteriorating jobs under dominating machines, Journal of the Operational Research Society57 (2006), 220–226.
J.-B. Wang,Flow shop scheduling problems with decreasing linear deterioration under dominant machines, Computers and Operations Research34(2007), 2043–2058.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Wang, Jb., Guo, AX., Shan, F. et al. Single machine group scheduling under decreasing linear deterioration. J. Appl. Math. Comput. 24, 283–293 (2007). https://doi.org/10.1007/BF02832317
Received:
Revised:
Issue Date:
DOI: https://doi.org/10.1007/BF02832317