Fuzzy Optimal Solution of Fully Fuzzy Project Crashing Problems with New Representation of LR Flat Fuzzy Numbers

  • Conference paper
Rough Sets, Fuzzy Sets, Data Mining and Granular Computing (RSFDGrC 2011)

Part of the book series: Lecture Notes in Computer Science ((LNAI,volume 6743))

  • 1175 Accesses

Abstract

In this paper, a new method, named as Mehar’s method, is proposed for solving fully fuzzy project crashing problems and a new representation of LR flat fuzzy numbers, named as JMD representation of LR flat fuzzy numbers, are introduced. Also, it is shown that it is better to use JMD representation of LR flat fuzzy numbers as compared to the existing representation of LR flat fuzzy numbers.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Subscribe and save

Springer+ Basic
£29.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Chapter
GBP 19.95
Price includes VAT (United Kingdom)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
GBP 35.99
Price includes VAT (United Kingdom)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
GBP 44.99
Price includes VAT (United Kingdom)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Similar content being viewed by others

References

  1. Chen, S.P., Hsueh, Y.J.: A simple approach to fuzzy critical path analysis in project networks. Applied Mathematical Modelling 32, 1289–1297 (2008)

    Article  MathSciNet  MATH  Google Scholar 

  2. Guang, J.C., Shang, J.Z., Yan, L., Min, Z.Y., Dong, H.Z.: Research on the fully fuzzy time-cost trade-off based on genetic algorithms. Journal of Marine Science and Application 4, 18–23 (2005)

    Article  Google Scholar 

  3. Kumar, A., Kaur, P.: A New Method for Fuzzy Critical Path Analysis in Project Networks with a New Representation of Triangular Fuzzy Numbers. Applications and Applied Mathematics: An International Journal 5, 1442–1466 (2010)

    MathSciNet  MATH  Google Scholar 

  4. Lin, F.T.: Fuzzy crashing problem on project management based on confidence-interval estimates. In: Eighth International Conference on Intelligent Systems Design and Applications, vol. 2, pp. 164–169 (2008)

    Google Scholar 

  5. Liu, S.T.: Fuzzy activity times in critical path and project crashing problems. Cybernetics and Systems 34, 161–172 (2003); 73, 227–234 (1995)

    Article  MATH  Google Scholar 

  6. Winston, W.L.: Operations Research: Applications and Algorithms, Singapore (2003)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2011 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Kumar, A., Kaur, P., Kaur, J. (2011). Fuzzy Optimal Solution of Fully Fuzzy Project Crashing Problems with New Representation of LR Flat Fuzzy Numbers. In: Kuznetsov, S.O., Ślęzak, D., Hepting, D.H., Mirkin, B.G. (eds) Rough Sets, Fuzzy Sets, Data Mining and Granular Computing. RSFDGrC 2011. Lecture Notes in Computer Science(), vol 6743. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-21881-1_28

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-21881-1_28

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-21880-4

  • Online ISBN: 978-3-642-21881-1

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics