Abstract
One of the major factors affecting the performance of material requirements planning (MRP) systems is the uncertainty in the availability of the components required to produce assemblies and finished products. Due to the complexities of the product structures and interactions between a large number of system variables, it is not possible to use analytical techniques to assess the impact on the overall performance of MRP systems. Computer simulation represents a possible alternative. This paper describes a material requirements planning simulator (MPPSIM) designed for use in conjunction with computer-aided production control systems. Examples of the use of the simulator to assess the impact of uncertainty, when considering the use of lot for lot and fixed period requirements lot sizing techniques, are given. The effect of maintaining various levels of safety stock on the overall performance of the MRP system, in terms of the percentage of jobs started on time, stock value, work-in-progress, and cumulative production, is assessed.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Similar content being viewed by others
References
Anderson, J C, Schroder, R G, Tupy, S E and White, E M, Material Requirements Planning: A Study of Implementation and Practice, American Production and Inventory Control Society, 1981.
Doll, R E, Requirements Planning Simulation - The new frontier of inventory management, Proceedings of the 14th International Conference of the American Production and Inventory Control Society, St. Louis, Missouri, p. 106–119, 1981.
Edson, N W, The realities of implementing MRP, Proceedings of the 23rd International Conference of the American Production and Inventory Control Society, Los Angeles, California, pp. 65–67, 1980.
Hollwey, M W M, Kochhar, A K, Parnaby, J and Ephraim, O M, Using a real-time mini-computer for production control, Journal of the Institution of Production Engineers, 57, 11, pp. 37–42, 1978.
Kochhar, A K, Development of Computer-based Production Systems, Edward Arnold, London, 1979.
Kochhar, A K, Why Computerised Production Control Systems Continue to Disappoint, Journal of the Institution of Production Engineers, 61, 12, p. 37–38, 1982.
New, C, Requirements Planning, Gower Press, Westmead, England, 1978.
Orlicky, J, Material Requirements Planning, McGraw-Hill, New York, 1975.
Plossl, G W and Wight, O W, Production and Inventory Control Principles and Techniques, Prentice Hall, Englewood Cliffs, N.J., 1967.
Wight, O W, To Order Point or Not To Order Point, Production and Inventory Management, 9, 3, p. 13–28, 1968.
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 1983 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Bassett, G., Kochhar, A.K. (1983). Computer Simulation of Material Requirements Planning Systems. In: Ameling, W. (eds) First European Simulation Congress ESC 83. Informatik-Fachberichte, vol 71. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-69295-6_82
Download citation
DOI: https://doi.org/10.1007/978-3-642-69295-6_82
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-12723-9
Online ISBN: 978-3-642-69295-6
eBook Packages: Springer Book Archive