Abstract
This paper introduces and incorporates the concept of rework in modelling of a merge production system under random conditions. Merge and split production stages are common in assembly lines. Merging of components can be performed correctly or otherwise. If not done properly, a merging operation can be redone, i.e. the merging operation can be reworked. This paper explains the modelling of a two stage merge production system subject to rework using semi-regenerative stochastic processes. The modelling has been done to obtain various busy period durations over finite time duration for transient state analysis. Also, the modelling and analysis has been carried out without any particular assumption on the distributions of processing times. All the processing times involved have been assumed to be arbitrarily distributed.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
References
Birolini, A.: On the use of stochastic processes in modeling reliability problems. Springer-Verlag, Lecture Notes in Economics and Mathematical Systems (1985)
Buffa, E.S.: Modern production/operations management, 7th edn. Wiley Eastern Ltd., New Delhi (1983)
Buzacott, J.A., Shanthikumar, J.G.: Stochastic models of manufacturing sys-tems. Prentice Hall Inc., New Jersey (1993)
De Koster, M.B.M., Wigngaard, J.: On the equivalence of multi-stage production lines and two-stage lines. I.I.E Trans. 19, 351–354 (1987).
Yang, L., Jingshan, L.: Performance analysis of split and merge production systems. In: Proceedings of 2009 American Control Conference, pp. 2190–2195 (2009).
Jones, J.G.: On the numerical solution of convolution integral equations and systems of such equations. Math. Comput. 15, 131–142 (1961)
Neuts, M.F.: Matrix-geometric solutions in stochastic models: an algorithmic approach. The John Hopkins University Press, Baltimore and London (1981)
Gopalan, M.N.: Dinesh Kumar, U.: On the production rate of a merge production system. Int. J. Qual. Reliab. Manage. 11(1994), 66–72 (1994)
Koneigsberg, E.: Production lines and internal storages : a review. Manage. Sci. 5, 410–433 (1959)
Shanthikumar, J.G., Tien, C.C.: An algorithmic solution to two-stage transfer lines with possible scrapping of units. Manage. Sci. 29, 1069–1086 (1993)
Buscher, U., Lindner, G.: Optimizing a production system with rework and equal sized batch shipments. Comput. Oper. Res. 34, 515–535 (2007)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2014 Springer India
About this paper
Cite this paper
Kannan, S., Ali, S.S. (2014). A New Approach to Rework in Merge Production Systems. In: Babu, B., et al. Proceedings of the Second International Conference on Soft Computing for Problem Solving (SocProS 2012), December 28-30, 2012. Advances in Intelligent Systems and Computing, vol 236. Springer, New Delhi. https://doi.org/10.1007/978-81-322-1602-5_56
Download citation
DOI: https://doi.org/10.1007/978-81-322-1602-5_56
Published:
Publisher Name: Springer, New Delhi
Print ISBN: 978-81-322-1601-8
Online ISBN: 978-81-322-1602-5
eBook Packages: EngineeringEngineering (R0)