[go: up one dir, main page]
More Web Proxy on the site http://driver.im/
Skip to main content

A Genetic Algorithm for Solving a Production and Delivery Scheduling Problem with Time Windows

  • Conference paper
  • First Online:
Advances in Artificial Intelligence — IBERAMIA 2002 (IBERAMIA 2002)

Part of the book series: Lecture Notes in Computer Science ((LNAI,volume 2527))

Included in the following conference series:

Abstract

This paper deals with the problem of selecting and scheduling a set of orders to be processed by a manufacturing plant and immediately delivered to the customer site. Constraints to be considered are the limited production capacity, the available number of vehicles and the time windows within which orders must be served. We describe the problem relating it to similar problems studied in the literature. A genetic algorithm to solve the problem is developed and tested empirically with randomly generated problems. Comparisons with an exact procedure and a tabu search procedure show that the method finds very good-quality solutions.

This research has been financed by the Spanish Ministry of Science and Technology under contract no. DPI2000-0567.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Subscribe and save

Springer+ Basic
£29.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Chapter
GBP 19.95
Price includes VAT (United Kingdom)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
GBP 71.50
Price includes VAT (United Kingdom)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
GBP 89.99
Price includes VAT (United Kingdom)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Similar content being viewed by others

References

  1. Hall N.G. and Sriskandarajah C.: A survey of machine scheduling problems with blocking and no-wait in process. Operations Research, 44, (1996) 510–525.

    MATH  MathSciNet  Google Scholar 

  2. Sriskandarajah C.: Performance of scheduling algorithms for no-wait flowshops with parallel machines. European Journal of Operations Research, 70, (1993) 365–378.

    Article  MATH  Google Scholar 

  3. Ramudhin A. and Ratliff H.D.: Generating daily production schedules in process industries. IIE Transactions, 27, (1995) 646–656.

    Article  Google Scholar 

  4. Kroon L.G., Salomon M. and Van Wassenhove L. N.: Exact and approximation algorithms for the operational fixed interval scheduling problem. European Journal of Operational Research, 82, (1995) 190–205.

    Article  MATH  Google Scholar 

  5. Gertsbakh I. and Stern H.: Minimal Resources for Fixed and Variable Job Schedules. Operations Research, 26 (1), (1978) 68–85.

    Article  MATH  MathSciNet  Google Scholar 

  6. Gabrel V.: Scheduling jobs within time windows on identical parallel machines: New model and algorithms. European Journal of Operations Research, 83, (1995) 320–329.

    Article  MATH  Google Scholar 

  7. Goldberg, D. E.: Genetic Algorithms in Search, Optimization, and Machine Learning. (1989). New York, NY: Addison-Wesley.

    Google Scholar 

  8. Garcia J. M., Smith K., Lozano S. and Guerrero F.: A Comparison of GRASP and an Exact Method for Solving a Production and Delivery Scheduling Problem. Proceedings of the International workshop on Hybrid Intelligent Systems HIS’2001, Adelaide, Australia. (2001).

    Google Scholar 

  9. Arking E.M., Silverberg E.B.: Scheduling jobs with fixed start and end times. Discrete Applied Mathematics 18, (1987) 1–8.

    Article  MathSciNet  Google Scholar 

  10. Kaufmann, M.: Fundations of Genetic Algorithms. Edited by Gregory J.E. Rawlins, San Mateo California, (1991).

    Google Scholar 

  11. Garcia J. M., Smith K., Lozano S., Guerrero F. and Calle M.: Production and Delivery Scheduling Problem with Time Windows. Proceedings of The 30-th International Conference on Computers and Industrial Engineering, Tynos Island, Greece (2002) 263–268.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2002 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Manuel Garcia, J., Lozano, S., Guerrero, F., Eguia, I. (2002). A Genetic Algorithm for Solving a Production and Delivery Scheduling Problem with Time Windows. In: Garijo, F.J., Riquelme, J.C., Toro, M. (eds) Advances in Artificial Intelligence — IBERAMIA 2002. IBERAMIA 2002. Lecture Notes in Computer Science(), vol 2527. Springer, Berlin, Heidelberg. https://doi.org/10.1007/3-540-36131-6_38

Download citation

  • DOI: https://doi.org/10.1007/3-540-36131-6_38

  • Published:

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-540-00131-7

  • Online ISBN: 978-3-540-36131-2

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics