US20140369750A1 - Grout containment sheet and method - Google Patents

Grout containment sheet and method Download PDF

Info

Publication number
US20140369750A1
US20140369750A1 US13/917,941 US201313917941A US2014369750A1 US 20140369750 A1 US20140369750 A1 US 20140369750A1 US 201313917941 A US201313917941 A US 201313917941A US 2014369750 A1 US2014369750 A1 US 2014369750A1
Authority
US
United States
Prior art keywords
grout
excavation
panel
sheet
moisture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/917,941
Inventor
Baltazar Siqueiros
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US13/917,941 priority Critical patent/US20140369750A1/en
Publication of US20140369750A1 publication Critical patent/US20140369750A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/003Pavings made of prefabricated single units characterised by material or composition used for beds or joints; characterised by the way of laying
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/03Arrangements for curing paving; Devices for applying curing means; Devices for laying prefabricated underlay, e.g. sheets, membranes; Protecting paving under construction or while curing, e.g. use of tents
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/10Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for raising or levelling sunken paving; for filling voids under paving; for introducing material into substructure
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/001Pavings made of prefabricated single units on prefabricated supporting structures or prefabricated foundation elements except coverings made of layers of similar elements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/06Pavings made of prefabricated single units made of units with cement or like binders
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/005Individual couplings or spacer elements for joining the prefabricated units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/10Coherent pavings made in situ made of road-metal and binders of road-metal and cement or like binders
    • E01C7/14Concrete paving
    • E01C7/147Repairing concrete pavings, e.g. joining cracked road sections by dowels, applying a new concrete covering

Definitions

  • This invention relates to a moisture (i.e., water) impermeable grout containment sheet and to a method including the step of locating the sheet within an excavation so as to lie between a (e.g., concrete) panel that has been lowered into the excavation and grout that has been pumped below the panel.
  • the group containment sheet and method have particular application during roadway construction or repair where a plurality of concrete panels are laid in excavations formed in a road bed and connected to one another to support vehicular traffic.
  • a common technique for building such roadways is to lay a number of heavy concrete panels or slabs end-to-end and side-by-side one another. All of the panels must be held in place relative to one another and connected together to establish a smooth and continuous driving surface. The foregoing is often accomplished by first grading a road bed and cutting excavations therein within which the concrete panels are laid.
  • a grout containment sheet and method having particular application, for example, during roadway construction or repair when excavations are cut into a road bed and (e.g., precast concrete) panels are laid inside the excavations to be connected end-to-end and/or side-by-side.
  • a moisture (i.e., water) impermeable (e.g., polyurethane) grout containment sheet Prior to laying a panel within an excavation, a moisture (i.e., water) impermeable (e.g., polyurethane) grout containment sheet is positioned inside the excavation to cover at least the bottom thereof.
  • the grout containment, sheet must be sufficiently strong to prevent water from passing therethrough.
  • the panel is lowered into the excavation so as to lie upon the grout containment sheet.
  • grout or a similar adhesive bonding material is pumped below the panel such as, for example, by way of filler tubes which run through the panel.
  • the grout containment sheet lies between the grout and the road bed above which the panel is located.
  • the grout containment sheet establishes a containment envelope around the grout throughout the construction project to prevent the grout from migrating away from the panel.
  • the grout containment sheet creates a barrier that prevents the grout from both drying out as a consequence of the moisture of the grout being absorbed by the road bed and from becoming too wet as a consequence of being exposed to rain water and ground water. Accordingly, the maximum strength, structural integrity and load-bearing characteristics of the grout upon which the panel is laid and supported can be maintained.
  • FIG. 1 shows an excavation that has been cut into a road bed and a grout containment sheet located within and covering the bottom of the excavation according to a preferred embodiment of this invention
  • FIG. 2 shows a solid panel such as, for example, a precast concrete panel used during the construction of a roadway lowered into the excavation and laying upon the grout containment sheet;
  • FIG. 3 shows an adhesive bonding material (e.g., grout) pumped into the excavation below the panel, such that the grout containment sheet creates a water impermeable containment barrier between the grout and the road bed.
  • adhesive bonding material e.g., grout
  • the grout containment sheet and method herein disclosed have particular application during roadway construction and/or repair where a plurality of concrete panels are laid inside one or more excavations so as to be connected end-to-end and/or side-by-side one another.
  • the system and method are also advantageous to facilitating the removal of a panel from its excavation should such removal be required during subsequent roadway maintenance and repair.
  • FIG. 1 shows a single excavation 10 that has been cut into a road bed 15 .
  • the excavation 10 can be cut by means of any of a variety of available construction machinery and plays no role in the present invention. In the event a roadway is being constructed, either a single continuous excavation or a series of adjacent excavations will be cut into the road bed for a purpose that will soon be explained. The dimensions of the excavation 10 will depend upon the purpose thereof.
  • a moisture (i.e., water) impermeable grout containment sheet 20 is laid inside the excavation 10 so as to completely cover the bottom thereof. It is important that the grout containment sheet 20 be long enough to initially extend upwardly and over top of the road bed 15 so that the sheet will not be pulled entirely inside the excavation 10 when a heavy panel is laid upon the sheet.
  • the grout containment sheet 20 may be carried to the construction site, for example, on a roll of continuous sheet material which is cut to size. Depending upon the size of the excavation 10 , it may be necessary to add one or more additional containment sheets (not shown) which overlap one another in end-to-end alignment.
  • the water-impermeable grout containment sheet 20 has a thickness of at last 6 mils.
  • the sheet 20 which covers the bottom of the excavation 10 must be manufactured from a material (e.g., polyurethane) that is strong enough to support a load (e.g., a concrete panel) located inside the excavation 10 and prevent water from passing through the sheet.
  • a material e.g., polyurethane
  • a (e.g., precast) panel 25 that is manufactured from concrete or any other suitable durable and weather-resistant material is transported to and lowered, by means of an overhead crane, or the like, into the excavation.
  • the panel 25 sits on the grout containment sheet 20 , and the sheet lies between the panel 25 and the solid surface (e.g., the road bed 15 ) into which the excavation has been cut.
  • the ends of the grout containment sheet 20 may then be shortened (i.e., cut) so as to conform to the dimensions of the excavation 10 and the panel 25 that has been lowered therewithin and laid upon the sheet.
  • FIG. 3 of the drawings shows a conventional bonding or adhesive filler material 30 , such as grout, or the like, being pumped below the panel 25 within the excavation 10 .
  • the grout 30 may be pumped underneath the panel 25 by way of one or more filler tubes 32 that run completely through the panel.
  • the filler tubes e.g., 32
  • the grout 30 creates a bond to hold the panel 25 in place within the excavation.
  • the grout 30 also creates a platform below the panel 25 , whereby the panel can be selectively raised or elevated within the excavation 10 in order to be made level with adjacent panels (e.g., designated 35 ) which are already in place within the excavation.
  • the water-impermeable grout containment sheet 20 lies between the grout 30 and the bottom of the excavation 10 that has been cut into the solid surface (i.e., road bed 15 ) to receive the (e.g., concrete) panel 25 .
  • the containment sheet 20 establishes a liner or barrier to prevent the grout bonding material 30 from migrating away from the panel 25 and flowing below an adjacent panel 35 .
  • portions of the sheet 20 are pulled upwardly to create a peripheral fold (designated 22 in FIGS. 2 and 3 ) which surrounds the panel 25 .
  • the water which is mixed into the grout will not pass downwardly through the grout containment sheet 20 to be absorbed by and contaminate the ground around and below the excavation.
  • the water-impermeable grout containment sheet 20 creates an envelope around the panel 25 and the grout 30 below the panel 25 so as to prevent the grout from becoming saturated with rain or ground water to which the grout may otherwise be exposed at the construction site. That is to say, grout is known to erode and become weaker as a consequence of either losing water or being mixed with too much water.
  • the grout containment sheet 20 maintains the structural integrity and load bearing characteristics of the grout during the time necessary for the grout to be fully cured and hardened.
  • the grout containment shed 20 facilitates a removal of the panel 25 from the excavation 10 for subsequent repair or replacement.
  • the panel By spraying or coating the bottom of the panel 25 at the time of construction with a conventional liquid bond breaker, the panel can be titled out of the excavation 10 so as to be either replaced with a different panel or cleaned, repaired and returned to the excavation.
  • the grout 30 will adhere to the grout containment sheet 20 so as to permit a relatively easy separation of the panel 25 from the grout 30 which remains inside the excavation.
  • a plurality of panels like those designated 25 and 35 , which have been lowered into respective excavations or a single continuous excavation, like that designated 10 , can be connected, such as by means of dowel bar couplers (designated 40 in FIG. 3 ), end-to-end and/or side-by-side.
  • a continuous roadway may be constructed along a road bed (e.g., 15 ) over which vehicular traffic can travel.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Road Paving Structures (AREA)

