[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

Launch of NOAA Weather Satellite Delayed

Technicians monitor movement and guide NOAA’s Geostationary Operation Environmental Satellite-U (GOES-U) as a crane hoists it on to a spacecraft dolly in a high bay at the Astrotech Space Operations Facility near the agency’s Kennedy Space Center in Florida.
Technicians monitor movement and guide NOAA’s Geostationary Operation Environmental Satellite-U (GOES-U) as a crane hoists it on to a spacecraft dolly in a high bay at the Astrotech Space Operations Facility near the agency’s Kennedy Space Center in Florida. Photo credit: NASA/Ben Smegelsky

NASA and SpaceX are now targeting no earlier than May 2024 for the launch of the fourth and final satellite in NOAA’s Geostationary Operational Environmental Satellites (GOES) – R Series, GOES-U. The new date allows for additional testing and preparation of a new Falcon Heavy center core booster after a liquid oxygen leak was discovered during routine new booster testing.     

NOAA oversees the GOES-R Series Program through an integrated NOAA-NASA office, managing the ground system, operating the satellites, and distributing their data to users worldwide. NASA’s Goddard Space Flight Center manages the acquisition of the spacecraft and instruments and also built the Magnetometer instrument for GOES-T and GOES-U. NASA’s Launch Services Program, based at Kennedy Space Center manages the launch services for the GOES missions. Lockheed Martin designs, builds, and tests the GOES-R series satellites. L3Harris Technologies provides the primary instrument, the Advanced Baseline Imager, along with the ground system, which includes the antenna system for data reception.