[go: up one dir, main page]
More Web Proxy on the site http://driver.im/
An Entity of Type: Thing, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Central Utah Project is a US federal water project that was authorized for construction under the Colorado River Storage Project Act of April 11, 1956, as a participating project. In general, the Central Utah Project develops a portion of Utah's share of the yield of the Colorado River, as set out in the Colorado River Compact of 1922. The Central Utah Project was authorized under the Colorado River Storage Project Act (CRSPA) (Public Law 84-485) on April 11, 1956, as a participating project of the Colorado River Storage Project to help meet Utah's long-term water needs.

Property Value
dbo:abstract
  • The Central Utah Project is a US federal water project that was authorized for construction under the Colorado River Storage Project Act of April 11, 1956, as a participating project. In general, the Central Utah Project develops a portion of Utah's share of the yield of the Colorado River, as set out in the Colorado River Compact of 1922. The Central Utah Project was authorized under the Colorado River Storage Project Act (CRSPA) (Public Law 84-485) on April 11, 1956, as a participating project of the Colorado River Storage Project to help meet Utah's long-term water needs. As originally planned and authorized, the Central Utah Project consisted of six units or sub-projects: the Bonneville Unit, the Jensen Unit, the Vernal Unit, the Uinta Unit, the Upalco Unit, and Ute Indian Unit. The largest and most complex is the Bonneville Unit, which diverts water from the Uinta Basin, a part of the Colorado River Basin, to the Lake Bonneville Basin. The other units were designed to provide for development of local water supplies in the Uinta Basin. The Central Utah Project develops water for irrigation, municipal, and industrial use; stream flows; and power generation. The project also provides recreation, fish and wildlife, flood control, water conservation, and water quality benefits. Construction progress on the Central Utah Project proceeded slowly because of: the complexity of the project; complex environmental analyses; and inadequate and sporadic Federal funding. The slow progress prompted state and local officials to ask Congress to empower the Central Utah Water Conservancy District to complete the planning and construction of the remaining portion of the CUP, specifically the Bonneville Unit. (en)
dbo:wikiPageID
  • 13747167 (xsd:integer)
dbo:wikiPageLength
  • 41371 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1047033940 (xsd:integer)
dbo:wikiPageWikiLink
dbp:cap
  • 1 (xsd:integer)
dbp:data
  • 4 (xsd:integer)
dbp:dwgs
  • 2 (xsd:integer)
dbp:id
  • ut0199 (en)
  • ut0349 (en)
  • ut0350 (en)
  • ut0351 (en)
  • ut0352 (en)
  • ut0353 (en)
  • ut0354 (en)
  • ut0355 (en)
  • ut0356 (en)
  • ut0357 (en)
  • ut0358 (en)
  • ut0359 (en)
  • ut0360 (en)
  • ut0361 (en)
  • ut0362 (en)
  • ut0363 (en)
dbp:link
  • no (en)
dbp:photos
  • 5 (xsd:integer)
  • 6 (xsd:integer)
  • 7 (xsd:integer)
  • 8 (xsd:integer)
  • 9 (xsd:integer)
  • 11 (xsd:integer)
  • 12 (xsd:integer)
dbp:survey
  • UT-41 (en)
  • UT-41-A (en)
  • UT-41-B (en)
  • UT-41-C (en)
  • UT-41-D (en)
  • UT-41-E (en)
  • UT-41-F (en)
  • UT-41-G (en)
  • UT-41-H (en)
  • UT-41-I (en)
  • UT-41-J (en)
  • UT-41-K (en)
  • UT-41-L (en)
  • UT-41-M (en)
  • UT-41-N (en)
  • UT-41-O (en)
dbp:title
  • Big Elk Lake Dam (en)
  • Crystal Lake Dam (en)
  • Duck Lake Dam (en)
  • Fire Lake Dam (en)
  • Island Lake Dam (en)
  • Long Lake Dam (en)
  • Lost Lake Dam (en)
  • Marjorie Lake Dam (en)
  • Pot Lake Dam (en)
  • Star Lake Dam (en)
  • Teapot Lake Dam (en)
  • Trial Lake Dam (en)
  • Wall Lake Dam (en)
  • Washington Lake Dam (en)
  • Weir Lake Dam (en)
  • High Mountain Dams in Bonneville Unit, Central Utah Project, Kamas, Summit County, UT (en)
dbp:wikiPageUsesTemplate
dct:subject
gold:hypernym
rdfs:comment
  • The Central Utah Project is a US federal water project that was authorized for construction under the Colorado River Storage Project Act of April 11, 1956, as a participating project. In general, the Central Utah Project develops a portion of Utah's share of the yield of the Colorado River, as set out in the Colorado River Compact of 1922. The Central Utah Project was authorized under the Colorado River Storage Project Act (CRSPA) (Public Law 84-485) on April 11, 1956, as a participating project of the Colorado River Storage Project to help meet Utah's long-term water needs. (en)
rdfs:label
  • Central Utah Project (en)
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
is dbo:wikiPageDisambiguates of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License