Abstract

A water-impermeable grout containment sheet and a method for using the sheet, for example, during the construction of a roadway to support vehicular traffic. An excavation is first cut into a road bed, and a moisture (i.e., water) impermeable grout containment sheet is laid inside the excavation. A plurality of concrete panels are positioned adjacent one another to be coupled together within the excavation, such that at least one of the panels sits on top of the water-impermeable grout containment sheet. Grout is then pumped below the one panel to hold the panel in place within the excavation. The water-impermeable grout containment sheet lies between the grout and the road bed to establish a containment envelope to stop the grout from migrating away from the panel and prevent water from seeping outwardly from the grout into the road bed and into the grout from the excavation.

Description

    BACKGROUND OF THE INVENTION
  • 1. Field of the Invention
  • This invention relates to a moisture (i.e., water) impermeable grout containment sheet and to a method including the step of locating the sheet within an excavation so as to lie between a (e.g., concrete) panel that has been lowered into the excavation and grout that has been pumped below the panel. The group containment sheet and method have particular application during roadway construction or repair where a plurality of concrete panels are laid in excavations formed in a road bed and connected to one another to support vehicular traffic.
  • 2. Background Art
  • As new communities are built, it is essential to have a roadway system to link each community with neighboring communities. Therefore, a series of highways and freeways are constructed to support vehicular traffic. A common technique for building such roadways is to lay a number of heavy concrete panels or slabs end-to-end and side-by-side one another. All of the panels must be held in place relative to one another and connected together to establish a smooth and continuous driving surface. The foregoing is often accomplished by first grading a road bed and cutting excavations therein within which the concrete panels are laid.
  • Once the concrete panels are located within the excavations, grout is typically pumped below the panels to retain the panels above the road bed. However, with the heavy panels sitting on top, the grout has been known to migrate underneath adjacent panels located within a single excavation or within adjacent excavations. Such migration can adversely affect the stability and level of the concrete panel relative to other panels. Moreover, the water with which the grout is mixed can sometimes seep into and be absorbed by the road bed below the panel. What is even more, the grout lying below the panel within the excavation is susceptible to the negative effects of being exposed to too much water. Such additional water may originate as rain water and/or ground water from the road bed. Until it is completely cured and hardened, which could take up to seven days or more, grout which becomes either too dry or too wet may become brittle or weakened and lose its maximum structural integrity and load-bearing ability.
  • Therefore, what would be desirable is a means to prevent the grout that is pumped between a concrete and and the road bed upon which the panel is laid from migrating away from the panel as well as losing its moisture and becoming too wet throughout the road construction project.
  • SUMMARY OF THE INVENTION
  • Briefly, and in general terms, a grout containment sheet and method are disclosed having particular application, for example, during roadway construction or repair when excavations are cut into a road bed and (e.g., precast concrete) panels are laid inside the excavations to be connected end-to-end and/or side-by-side. Prior to laying a panel within an excavation, a moisture (i.e., water) impermeable (e.g., polyurethane) grout containment sheet is positioned inside the excavation to cover at least the bottom thereof. The grout containment, sheet must be sufficiently strong to prevent water from passing therethrough.
  • The panel is lowered into the excavation so as to lie upon the grout containment sheet. In order to hold the panel in place within the excavation, grout or a similar adhesive bonding material is pumped below the panel such as, for example, by way of filler tubes which run through the panel. Thus, the grout containment sheet lies between the grout and the road bed above which the panel is located. By virtue of the foregoing, the grout containment sheet establishes a containment envelope around the grout throughout the construction project to prevent the grout from migrating away from the panel. At the same time, the grout containment sheet creates a barrier that prevents the grout from both drying out as a consequence of the moisture of the grout being absorbed by the road bed and from becoming too wet as a consequence of being exposed to rain water and ground water. Accordingly, the maximum strength, structural integrity and load-bearing characteristics of the grout upon which the panel is laid and supported can be maintained.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 shows an excavation that has been cut into a road bed and a grout containment sheet located within and covering the bottom of the excavation according to a preferred embodiment of this invention;
  • FIG. 2 shows a solid panel such as, for example, a precast concrete panel used during the construction of a roadway lowered into the excavation and laying upon the grout containment sheet; and
  • FIG. 3 shows an adhesive bonding material (e.g., grout) pumped into the excavation below the panel, such that the grout containment sheet creates a water impermeable containment barrier between the grout and the road bed.
  • DESCRIPTION OF THE PREFERRED EMBODIMENT
  • Shown and described herein are a water-impermeable grout containment sheet and a method for using the sheet with a solid (e.g., concrete) panel or slab where the panel is transported to and laid upon the sheet after the sheet is first located inside an excavation that is cut into a solid surface. By way of example, the grout containment sheet and method herein disclosed have particular application during roadway construction and/or repair where a plurality of concrete panels are laid inside one or more excavations so as to be connected end-to-end and/or side-by-side one another. In this same regard, the system and method are also advantageous to facilitating the removal of a panel from its excavation should such removal be required during subsequent roadway maintenance and repair.
  • Turning to the drawings, FIG. 1 shows a single excavation 10 that has been cut into a road bed 15. The excavation 10 can be cut by means of any of a variety of available construction machinery and plays no role in the present invention. In the event a roadway is being constructed, either a single continuous excavation or a series of adjacent excavations will be cut into the road bed for a purpose that will soon be explained. The dimensions of the excavation 10 will depend upon the purpose thereof.
  • In accordance with a preferred embodiment of this invention, a moisture (i.e., water) impermeable grout containment sheet 20 is laid inside the excavation 10 so as to completely cover the bottom thereof. It is important that the grout containment sheet 20 be long enough to initially extend upwardly and over top of the road bed 15 so that the sheet will not be pulled entirely inside the excavation 10 when a heavy panel is laid upon the sheet. The grout containment sheet 20 may be carried to the construction site, for example, on a roll of continuous sheet material which is cut to size. Depending upon the size of the excavation 10, it may be necessary to add one or more additional containment sheets (not shown) which overlap one another in end-to-end alignment. By way of example only, the water-impermeable grout containment sheet 20 has a thickness of at last 6 mils. The sheet 20 which covers the bottom of the excavation 10 must be manufactured from a material (e.g., polyurethane) that is strong enough to support a load (e.g., a concrete panel) located inside the excavation 10 and prevent water from passing through the sheet.
  • With the grout containment sheet 20 laid inside the excavation 10 and covering the bottom thereof, and referring now to FIG. 2 of the drawings, a (e.g., precast) panel 25 that is manufactured from concrete or any other suitable durable and weather-resistant material is transported to and lowered, by means of an overhead crane, or the like, into the excavation. Thus, the panel 25 sits on the grout containment sheet 20, and the sheet lies between the panel 25 and the solid surface (e.g., the road bed 15) into which the excavation has been cut. The ends of the grout containment sheet 20 may then be shortened (i.e., cut) so as to conform to the dimensions of the excavation 10 and the panel 25 that has been lowered therewithin and laid upon the sheet.
  • FIG. 3 of the drawings shows a conventional bonding or adhesive filler material 30, such as grout, or the like, being pumped below the panel 25 within the excavation 10. The grout 30 may be pumped underneath the panel 25 by way of one or more filler tubes 32 that run completely through the panel. For example, if the panel 25 is a precast concrete panel, the filler tubes (e.g., 32) are typically embedded within the panel during the manufacturing (i.e., casting) process. The grout 30 creates a bond to hold the panel 25 in place within the excavation. Moreover, the grout 30 also creates a platform below the panel 25, whereby the panel can be selectively raised or elevated within the excavation 10 in order to be made level with adjacent panels (e.g., designated 35) which are already in place within the excavation.
  • Accordingly, it may be appreciated that the water-impermeable grout containment sheet 20 lies between the grout 30 and the bottom of the excavation 10 that has been cut into the solid surface (i.e., road bed 15) to receive the (e.g., concrete) panel 25. By virtue of the foregoing, the containment sheet 20 establishes a liner or barrier to prevent the grout bonding material 30 from migrating away from the panel 25 and flowing below an adjacent panel 35. To this end, portions of the sheet 20 are pulled upwardly to create a peripheral fold (designated 22 in FIGS. 2 and 3) which surrounds the panel 25. Thus, the water which is mixed into the grout will not pass downwardly through the grout containment sheet 20 to be absorbed by and contaminate the ground around and below the excavation. In this same regard, and as another important advantage, the water-impermeable grout containment sheet 20 creates an envelope around the panel 25 and the grout 30 below the panel 25 so as to prevent the grout from becoming saturated with rain or ground water to which the grout may otherwise be exposed at the construction site. That is to say, grout is known to erode and become weaker as a consequence of either losing water or being mixed with too much water. However, the grout containment sheet 20 maintains the structural integrity and load bearing characteristics of the grout during the time necessary for the grout to be fully cured and hardened.
  • What is even still more, the grout containment shed 20 facilitates a removal of the panel 25 from the excavation 10 for subsequent repair or replacement. By spraying or coating the bottom of the panel 25 at the time of construction with a conventional liquid bond breaker, the panel can be titled out of the excavation 10 so as to be either replaced with a different panel or cleaned, repaired and returned to the excavation. In this case, the grout 30 will adhere to the grout containment sheet 20 so as to permit a relatively easy separation of the panel 25 from the grout 30 which remains inside the excavation.
  • As previously explained, a plurality of panels, like those designated 25 and 35, which have been lowered into respective excavations or a single continuous excavation, like that designated 10, can be connected, such as by means of dowel bar couplers (designated 40 in FIG. 3), end-to-end and/or side-by-side. Thus, a continuous roadway may be constructed along a road bed (e.g., 15) over which vehicular traffic can travel.

