[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

WO2014168460A1 - Method for controlling uplink power in multi-subframe scheduling - Google Patents

Method for controlling uplink power in multi-subframe scheduling Download PDF

Info

Publication number
WO2014168460A1
WO2014168460A1 PCT/KR2014/003199 KR2014003199W WO2014168460A1 WO 2014168460 A1 WO2014168460 A1 WO 2014168460A1 KR 2014003199 W KR2014003199 W KR 2014003199W WO 2014168460 A1 WO2014168460 A1 WO 2014168460A1
Authority
WO
WIPO (PCT)
Prior art keywords
subframe
pucch
power
scheduling instruction
pusch
Prior art date
Application number
PCT/KR2014/003199
Other languages
French (fr)
Inventor
Shichang Zhang
Yingyang Li
Chengjun Sun
Original Assignee
Samsung Electronics Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Samsung Electronics Co., Ltd. filed Critical Samsung Electronics Co., Ltd.
Priority to KR1020157032499A priority Critical patent/KR102171515B1/en
Priority to EP14782227.4A priority patent/EP2984880A4/en
Publication of WO2014168460A1 publication Critical patent/WO2014168460A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0053Allocation of signaling, i.e. of overhead other than pilot signals
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0053Allocation of signaling, i.e. of overhead other than pilot signals
    • H04L5/0055Physical resource allocation for ACK/NACK
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/0091Signaling for the administration of the divided path
    • H04L5/0092Indication of how the channel is divided
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/14Two-way operation using the same type of signal, i.e. duplex
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/30TPC using constraints in the total amount of available transmission power
    • H04W52/32TPC of broadcast or control channels
    • H04W52/325Power control of control or pilot channels
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/06TPC algorithms
    • H04W52/14Separate analysis of uplink or downlink
    • H04W52/146Uplink power control
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/18TPC being performed according to specific parameters
    • H04W52/22TPC being performed according to specific parameters taking into account previous information or commands
    • H04W52/228TPC being performed according to specific parameters taking into account previous information or commands using past power values or information
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Definitions

