Senj Hydroelectric Power Plant is a large high-pressure diversion power plant harnessing the Lika and Gacka Rivers water in Croatia. Senj HPP has four turbines with a nominal capacity of 72 MW each having a total capacity of 220 MW. It is operated by Hrvatska elektroprivreda. Another unit of HE Senj is about to be built with the support of EU funds and HEP Croatian Energy Company. A construction on a billion dollar project is set to start in mid 2014 with completion dates around 2017 or 2018 at the latest.

Property Value
dbo:abstract
  • Senj Hydroelectric Power Plant is a large high-pressure diversion power plant harnessing the Lika and Gacka Rivers water in Croatia. Senj HPP has four turbines with a nominal capacity of 72 MW each having a total capacity of 220 MW. It is operated by Hrvatska elektroprivreda. Another unit of HE Senj is about to be built with the support of EU funds and HEP Croatian Energy Company. A construction on a billion dollar project is set to start in mid 2014 with completion dates around 2017 or 2018 at the latest. (en)
dbo:country
dbo:lake
dbo:location
dbo:part
dbo:wikiPageID
  • 20012917 (xsd:integer)
dbo:wikiPageLength
  • 6365 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1077936022 (xsd:integer)
dbo:wikiPageWikiLink
dbp:country
  • Croatia (en)
dbp:location
dbp:plantName
  • Senj Hydroelectric Power Plant (en)
dbp:resName
  • Senj (en)
dbp:wikiPageUsesTemplate
dct:subject
gold:hypernym
rdf:type
rdfs:comment
  • Senj Hydroelectric Power Plant is a large high-pressure diversion power plant harnessing the Lika and Gacka Rivers water in Croatia. Senj HPP has four turbines with a nominal capacity of 72 MW each having a total capacity of 220 MW. It is operated by Hrvatska elektroprivreda. Another unit of HE Senj is about to be built with the support of EU funds and HEP Croatian Energy Company. A construction on a billion dollar project is set to start in mid 2014 with completion dates around 2017 or 2018 at the latest. (en)
rdfs:label
  • Senj Hydroelectric Power Plant (en)
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License