Claims (8)

1. A method for installing at least a first panel on a surface, said method comprising the steps of:
placing a moisture-impermeable sheet over the surface;
laying the first panel on top of the moisture-impermeable sheet; and
pumping an adhesive bonding material between the first panel and the moisture-impermeable sheet such that said sheet lies between the adhesive bonding material and the surface over which the sheet is placed.
2. The method recited in claim 1, comprising the additional step of cutting an excavation into a road bed such that said excavation forms the surface upon which said moisture-impermeable sheet is placed.
3. The method recited in claim 2, comprising the additional step of positioning said moisture-impermeable sheet within the excavation so as to form a containment envelope around the adhesive bonding material for preventing said bonding material from migrating away from the first panel.
4. The method recited in claim 2, comprising the additional step of manufacturing said moisture-impermeable sheet from a material that is impervious to the passage of water therethrough so as to separate the adhesive bonding material from the excavation.
5. The method recited in claim 2, comprising the additional steps of laying a second panel within the excavation adjacent said first panel; and coupling said first and second panels to one another to establish a roadway to support vehicular traffic thereover.
6. The method recited in claim 1, wherein said adhesive bonding material is grout.
7. The method recited in claim 1, comprising the additional step of manufacturing said first panel from concrete.
8. A method for constructing a roadway to support vehicular traffic thereover, said method comprising the steps of:
cutting an excavation into a road bed;
placing a moisture-impermeable sheet inside the excavation;
laying a plurality of concrete panels adjacent one another within the excavation such that at least a first of said concrete panels sits on top of said moisture-impermeable sheet;
pumping grout between the first concrete panel and the moisture-impermeable sheet such that said sheet creates a barrier between the grout and the excavation for preventing the grout from migrating away from the first concrete panel within the excavation; and
coupling said plurality of adjacent concrete panels one to the other to establish said roadway.
US13/917,941 2013-06-14 2013-06-14 Grout containment sheet and method Abandoned US20140369750A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US13/917,941 US20140369750A1 (en) 2013-06-14 2013-06-14 Grout containment sheet and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US13/917,941 US20140369750A1 (en) 2013-06-14 2013-06-14 Grout containment sheet and method

