[go: up one dir, main page]
More Web Proxy on the site http://driver.im/
Skip to main content

Alternative Interoperability Between BPMn and Project Management Tools

  • Conference paper
Knowledge Management in Organizations (KMO 2018)

Abstract

This article presents the proof of concept of a proposed architecture that allows building an environment to automate the activities of planning, monitoring and controlling of a project, from the integration of workflow tools and scheduling of project. In order to validate the architecture, it was implemented on the Intalio tool as a workflow and Open Project as a scheduling tool, the first being a business process management platform allowed the coherent integration of the process tasks towards the updating of the scheduling tool in real time. The proposed integration allows to feed a knowledge base from which the system automatically proposes a new timetable for the pending activities, according to the real progress of the project. This makes it easier for the project manager to visualize the real progress of the work, the optimal management of the time resources and the timely making of decisions that leads to the fulfilment of objectives, which, having a knowledge management base, becomes a support for the administration of future related and/or similar projects.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Subscribe and save

Springer+ Basic
£29.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Chapter
GBP 19.95
Price includes VAT (United Kingdom)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
GBP 71.50
Price includes VAT (United Kingdom)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
GBP 89.99
Price includes VAT (United Kingdom)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Similar content being viewed by others

References

  1. Mouriño, F.F.: Mejora e innovación de procesos (2002). [En línea] 09 de 2002. [Citado el: 05 de 04 de 2009.] http://www.gestiopolis.com/canales/gerencial/articulos/44/mejinnoproceso.htm

  2. Sommerville, I.: Ingeniería del software, 7th edn, p. 687. Pearson Educación, S.A, Madrid (2005). ISBN 10:84-7829-074-5

    Google Scholar 

  3. Intalio. http://bpms.intalio.com/

  4. Izquierdo, J.L.C., Ramón, Ó.S., Molina, J.G., Alarcón, C.C.: Un caso de estudio para la adopción de un BPMS. Facultad de Informática, Universidad de Murcia. http://www.sistedes.es/sistedes/pdf/2007/pnis-07-canovas-bpms.pdf

  5. Juric, M., Pulnik, M., Rozman, I., Lumak, B.: Business Process Orchestration and eBusiness. Association for Information Systems (2003). http://aisel.aisnet.org/bled2003/11

  6. Baeyens, T.: Independent software consultant specialized in J2EE, BPM & workflow, and creator of the jBpm open source project. jBpm: open source solution for BPM. http://is.tm.tue.nl/bpm2003/download/demo%20jbpm.pdf

  7. Sedlmayr, M., Rose, T., Röhring, R., Meister, M.: Fraunhofer Institute für angewadndet Informationstechnik (FIT), Snak Augustin, Germany. http://www.openclinical.org/docs/ext/conferences/cgp2006/papers/Sedlmayr.pdf

  8. Koenig, J.: JBOSS jBPM, Noviembre de 2004. http://www.hmquiroz.com.ar/e-books/Packt.Publishing.Business.Process.Management.with.JBoss.jBPM.Jul.2007.pdf

  9. Ivankan, M.: The Business Process Management Guide (2009)

    Google Scholar 

  10. Toral, J.: Introduction to Software Process Improvement (2001). http://www.cmmiphilippines.com/intro.html

  11. Von Ammon, R.: Existing and Future Standards for Event-Driven Business Process Management (2009). https://dl.acm.org/citation.cfm?id=1619258.1619290

  12. Zimmer, B.: Software quality and productivity analysis at Hewlett-Packard. In: Proceedings of the 13th Annual International on Computer Software and Applications Conference, COMPSAC 1989 (1989). artículo de revista

    Google Scholar 

  13. Hernández Sampieri, R., Fernández Collado, C., Baptista Lucio, M.: Metodología de la Investigación. McGraw Hill, New York (2010)

    Google Scholar 

  14. Borja, M.: Metodología de la investigación científica para ingenieros, Chiclayo (2012)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Jorge Enrique Otálora Luna .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2018 Springer International Publishing AG, part of Springer Nature

About this paper

Cite this paper

Otálora Luna, J.E., Alarcón Aldana, A.C., Callejas Cuervo, M. (2018). Alternative Interoperability Between BPMn and Project Management Tools. In: Uden, L., Hadzima, B., Ting, IH. (eds) Knowledge Management in Organizations. KMO 2018. Communications in Computer and Information Science, vol 877. Springer, Cham. https://doi.org/10.1007/978-3-319-95204-8_39

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-95204-8_39

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-95203-1

  • Online ISBN: 978-3-319-95204-8

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics