Abstract
The paper reports on the experience made with the IEC 61508 implementation in recent projects of European and North American system vendors and Japanese equipment vendors. As an answer to the identified problems, the paper describes a knowledge tool to ease a formalized verification process and proposes a combination of software verification methods to address the particular issues with pre-existing software for use in programmable electronic safety systems.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Similar content being viewed by others
References
Requirements for Safety Related Software in Defence Equipment
HAZOP Studies on Systems Containing Programmable Electronics
Hardware Architectures and Common Cause; June 2001 (can be requested from the author: Rainer.Faller@exida.com)
IEC 61508:1998 and 2000, part 1 to 7; Functional Safety of Electrical, Electronic and Programmable Electronic Systems
Interkama / ISATech 1999; Compliance to IEC 61508 (/ IEC 61511) Classification and Implementation of Instrumented Protective Functions-The SHELL approach; Jan Wiegerinck; SHELL Global Solutions
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2001 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Faller, R. (2001). Project Experience with IEC 61508 and Its Consequences. In: Voges, U. (eds) Computer Safety, Reliability and Security. SAFECOMP 2001. Lecture Notes in Computer Science, vol 2187. Springer, Berlin, Heidelberg. https://doi.org/10.1007/3-540-45416-0_20
Download citation
DOI: https://doi.org/10.1007/3-540-45416-0_20
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-42607-3
Online ISBN: 978-3-540-45416-8
eBook Packages: Springer Book Archive