[go: up one dir, main page]
More Web Proxy on the site http://driver.im/
Skip to main content

Demand Fulfillment in an Assemble-to-Order Production System

  • Conference paper
  • First Online:
Operations Research Proceedings 2013

Part of the book series: Operations Research Proceedings ((ORP))

  • 1645 Accesses

Abstract

We consider a computer manufacturer who assembles customized final products from various components. Customer orders specify the product configuration, the quantity and a desired delivery date. The online order promising (OP) process must announce a first promised delivery date to the customer. Demand fulfillment in this Assemble-to-Order (ATO) case is still little investigated and differs remarkably from the more popular Make-to-Stock (MTS) case: Bottlenecks are the assembly capacity and the stocks of components, which are available to promise (ATP). An important task of the demand fulfillment, besides OP, is Demand Supply Matching (DSM), i.e. deciding on the assembly date of orders and eventually changing the delivery date of promised orders (repromising). We present a new concept for demand fulfillment in the ATO case which consists of online OP for single orders arriving during the day and DSM once a day, linked in a rolling-horizon scheme. The DSM is based on a mixed integer programming (MIP) model which simultaneously determines assembly and delivery dates for all promised orders. We report on a case study with real data of a computer manufacturer with more than 10,000 orders on hand and 2,000 different components.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Subscribe and save

Springer+ Basic
£29.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Chapter
GBP 19.95
Price includes VAT (United Kingdom)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
GBP 71.50
Price includes VAT (United Kingdom)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
GBP 89.99
Price includes VAT (United Kingdom)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Similar content being viewed by others

References

  1. Fleischmann, B., & Geier, S. (2011). Global available-to-promise (global ATP). In H. Stadtler, et al. (Eds.), Advanced planning in supply chains (pp. 195–215). Heidelberg: Springer.

    Google Scholar 

  2. Geier, S. (2013). Demand fulfillment bei assemble-to-order-Fertigung—Analyse, Optimierung und Anwendung in der Computer-Industrie. Dissertation, Universitaet Augsburg.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Sebastian Geier .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2014 Springer International Publishing Switzerland

About this paper

Cite this paper

Geier, S., Fleischmann, B. (2014). Demand Fulfillment in an Assemble-to-Order Production System. In: Huisman, D., Louwerse, I., Wagelmans, A. (eds) Operations Research Proceedings 2013. Operations Research Proceedings. Springer, Cham. https://doi.org/10.1007/978-3-319-07001-8_19

Download citation

Publish with us

Policies and ethics