[go: up one dir, main page]
More Web Proxy on the site http://driver.im/
An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Alpaslan-2 Dam is an embankment dam on the Murat River in Muş Province, Turkey. The dam is located about 32 km (20 mi) north of the provincial capital, Muş. The primary purpose of the dam is hydroelectric power production and irrigation. Its power station has an installed capacity of 280 MW, planning to deliver 850 GWh annually, and the reservoir will help irrigate 78,000 ha (190,000 acres) of land.

Property Value
dbo:Infrastructure/length
  • 0.844 (dbd:kilometre)
dbo:abstract
  • The Alpaslan-2 Dam is an embankment dam on the Murat River in Muş Province, Turkey. The dam is located about 32 km (20 mi) north of the provincial capital, Muş. The primary purpose of the dam is hydroelectric power production and irrigation. Its power station has an installed capacity of 280 MW, planning to deliver 850 GWh annually, and the reservoir will help irrigate 78,000 ha (190,000 acres) of land. (en)
  • ГЕС Альпаслан 2 (тур. Alpaslan-2 Barajı) – гідроелектростанція, що споруджується на південному сході Туреччини. Знаходячись між ГЕС Альпаслан 1 (вище по течії) та ГЕС Yukarı Kaleköy, входитиме до складу каскаду на Мураті (лівий витік Євфрату). В межах проекту річку перекриють кам'яно-накидною греблею із глиняним ядром висотою 116 метрів (від фундаменту, висота від дна річки – 99 метрів), довжиною 844 метри (з урахуванням водоскидної секції 936 метрів) та товщиною по гребеню 12 метрів, яка потребуватиме 12,5 млн м3 матеріалу. На час будівництва вода відводиться за допомогою двох тунелів довжиною 0,88км та 0,9 км з діаметрами по 8 метрів. Гребля утримуватиме водосховище з площею поверхні від 35 км2 до 54,7 км2 та об’ємом 2097 млн м3, в т.ч. корисний об’єм 1099 млн м3, що забезпечуватиметься коливанням рівня у операційному режимі між позначками 1340 та 1368 метрів НРМ. Подачу води до пригреблевого машинного залу організують через тунелі, якими відводилась вода під час будівництва. Вони продовжуватимуться короткими (0,16 – 0,17 км) напірними водоводами діаметром по 6,3 метра, кожен з яких розгалужуватиметься на два діаметрами 4,5 метра і 2,4 метра. Основне обладнання станції становитимуть чотири турбіни типу Френсіс – дві потужністю по 115 МВт та дві по 31 МВт. При напорі від 84,5 до 97,9 метра вони повинні забезпечувати виробництво 734 млн кВт-год електроенергії на рік. Видача продукції відбуватиметься по ЛЕП, розрахованій на роботу під напругою 154 кВ. Введення електростанції в експлуатацію заплановане на 2020 рік. Окрім виробництва енергії, комплекс забезпечуватиме зрошення 68 тисяч гектарів земель. (uk)
dbo:buildingStartDate
  • 2012
dbo:buildingStartYear
  • 2012-01-01 (xsd:gYear)
dbo:country
dbo:description
  • Embankment, rock-fill with clay-core (en)
dbo:elevation
  • 1371.000000 (xsd:double)
dbo:height
  • 116.000000 (xsd:double)
dbo:lake
dbo:length
  • 844.000000 (xsd:double)
dbo:location
dbo:openingYear
  • 2021-01-01 (xsd:gYear)
dbo:operator
dbo:part
dbo:purpose
  • Power, irrigation
dbo:river
dbo:status
  • Operational
dbo:volume
  • 12450000.000000 (xsd:double)
dbo:wikiPageID
  • 39532555 (xsd:integer)
dbo:wikiPageLength
  • 6324 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1123229699 (xsd:integer)
dbo:wikiPageWikiLink
dbp:constructionBegan
  • 2012 (xsd:integer)
dbp:country
dbp:damCrosses
dbp:damType
  • Embankment, rock-fill with clay-core (en)
dbp:location
dbp:locationMap
  • Turkey (en)
dbp:name
  • Alpaslan-2 Dam (en)
dbp:nameOfficial
  • Alpaslan-2 Baraji (en)
dbp:opening
  • 2021 (xsd:integer)
dbp:operator
  • Energo-Pro (en)
dbp:owner
  • Enerjisa Power Generation Inc. (en)
dbp:plantAnnualGen
  • 850.0 (dbd:gigawattHour)
dbp:plantCapacity
  • 280.0 (dbd:megawatt)
dbp:plantCommission
  • 2020 (xsd:integer)
dbp:plantTurbines
  • 2 (xsd:integer)
dbp:purpose
  • Power, irrigation (en)
dbp:resName
  • Alpaslan-2 Reservoir (en)
dbp:spillwayType
  • Controlled chute, 6 radial gates (en)
dbp:status
  • Operational (en)
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
georss:point
  • 39.03527777777778 41.51833333333333
rdf:type
rdfs:comment
  • The Alpaslan-2 Dam is an embankment dam on the Murat River in Muş Province, Turkey. The dam is located about 32 km (20 mi) north of the provincial capital, Muş. The primary purpose of the dam is hydroelectric power production and irrigation. Its power station has an installed capacity of 280 MW, planning to deliver 850 GWh annually, and the reservoir will help irrigate 78,000 ha (190,000 acres) of land. (en)
  • ГЕС Альпаслан 2 (тур. Alpaslan-2 Barajı) – гідроелектростанція, що споруджується на південному сході Туреччини. Знаходячись між ГЕС Альпаслан 1 (вище по течії) та ГЕС Yukarı Kaleköy, входитиме до складу каскаду на Мураті (лівий витік Євфрату). Видача продукції відбуватиметься по ЛЕП, розрахованій на роботу під напругою 154 кВ. Введення електростанції в експлуатацію заплановане на 2020 рік. Окрім виробництва енергії, комплекс забезпечуватиме зрошення 68 тисяч гектарів земель. (uk)
rdfs:label
  • Alpaslan-2 Dam (en)
  • ГЕС Альпаслан 2 (uk)
owl:sameAs
geo:geometry
  • POINT(41.518333435059 39.035278320312)
geo:lat
  • 39.035278 (xsd:float)
geo:long
  • 41.518333 (xsd:float)
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
foaf:name
  • Alpaslan-2 Baraji (en)
  • Alpaslan-2 Dam (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License