Publications (1)

Publication Number Publication Date
US20140369750A1 true US20140369750A1 (en) 2014-12-18

Family

ID=52019345

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/917,941 Abandoned US20140369750A1 (en) 2013-06-14 2013-06-14 Grout containment sheet and method

Country Status (1)

Country Link
US (1) US20140369750A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150267358A1 (en) * 2014-03-19 2015-09-24 Mark Sanders Pre-cast concrete road repair panel
US20150284915A1 (en) * 2014-03-19 2015-10-08 Mark E. Sanders Leveling plate apparatus for a road repair system
CN109024130A (en) * 2018-08-30 2018-12-18 泰山学院 A kind of floor tile and laying method
CN112681087A (en) * 2021-01-14 2021-04-20 刘为浩 Automatic tectorial membrane concrete maintenance device that permeates water
CN114875732A (en) * 2021-12-17 2022-08-09 长沙理工大学 Embankment settlement prevention structure and method for expressway reconstruction and extension project

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US169005A (en) * 1875-10-19 Improvement in pavements
US1330139A (en) * 1917-04-26 1920-02-10 Ward Carpenter And Company Inc Roadway or pavement and method of constructing same
US1664638A (en) * 1926-02-23 1928-04-03 Joseph H Mitter Floor construction
US2737092A (en) * 1952-07-19 1956-03-06 Clarence U Gramelspacher Rubber-coated plywood for roadbed on highways
US3909143A (en) * 1971-05-18 1975-09-30 Romanski Lon H Roadway construction and method therefor
US5586834A (en) * 1994-04-08 1996-12-24 Otaru Development And Construction Department Of Hokkaido Development Bureau Joint structure for coupling precast concrete pavement slabs
US5957619A (en) * 1995-10-12 1999-09-28 Taisei Rotec Corporation Method of constructing block pavement
US6146051A (en) * 1994-10-14 2000-11-14 Conventry University Paving system for spillage and flood management
US20010002497A1 (en) * 1999-04-12 2001-06-07 Alberto M. Scuero Geocomposite system for roads and bridges and construction method
US7059800B2 (en) * 2001-02-28 2006-06-13 Owens Corning Fiberglas Technology, Inc. Method of reinforcing and waterproofing a paved surface
US7134805B2 (en) * 2004-04-01 2006-11-14 Kwik Slab, Llc Precast concrete slab system and method therefor
US8186117B2 (en) * 2008-05-27 2012-05-29 Eren Tumer H System for creating a decking/flooring and a method for installing same