  • the present invention generally relates to power controlling technologies in a communication system, and more particularly, to a method for controlling Uplink (UL) power in a cell using a multi-subframe scheduling.
  • UL Uplink
  • a Long Term Evolution (LTE) system of the 3 rd Generation Partnership Project (3GPP) standardization organization may support two duplex modes, that is, Frequency-Division Duplexing (FDD) and Time-Division Duplexing (TDD).
  • FDD Frequency-Division Duplexing
  • TDD Time-Division Duplexing
  • length of each radio frame is 10ms.
  • Each radio frame may consist of 10 subframes, the length of which is 1ms.
  • the subframe may consist of two consecutive time slots, the length of which is 0.5ms. That is, a K th subframe includes time slots 2 k and (2 k +1).
  • Uplink and Downlink (UL-DL) transmissions may be implemented with two symmetric bands.
  • a UL subframe and a Downlink (DL) subframe may exist simultaneously.
  • UL-DL transmissions may be implemented with one band, which may be differentiated with time. That is, based on different configurations, different subframes in one system frame may be respectively defined as a UL subframe, a DL subrame, a special subframe (that is, a subframe consisting of a Downlink Pilot Time Slot (DwPTS), a Guard Period (GP) and an Uplink Pilot Time Slot (UpPTS)).
  • DwPTS Downlink Pilot Time Slot
  • GP Guard Period
  • UpPTS Uplink Pilot Time Slot
  • the UL-DL transmission may be implemented with scheduling of an evolved Node B (eNB).
  • eNB evolved Node B
  • an eNB may transmit a DL scheduling command for a certain UE via a Physical Downlink Control CHannel (PDCCH)/an Enhanced PDCCH (EPDCCH) in a DL subframe n.
  • the corresponding UE may receive Physical Downlink Shared CHannel (PDSCH) data in subframe n, based on the DL scheduling instruction of the PDCCH/EPDCCH data.
  • the corresponding UE may also feed back the Acknowledge (ACK)/Negative ACK (NACK) of the PDSCH data via a Physical Uplink Control CHannel (PUCCH) or Physical Uplink Shared CHannel (PUSCH) of an uplink subframe ( n+k ).
  • PUCCH Physical Uplink Control CHannel
  • PUSCH Physical Uplink Shared CHannel
  • Table 2 Values of k corresponding to different TDD UL-DL configurations
  • an eNB may transmit a UL scheduling command for a certain UE via a PDCCH/EPDCCH in the DL subframe n.
  • the corresponding UE may transmit PUSCH data in a UL subframe n+K PUSCH, based on the UL scheduling instruction in the PDCCH/EPDCCH data.
  • K PUSCH is always 4.
  • the value of K PUSCH is dependent on the UL-DL configurations of TDD, as shown in Table 3.
  • Table 3 Values of K PUSCH corresponding to different TDD UL-DL configurations
  • transmitting power of a UL subframe may be dynamically controlled by an eNB.
  • the eNB may inform a UE about UL power controlling parameters of static and semi-state, by using a broadcast message and a Radio Resource Control (RRC) layer message.
  • RRC Radio Resource Control
  • a UE may determine the transmitting power of the PUSCH, and/or PUCCH of a current subframe, by using these UL power controlling parameters and a power controlling instruction, which was received via the PDCCH/EPDCCH previously.
  • the power of PUSCH of subframe i in current cell c may be determined by using the following formula.
  • f c ( i ) f c ( i -1)+ ⁇ PUSCH, c ( i - K PUSCH ).
  • f c ( i ) ⁇ PUSCH, c ( i - K PUSCH ).
  • ⁇ PUSCH, c is a power controlling command value, which is in a UL scheduling instruction used for scheduling a UL subframe i, or in a Downlink Control Information (DCI) format 3/3 A of the UE.
  • DCI Downlink Control Information
  • the power of PUCCH of subframe i in current cell c may be determined by using the following formula.
  • [dBm] ⁇ PUCCH is a power controlling command value, which is in a DL scheduling instruction used for scheduling a DL subframe i-k m, or in the DCI format 3/3 A of the UE.
  • the values of M and k m are as shown in Table 4. The specific meanings of each physical parameter may be found by referring to 3GPP protocol 36.213.
  • Table 4 Indexes ⁇ k 0 , k 1 ,... k M -1 ⁇ of a binding relationship between a DL subframe and a UL subframe in a TDD system
  • multi-subframe scheduling technologies are becoming more and more focused.
  • one scheduling instruction may simultaneously schedule multiple DL subframes, or multiple UL subframes. That is, the scheduling instruction and scheduled subframe are no longer in a one to one correspondence.
  • resource overheads of scheduling instructions may be saved.
  • a UL subframe corresponding to the DL subframe may not be scheduled. The foregoing problem may be well solved, by using the multi-subframe scheduling technologies.
  • the power of PUSCH of a certain UL subframe may be controlled by a power controlling command, which is in a UL scheduling command of a corresponding DL subframe, or is in the DCI format 3/3 A of the UE.
  • the power of PUCCH of a certain UL subframe may be determined by a DL scheduling command, which is in a DL subframe bound with the UL subframe, or may be determined by a scheduling command in the DCI format 3/3A of the UE.
  • the foregoing corresponding relationship may be disorganized. Thus, it is necessary to re-design the power controlling method of the PUSCH and PUCCH, based on the characteristics of the multi-subframe scheduling.
  • an aspect of the present invention is to provide a method for controlling a UL power in a multi-subframe scheduling system, so as to reasonably control the transmitting power of PUSCH/PUCCH of a UL subframe.
  • a method for controlling a power of a PUSCH in a multi-subframe scheduling system includes receiving, by a UE, a multi-subframe UL scheduling instruction or PDCCH data of a DCI format 3/3 A of the UE, in a DL subframe where the multi-subframe UL scheduling instruction is transmitted, wherein the multi-subframe UL scheduling instruction or the PDCCH with DCI format 3/3 A includes a power controlling command of the PUSCH; and determining, by the UE, a transmitting power of the PUSCH of each UL subframe, which is scheduled by the multi-subframe UL scheduling instruction, based on a power controlling command value, and transmitting corresponding PUSCH data based on the transmitting power calculated.
  • a method for controlling a power of a PUCCH in a multi-subframe scheduling system includes receiving, by a UE, a multi-subframe DL scheduling instruction or PDCCH with DCI format 3/3 A of the UE, in a DL subframe where the multi-subframe DL scheduling instruction is transmitted, wherein the multi-subframe DL scheduling instruction or the PDCCH with DCI format 3/3 A carries a power controlling instruction of the PUCCH, which is used for feeding back ACK/ NACK information of scheduled DL subframes; and determining, by the UE, a transmitting power of the PUCCH, which corresponds to each DL subframe scheduled by the multi-subframe DL scheduling instruction, and transmitting corresponding PUCCH data based on the transmitting power calculated.
  • FIG.1 is a schematic diagram illustrating a single-subframe scheduling and a multi-subframe scheduling
  • FIG.2 is a flowchart illustrating a first embodiment of the present invention
  • FIG.3 is a flowchart illustrating a second embodiment of the present invention.
  • FIG.4 is a flowchart illustrating a third embodiment of the present invention.
  • FIG.5 is a flowchart illustrating a fourth embodiment of the present invention.
  • the present invention is described by referring mainly to embodiments thereof.
  • numerous specific details are set forth in order to provide a thorough understanding of the present invention. It will be readily apparent however, that the present invention may be practiced without limitation to these specific details. In other instances, some methods and structures have not been described in detail so as not to unnecessarily obscure the present invention.
  • the term “includes” means includes but not limited to, the term “including” means including but not limited to.
  • the term “based on” means based at least in part on.
  • the terms “a” and “an” are intended to denote at least one of a particular element.
  • a multi-subframe scheduling system since a corresponding relationship between a UL/DL scheduling command and a scheduled UL/DL subframe is changed, the power controlling method for the PUSCH and PUCCH in the existing standard is no longer applicable.
  • the power controlling method for the PUSCH and PUCCH in the existing standard is no longer applicable.
  • the basic idea of the present invention is as follows.
  • a corresponding relationship for a power controlling instruction of the PUSCH/PUCCH of a UL subframe is reset.
  • the number of bits in a power controlling field of a scheduling instruction is increased, and a corresponding relationship between a power controlling bit and the PUSCH/PUCCH of a UL subframe is re-defined, so as to guarantee that the PUSCH and PUCCH of any UL subframe may have a corresponding power controlling instruction.
  • examples of the present invention provide 4 kinds of adjustment modes for controlling a power of a UL signal.
  • the 4 kinds of methods for controlling the power of a UL signal may include 2 power controlling methods regarding the PUSCH and 2 power controlling methods regarding the PUCCH, which will be described with reference to the following specific examples.
  • the first and third examples introduce the power controlling method regarding the PUSCH.
  • the second and fourth examples introduce the power controlling method regarding the PUCCH.
  • a multi-subframe UL scheduling instruction and number of power controlling bits in a DCI format 3/3 A of a UE are respectively consistent with definitions in LTE release 11.
  • the effective power controlling about all of the simultaneously scheduled PUSCHs may be implemented in a multi-subframe scheduling, by re-defining a corresponding relationship between a PUSCH and a UL power controlling command, and allocating a power controlling instruction for the PUSCHs of multiple UL subframes, which are simultaneously scheduled in the multi-subframe scheduling.
  • FIG.2 is a flowchart illustrating a method for controlling a power of a PUSCH, in accordance with the first example of the present invention.
  • a UE receives a multi-subframe UL scheduling instruction, or PDCCH data in the DCI format 3/3 A of the UE, in a DL subframe n located by the multi-subframe UL scheduling instruction.
  • the position of the DL subframe, which is located by the multi-subframe UL scheduling instruction may be defined in advance by the standard, or may be indicated by high-level or physical layer signaling.
  • the effective range of a scheduling instruction is V UL subframes. Positions of the V UL subframes may be defined in advance by the standard, or indicated by high-level or physical layer signaling.
  • the number N of UL subframes, which are actually scheduled by the scheduling instruction may be less than or equal to V. That is, the scheduling instruction may schedule some UL subframes of the V UL subframes. At this time, positions of the subframes, which are actually scheduled, may be indicated by bit information in the scheduling instruction or other physical layer signaling.
  • the effective range of the power controlling command which is included in the UL scheduling instruction and the PDCCH of the DCI format 3/3 A, may be the foregoing V UL subframes.
  • a subframe interval between a DL subframe and a UL sufbrame is a set ⁇ r 0 , r 1 , ... r V -1 ⁇ , in which the DL subframe is the one where the UL scheduling instruction or the DCI format 3/3 A is transmitted.
  • the effective range of the power controlling command which is included in the UL scheduling instruction and the PDCCH of the DCI format 3/3A, may be the N UL subframes, which are actually scheduled.
  • the subframe interval between the DL subframe and a UL subframe is a set ⁇ r 0 , r 1 , ... r N -1 ⁇ , in which the DL subframe is the one where the UL scheduling instruction or the DCI format 3/3 A is transmitted.
  • the number of power controlling bits included in the multi-subframe UL scheduling instruction and the DCI format 3 for the UE is still 2.
  • the number of power controlling bits in the DCI format 3A is 1.
  • the UE determines the transmitting power of the scheduled PUSCH, based on the power controlling command in the multi-subframe UL scheduling instruction or in the DCI format 3/3A of the UE.
  • the transmitting power of PUSCH may be determined by the first scheduled UL subframe based on the power controlling instruction A in the prior art.
  • the PUSCH power of another scheduled UL subframes is the same as the last PUSCH power of the same UL subframe.
  • the transmitting power of the PUSCH in a UL subframe u may be determined by the following formula.
  • P PUSCH , c ( u ) represents the transmitting power of the PUSCH in a UL subframe u of serving cell c of the UE.
  • P CMAX , c ( u ) represents the maximum transmitting power in UL subframe u of serving cell c of the UE.
  • M PUSCH , c ( u ) represents number of Physical Resource Blocks (PRBs), which are scheduled for the UE by an eNB in the UL subframe u of serving cell c , by using the multi-subframe UL scheduling command.
  • PRBs Physical Resource Blocks
  • P O_PUSCH , c ( j ) represents an open-loop basic operating point of the PUSCH in the serving cell c of the UE, which may be configured by the eNB with high-level signaling, and the value of j may be dependent on the scheduling mode of the PUSCH.
  • ⁇ c ( j ) represents a path loss compensation coefficient
  • PL c represents a path loss
  • c ( u ) represents a power compensation for a controlling bit, which is transmitted within the PUSCH, such as a Channel Quality Indicator (CQI).
  • CQI Channel Quality Indicator
  • f c ( u ) represents a closed-loop power adjustment factor of the PUSCH.
  • ⁇ PUSCH,c ( u-r 0 ) is a power controlling command value, which is in a UL scheduling instruction of a DL subframe u-r 0, or in the DCI format 3/3 A of the UE.
  • f c ( u ) ⁇ PUSCH,c ( u-r 0 ).
  • ⁇ PUSCH, c ( u-r 0 ) represents a power controlling command value in the UL scheduling instruction or in the DCI format 3.
  • ⁇ PUSCH,c ( u-r 0 ) a power controlling command value in the UL scheduling instruction or in the DCI format 3.
  • the power controlling command in the DL scheduling command is employed.
  • the method for controlling the UL power in the above example may be terminated.
  • the effective ranges of multiple scheduling instructions includes a UL subframe u
  • the UL subframe u may adjust the transmitting power of the PUSCH, based on the power controlling command in the last UL scheduling instruction and the effective range r of the power controlling command.
  • the number of power controlling bits, which are in a multi-subframe DL scheduling instruction and DCI format 3/3 A of the UE, is consistent with the definition in LTE release 11.
  • a power controlling instruction may be allocated for the feedback of the PUCCH in the multi-subframe DL scheduling, by re-defining a corresponding relationship between the PUCCH and the UL power controlling command.
  • FIG.3 is a flowchart illustrating a method for controlling a PUCCH power, in accordance with the second example of the present invention.
  • a UE receives PDCCH data, which is about a multi-frame DL scheduling instruction or the DCI format 3/3 A of the UE, in a DL subframe n located by the multi-subframe DL scheduling instruction.
  • the position of the DL subframe, which is located by the multi-subframe DL scheduling instruction may be defined by the standard in advance, or may be indicated by high-level or physical layer signaling.
  • the effective range of a scheduling instruction may be V DL subframes. Positions of the V DL subframes may be defined by the standard in advance, or may be indicated by high-level or physical layer signaling.
  • the number N of DL subframes, which are actually scheduled by the scheduling instruction may be less than or equal to V. That is, the scheduling instruction may schedule some DL subframes of the V DL subframes. At this time, positions of the N DL subframes actually scheduled may be indicated by bit information in the scheduling instruction, or in another physical layer signaling.
  • the effective range of the power controlling command which is included in the DL scheduling instruction and in the PDCCH of DCI format 3/3 A, may be the foregoing V DL subframes.
  • a subframe interval between a DL subframe and V DL subframes is a set r : ⁇ r 0 , r 1 , ... r V -1 ⁇ .
  • the DL subframe is the one where DL scheduling instruction or the DCI format 3/3 A is transmitted.
  • the effective range of the power controlling command which is included in the DL scheduling instruction and in the PDCCH of the DCI format 3/3 A, may be the N DL subframes actually scheduled.
  • the subframe interval between the DL subframe and the N DL subframes is a set r : ⁇ r 0 , r 1 , ... r N -1 ⁇ .
  • number of power controlling bits for the UE which are in the multi-subframe DL scheduling instruction and DCI format 3, is still 2.
  • the number of power controlling bits in the DCI format 3A is 1.
  • the UE determines the transmitting power of the PUCCH of a corresponding UL subframe, based on a power controlling command in the multi-subframe DL scheduling instruction or in the DCI format 3/3 A of the UE.
  • the transmitting power of the PUCCH of a UL subframe u may be determined by using the following formula.
  • P PUCCH ( u ) represents the transmitting power of the PUCCH in a UL subframe u of the UE.
  • P CMAX , c ( u ) represents the maximum transmitting power in the UL subframe u of serving cell c of the UE.
  • h ( n CQI ,n HARQ ,n SR ) is dependent on the format of the PUCCH, which is a function value determined by the current PUCCH format, as well as a bit number of CQI, Hybrid Automatic Repeat reQuest (HARQ) and Scheduling Request (SR) included in the current PUCCH.
  • HARQ Hybrid Automatic Repeat reQuest
  • SR Scheduling Request
  • P O_PUCCH is an open-loop basic operating point of the PUCCH of the UE, which may be configured by an eNB with high-levelsignaling.
  • PL c represents a path loss.
  • ⁇ F_PUCCH ( F ) represents a power adjustment factor for different PUCCH formats, in which F represents a different PUCCH format.
  • ⁇ TxD ( F ') represents a power adjustment factor for different PUCCH formats, when the PUCCH uses space to obtain a diversity, in which F ' represents a different PUCCH format.
  • g ( u ) represents a closed-loop power adjustment factor of the PUCCH. The specific meaning of each foregoing parameter may be found by referring to 3GPP protocol 36.213.
  • the transmitting power of the PUCCH may be determined based on the power controlling instruction A in the prior art.
  • the transmitting power of a PUCCH corresponding to another scheduled DL subframe may be the same as the previous transmitting power of the PUCCH.
  • ⁇ PUCCH ( n ) represents a power controlling command value in the multi-subframe DL scheduling instruction, or in the DCI format 3/3 A of the UE in subframe n.
  • ( n + r 0 ) may represent a first DL subframe of the foregoing V DL subframes, or represent the first DL subframe of the foregoing N DL subframes actually scheduled.
  • the value of M may be re-defined by the standard, the value of M corresponding to the TDD system may be re-defined by the standard or use the M value shown in Table 4)
  • DL subframes fed back by the UL subframe u the multi-subframe scheduling instruction used for scheduling these DL subframes is determined, and DL subframes m 0 ,..., m T -1 located by the PDCCH data in DCI format 3/3 A of the UE in the M DL subframes.
  • the sum of the power controlling command values carried by the DL subframes m 0 ,..., m T -1 is calculated to obtain an intermediate result, and the result of g(u-1) is added to the intermediate result to obtain g(u) .
  • ⁇ PUCCH ( m t ) represents a power controlling command value in the multi-subframe DL scheduling instruction of subframe m t, or in the DCI format 3/3 A of the UE in subframe m t .
  • the method for controlling the UL power in the example may be terminated.
  • the effective power controlling of all of the simultaneously scheduled PUSCHs in a multi-subframe scheduling may be implemented, by increasing number of power controlling bits within a multi-subframe UL power controlling command, and matching different power controlling bits to the PUSCHs of multiple UL subframes simultaneously scheduled.
  • FIG.4 is a flowchart illustrating a method for controlling PUSCH power, in accordance with a third example of the present invention.
  • a UE receives a multi-subframe UL scheduling instruction in a DL subframe n , which is located by the multi-subframe UL scheduling instruction.
  • the position of the DL subframe, which is located by the multi-subframe UL scheduling instruction may be defined in advance by the standard, or may be indicated by high-level or physical layer signaling.
  • the effective range of the scheduling instruction may be V UL subframes. Positions of the V UL subframes may be defined by the standard in advance, or may be indicated by high-level or physical layer signaling.
  • the number N of UL subframes actually scheduled by the scheduling instruction may be less than or equal to V. That is, the scheduling instruction may schedule some UL subframes of the V UL subframes. At this time, positions of the subframes actually scheduled may be indicated by bit information in the scheduling information, or within another physical layer signaling.
  • the effective range of the power controlling command in the UL scheduling instruction, and within the PDCCH data of the DCI format 3/3 A may be the foregoing V UL subframes.
  • a subframe interval between a DL subframe and a UL subframe may be a set r : ⁇ r 0 , r 1 , ... r V -1 ⁇ , in which the DL subframe is the one where the UL scheduling instruction or the DCI format 3/3 A is transmitted.
  • the effective ranges of the power controlling command in the UL scheduling instruction and within the PDCCH data of the DCI format 3/3 A may be the subframes actually scheduled.
  • the subframe interval between the DL subframe and a UL subframe is a set r : ⁇ r 0 , r 1 , ... r N -1 ⁇ , in which the DL subframe is the one where the UL scheduling instruction or the DCI format 3/3 A is transmitted.
  • the number of power controlling bits in the multi-subframe UL scheduling instruction is 2 V or 2 N.
  • step 402 the UE adjusts the transmitting power of the scheduled PUSCH, based on the multi-subframe UL scheduling instruction.
  • the transmitting power of the PUSCH in a UL subframe ( n + r i ) may be determined by the following formula, in which r i ⁇ r 0 , r 1 , ... r V -1 ⁇ or ⁇ r 0 , r 1 , ... r N -1 ⁇ .
  • f c ( n + r i ) f c ( n + r i - 1)+ ⁇ PUSCH,c ( n i ).
  • ⁇ PUSCH, c ( n i ) represents a power controlling command value indicated by power controlling bits 2 i , 2 i +1 in the UL scheduling instruction.
  • f c ( n + r 0 ) ⁇ PUSCH,c ( n i ).
  • ⁇ PUSCH,c ( n i ) represents the power controlling command value indicated by power controlling bits 2 i , 2 i +1,which are in the UL scheduling instruction or in the DCI format 3.
  • the method for controlling the UL power in the example may be terminated.
  • the UL subframe u may adjust the transmitting power of PUSCH, based on the power controlling command in the previous UL scheduling instruction and the effective range r of the foregoing power controlling command.
  • a power controlling instruction is allocated for the feedback of the PUCCH in a multi-subframe DL scheduling, by increasing number of power controlling bits in a multi-subframe DL scheduling instruction, and respectively matching different power controlling bits with PUCCHs, which correspond to the multiple DL subframes simultaneously scheduled.
  • FIG.5 is a flowchart illustrating a method for controlling PUCCH power, in accordance with a fourth example of the present invention.
  • a UE receives a multi-subframe DL scheduling instruction in a DL subframe n , which is located by the multi-subframe DL scheduling instruction.
  • the position of the DL subframe, which is located by the multi-subframe DL scheduling instruction may be defined by the standard in advance, or may be indicated by high-level or physical layer signaling.
  • the effective range of the scheduling instruction may be V DL subframes. Positions of the V DL subframes may be defined by the standard in advance, or may be indicated by high-level or physical layer signaling.
  • the number N of DL subframes actually scheduled by the scheduling instruction may be less than or equal to V. That is, the scheduling instruction may schedule some DL subframes of the V DL subframes. At this time, positions of the N DL subframes actually scheduled may be indicated by bit information in the scheduling instruction, or within another physical layer signaling.
  • the effective range of a power controlling command which is included in a DL scheduling instruction and the PDCCH data of the DCI format 3/3 A, may be the foregoing V DL subframes.
  • a subframe interval between a DL subframe and V DL subframes is a set r : ⁇ r 0 , r 1 , ... r V -1 ⁇ , in which the DL subframe is the one where the DL scheduling instruction or the DCI format 3/3 A is transmitted.
  • the effective range of the power controlling command which is included in the DL scheduling instruction and the PDCCH data of the DCI format 3/3 A, may be the N DL subframes actually scheduled.
  • the subframe interval between the DL subframe and N DL subframes is a set r : ⁇ r 0 , r 1 , ... r N -1 ⁇ , in which the DL subframe is the one where the DL scheduling instruction or the DCI format 3/3 A is transmitted.
  • the number of power controlling bits in the multi-subframe DL scheduling instruction is 2 V or 2 N.
  • Power controlling bits 2i and 2i+1 may correspond to the DL subframes n + r i.
  • step 502 the UE adjusts the transmitting power of the PUCCH of a corresponding UL subframe, based on the power controlling command in the multi-subframe DL scheduling instruction.
  • the transmitting power of the PUCCH of a UL subframe u may be determined by the following formula.
  • ⁇ PUCCH ( n + r i ) represents a power controlling command value corresponding to subframe n + r i in the multi-subframe DL scheduling instruction.
  • ⁇ PUCCH ( u-k m ) represents a power controlling command value corresponding to subframe u - k m in the multi-subframe DL scheduling instruction.
  • M represents the number of DL subframes bound with the UL subframe u.
  • value of M may be re-defined by the standard.
  • value of M may be re-defined by the standard or is as shown in Table 4.
  • a UE may adjust the size of an open-loop basic operating point of conflicted UL subframes, by enabling an eNB to transmit a specific parameter about the open-loop basic operating point of a UE of the conflicted UL subframes. Subsequently, power controlling may be implemented more reasonably. Special interference and noise effects suffered by a UL subframe may be well compensated.

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

A method for controlling an uplink (UL) power in a multi-subframe scheduling system is provided. The method includes receiving by a User Equipment (UE), a multi-subframe uplink (UL) scheduling instruction or Physical Downlink Control Channel CHannel (PDCCH) data of a Downlink Control Information (DCI) format 3/3 A of the UE, in a Downlink (DL) subframe where the multi-subframe UL scheduling instruction is transmitted, wherein the multi-subframe UL scheduling instruction or the PDCCH data with DCI format 3/3 A comprises a power controlling command of the PUSCH and determining, by the UE, a transmitting power of the PUSCH of each UL subframe, which is scheduled by the multi-subframe UL scheduling instruction, based on a power controlling command value, and transmitting corresponding PUSCH data based on the transmitting power calculated.

Description

METHOD FOR CONTROLLING UPLINK POWER IN MULTI-SUBFRAME SCHEDULING
The present invention generally relates to power controlling technologies in a communication system, and more particularly, to a method for controlling Uplink (UL) power in a cell using a multi-subframe scheduling.
A Long Term Evolution (LTE) system of the 3rd Generation Partnership Project (3GPP) standardization organization may support two duplex modes, that is, Frequency-Division Duplexing (FDD) and Time-Division Duplexing (TDD). For the foregoing two modes, length of each radio frame is 10ms. Each radio frame may consist of 10 subframes, the length of which is 1ms. The subframe may consist of two consecutive time slots, the length of which is 0.5ms. That is, a Kthsubframe includes time slots 2k and (2k+1).
For an LTE FDD system, Uplink and Downlink (UL-DL) transmissions may be implemented with two symmetric bands. Thus, at each moment, a UL subframe and a Downlink (DL) subframe may exist simultaneously. For an LTE TDD system, UL-DL transmissions may be implemented with one band, which may be differentiated with time. That is, based on different configurations, different subframes in one system frame may be respectively defined as a UL subframe, a DL subrame, a special subframe (that is, a subframe consisting of a Downlink Pilot Time Slot (DwPTS), a Guard Period (GP) and an Uplink Pilot Time Slot (UpPTS)). The existing LTE TDD system may support 7 kinds of UL-DL configurations, as shown in Table 1. In Table 1, “D” represents a DL subframe, “U” represents a UL subframe, and “S” represents a special subframe.
Table 1: LTE TDD UL-DL configurations
Table 1
configuration sequence number conversion point period subframe number
0 1 2 3 4 5 6 7 8 9
0 5 ms D S U U U D S U U U
1 5 ms D S U U D D S U U D
2 5 ms D S U D D D S U D D
3 10 ms D S U U U D D D D D
4 10 ms D S U U D D D D D D
5 10 ms D S U D D D D D D D
6 10 ms D S U U U D S U U D
In an LTE system, the UL-DL transmission may be implemented with scheduling of an evolved Node B (eNB).
For a DL transmission, an eNB may transmit a DL scheduling command for a certain UE via a Physical Downlink Control CHannel (PDCCH)/an Enhanced PDCCH (EPDCCH) in a DL subframe n. The corresponding UE may receive Physical Downlink Shared CHannel (PDSCH) data in subframe n, based on the DL scheduling instruction of the PDCCH/EPDCCH data. The corresponding UE may also feed back the Acknowledge (ACK)/Negative ACK (NACK) of the PDSCH data via a Physical Uplink Control CHannel (PUCCH) or Physical Uplink Shared CHannel (PUSCH) of an uplink subframe (n+k). For an FDD system, the value of k is always 4. For a TDD system, value of k is dependent on the UL-DL configurations of the TDD, as shown in Table 2.
Table 2: Values of k corresponding to different TDD UL-DL configurations
Table 2
configuration sequence number subframe number n
0 1 2 3 4 5 6 7 8 9
0 4 6 - - - 4 6 - - -
1 7 6 - - - 7 6 - 4 4
2 7 6 - 4 8 7 6 - 4 8
3 4 11 - - - 7 6 6 5 5
4 12 11 - - 8 7 7 6 5 4
5 12 11 - 9 8 7 6 5 4 13
6 7 7 - - - 7 7 - - 5
For the UL transmission, an eNB may transmit a UL scheduling command for a certain UE via a PDCCH/EPDCCH in the DL subframe n. The corresponding UE may transmit PUSCH data in a UL subframe n+K PUSCH, based on the UL scheduling instruction in the PDCCH/EPDCCH data. For an FDD system, the value of K PUSCH is always 4. For a TDD system, the value of K PUSCH is dependent on the UL-DL configurations of TDD, as shown in Table 3.
Table 3: Values of K PUSCH corresponding to different TDD UL-DL configurations
Table 3
configuration sequence number DL subframe index n
0 1 2 3 4 5 6 7 8 9
0 4,7 6,7 4,7 6,7
1 6 4 6 4
2 4 4
3 4 4 4
4 4 4
5 4
6 7 7 7 7 5
In the existing LTE/LTE-Advanced (LTE-A) system, transmitting power of a UL subframe may be dynamically controlled by an eNB. The eNB may inform a UE about UL power controlling parameters of static and semi-state, by using a broadcast message and a Radio Resource Control (RRC) layer message. In each UL subframe, a UE may determine the transmitting power of the PUSCH, and/or PUCCH of a current subframe, by using these UL power controlling parameters and a power controlling instruction, which was received via the PDCCH/EPDCCH previously.
For example, when PUSCH data and PUCCH data are not transmitted via a same UL subframe, the power of PUSCH of subframe i in current cell c may be determined by using the following formula.
Figure PCTKR2014003199-appb-I000001
[dBm]
When accumulation is active, f c (i) = f c (i-1)+δ PUSCH, c (i-K PUSCH). When the accumulation is inactive, f c (i) = δ PUSCH, c (i-K PUSCH). δ PUSCH, c is a power controlling command value, which is in a UL scheduling instruction used for scheduling a UL subframe i, or in a Downlink Control Information (DCI) format 3/3 A of the UE. The specific meanings of other physical parameters may be found by referring to 3GPP protocol 36.213.
The power of PUCCH of subframe i in current cell c may be determined by using the following formula.
Figure PCTKR2014003199-appb-I000002
[dBm]
Figure PCTKR2014003199-appb-I000003
δ PUCCH is a power controlling command value, which is in a DL scheduling instruction used for scheduling a DL subframe i-k m, or in the DCI format 3/3 A of the UE. For the FDD system, M=1,k 0=4. For the TDD system, the values of M and k m are as shown in Table 4. The specific meanings of each physical parameter may be found by referring to 3GPP protocol 36.213.
Table 4: Indexes {k 0,k 1,…k M -1} of a binding relationship between a DL subframe and a UL subframe in a TDD system
Table 4
configuration sequence number subframe number n
0 1 2 3 4 5 6 7 8 9
0 - - 6 - 4 - - 6 - 4
1 - - 7, 6 4 - - - 7, 6 4 -
2 - - 8, 7, 4, 6 - - - - 8, 7, 4, 6 - -
3 - - 7, 6, 11 6, 5 5, 4 - - - - -
4 - - 12, 8, 7, 11 6, 5, 4, 7 - - - - - -
5 - - 13, 12, 9, 8, 7, 5, 4, 11, 6 - - - - - - -
6 - - 7 7 5 - - 7 7 -
Accompanying the increasing data rate requirements put forward by users, in LTE-A, multi-subframe scheduling technologies are becoming more and more focused. In the multi-subframe scheduling, one scheduling instruction may simultaneously schedule multiple DL subframes, or multiple UL subframes. That is, the scheduling instruction and scheduled subframe are no longer in a one to one correspondence. As shown in FIG.1, by using the multi-subframe scheduling technologies, resource overheads of scheduling instructions may be saved. In addition, since there is no sufficient resource for some special subframes to transmit a UL scheduling command, a UL subframe corresponding to the DL subframe may not be scheduled. The foregoing problem may be well solved, by using the multi-subframe scheduling technologies.
However, a new problem about UL power controlling may be introduced by the multi-subframe scheduling. As mentioned above, based on a definition of the existing standard, the power of PUSCH of a certain UL subframe may be controlled by a power controlling command, which is in a UL scheduling command of a corresponding DL subframe, or is in the DCI format 3/3 A of the UE. The power of PUCCH of a certain UL subframe may be determined by a DL scheduling command, which is in a DL subframe bound with the UL subframe, or may be determined by a scheduling command in the DCI format 3/3A of the UE. However, in the multi-subframe scheduling, the foregoing corresponding relationship may be disorganized. Thus, it is necessary to re-design the power controlling method of the PUSCH and PUCCH, based on the characteristics of the multi-subframe scheduling.
Based on foregoing analysis, it can be seen that a new problem regarding power controlling of PUSCH and PUCCH may be brought about by multi-subframe scheduling. At present, there is no effective method to solve this problem.
The present invention has been made to address at least the problems and disadvantages described above, and to provide at least the advantages described below. Accordingly, an aspect of the present invention is to provide a method for controlling a UL power in a multi-subframe scheduling system, so as to reasonably control the transmitting power of PUSCH/PUCCH of a UL subframe.
According to an aspect of the present invention, a method for controlling a power of a PUSCH in a multi-subframe scheduling system is provided. The method includes receiving, by a UE, a multi-subframe UL scheduling instruction or PDCCH data of a DCI format 3/3 A of the UE, in a DL subframe where the multi-subframe UL scheduling instruction is transmitted, wherein the multi-subframe UL scheduling instruction or the PDCCH with DCI format 3/3 A includes a power controlling command of the PUSCH; and determining, by the UE, a transmitting power of the PUSCH of each UL subframe, which is scheduled by the multi-subframe UL scheduling instruction, based on a power controlling command value, and transmitting corresponding PUSCH data based on the transmitting power calculated.
According to another aspect of the present invention, a method for controlling a power of a PUCCH in a multi-subframe scheduling system is provided. The method includes receiving, by a UE, a multi-subframe DL scheduling instruction or PDCCH with DCI format 3/3 A of the UE, in a DL subframe where the multi-subframe DL scheduling instruction is transmitted, wherein the multi-subframe DL scheduling instruction or the PDCCH with DCI format 3/3 A carries a power controlling instruction of the PUCCH, which is used for feeding back ACK/ NACK information of scheduled DL subframes; and determining, by the UE, a transmitting power of the PUCCH, which corresponds to each DL subframe scheduled by the multi-subframe DL scheduling instruction, and transmitting corresponding PUCCH data based on the transmitting power calculated.
FIG.1 is a schematic diagram illustrating a single-subframe scheduling and a multi-subframe scheduling;
FIG.2 is a flowchart illustrating a first embodiment of the present invention;
FIG.3 is a flowchart illustrating a second embodiment of the present invention;
FIG.4 is a flowchart illustrating a third embodiment of the present invention; and
FIG.5 is a flowchart illustrating a fourth embodiment of the present invention.
For simplicity and illustrative purposes, the present invention is described by referring mainly to embodiments thereof. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. It will be readily apparent however, that the present invention may be practiced without limitation to these specific details. In other instances, some methods and structures have not been described in detail so as not to unnecessarily obscure the present invention. As used throughout the present description, the term “includes” means includes but not limited to, the term “including” means including but not limited to. The term “based on” means based at least in part on. In addition, the terms “a” and “an” are intended to denote at least one of a particular element.
In a multi-subframe scheduling system, since a corresponding relationship between a UL/DL scheduling command and a scheduled UL/DL subframe is changed, the power controlling method for the PUSCH and PUCCH in the existing standard is no longer applicable. To effectively control a UL transmitting power of a UE, it is necessary to re-design a method for controlling a UL power, based on characteristics of a multi-subframe scheduling system.
The basic idea of the present invention is as follows. In a multi-subframe scheduling system, a corresponding relationship for a power controlling instruction of the PUSCH/PUCCH of a UL subframe is reset. Alternatively, in the multi-subframe scheduling, the number of bits in a power controlling field of a scheduling instruction is increased, and a corresponding relationship between a power controlling bit and the PUSCH/PUCCH of a UL subframe is re-defined, so as to guarantee that the PUSCH and PUCCH of any UL subframe may have a corresponding power controlling instruction.
Strictly speaking, examples of the present invention provide 4 kinds of adjustment modes for controlling a power of a UL signal. The 4 kinds of methods for controlling the power of a UL signal may include 2 power controlling methods regarding the PUSCH and 2 power controlling methods regarding the PUCCH, which will be described with reference to the following specific examples. The first and third examples introduce the power controlling method regarding the PUSCH. The second and fourth examples introduce the power controlling method regarding the PUCCH.
First Example
In this example, a multi-subframe UL scheduling instruction and number of power controlling bits in a DCI format 3/3 A of a UE are respectively consistent with definitions in LTE release 11. The effective power controlling about all of the simultaneously scheduled PUSCHs may be implemented in a multi-subframe scheduling, by re-defining a corresponding relationship between a PUSCH and a UL power controlling command, and allocating a power controlling instruction for the PUSCHs of multiple UL subframes, which are simultaneously scheduled in the multi-subframe scheduling.
FIG.2 is a flowchart illustrating a method for controlling a power of a PUSCH, in accordance with the first example of the present invention.
In step 201, a UE receives a multi-subframe UL scheduling instruction, or PDCCH data in the DCI format 3/3 A of the UE, in a DL subframe n located by the multi-subframe UL scheduling instruction.
The position of the DL subframe, which is located by the multi-subframe UL scheduling instruction, may be defined in advance by the standard, or may be indicated by high-level or physical layer signaling. The effective range of a scheduling instruction is V UL subframes. Positions of the V UL subframes may be defined in advance by the standard, or indicated by high-level or physical layer signaling. The number N of UL subframes, which are actually scheduled by the scheduling instruction, may be less than or equal to V. That is, the scheduling instruction may schedule some UL subframes of the V UL subframes. At this time, positions of the subframes, which are actually scheduled, may be indicated by bit information in the scheduling instruction or other physical layer signaling.
The effective range of the power controlling command, which is included in the UL scheduling instruction and the PDCCH of the DCI format 3/3 A, may be the foregoing V UL subframes. At this time, a subframe interval between a DL subframe and a UL sufbrame is a set {r 0, r 1, …r V -1}, in which the DL subframe is the one where the UL scheduling instruction or the DCI format 3/3 A is transmitted. Alternatively, the effective range of the power controlling command, which is included in the UL scheduling instruction and the PDCCH of the DCI format 3/3A, may be the N UL subframes, which are actually scheduled. At this time, the subframe interval between the DL subframe and a UL subframe is a set {r 0, r 1, …r N -1}, in which the DL subframe is the one where the UL scheduling instruction or the DCI format 3/3 A is transmitted.
At this time, the number of power controlling bits included in the multi-subframe UL scheduling instruction and the DCI format 3 for the UE, is still 2. The number of power controlling bits in the DCI format 3A is 1.
In step 202, the UE determines the transmitting power of the scheduled PUSCH, based on the power controlling command in the multi-subframe UL scheduling instruction or in the DCI format 3/3A of the UE.
In this example, regarding the power controlling instruction A, which is included in the multi-subframe UL scheduling instruction or in the DCI format 3/3 A of the UE, when transmitting multiple UL subframes, which are scheduled by the multi-subframe UL scheduling instruction, the transmitting power of PUSCH may be determined by the first scheduled UL subframe based on the power controlling instruction A in the prior art. The PUSCH power of another scheduled UL subframes is the same as the last PUSCH power of the same UL subframe.
Specifically, the transmitting power of the PUSCH in a UL subframe u may be determined by the following formula.
Figure PCTKR2014003199-appb-I000004
[dBm]
In the above formula, P PUSCH,c(u) represents the transmitting power of the PUSCH in a UL subframe u of serving cell c of the UE. P CMAX,c(u) represents the maximum transmitting power in UL subframe u of serving cell c of the UE.M PUSCH,c(u) represents number of Physical Resource Blocks (PRBs), which are scheduled for the UE by an eNB in the UL subframe u of serving cell c, by using the multi-subframe UL scheduling command. P O_PUSCH,c(j) represents an open-loop basic operating point of the PUSCH in the serving cell c of the UE, which may be configured by the eNB with high-level signaling, and the value of j may be dependent on the scheduling mode of the PUSCH. α c (j) represents a path loss compensation coefficient, PL c represents a path loss, and TF , c (u) represents a power compensation for a controlling bit, which is transmitted within the PUSCH, such as a Channel Quality Indicator (CQI). f c (u) represents a closed-loop power adjustment factor of the PUSCH.
Based on the definition of the effective range of the power controlling command in step 201, under the circumstances that the effective range of the power controlling command is the foregoing V UL subframes, and the accumulation is active, when u= n+r 0 f c (u) = f c (u-1)+δ PUSCH, c (u-r 0 ). When n+r 0 <un+r V-1 f c (u) = f c (u-1). δ PUSCH,c (u-r 0 ) is a power controlling command value, which is in a UL scheduling instruction of a DL subframe u-r 0, or in the DCI format 3/3 A of the UE. Under the circumstances that the accumulation is inactive, when u= n+r 0 f c (u) = δ PUSCH,c (u-r 0 ). When n+r 0 <un+r V-1 , f c (u) = f c (u-1). δ PUSCH, c (u-r 0 ) represents a power controlling command value in the UL scheduling instruction or in the DCI format 3.
Under the circumstances that the effective range of the power controlling command is the foregoing N UL subframes, when the accumulation is active and u= n+r 0 f c (u) = f c (u-1)+δ PUSCH, c (u-r 0 ). When n+r 0 <un+r V-1 f c (u) = f c (u-1). δ PUSCH,c (u-r 0 ) represents a power controlling command value in the UL scheduling instruction of a DL subframe u-r 0, or in the DCI format 3/3 A of the UE. Under the circumstances that the accumulation is inactive, when u= n+r 0 f c (u) = δ PUSCH,c (u-r 0 ). When n+r 0 <un+r N-1 f c (u) = f c (u-1). δ PUSCH, c (u-r 0 ) represents a power controlling command value in the UL scheduling instruction or in the DCI format 3.
When the PDCCH data in the UL scheduling command and the DCI format 3/3 A simultaneously occur in one subframe, the power controlling command in the DL scheduling command is employed.
At this point, the method for controlling the UL power in the above example may be terminated. When the effective ranges of multiple scheduling instructions (multi-subframe scheduling instruction or single-subframe scheduling instruction) includes a UL subframe u, the UL subframe u may adjust the transmitting power of the PUSCH, based on the power controlling command in the last UL scheduling instruction and the effective range r of the power controlling command.
Second Example
In this example, the number of power controlling bits, which are in a multi-subframe DL scheduling instruction and DCI format 3/3 A of the UE, is consistent with the definition in LTE release 11. A power controlling instruction may be allocated for the feedback of the PUCCH in the multi-subframe DL scheduling, by re-defining a corresponding relationship between the PUCCH and the UL power controlling command.
FIG.3 is a flowchart illustrating a method for controlling a PUCCH power, in accordance with the second example of the present invention.
In step 301, a UE receives PDCCH data, which is about a multi-frame DL scheduling instruction or the DCI format 3/3 A of the UE, in a DL subframe n located by the multi-subframe DL scheduling instruction.
The position of the DL subframe, which is located by the multi-subframe DL scheduling instruction may be defined by the standard in advance, or may be indicated by high-level or physical layer signaling. The effective range of a scheduling instruction may be V DL subframes. Positions of the V DL subframes may be defined by the standard in advance, or may be indicated by high-level or physical layer signaling. The number N of DL subframes, which are actually scheduled by the scheduling instruction, may be less than or equal to V. That is, the scheduling instruction may schedule some DL subframes of the V DL subframes. At this time, positions of the N DL subframes actually scheduled may be indicated by bit information in the scheduling instruction, or in another physical layer signaling.
The effective range of the power controlling command, which is included in the DL scheduling instruction and in the PDCCH of DCI format 3/3 A, may be the foregoing V DL subframes. At this time, a subframe interval between a DL subframe and V DL subframes is a set r:{r 0, r 1, …r V -1}. The DL subframe is the one where DL scheduling instruction or the DCI format 3/3 A is transmitted. Alternatively, the effective range of the power controlling command, which is included in the DL scheduling instruction and in the PDCCH of the DCI format 3/3 A, may be the N DL subframes actually scheduled. At this time, the subframe interval between the DL subframe and the N DL subframes is a set r:{r 0, r 1, …r N -1}.
At this time, number of power controlling bits for the UE, which are in the multi-subframe DL scheduling instruction and DCI format 3, is still 2. The number of power controlling bits in the DCI format 3A is 1.
In step 302, the UE determines the transmitting power of the PUCCH of a corresponding UL subframe, based on a power controlling command in the multi-subframe DL scheduling instruction or in the DCI format 3/3 A of the UE.
The transmitting power of the PUCCH of a UL subframe u may be determined by using the following formula.
Figure PCTKR2014003199-appb-I000005
[dBm]
P PUCCH(u) represents the transmitting power of the PUCCH in a UL subframe u of the UE. P CMAX,c(u) represents the maximum transmitting power in the UL subframe u of serving cell c of the UE. h(n CQI ,n HARQ ,n SR ) is dependent on the format of the PUCCH, which is a function value determined by the current PUCCH format, as well as a bit number of CQI, Hybrid Automatic Repeat reQuest (HARQ) and Scheduling Request (SR) included in the current PUCCH. P O_PUCCH is an open-loop basic operating point of the PUCCH of the UE, which may be configured by an eNB with high-levelsignaling. PL c represents a path loss. F_PUCCH(F) represents a power adjustment factor for different PUCCH formats, in which F represents a different PUCCH format. TxD (F') represents a power adjustment factor for different PUCCH formats, when the PUCCH uses space to obtain a diversity, in which F' represents a different PUCCH format. g(u) represents a closed-loop power adjustment factor of the PUCCH. The specific meaning of each foregoing parameter may be found by referring to 3GPP protocol 36.213.
For an FDD system, when one UL subframe only feeds back the ACK/NACK information of one DL subframe, regarding the power controlling instruction A in the multi-subframe DL scheduling instruction or in the DCI format 3/3 A of the UE, when executing the PUCCH transmission corresponding to multiple DL subframes scheduled by the multi-subframe DL scheduling instruction, for the PUCCH corresponding to the first scheduled DL subframe, the transmitting power of the PUCCH may be determined based on the power controlling instruction A in the prior art. The transmitting power of a PUCCH corresponding to another scheduled DL subframe may be the same as the previous transmitting power of the PUCCH.
Specifically, when u= n+r 0 +k= n+r 0 +4,g(u) = g (u-1)+δ PUCCH (n). δ PUCCH(n) represents a power controlling command value in the multi-subframe DL scheduling instruction, or in the DCI format 3/3 A of the UE in subframe n. Based on the definition of the effective range of power controlling command provided in step 301, (n+r 0 ) may represent a first DL subframe of the foregoing V DL subframes, or represent the first DL subframe of the foregoing N DL subframes actually scheduled. When n+r 0 +4<u n+r V-1 +4 (when the effective range of the power controlling command is V UL subframes) or n+r 0 +4<u n+r N-1 +4(when the effective range of the power controlling command is N UL subframes),g(u) = g (u-1).
For an FDD system, when one UL subframe u feeds back the ACK/NACK information of multiple DL subframes, or, for a TDD system, regarding all of the M (for the FDD system, the value of M may be re-defined by the standard, the value of M corresponding to the TDD system may be re-defined by the standard or use the M value shown in Table 4) DL subframes fed back by the UL subframe u, the multi-subframe scheduling instruction used for scheduling these DL subframes is determined, and DL subframes m 0 ,…,m T -1 located by the PDCCH data in DCI format 3/3 A of the UE in the M DL subframes. The sum of the power controlling command values carried by the DL subframes m 0 ,…,m T -1 is calculated to obtain an intermediate result, and the result of g(u-1) is added to the intermediate result to obtain g(u).
Specifically,
Figure PCTKR2014003199-appb-I000006
,. T represents number of subframes, which include the multi-subframe DL scheduling instruction or the PDCCH data of DCI format 3/3 A of the UE, of the M DL subframes bound with the UL subframe u. δ PUCCH(m t ) represents a power controlling command value in the multi-subframe DL scheduling instruction of subframe m t, or in the DCI format 3/3 A of the UE in subframe m t . When the PDCCH data of the DL scheduling command and the DCI format 3/3 A simultaneously occur in one subframe, only the power controlling command of the DL scheduling command is employed.
At this point, the method for controlling the UL power in the example may be terminated.
Third Example
In this example, the effective power controlling of all of the simultaneously scheduled PUSCHs in a multi-subframe scheduling may be implemented, by increasing number of power controlling bits within a multi-subframe UL power controlling command, and matching different power controlling bits to the PUSCHs of multiple UL subframes simultaneously scheduled.
FIG.4 is a flowchart illustrating a method for controlling PUSCH power, in accordance with a third example of the present invention.
In step 401, a UE receives a multi-subframe UL scheduling instruction in a DL subframe n, which is located by the multi-subframe UL scheduling instruction.
The position of the DL subframe, which is located by the multi-subframe UL scheduling instruction, may be defined in advance by the standard, or may be indicated by high-level or physical layer signaling. The effective range of the scheduling instruction may be V UL subframes. Positions of the V UL subframes may be defined by the standard in advance, or may be indicated by high-level or physical layer signaling. The number N of UL subframes actually scheduled by the scheduling instruction may be less than or equal to V. That is, the scheduling instruction may schedule some UL subframes of the V UL subframes. At this time, positions of the subframes actually scheduled may be indicated by bit information in the scheduling information, or within another physical layer signaling.
The effective range of the power controlling command in the UL scheduling instruction, and within the PDCCH data of the DCI format 3/3 A may be the foregoing V UL subframes. At this time, a subframe interval between a DL subframe and a UL subframe may be a set r:{r 0, r 1, …r V -1}, in which the DL subframe is the one where the UL scheduling instruction or the DCI format 3/3 A is transmitted. The effective ranges of the power controlling command in the UL scheduling instruction and within the PDCCH data of the DCI format 3/3 A may be the subframes actually scheduled. At this time, the subframe interval between the DL subframe and a UL subframe is a set r:{r 0, r 1, …r N -1}, in which the DL subframe is the one where the UL scheduling instruction or the DCI format 3/3 A is transmitted. At this time, based on the effective range of the power controlling instruction, the number of power controlling bits in the multi-subframe UL scheduling instruction is 2V or 2N.
In step 402, the UE adjusts the transmitting power of the scheduled PUSCH, based on the multi-subframe UL scheduling instruction.
The transmitting power of the PUSCH in a UL subframe (n+r i ) may be determined by the following formula, in which r i ∈{r 0, r 1, …r V -1} or {r 0, r 1, …r N -1}.
Figure PCTKR2014003199-appb-I000007
[dBm]
The meaning of each parameter in the above formula is the same as that in the first example.
When the accumulation is active, f c (n+r i ) = f c (n+r i -1)+δ PUSCH,c (n i ). δ PUSCH, c (n i ) represents a power controlling command value indicated by power controlling bits 2i, 2i+1 in the UL scheduling instruction. When the accumulation is inactive, f c (n+r 0 ) = δ PUSCH,c (n i ). δ PUSCH,c (n i ) represents the power controlling command value indicated by power controlling bits 2i, 2i+1,which are in the UL scheduling instruction or in the DCI format 3.
At this point, the method for controlling the UL power in the example may be terminated. When each of the effective ranges of multiple scheduling instructions (multi-subframe scheduling instruction or single-subframe scheduling instruction) includes the UL subframe u, the UL subframe u may adjust the transmitting power of PUSCH, based on the power controlling command in the previous UL scheduling instruction and the effective range r of the foregoing power controlling command.
Fourth Example
In this example, a power controlling instruction is allocated for the feedback of the PUCCH in a multi-subframe DL scheduling, by increasing number of power controlling bits in a multi-subframe DL scheduling instruction, and respectively matching different power controlling bits with PUCCHs, which correspond to the multiple DL subframes simultaneously scheduled.
FIG.5 is a flowchart illustrating a method for controlling PUCCH power, in accordance with a fourth example of the present invention.
In step 501, a UE receives a multi-subframe DL scheduling instruction in a DL subframe n, which is located by the multi-subframe DL scheduling instruction.
The position of the DL subframe, which is located by the multi-subframe DL scheduling instruction, may be defined by the standard in advance, or may be indicated by high-level or physical layer signaling. The effective range of the scheduling instruction may be V DL subframes. Positions of the V DL subframes may be defined by the standard in advance, or may be indicated by high-level or physical layer signaling. The number N of DL subframes actually scheduled by the scheduling instruction may be less than or equal to V. That is, the scheduling instruction may schedule some DL subframes of the V DL subframes. At this time, positions of the N DL subframes actually scheduled may be indicated by bit information in the scheduling instruction, or within another physical layer signaling.
The effective range of a power controlling command, which is included in a DL scheduling instruction and the PDCCH data of the DCI format 3/3 A, may be the foregoing V DL subframes. At this time, a subframe interval between a DL subframe and V DL subframes is a set r:{r 0, r 1, …r V -1}, in which the DL subframe is the one where the DL scheduling instruction or the DCI format 3/3 A is transmitted. The effective range of the power controlling command, which is included in the DL scheduling instruction and the PDCCH data of the DCI format 3/3 A, may be the N DL subframes actually scheduled. At this time, the subframe interval between the DL subframe and N DL subframes is a set r:{r 0, r 1, …r N -1}, in which the DL subframe is the one where the DL scheduling instruction or the DCI format 3/3 A is transmitted. At this time, based on the effective range of the power controlling instruction, the number of power controlling bits in the multi-subframe DL scheduling instruction is 2V or 2N. Power controlling bits 2i and 2i+1 may correspond to the DL subframes n+r i.
In step 502, the UE adjusts the transmitting power of the PUCCH of a corresponding UL subframe, based on the power controlling command in the multi-subframe DL scheduling instruction.
The transmitting power of the PUCCH of a UL subframe u may be determined by the following formula.
[dBm]
The meaning of each parameter in the above formula is the same as that in the second example.
For an FDD system, under the circumstances that one UL subframe only feeds back the ACK/NACK information of one DL subframe, when u=n+r i +4,g(u) = g (u-1)+δ PUCCH (n+r i ). δ PUCCH (n+r i ) represents a power controlling command value corresponding to subframe n+r i in the multi-subframe DL scheduling instruction.
For an FDD system, when one UL subframe only feeds back the ACK/NACK information of multiple DL subframes, or for a TDD system,
Figure PCTKR2014003199-appb-I000009
. δ PUCCH(u-k m ) represents a power controlling command value corresponding to subframe u-k m in the multi-subframe DL scheduling instruction. M represents the number of DL subframes bound with the UL subframe u. For an FDD system, value of M may be re-defined by the standard. For a TDD system, value of M may be re-defined by the standard or is as shown in Table 4.
At this point, the method for controlling the UL power in the example may be terminated. As mentioned above, a UE may adjust the size of an open-loop basic operating point of conflicted UL subframes, by enabling an eNB to transmit a specific parameter about the open-loop basic operating point of a UE of the conflicted UL subframes. Subsequently, power controlling may be implemented more reasonably. Special interference and noise effects suffered by a UL subframe may be well compensated.
Based on the foregoing, it can be seen that, in the embodiments of the present invention, by resetting a corresponding relationship of a power controlling instruction for the PUSCH/PUCCH in a UL subframe, alternatively, by increasing number of bits in a power controlling field of a scheduling instruction in the multi-subframe scheduling, and re-defining a corresponding relationship between a power controlling bit and the PUSCH/PUCCH in a UL subframe, it may be guaranteed that the PUSCH and PUCCH of any UL subframe may have a corresponding power controlling instruction. Subsequently, the effective controlling of transmitting power of UL PUSCH and PUCCH of a UE may be implemented.
While the invention has been shown and described with reference to certain embodiments thereof, it will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims and their equivalents.

Claims (10)

  1. A method for controlling a power of a Physical Uplink Shared CHannel (PUSCH) in a multi-subframe scheduling system, comprising:receiving, by a User Equipment (UE), a multi-subframe uplink (UL) scheduling instruction or Physical Downlink Control CHannel (PDCCH) data of a Downlink Control Information (DCI) format 3/3 A of the UE, in a Downlink (DL) subframe where the multi-subframe UL scheduling instruction is transmitted, wherein the multi-subframe UL scheduling instruction or the PDCCH data with DCI format 3/3 A comprises a power controlling command of the PUSCH; determining, by the UE, a transmitting power of the PUSCH of each UL subframe, which is scheduled by the multi-subframe UL scheduling instruction, based on a power controlling command value; and transmitting, by the UE, corresponding PUSCH data based on the transmitting power calculated.
  2. The method according to claim 1, wherein the power controlling command of the PUSCH consists of 2 bits or 1 bit.
  3. The method according to claim 2, wherein determining the transmitting power of the PUSCH of each UL subframe, which is scheduled by the multi-subframe UL scheduling instruction, comprises:for a first UL subframe scheduled by the multi-subframe UL scheduling instruction, calculating the transmitting power of the PUSCH of the first UL subframe, based on the transmitting power of the PUSCH of a previous subframe and the power controlling command; and for another UL subframe scheduled by the multi-subframe UL scheduling instruction except for the first UL subframe, determining that the transmitting power of the PUSCH of the another UL subframe is the same as the transmitting power of the PUSCH of a previous subframe.
  4. The method according to claim 1, wherein the power controlling command of the PUSCH comprises a power controlling command corresponding to each scheduled UL subframe, and wherein determining the transmitting power of the PUSCH of each UL subframe, which is scheduled by the multi-subframe UL scheduling instruction, comprises:for each UL subframe scheduled by the multi-subframe UL scheduling instruction, calculating the transmitting power of the PUSCH of a corresponding UL subframe, based on the transmitting power of the PUSCH of a previous subframe of the corresponding UL subframe and the power controlling command of the corresponding UL subframe.
  5. The method according to claim 4, wherein when a same UL subframe is scheduled by more than one multi-subframe UL scheduling instruction, calculating the transmitting power of the PUSCH of the corresponding UL subframe, based on the power controlling command comprised in a latest UL scheduling instruction.
  6. A method for controlling a power of a Physical Uplink Control CHannel (PUCCH) in a multi-subframe scheduling system, comprising:receiving, by a User Equipment (UE), a multi-subframe Downlink (DL) scheduling instruction or Physical Downlink Control CHannel (PDCCH) data with Downlink Control Indicator (DCI) format 3/3 A of the UE, in a DL subframe where the multi-subframe DL scheduling instruction is transmitted, wherein the multi-subframe DL scheduling instruction or the PDCCH data with DCI format 3/3 A carries a power controlling instruction of the PUCCH, which is used for feeding back Acknowledge (ACK)/Negative ACK (NACK) information of scheduled DL subframes; determining, by the UE, a transmitting power of the PUCCH, which corresponds to each DL subframe scheduled by the multi-subframe DL scheduling instruction; and transmitting corresponding PUCCH data based on the transmitting power calculated.
  7. The method according to claim 6, wherein the power controlling command consists of 2 bits or 1 bit.
  8. The method according to claim 7, wherein for a Frequency-Division Duplexing (FDD) system, if ACK/NACK information fed back in one UL subframe is for one DL subframe, determining the transmitting power of the PUCCH corresponding to each DL subframe, which is scheduled by the multi-subframe DL scheduling instruction, comprises:for a PUCCH corresponding to a first DL subframe scheduled by the multi-subframe DL scheduling instruction, calculating the transmitting power of the PUCCH corresponding to the first DL subframe, based on the power controlling command and the transmitting power of the PUCCH of a previous subframe; andfor a PUCCH corresponding to another DL subframe scheduled by the multi-subframe DL scheduling instruction except for the first DL subframe, determining that the transmitting power of the PUCCH of the another DL subframe is the same as the transmitting power of a previous PUCCH subframe.
  9. The method according to claim 7, wherein for the FDD system, if the ACK/NACK information fed back in one UL subframe is for multiple DL subframes, or for a Time-Division Duplexing (TDD) system, determining the transmitting power of the PUCCH corresponding to each DL subframe, which is scheduled by the multi-subframe DL scheduling instruction, comprises:for all of M DL subframes fed back in a UL subframe u, determining DL subframes m 0 ,…,m T -1 out of the M DL subframes, in which a multi-subframe scheduling instruction used for scheduling the M DL subframes or PDCCH with DCI format 3/3 A comprising the UE’s power controlling command is transmitted, calculating a sum of power controlling command values carried by the DL subframes m 0 ,…,m T -1 to obtain an intermediate result, adding a result of g(u-1) to the intermediate result to obtain a value of g(u),and calculating
    Figure PCTKR2014003199-appb-I000010
    [dBm]as the transmitting power of the PUCCH of the UL subframe u; wherein P PUCCH(u) represents the transmitting power of the PUCCH in the UL subframe u of the UE; P CMAX,c(u) represents a maximum transmitting power in the UL subframe u of a serving cell c of the UE; h(n CQI ,n HARQ ,n SR ) is dependent on a format of the PUCCH, which is a function value determined by a current PUCCH format, as well as bit numbers of Channel Quality Indicator (CQI), Hybrid Automatic Repeat reQuest (HARQ) and Scheduling Request (SR) within the current PUCCH data; P O_PUCCH represents an open-loop basic operating point of the PUCCH of the UE, which is configured by an evolved Node B (eNB) with high-level signaling; PL c represents a path loss; F_PUCCH(F) represents a power adjustment factor for different PUCCH formats, wherein F represents a different PUCCH format; TxD (F') represents a power adjustment factor for different PUCCH formats, when the PUCCH employs space to obtain a diversity, wherein F' represents a different PUCCH format, and g(u) represents a closed-loop power adjustment factor of the PUCCH.
  10. The method according to claim 6, wherein the power controlling instruction of the PUCCH comprises a power controlling command of a PUCCH corresponding to each scheduled DL subframe, and wherein determining the transmitting power of the PUCCH corresponding to each DL subframe scheduled by the multi-subframe DL scheduling instruction comprises:for the each DL subframe scheduled by the multi-subframe DL scheduling instruction, calculating the transmitting power of the PUCCH corresponding to the DL subframe, based on the PUCCH transmitting power of a previous subframe of the PUCCH corresponding to the DL subframe, and a power controlling command for the PUCCH corresponding to the DL subframe.
PCT/KR2014/003199 2013-04-12 2014-04-14 Method for controlling uplink power in multi-subframe scheduling WO2014168460A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020157032499A KR102171515B1 (en) 2013-04-12 2014-04-14 Method for controlling uplink power in multi-subframe scheduling
EP14782227.4A EP2984880A4 (en) 2013-04-12 2014-04-14 Method for controlling uplink power in multi-subframe scheduling

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201310126249.2 2013-04-12
CN201310126249.2A CN104105188B (en) 2013-04-12 2013-04-12 A kind of ascending power control method in more subframe schedulings

Publications (1)

Publication Number Publication Date
WO2014168460A1 true WO2014168460A1 (en) 2014-10-16

Family

ID=51672894

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2014/003199 WO2014168460A1 (en) 2013-04-12 2014-04-14 Method for controlling uplink power in multi-subframe scheduling

Country Status (5)

Country Link
US (4) US9961643B2 (en)
EP (1) EP2984880A4 (en)
KR (1) KR102171515B1 (en)
CN (2) CN110430032B (en)
WO (1) WO2014168460A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3420769A1 (en) * 2016-02-26 2019-01-02 Telefonaktiebolaget LM Ericsson (publ) Multi-subframe grant with scheduling of both data and control channels
US10542439B2 (en) 2016-02-26 2020-01-21 Telefonaktiebolaget Lm Ericsson (Publ) Multi-subframe grant with scheduling of both data and control channels

Families Citing this family (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103379604B (en) * 2012-04-20 2018-04-27 北京三星通信技术研究有限公司 Ascending power control method in dynamic TDD cell
CN103581891B (en) * 2012-08-06 2019-01-25 中兴通讯股份有限公司 The processing method and processing device of information
CN110430032B (en) * 2013-04-12 2022-04-12 北京三星通信技术研究有限公司 Uplink power control method in multi-subframe scheduling
JP6410153B2 (en) * 2013-07-09 2018-10-24 シャープ株式会社 Terminal device, base station device, communication method, and integrated circuit
US9578539B1 (en) * 2013-07-19 2017-02-21 Sprint Spectrum L.P. Transmitting a data packet over a wireless communication link
WO2015163748A1 (en) * 2014-04-25 2015-10-29 엘지전자 주식회사 Method and device for transmitting/receiving radio signal in wireless communication system
US9800387B2 (en) * 2014-11-06 2017-10-24 Intel IP Corporation Computing apparatus with cross-subframe scheduling
US10225859B2 (en) 2015-05-14 2019-03-05 Qualcomm Incorporated Techniques for uplink transmission management
CN105764146B (en) * 2016-02-05 2019-03-08 宇龙计算机通信科技(深圳)有限公司 A kind of method of sub-frame configuration, method, relevant device and the system of data transmission
US9979581B2 (en) * 2016-04-01 2018-05-22 Mediatek Inc. Control channel design for eLAA
CN107277908B (en) 2016-04-06 2021-06-15 华为技术有限公司 Power control method and equipment
MX2019009595A (en) * 2017-02-13 2019-10-02 Ericsson Telefon Ab L M Resource signaling for pucch.
KR102210990B1 (en) 2017-04-17 2021-02-02 삼성전자 주식회사 Method and apparatus for uplink power control
EP4181450A1 (en) 2017-04-17 2023-05-17 Samsung Electronics Co., Ltd. Method and device for dynamic resource allocation
CN109219120B (en) * 2017-07-03 2021-10-26 北京三星通信技术研究有限公司 Method and equipment for controlling uplink power
CN110679193A (en) * 2017-06-01 2020-01-10 中兴通讯股份有限公司 Method and computing device for configuring resource scheduling
US11025403B2 (en) * 2017-07-12 2021-06-01 Qualcomm Incorporated Frame structure dependent configuration of physical channels
KR102354587B1 (en) * 2017-09-08 2022-01-24 삼성전자 주식회사 Apparatus and method for transmitting uplink signals in wireless communication system
CN109788537B (en) * 2017-11-15 2022-04-01 中国移动通信有限公司研究院 Method, base station and terminal for controlling uplink power
CN110167122B (en) * 2018-02-13 2021-03-16 电信科学技术研究院有限公司 Uplink physical shared channel power control method and terminal
EP3833142A4 (en) * 2018-07-31 2021-08-25 Beijing Xiaomi Mobile Software Co., Ltd. Transmission block processing method and apparatus, electronic device and computer-readable storage medium
CN110971338B (en) * 2018-09-28 2021-07-09 华为技术有限公司 Method and apparatus for determining transmit power
CN113543297B (en) * 2020-04-14 2023-02-10 海能达通信股份有限公司 Uplink power control method and related device
US11690024B2 (en) * 2021-01-27 2023-06-27 Qualcomm Incorporated Configuring client device regulation modes for sidelink communications
US12057803B2 (en) 2021-06-16 2024-08-06 Conti Innovation Center, Llc Mechanically stacked solar transmissive cells or modules
GB2618316A (en) * 2022-04-26 2023-11-08 Nec Corp Communication system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100331037A1 (en) * 2009-06-24 2010-12-30 Yu-Chih Jen Method and Related Communication Device for Enhancing Power Control Mechanism
US20120087324A1 (en) * 2009-05-18 2012-04-12 Ntt Docomo, Inc. Radio base station and mobile communication method
US20130039286A1 (en) * 2011-08-09 2013-02-14 Telefonaktiebolaget L M Ericsson (Publ) Method and Arrangement for Uplink Power Control

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7881742B2 (en) * 2007-01-31 2011-02-01 Qualcomm, Incorporated Method and apparatus for power control during DTX operation
US8233458B2 (en) * 2008-01-07 2012-07-31 Lg Electronics Inc. Method of controlling transmission power in a wireless communication system
US8749400B2 (en) * 2008-08-18 2014-06-10 Halliburton Energy Services, Inc. Symbol synchronization for downhole OFDM telemetry
US8315217B2 (en) 2008-09-23 2012-11-20 Qualcomm Incorporated Method and apparatus for controlling UE emission in a wireless communication system
EP2434818B1 (en) * 2009-05-22 2019-05-01 Huawei Technologies Co., Ltd. Method for dispatching multi sub-frames and the system, the terminal, the base station and the computer program product thereof
US9042840B2 (en) * 2009-11-02 2015-05-26 Qualcomm Incorporated Cross-carrier/cross-subframe indication in a multi-carrier wireless network
JP5132723B2 (en) 2010-02-15 2013-01-30 株式会社エヌ・ティ・ティ・ドコモ Reference signal transmission method, mobile station apparatus and base station apparatus
US8744513B2 (en) * 2010-06-29 2014-06-03 Qualcomm Incorporated Interaction between maximum power reduction and power scaling in wireless networks
WO2012169756A2 (en) * 2011-06-06 2012-12-13 엘지전자 주식회사 Multiplexing method for signals related to a plurality of terminals in a wireless communication system applying carrier aggregation techniques and apparatus therefor
ES2663837T3 (en) * 2011-09-21 2018-04-17 Lg Electronics Inc. Uplink signal transmission power control terminal device, and procedure for the same
CN103037489B (en) * 2011-09-29 2017-12-26 中兴通讯股份有限公司 uplink signal power control method and device
JP6014421B2 (en) * 2012-08-30 2016-10-25 株式会社Nttドコモ Base station and transmission power control method
CN110430032B (en) * 2013-04-12 2022-04-12 北京三星通信技术研究有限公司 Uplink power control method in multi-subframe scheduling

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120087324A1 (en) * 2009-05-18 2012-04-12 Ntt Docomo, Inc. Radio base station and mobile communication method
US20100331037A1 (en) * 2009-06-24 2010-12-30 Yu-Chih Jen Method and Related Communication Device for Enhancing Power Control Mechanism
US20130039286A1 (en) * 2011-08-09 2013-02-14 Telefonaktiebolaget L M Ericsson (Publ) Method and Arrangement for Uplink Power Control

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2984880A4 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3420769A1 (en) * 2016-02-26 2019-01-02 Telefonaktiebolaget LM Ericsson (publ) Multi-subframe grant with scheduling of both data and control channels
US10542439B2 (en) 2016-02-26 2020-01-21 Telefonaktiebolaget Lm Ericsson (Publ) Multi-subframe grant with scheduling of both data and control channels

Also Published As

Publication number Publication date
US20210204219A1 (en) 2021-07-01
US9961643B2 (en) 2018-05-01
KR20150140834A (en) 2015-12-16
EP2984880A1 (en) 2016-02-17
US20200045638A1 (en) 2020-02-06
US20180249419A1 (en) 2018-08-30
KR102171515B1 (en) 2020-10-30
CN110430032A (en) 2019-11-08
US10448339B2 (en) 2019-10-15
US11570718B2 (en) 2023-01-31
CN104105188B (en) 2019-10-11
CN110430032B (en) 2022-04-12
US10959180B2 (en) 2021-03-23
CN104105188A (en) 2014-10-15
US20140307652A1 (en) 2014-10-16
EP2984880A4 (en) 2016-10-05

Similar Documents

Publication Publication Date Title
WO2014168460A1 (en) Method for controlling uplink power in multi-subframe scheduling
WO2015142125A1 (en) Method for controlling tpc command timing based on consideration of tdd-fdd aggregation and device therefor
WO2018203732A1 (en) Method for transmitting uplink signal in wireless communication system and device therefor
WO2012141497A2 (en) Method and apparatus for operating subframe and transmitting channel informaiton for controlling interference in communication system
WO2017200307A1 (en) Method for transmitting uplink control information in wireless communication system, and device therefor
WO2017135745A1 (en) Method for mapping, transmitting, or receiving uplink control information in wireless communication system and device for same
WO2015115818A1 (en) Method and device for transmitting harq ack/nack
WO2016021957A1 (en) Ack/nack feedback method and user equipment
WO2017196065A1 (en) Method for controlling uplink transmission power in wireless communication system and device therefor
WO2013122384A1 (en) Device to device communication method and device for performing same
WO2014208924A1 (en) Method and device for processing uplink transmission
WO2013129868A1 (en) Mobile communication system and channel transmission/reception method thereof
WO2012108725A2 (en) Method and apparatus for assigning response channel resources
WO2013073916A1 (en) Method for transmitting uplink control channel by terminal in wireless communication system
WO2018062766A1 (en) Method for plurality of processing time or plurality of transmission time intervals in wireless communication system, and apparatus therefor
WO2016190631A1 (en) Channel sensing in wireless communication system, transmission method based on same, and device therefor
WO2018143701A1 (en) Method for supporting multiple transmission time intervals, multiple subcarrier intervals, or multiple processing time intervals in wireless communication system, and apparatus therefor
EP3251261A1 (en) Method and apparatus for transmitting/receiving harq-ack signal in wireless communication system supporting carrier aggregation
KR20190138800A (en) Method for reporting power headroom in wireless communication system and apparatus for same
WO2019151789A1 (en) Method and apparatus for uplink repetition on basis of semi-persistent scheduling
WO2016089044A1 (en) Method for interference control in radio resource and device therefor
WO2018208134A1 (en) Method for controlling transmit power in wireless communication system and apparatus therefor
WO2017171413A1 (en) Method for transmitting or receiving uplink control information in wireless communication system and device therefor
WO2012157967A2 (en) Method for controlling uplink transmission power by a terminal that adopts a time division duplex (tdd) scheme in a wireless communication system, and terminal device thereof
WO2013095011A1 (en) Method and apparatus for transmitting and receiving periodic channel information in wireless communication system

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14782227

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2014782227

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 20157032499

Country of ref document: KR

Kind code of ref document: A