dbo:abstract
|
- Čakovec Hydroelectric Power Plant is a large hydroelectric power plant in Croatia that has four turbines with a total nominal capacity of 78 MW (unit A - 38 MW, unit B - 38 MW, unit C - 1.1 MW and unit D - 0.34 MW). According to the type of power plant, it is a flow, low-pressure, derivation hydroelectric power plant with an accumulation (area of 10.5 km2 (4 sq mi) and volume of 51.6 [hm^3] for daily and partial weekly flow regulation. Units A and B of the power plant have horizontal pipe turbines and the generators are "in the bulb". It is a multipurpose facility harnessing the Drava River water power, providing flood and erosion control, improving drainage, water supply, traffic and conditions for development of leisure industry and sports. Čakovec hydro plant installed power at generator terminals is 75.9 MW, and possible average annual output is 400 GWh. Gross head at the power house for Qi is 17.53 m. The power plant uses Lake Varaždin as its reservoir and was completed in 1982. It is located near the villages of Šemovec and Orehovica. Although named after Čakovec, the county seat of Međimurje County, the power plant is almost entirely located within Varaždin County, while the reservoir is equally divided between the two counties. It is operated by Hrvatska elektroprivreda. (en)
- ГЕС Чаковець — гідроелектростанція на півночі Хорватії на річці Драва. Середня серед станцій дравського каскаду на території Хорватії, знаходиться між ГЕС Вараждин (вище по течії) та ГЕС Дубрава. Під час будівництва станції, введеної в експлуатацію у 1982 році, річку перекрили бетонною греблею. Створений нею підпір призвів до появи витягнутого на 21 км сховища із об'ємом 10,5 млн м3, з якого вода відводиться у короткий дериваційний канал. На його середині розташована будівля машинного залу, після чого відпрацьована вода повертається до Драви. Всього при спорудженні комплексу ГЕС здійснили земляні роботи в обсязі 5,6 млн м3, використали 109 тис. м3 бетону та облаштували 403 тис. м2 асфальтового облицювання. Машинний зал обладнано двома бульбовими турбінами потужністю по 38 МВт, які працюють при напорі у 17,5 метра. На початку 2010-х років виробництво електроенергії на ГЕС Чаковець коливалось від 308 до 427 млн кВт-год. Управління станцією здійснюється з диспетчерського центру дравського каскаду у Вараждині. (uk)
|
dbo:country
| |
dbo:location
| |
dbo:operator
| |
dbo:owner
| |
dbo:thumbnail
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 3571 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbp:country
| |
dbp:imageCaption
|
- Čakovec Hydroelectric Power Plant - east view (en)
|
dbp:location
| |
dbp:name
|
- Čakovec Hydroelectric Power Plant (en)
|
dbp:nameOfficial
| |
dbp:operator
| |
dbp:owner
| |
dbp:wikiPageUsesTemplate
| |
dcterms:subject
| |
gold:hypernym
| |
georss:point
|
- 46.31138888888889 16.494444444444444
|
rdf:type
| |
rdfs:comment
|
- Čakovec Hydroelectric Power Plant is a large hydroelectric power plant in Croatia that has four turbines with a total nominal capacity of 78 MW (unit A - 38 MW, unit B - 38 MW, unit C - 1.1 MW and unit D - 0.34 MW). According to the type of power plant, it is a flow, low-pressure, derivation hydroelectric power plant with an accumulation (area of 10.5 km2 (4 sq mi) and volume of 51.6 [hm^3] for daily and partial weekly flow regulation. Units A and B of the power plant have horizontal pipe turbines and the generators are "in the bulb". It is operated by Hrvatska elektroprivreda. (en)
- ГЕС Чаковець — гідроелектростанція на півночі Хорватії на річці Драва. Середня серед станцій дравського каскаду на території Хорватії, знаходиться між ГЕС Вараждин (вище по течії) та ГЕС Дубрава. Під час будівництва станції, введеної в експлуатацію у 1982 році, річку перекрили бетонною греблею. Створений нею підпір призвів до появи витягнутого на 21 км сховища із об'ємом 10,5 млн м3, з якого вода відводиться у короткий дериваційний канал. На його середині розташована будівля машинного залу, після чого відпрацьована вода повертається до Драви. Всього при спорудженні комплексу ГЕС здійснили земляні роботи в обсязі 5,6 млн м3, використали 109 тис. м3 бетону та облаштували 403 тис. м2 асфальтового облицювання. (uk)
|
rdfs:label
|
- Čakovec Hydroelectric Power Plant (en)
- ГЕС Чаковець (uk)
|
owl:sameAs
| |
geo:geometry
|
- POINT(16.494443893433 46.311389923096)
|
geo:lat
| |
geo:long
| |
prov:wasDerivedFrom
| |
foaf:depiction
| |
foaf:isPrimaryTopicOf
| |
foaf:name
|
- Čakovec Hydroelectric Power Plant (en)
|
is dbo:wikiPageRedirects
of | |
is dbo:wikiPageWikiLink
of | |
is foaf:primaryTopic
of | |