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US169005A (en) * 1875-10-19 Improvement in pavements
US1330139A (en) * 1917-04-26 1920-02-10 Ward Carpenter And Company Inc Roadway or pavement and method of constructing same
US1664638A (en) * 1926-02-23 1928-04-03 Joseph H Mitter Floor construction
US2737092A (en) * 1952-07-19 1956-03-06 Clarence U Gramelspacher Rubber-coated plywood for roadbed on highways
US3909143A (en) * 1971-05-18 1975-09-30 Romanski Lon H Roadway construction and method therefor
US5586834A (en) * 1994-04-08 1996-12-24 Otaru Development And Construction Department Of Hokkaido Development Bureau Joint structure for coupling precast concrete pavement slabs
US6146051A (en) * 1994-10-14 2000-11-14 Conventry University Paving system for spillage and flood management
US5957619A (en) * 1995-10-12 1999-09-28 Taisei Rotec Corporation Method of constructing block pavement
US20010002497A1 (en) * 1999-04-12 2001-06-07 Alberto M. Scuero Geocomposite system for roads and bridges and construction method
US7059800B2 (en) * 2001-02-28 2006-06-13 Owens Corning Fiberglas Technology, Inc. Method of reinforcing and waterproofing a paved surface
US7134805B2 (en) * 2004-04-01 2006-11-14 Kwik Slab, Llc Precast concrete slab system and method therefor
US8186117B2 (en) * 2008-05-27 2012-05-29 Eren Tumer H System for creating a decking/flooring and a method for installing same

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150267358A1 (en) * 2014-03-19 2015-09-24 Mark Sanders Pre-cast concrete road repair panel
US20150284915A1 (en) * 2014-03-19 2015-10-08 Mark E. Sanders Leveling plate apparatus for a road repair system
US9546454B2 (en) * 2014-03-19 2017-01-17 Mark Sanders Pre-cast concrete road repair panel
US9556566B2 (en) * 2014-03-19 2017-01-31 Mark E. Sanders Leveling plate apparatus for a road repair system
CN109024130A (en) * 2018-08-30 2018-12-18 泰山学院 A kind of floor tile and laying method
CN112681087A (en) * 2021-01-14 2021-04-20 刘为浩 Automatic tectorial membrane concrete maintenance device that permeates water
CN114875732A (en) * 2021-12-17 2022-08-09 长沙理工大学 Embankment settlement prevention structure and method for expressway reconstruction and extension project

Similar Documents

Publication Publication Date Title
US8474080B2 (en) Construction method of steel composition girder bridge
US9874036B2 (en) Prefabricated, deconstructable, multistory building construction
CN104631349B (en) A kind of dismounting of urban viaduct steel box-girder and deposit method
US20140369750A1 (en) Grout containment sheet and method
CN104895089B (en) Basement floor and the construction method of the cooperative permanent support system of support pile
EP3099859B1 (en) Method for waterproofing railway bridges
KR101036277B1 (en) Expansion joint waterproof material of structure including road and bridge, and constructing method of expansion joint part using this
CN108798059A (en) A kind of old masonry seismic reinforcing structure and construction method
CN109648696A (en) Side slope precast lattice beam of reinforcing bar connection and preparation method thereof and construction method
CN110863405B (en) Assembled photovoltaic power generation-high-performance concrete pavement structure and construction method
CA1122021A (en) Method of filling a hole in the ground
CN105888281A (en) Method for utilizing jacking storey-adding technique to promote integrated function of community
CN113502835A (en) Wet cellular assembled gridwork roof beam slope protection structure of connecting
CN108708290A (en) The case crane span structure hollow structure and cast-in-situ construction method of minor radius railway curve unit
CN105780624B (en) composite structure layer and its laying method
RU84857U1 (en) HIGHWAY
KR100214388B1 (en) Bridge repairing method using the existing super structure
CN114059414A (en) Overhead superposed type tunnel structure suitable for frozen soil area and construction method
CN110821021A (en) Floor slab capable of being installed rapidly
US11332897B2 (en) Bridge support system
AU2016225892B2 (en) Modular bridge, modular component and method for constructing modular bridge
CN115075076B (en) High-fill and low-soil composite roadbed structure and construction method
CN110820468B (en) Multifunctional assembled photovoltaic power generation pavement and construction method
CN106836231A (en) The assembling constructing method of big cross section precast construction in the deep big foundation pit of soft clay area
CN108571080B (en) A kind of adjustable deformation modularization skin-type composite water-proof construction method

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION