US20020067373A1 - System and method for defining and displaying a reservoir model - Google Patents
System and method for defining and displaying a reservoir model Download PDFInfo
- Publication number
- US20020067373A1 US20020067373A1 US09/895,137 US89513701A US2002067373A1 US 20020067373 A1 US20020067373 A1 US 20020067373A1 US 89513701 A US89513701 A US 89513701A US 2002067373 A1 US2002067373 A1 US 2002067373A1
- Authority
- US
- United States
- Prior art keywords
- definition
- window
- reservoir
- well
- user
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
- G06T17/05—Geographic models
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V11/00—Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
- G06F30/23—Design optimisation, verification or simulation using finite element methods [FEM] or finite difference methods [FDM]
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
- G06T17/20—Finite element generation, e.g. wire-frame surface description, tesselation
Definitions
- the present invention provides a system and method for defining and displaying a reservoir model that substantially eliminates or reduces disadvantages associated with previously developed systems and methods for defining and displaying reservoir models.
- one embodiment of the present invention provides a system and method for defining and displaying a reservoir model comprising a software program executable by a computer processor to provide a graphical user interface that displays a series of windows walking a user through all of the steps necessary to provide a reservoir model definition and a simulation run definition.
- the graphical user interface can also display a set of results derived from the reservoir model definition and a simulation run definition.
- the software program can be further executable to receive the reservoir model definition and simulation run definition from the user.
- the embodiments of the present invention provide yet another technical advantage over previously developed systems of defining and displaying reservoir models by directly presenting the user with data that is pertinent to field users.
- FIG. 1 is a diagrammatic representation of a system for defining and displaying reservoir models according to the present invention
- FIG. 2 is a screen shot of one embodiment of a graphical user interface according to the present invention.
- FIG. 4 is a screen shot of one embodiment of a graphical user interface displaying a 2-D editor according to the present invention
- timeframes can include a description of how the model of the reservoir will be extruded by a modeler program in a time dimension.
- a dialog box very similar to the zone layer editor 500 of FIG. 5 can be used.
- a user could define time layers, either by directly entering time layer data or by manipulating a timeframe graphic.
- the user can drag the reservoir model definition into the 3-D display window 292 .
- 3-D display window 292 can be called up, for example, by the user clicking on the view option in menu toolbar 250 and then clicking on a 3-D viewer option in the corresponding pull-down menu.
- a reservoir model definition such as the “reservoir 1” definition (e.g., element 277 ) into 3-D viewer 292
- 3-D viewer 292 will display a 3-D view of the reservoir defined by reservoir model definition 1 .
- the user can define additional reservoir model definitions.
- a reservoir model definition 2 e.g., element 278 ).
- the user can enter a name of the zone boundary by using name fields 1025 , in this case, “CircularReservoirBoundary.”
- Graphical user interface 135 can also display a task list 1030 which gives the status of the various steps in specifying a reservoir model definition in a simulation run definition. The user can click on an item in task list 1030 to skip to a particular step in defining the reservoir model definition or simulation run definition. When the user has finished defining the reservoir boundaries, the user can click on the finish button 1035 to move onto the next step.
- well definition field 1225 which can be linked to 2-D editor 290 , the user can define various points for the location of wells.
- the user can click on finish button 1230 and proceed to the next step in defining the reservoir model.
- the present invention can allow a user to resume creating a reservoir model definition. If a user wishes to return to a project, they can open a saved reservoir model definition and continue to define the reservoir model or redefine elements of the reservoir model.
- model program 150 can simply perform calculations for elements that have been redefined rather than rerunning the entire model. Additionally, the present invention can resume a terminated simulation run at the point where the simulation was previously terminated by a user. The user, therefore, does not have to reenter an entire reservoir model definition and can thus save substantial time.
- Window 1620 can include data elements provided by the user to define the reservoir model definition and a simulation run definition (e.g., the definition of reservoir model and how that model should be acted upon by modeler program 150 ).
- a user could provide data regarding the boundaries of a reservoir, which could be represented by the element 1665 labeled “Reservoir Boundary 1.”
- the user can provide other sets of model data relating to a reservoir or to a simulation run.
- graphical user interface 135 can display simulation run definition.
- model tree 1670 various simulation run definitions for modeling a reservoir can be displayed.
- the user can define a simulation run by dragging and dropping elements from one simulation run definition into another.
- the user can use various reservoir model definitions and simulation run definitions to define other reservoir model definitions and simulation run definitions. This can be done simply by dragging and dropping elements from one reservoir model definition or simulation run definition into another without having to actually re-enter data.
- the user can run the simulation run by, for example, selecting a run option from a simulation run context menu.
- the selected simulation runs can then be processed by modeler program 150 .
- the reservoir model which was created by the simulation run, can be archived.
- FIG. 16 shows that reservoir 1 has been modeled and is archived under results element 1683 of model tree 1670 .
- a user can then drag and drop the results into 3-D viewer 1692 to view the modeled reservoir.
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Software Systems (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Computer Graphics (AREA)
- Mathematical Analysis (AREA)
- Geophysics (AREA)
- Structural Engineering (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Computational Mathematics (AREA)
- Remote Sensing (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Complex Calculations (AREA)
- Image Generation (AREA)
- Prostheses (AREA)
- Instructional Devices (AREA)
- Processing Or Creating Images (AREA)
- Supply Devices, Intensifiers, Converters, And Telemotors (AREA)
- Geophysics And Detection Of Objects (AREA)
- User Interface Of Digital Computer (AREA)
- Testing Of Coins (AREA)
- Preparation Of Compounds By Using Micro-Organisms (AREA)
- Optical Integrated Circuits (AREA)
- Treatment Of Liquids With Adsorbents In General (AREA)
- Medicines Containing Antibodies Or Antigens For Use As Internal Diagnostic Agents (AREA)
- Optical Radar Systems And Details Thereof (AREA)
- Silicates, Zeolites, And Molecular Sieves (AREA)
- Testing Of Engines (AREA)
- Crystals, And After-Treatments Of Crystals (AREA)
- Detection And Correction Of Errors (AREA)
Abstract
Description
- This application claims priority under 35 U.S.C. 119(e) to provisional patent application No. 60/215,697, filed Jun. 29, 2000, entitled “Method and System for Oil Reservoir Simulation and Modeling,” which is hereby fully incorporated by reference.
- This invention relates generally to reservoir modeling procedures and methods and more particularly to a system and method for defining and displaying a reservoir model.
- Modeling of oil and gas reservoirs aid petroleum engineers in placing wells and increasing the efficiency of recovery operations. The numerical simulation techniques required to model a reservoir with a reasonable degree of accuracy, however, require the processing of a vast amount of data. Because of the processing requirements, high performance computers and sophisticated reservoir modeling programs are becoming increasingly important in the recovery of non-renewable energy resources.
- Current reservoir simulation programs require that the user define a “mesh” so that the program can model the reservoir. In order to define a “mesh” which will result in an accurate model of the reservoir, the user of the program must have knowledge of numerical simulation techniques and computational fluid dynamics. While average petroleum engineers are highly skilled professionals, they often lack the training in these fields. Furthermore, current reservoir simulation programs do not provide a user-friendly graphical user interface in which to input the necessary data, making the programs time-consuming and frustrating to typical petroleum engineers.
- Additionally, prior art reservoir simulation programs lack much of the functionality that field engineers desire. For example, prior art reservoir simulation programs do not allow field engineers to easily compare multiple simulations. Further, prior art reservoir simulation programs require significant post processing of the results of various simulations to analyze and compare the simulations. Furthermore, prior art systems do not allow the field engineer to easily define multiple simulations without reentering a large amount of data.
- The present invention provides a system and method for defining and displaying a reservoir model that substantially eliminates or reduces disadvantages associated with previously developed systems and methods for defining and displaying reservoir models. In particular, one embodiment of the present invention provides a system and method for defining and displaying a reservoir model comprising a software program executable by a computer processor to provide a graphical user interface that displays a series of windows walking a user through all of the steps necessary to provide a reservoir model definition and a simulation run definition. The graphical user interface can also display a set of results derived from the reservoir model definition and a simulation run definition. The software program can be further executable to receive the reservoir model definition and simulation run definition from the user.
- The embodiments of the present invention provide a substantial advantage over previously developed systems for defining and displaying reservoir models by allowing a user to define multiple reservoir model definitions and simulation run definitions.
- The embodiments of the present invention provide another substantial advantage over previously developed systems for defining and displaying reservoir models by allowing the user easily manipulate reservoir model definitions and simulation run definitions.
- The embodiments of the present invention provide yet another substantial advantage by allowing a user to quickly and easily modify reservoir model definitions.
- The embodiment of the present invention provide yet another substantial advantage over previously developed systems for defining and displaying reservoirs by allowing a user to define a reservoir without having extensive knowledge of reservoir modeling techniques or computational fluid dynamics.
- The embodiment of the present invention provide yet another technical advantage over previously developed systems of defining and displaying reservoir models by allowing a user to quickly and easily provide reservoir model definitions.
- The embodiment of the present invention provide yet another technical advantage over previously developed systems of defining and displaying reservoir models by allowing the user to quickly and easily compare the results of multiple simulation runs.
- The embodiments of the present invention provide yet another technical advantage over previously developed systems of defining and displaying reservoir models by directly presenting the user with data that is pertinent to field users.
- The embodiments of the present invention provide yet another technical advantage over previously developed systems of defining and displaying reservoir models by providing the user with substantial time savings over previously developed systems.
- A more complete understanding of the present invention and the advantages thereof may be acquired by referring to the following description, taken in conjunction with the accompanying drawings in which like reference numbers indicate like features and wherein:
- FIG. 1 is a diagrammatic representation of a system for defining and displaying reservoir models according to the present invention;
- FIG. 2 is a screen shot of one embodiment of a graphical user interface according to the present invention;
- FIG. 3 is a screen shot of one embodiment of a graphical user interface at the beginning of a new project;
- FIG. 4 is a screen shot of one embodiment of a graphical user interface displaying a 2-D editor according to the present invention;
- FIG. 5 is a screen shot of a graphical user interface displaying a zone layer editor according to the present invention;
- FIG. 6A is a screen shot of one embodiment of a condition editor dialog box according to the present invention;
- FIG. 6B is a screen shot of another embodiment of a condition editor dialog box according to the present invention;
- FIG. 6C is a screen shot of yet another embodiment of a condition editor dialog box according to the present invention;
- FIG. 7 is a screen shot of one embodiment of a PVT edit dialog box according to the present invention;
- FIG. 8 is a screen shot of one embodiment of a dialog box for creating time slices of an archived model according to the present invention;
- FIG. 9 is a screen shot of another embodiment of a graphical user interface according to the present invention;
- FIG. 10 is a screen shot of one embodiment of a graphical user interface displaying a 2-D editor according to the present invention;
- FIG. 11 is a screen shot of one embodiment of a zone layer editor according to the present invention;
- FIG. 12 is a screen shot of one embodiment of a well definition window according to the present invention;
- FIG. 13 is a screen shot of one embodiment of a graphical user interface for defining fluid properties according to the present invention;
- FIG. 14 is a screen shot of one embodiment of a graphical user interface for displaying a well conditions window according to the present invention;
- FIG. 15 is a screen shot of one embodiment of a graphical user interface for displaying a model parameters window according to the present invention;
- FIG. 16 is a screen shot of one embodiment of a graphical user interface according to the present invention;
- FIG. 17 is a screen shot of one embodiment of a graphical user interface at the beginning of a new project;
- FIG. 18 is a screen shot of one embodiment of a graphical user interface displaying a 2-D editor according to the present invention;
- FIG. 19 is a screen shot of a graphical user interface displaying a zone layer editor according to the present invention;
- FIG. 20A is a screen shot of one embodiment of a condition editor dialog box according to the present invention;
- FIG. 20B is a screen shot of another embodiment of a condition editor dialog box according to the present invention;
- FIG. 21 is a screen shot of one embodiment of a PVT edit dialog box according to the present invention;
- FIG. 22A-22C are a screen shots for embodiments of a dialog boxes for defining a simulation run definition.
- Embodiments of the present invention are illustrated in the FIGUREs, like numerals being used to refer to like and corresponding parts of various drawings.
- Computer simulations of oil and gas reservoirs provide petroleum engineers with valuable insights into placing wells in the reservoir and increasing the production efficiency of recovery operations from the reservoir. The present invention provides a system for defining and displaying computer models of reservoirs. Because the present invention provides a user-friendly graphical user interface for defining and displaying models of reservoirs, petroleum engineers can easily define reservoir models, create multiple simulations and view and compare the results of the simulations.
- FIG. 1 is a diagrammatic representation of a
system 100 for defining and displaying reservoir models according to an embodiment of the present invention. Insystem 100, asoftware program 110 residing on a computer-readable medium 120 is executable by acomputer processor 130 to display agraphical user interface 135 indisplay device 140. Throughgraphical user interface 135, a user can provide a set of project data that can be used to define a reservoir model and a simulation run. The reservoir model definition defines the physical characteristics of the reservoir that the user is attempting to model, whereas the simulation run definition defines how themodeler program 150 will model the reservoir, including time constraints and/or boundary conditions.Software program 110 can then forward the reservoir model and/or the simulation run tomodeler program 150.Modeler program 150 can model the reservoir based on the simulation run definition and the reservoir model definition and return a set of results tosoftware program 110. The set of results can be displayed ingraphical user interface 135 bysoftware program 110. It should be noted that whilesoftware program 110 andmodeler program 150 are shown as being separate in FIG. 1, they can be part of an integrated software package. Furthermore, whilesystem 100 only illustrates one computer for the sake of simplicity, the functionality ofsystem 100 can be distributed over many computers in a network. - FIG. 2 is a screen shot of one embodiment of
graphical user interface 135 according to an embodiment of the present invention.Graphical user interface 135 can include aproject data window 210, areservoir model window 220, asimulation window 230, and adisplay window 240.Graphical user interface 135 can also include amenu toolbar 250 for presenting pull-down menus and icons to represent the most commonly used functions from the menu bar. As illustrated in FIG. 2,project data window 210 can include aproject data tree 255.Project data tree 255 can include a series of elements, such asgeometry element 257 andwells element 259, to categorize the project data. In one embodiment of the present invention, a user can click on an element, such asgeometry element 257, to display a pop-up context menu relating to the element. Forgeometry element 257, this might include a pop-up menu with “create new reservoir,” “cut,” “paste” or other such options.Project data window 210 can include data elements provided by the user to define the reservoir model definition and a simulation run definition. As one example, a user could provide data regarding the boundaries of a reservoir, which could be represented by theelement 265 labeled “zone boundary 1.” As will be discussed in greater detail below, the user can provide other sets of project data relating to a reservoir or to a simulation run. - Along with displaying project data in
graphical user interface 135, a reservoir model definition can be displayed in reservoirmodel definition window 220. In reservoirmodel definition window 220, areservoir model tree 270 can be displayed.Reservoir model tree 270 can be used to categorize and organize data relating to a particular reservoir model definition. If a user wishes to define a particular reservoir model definition (e.g. in reservoir definition window 220) upon which a simulation could be based, the user could populate reservoir model definition using elements contained in the project data (e.g., elements from project data tree 255). In one embodiment of the present invention, this could be done by dragging and dropping elements fromproject data window 210 into reservoirmodel definition window 220. Thus, for example, if a user wanted to run a simulation on a reservoir model having a zone boundary corresponding to “zone boundary 1,” the user could dragelement 265 fromproject data window 210 into reservoirmodel definition window 220. In this example, after being dragged and dropped, the user will seeelement 275 in reservoirmodel definition window 220. The user can similarly drag and drop other elements from theproject data window 210 into reservoirmodel definition window 220 to fully define a reservoir model definition. This allows the user to use the elements contained inproject data window 210 as the basic building blocks for various reservoir model definitions. - In addition to displaying project data and a reservoir model definition,
graphical user interface 135 can display a simulation run definition. Insimulation window 230, the user can define various simulation run definitions for modeling a reservoir, andsimulation window 230 can include asimulation run tree 280 to categorize the various elements of simulation run definitions. In one embodiment of the present invention, the user can define a simulation run by dragging and dropping a reservoir definition fromreservoir definition window 220 and elements, fromproject data window 210, intosimulation window 230. In this manner, the user can use various reservoir model definitions and elements from the project data to define multiple simulation run definitions simply by dragging and dropping elements from one window into another without having to actually re-enter data. - Once a simulation run definition has been defined,
modeler program 150 can model the reservoir and return a set of results, which can be displayed in simulation window 230 (e.g., element 283). The results can then be dragged intodisplay window 240 and be shown in various formats, including a two-dimensional model, a three-dimensional model, or charts and graphs displaying various properties of the modeled reservoir. - In addition to displaying the results returned by
modeler program 150,display window 240 can include a 2-D editor 290. As will be discussed below, the user can use 2-D editor 290 to define various elements in the set of project data displayed inproject data window 210.Display window 240 can also include a 3-D viewer 292. In one embodiment of the present invention, the user can drag a reservoir model definition into the 3-D viewer, and the 3-D viewer will display a three-dimensional view of the reservoir model. This can aid the user in visualizing the model and in correcting errors in the reservoir model definition. Additionally,display window 240 can also include achart viewer 294 which can be used to display various charts and graphs related to the reservoir model definition, the simulation run definition, or the results returned by the modeler program. Again, the display inchart viewer 294 can be prompted by the user dragging and dropping an element intochart viewer 294. Thus, for example, if the user dragged and dropped the results from one simulation run intochart viewer 294,chart viewer 294 would display various properties related to that simulation run. If user dragged and dropped the results from a second simulation run intochart viewer 294,chart viewer 294 could show a comparison of the results between the two simulation runs. - As can be easily understood from the above discussion,
graphical user interface 135 provides an easy, user-friendly interface for users to provide a reservoir model definition and to display the results of modeling a reservoir. Becausegraphical user interface 135 can include drag-and-drop functionality, a user can easily build new reservoir model definitions from extant elements in a set of project data and, likewise, can easily build new simulation runs from various reservoir model definitions or elements in the project data. Thus, the user can easily create several reservoir model definitions and multiple simulation runs without having to enter new data. Furthermore,graphical user interface 135 can provide an aesthetic and well-organized system for displaying data related to the modeling of a reservoir. - To better aid in an understanding of the ease and simplicity of the present invention for defining and displaying a reservoir model, FIGS.3-8 illustrate screen shots of one embodiment of
graphical user interface 135 during various stages of a user defining and displaying the reservoir model definition and the results of a simulation run. - In one embodiment of the present invention, when a user is interested in creating a new project, the user can click on the file menu on the
menu toolbar 250 and then click on “new” in the file pull-down menu. This functionality should be familiar to any computer user who has created a new document in common word processing applications such as Microsoft Word. After a user has clicked on the file and new options as previous described, the user can be given an option of naming his project and giving the project a directory location where the project file can be kept. In addition to naming the project, the user can be given the option in a dialog box (not shown) to select an appropriate physics module and customize the module's global constraints if necessary. Physics modules can be used to define the internal physics of a reservoir and can include, for example, one phase gas 3D, one phase gas 4D, two phase 3D, etc. - FIG. 3 illustrates a screen shot of one embodiment of
graphical user interface 135 according to the present invention after the user has opened a new project and selected a name for the project. When the new project is created,project data window 210, reservoirmodel definition window 220, andsimulation window 230 can be initialized without any data. As can be seen in FIG. 3,project data tree 255, reservoirmodel definition tree 270, andsimulation run tree 280 are empty (e.g. none of the elements inproject data tree 255, such as “geometry” have been populated with data). To begin defining the set of project data, the user can click on the view option ofmenu toolbar 250 to pull down a view menu. The user could then click on a “map” view option in that pull-down menu. This can cause 2-D editor 290 to be displayed indisplay window 240. - FIG. 4 shows a screen shot of one embodiment of
graphical user interface 135 according to the present invention with 2-D editor 290 displayed indisplay window 240. Using 2-D editor 290, the user can create, edit, and display zone boundaries. Similar to other computer drawing tools, the user will be able to create poly-lines, by simply clicking on points in 2-D editor 290. Alternatively the user can crate zone boundaries using ellipses, polygons, etc., or the user can load zone boundaries that are stored in a compatible file format such as a spreadsheet. When a user is finished defining a zone boundary, such aszone boundary 401, a pop-up dialog can prompt the user to name the new zone boundary. The name of the new zone boundary can then appear in graphical user interface 135 (e.g.,element 407 represents “zone boundary 1”). The user can then define additional zone boundaries for the reservoir model definition. - In addition to defining zone boundaries in 2-
D editor 290, the user can provide well definitions. In one embodiment of the present invention, when the user clicks onwell element 410 ofproject data tree 255, a context menu with a “create well” option could appear. After clicking on the “create well” option, a dialog box (not shown) could appear asking the user to input well properties, such as inner and outer radius of the well and other relevant information used bymodeler program 150 to create a finite elements mesh around the well. The user can specify whether the well is an injector or a producer and name the well. The well can be displayed as an element underwell element 410 ofproject data tree 255. The user could then select the location of the well by placing an icon representing the well in the 2-D editor 290 (e.g., well icon 420). - From 2-
D editor 290, the user can also create, edit and display zone points. Zone points are points that will be honored during the automatic meshing process. The user can click zone points into existence by clicking on points in 2-D editor 290. In one embodiment of the present invention, the user can toggle 2-D editor 290 into showing the mesh that modelerprogram 150 will apply to the reservoir model. Furthermore, the user can instantaneously see a re-mesh as the user adds or removes zone points from 2-D editor 290. - In addition to using 2-
D editor 290 to define zone boundaries, wells and zone points, a user can specify the reservoir properties at various points in the reservoir. Fromproject data tree 255, the user can click onproperty maps element 415 and select “create data property map” option from a pop-up context menu. After selecting “create data property map,” a dialog box can prompt the user to name the new property map, as well as enter the units of the property being entered. The user could then click on points in 2-D editor 290 to specify points associated with the new property map. For each point, the user can specify the property value for that point. Examples of reservoir properties that can be included in the property map include things such as permeability of the reservoir in the X direction, the porosity of the reservoir, or the thickness, etc. Thus, a user can define the porosity of the reservoir at different locations by clicking on various points in 2-D editor 290 and assigning those points a porosity value. Alternatively, the user can assign constant porosity values to the reservoir (e.g., the reservoir could have a constant porosity throughout). - Along with defining zone boundaries, zone points, wells and property maps, the user can define zone layers using
graphical user interface 135. A zone layer corresponds to the depth and thickness of a particular zone in a reservoir. Fromproject data tree 255, the user can click onzone layers element 430 to call up a context menu. In the context menu, the user can select a “create zone layer” option, prompting a zone layer editor to appear indisplay window 240. FIG. 5 is a screen shot of one embodiment ofzone layer editor 500 according to the present invention. Inzone layer editor 500, the user can create zone layers and specify the base and top depths of each layer. The user can either define the layers in layer graphic 510 by moving the depth bars 520 up and down or can directly enter the layer depth in the fields provided. Additionally, the user can drag property maps fromproject data tree 255 onto the layers to associate the property maps with the layers. For example, if a property map had been previously created named “Property Map 1,” and was stored underproperty map element 420 of FIG. 4,Property Map 1 could be dragged intolayer editor 500 and dropped intolayer 2. This would associateProperty Map 1 withlayer 2. Alternatively, the user can also define zone layers by entering data in zone layer fields 530. - A user can also define conditions for zone boundaries, wells and zone layers. The user can select the zone boundary, well or zone layer from
project data tree 255, 2-D editor 290 orlayer editor 500 and display a pop-up context menu. From the pop-up context menu the user can select a “create condition” option to create a new condition set. A condition editor dialog box can appear indisplay window 240 that allows the user to create outer boundary conditions, well conditions, initial conditions, and interior conditions and them insert them into a selected condition set. FIGS. 6A through 6C show screen shots of one embodiment of the condition editor dialog box according to the present invention. FIG. 6A shows a dialog box for specifying initial conditions, FIG. 6B shows a dialog box for specifying outer boundary conditions, and FIG. 6C shows a dialog box for specifying well conditions. As can be seen in each of these figures, a condition setname field 610 can be used to specify the conditions set to which a particular condition belongs. The name of the conditions set can appear inproject data window 210 under conditions set element 430 (see FIG. 4). - In one embodiment of the present invention, the user can also define rock and fluid properties. In response to the user clicking on the “create pvt items” option in a context pop-up menu, a pvt edit dialog box can appear. FIG. 7 illustrates a screen shot of one embodiment of the pvt
edit dialog box 700 according to the present invention. In pvtedit dialog box 700, the user can specify such rock and fluid properties for a reservoir such as the pressure, volume, temperature, relative permeability and the capillary pressure. When data has been entered in the fields inwindow 710, the user can create charts, such aschart 720, to visualize what was just entered. - From
project data tree 255, the user can also create a set of timeframes. The timeframes can include a description of how the model of the reservoir will be extruded by a modeler program in a time dimension. To enter the timeframes, a dialog box very similar to thezone layer editor 500 of FIG. 5 can be used. In the timeframe dialog box, a user could define time layers, either by directly entering time layer data or by manipulating a timeframe graphic. - Additionally, a user can click on solver element440 in
project data tree 225 to create a set of solver properties. From a pop-up context menu, the user can select “create solver properties,” which can prompt a solver properties dialog box to be displayed indisplay window 240. FIG. 8 illustrates a screen shot of one embodiment of the solver properties dialog box 800 according to one embodiment of the present invention. Solver properties can be used to control how a reservoir is modeled bymodeling program 140. Solver properties can include items such as error estimations, number of iterations, tolerances, etc. As can be seen from FIG. 8, a solver property name can be used to identify a particular set of solver properties. - Returning again to FIG. 2, FIG. 2 illustrates one embodiment of the
graphical user interface 135 according to the present invention, in which theproject data tree 255 has been populated with data entered by a user. In one embodiment of the present invention, the data can be entered by the user in the manner described in conjunction with FIGS. 2 through 8. To define the reservoir model definition in this embodiment of the present invention, the user can drag and drop elements fromproject data tree 225 into reservoirmodel definition tree 270. By dragging and dropping different combinations of elements fromproject data tree 225 intoreservoir model tree 270, the user can define several reservoir model definitions. - In order to view the reservoir model that is defined by the reservoir model definition, the user can drag the reservoir model definition into the 3-D display window292. 3-D display window 292 can be called up, for example, by the user clicking on the view option in
menu toolbar 250 and then clicking on a 3-D viewer option in the corresponding pull-down menu. In one embodiment of the present invention, by dragging a reservoir model definition, such as the “reservoir 1” definition (e.g., element 277) into 3-D viewer 292, 3-D viewer 292 will display a 3-D view of the reservoir defined byreservoir model definition 1. Furthermore, by dragging and dropping a different set of elements fromproject data tree 255, the user can define additional reservoir model definitions. For example, a reservoir model definition 2 (e.g., element 278). - Similarly, the user can define multiple simulation run definitions. In one embodiment of the present invention, this can be done by the user dragging and dropping a reservoir model definition (e.g., reservoir model definition1) into
simulation run tree 280. As can be seen,reservoir model definition 1 is contained in run simulation definition 3 (e.g., element 281). The user can further define a simulation run definition by dragging and dropping a conditions set fromproject data tree 255 and dropping it into simulationrun definition tree 280. The user can also drag and drop a set of solver properties fromproject data tree 255 tosimulation run tree 280. - After defining a simulation run definition, the user can run the simulation run by, for example, selecting a run option from a simulation run context menu. The selected simulation runs can then be processed by
modeler program 150. Once a simulation run has been completed, the reservoir model which was created by the simulation run can be archived. For example, FIG. 2 shows thatreservoir 1 has been modeled and is archived underresults element 283 of the simulation runstree 280. A user can then drag and drop the archived results into 3-D viewer 292 to view the modeled reservoir. - In one embodiment of the present invention, the archived model can also be dragged and dropped into
chart viewer 294 ofgraphical user interface 135.Chart viewer 294 can display charts and graphs that are pertinent to field engineers, such as formation volume factor versus pressure, viscosity versus pressure, solution gas ratio versus pressure, relative permeability versus saturation, or capillary pressure versus saturation. Additionally,chart viewer 294 can provide well production time series plots which can give the user insight into the production of a given well over time. Examples of well production time series plots include production of phase rates, ratios, and cumulative phase volume charts. Furthermore,chart viewer 294 can allow the user to display user defined charts so that the user can plot one property of a given reservoir against another property. In addition, a user can drag and drop multiple archived reservoir solutions intochart viewer 294 so that the results from various reservoir models can be directly compared by the user. To further aid in analysis of the archived model, the archived model can also be sliced with the predefined slice operations. FIG. 8 shows one embodiment of a dialog box 800 for creating slices of the archived model according to the teachings of the present invention. As illustrated in FIG. 8, both time slices and well slices can be made by the user. - As can be understood from the foregoing discussion, the present invention can provide a user-friendly system and method for defining and displaying computer simulation models of reservoirs. The present invention can allow a user to define the basic building blocks for reservoir models and to then easily combine those building blocks into different reservoir models without having to re-enter large amounts of data. Additionally, the present invention can allow a user to define several sets of parameters for simulation run definitions and to then define multiple simulation run definitions using various sets of parameters and the different reservoir models defined by the user.
- In one embodiment of the present invention, the defining of the reservoir model definitions and simulation run definitions can be done through a series of user-friendly dialog boxes and graphics tools. Furthermore, the reservoir model definition and simulation run definition can easily be defined by dragging and dropping various components of the definitions from a set of project data.
- Because the actual modeling of the reservoir occurs in the background, a user does not need extensive knowledge of modeling techniques. Furthermore, the type of data entered in
project data tree 255 is the type of data that would be generally known and understandable to petroleum engineers or workers out in the field, making the present invention exceptionally easy to use. Thus, the present invention provides substantial advantages over the prior art by allowing the user to define and display a computer simulation of a reservoir in a user-friendly manner. Furthermore, the present invention provides another advantage because the present invention allows the quick display of the type of information that is directly useful by reservoir engineers working in the field. - In another embodiment of the present invention,
graphical user interface 135 can present a user with a series of windows walking the user through all the steps necessary to define a reservoir model definition in the simulation run definition. In this embodiment,graphical user interface 135 can automatically present the user with a series of windows to guide the user through defining a reservoir model definition and a simulation run definition, whereas in the embodiment described in conjunction with FIGS. 2-8, the graphical user interface would present dialog boxes when called by the user. It should also be noted, however, that the windows can be presented in any order, and that the sequence provided below is exemplary only. FIG. 9 is a screen shot of one embodiment ofgraphical user interface 135 according to the present invention.Graphical user interface 135 can include atool bar 905 containing commonly used functions, aproject window 910 containing areservoir model tree 915, having various previously defined reservoir definitions and simulation run definitions, and resultswindow 915 containing aresults tree 925, representing the results of previously run simulations.Graphical user interface 135 can also include adisplay window 920 for displaying various windows to walk a user through providing a reservoir model definition and a simulation run definition. - In operation, to begin defining a new reservoir model definition, the user can click on the “file” button in
toolbar 905 and then on a “new” option in the context pop-up menu that appears when the user clicked on the file button. In response to the user clicking on “file” and “new,”graphical user interface 135 can display a zone boundary definition window with a 2-D editor. FIG. 10 is a screen shot of one embodiment ofgraphical user interface 135 with 2-D editor 290 displayed indisplay window 920. As previously discussed with regards to FIG. 4, the user can create, edit and display zone boundaries such aszone boundary 1005 in 2-D editor 290. Similar to other computer drawing tools, the user will be able to create poly-lines by simply clicking on points in 2-D editor 290, or the user can define zone boundaries using predefined shapes, such aspredefined shapes 1010, displayed in thetoolbar 1015 of 2-D editor 290. In addition to displaying 2-D editor 290,graphical user interface 135 can display a set of zoneboundary definition fields 1020 that are linked to a two dimensional shape drawn in 2-D editor 290. Thus, the user can enter the coordinates of a zone boundary either by drawing the zone boundary in 2-D editor 290, by entering points along the zone boundary in a set offields 1020 or, as previously discussed, by importing a zone boundary from a compatible file format. Additionally, in the zone boundary definition window, the user can enter a name of the zone boundary by using name fields 1025, in this case, “CircularReservoirBoundary.”Graphical user interface 135 can also display atask list 1030 which gives the status of the various steps in specifying a reservoir model definition in a simulation run definition. The user can click on an item intask list 1030 to skip to a particular step in defining the reservoir model definition or simulation run definition. When the user has finished defining the reservoir boundaries, the user can click on thefinish button 1035 to move onto the next step. - When the user clicks on the
finished button 1035,graphical user interface 135 can display a zone layer definition window as illustrated in FIG. 11. The zone layer definition window can include atask list 1130 specifying the tasks that should be completed in defining the reservoir model definition in the simulation run definition. Additionally, the zone layer definition window can include a zone layer graphic 1110. As with layer graphic 510 discussed in conjunction with FIG. 5, a user can define the depth of zone layers by moving depth bars in graphic 1110 up and down, or the user can directly enter the thickness of the layer by defining the top elevation and the bottom elevation of the layer inelevation fields 1115 and 1120 respectively. Additionally, in zonelayer property area 1130, the user can define various conditions present in the zone layer. For example, the user can define the X permeability, the Y permeability, the thickness of the layer, the porosity, etc. Additionally, in maptype check boxes 1125, the user can check whether particular zone conditions are constant, scattered or correspond to some pattern such as a grid. In the case in which the zone conditions correspond to a grid pattern, the user can import a grid from another software program in a compatible format. Furthermore, inlayer name box 1135, the user can provide a name for a particular zone layer. This process can be repeated for multiple zone layers in the same reservoir model definition. When the user has finished defining the conditions for all the zone layers in the reservoir, the user can click onfinished button 1140. - After the user has defined the zone layer conditions (see, FIG. 11),
graphical user interface 135, as shown in FIG. 12, can display a well definition window. The well definition window can, again, include a 2-D editor 290 through which the user can define the placement of a well in the reservoir. Additionally, the user inwell property area 1203 can define whether the well is a producer or an injector (checkbox 1205) and can define a well's inclination (checkbox 1210). Also, by clicking on the tabs provided (e.g. tubing model and completion), the user can define other well properties, as would be understood by those of ordinary skill in the art. In addition, infield 1215, the user can define the well radius and in field 1220 the user can name the well. Additionally, inwell definition field 1225, which can be linked to 2-D editor 290, the user can define various points for the location of wells. When the user is finished defining various wells, the user can click onfinish button 1230 and proceed to the next step in defining the reservoir model. - As shown in FIG. 13, the user can next define fluid properties for the reservoir model. FIG. 13, is a screen shot of one embodiment of
graphical user interface 135 for defining the fluid properties according to the present invention. Influid properties area 1303, a user, viaproperty fields 1305, can define such fluid properties as the initial reservoir pressure, reservoir temperature, separator gas gravity, condensate gravity, and other reservoir fluid properties that can be determined to be known to those of ordinary skill in the art. Inchart viewer 1310, the user can view charts illustrating various fluid properties selected by the user.Chart viewer 1310, in one embodiment of the present invention, can show a generated graph of the pressure, formation volume factor, and viscosity for a reservoir.Graphical user interface 135 can providename field 1315 through which the user can name a particular set of fluid properties. The user can then proceed to the next step in defining the reservoir model definition by clicking on thefinish button 1320. - FIG. 14 is a screen shot of one embodiment of
graphical user interface 135 for displaying a well conditions window, according to the present invention. In wellcondition name field 1405, the user can name the well conditions that he or she is defining for a particular well. In well properties area 1407, the user can determine to which well the condition is going to be applied (field 1410) and define the specific well conditions (well condition fields 1420).Chart viewer 1425 can graphically display the well conditions in chart format for review by the user. When the user is finished defining the well conditions for the various wells in a reservoir model definition, the user can click onfinish button 1430 to proceed to defining the simulation run definition. - FIG. 15 shows a screen shot of
graphical user interface 135 for displaying one embodiment of a model parameters window according to the present invention. Inname field 1505, the user can provide a name for a simulation run and in description field 1510 provide a brief description of the simulation run. Additionally, in model runtime frame fields 1515, the user can specify the time and date to begin a simulation run and the time that the simulation run should end. Furthermore, in reservoir elevation andinitial pressure fields 1520, the user can define the pressure at a reference elevation. In fields 1525, the users can indicate whether they are interested in displaying time slices of a model and the times for which they wish to view the time slices. Additionally, inchart area 1530, the user can check off which charts they wish to view after the simulation run is complete. In this example, the user has indicated that he or she wishes to see the pressure and rate charts for the well named “well” of the reservoir, and the pressure rate and cumulative charts for the well named well one for the reservoir. When the user has completed entering all the model parameters, the user can click on therun button 1550 to run the simulation. Results of the simulation can be displayed ingraphical user interface 135 in chart format, graph format or as a 3-D model. Referring again to FIG. 9, the results from the most recent simulation. or a previous simulation, can be represented inresults window 915. By clicking on the results shown inresults window 915, the user can view the set of results associated with a particular simulation run. Various charts and three-dimensional views of the simulation run can be displayed indisplay window 920. - In addition to allowing a user to easily define a reservoir model, the present invention can allow a user to resume creating a reservoir model definition. If a user wishes to return to a project, they can open a saved reservoir model definition and continue to define the reservoir model or redefine elements of the reservoir model. In one embodiment of the present invention, for a reservoir model that has already been simulated,
model program 150 can simply perform calculations for elements that have been redefined rather than rerunning the entire model. Additionally, the present invention can resume a terminated simulation run at the point where the simulation was previously terminated by a user. The user, therefore, does not have to reenter an entire reservoir model definition and can thus save substantial time. - As could be understood from the forgoing discussion, the user does not need any significant knowledge, if they need any knowledge at all, of computational fluid dynamics or of reservoir modeling techniques. Instead, the user need only understand concepts that are familiar to most petroleum field engineers, such as field boundaries, layer definitions, reservoir properties, fluid properties, initial conditions, etc. Additionally,
graphical user interface 135 can walk a user through the various steps in defining a reservoir model definition in a simulation run definition. In this manner, the graphical user interface of the various embodiments of this invention can obviate the need for a user to have detailed knowledge of reservoir modeling. Becausegraphical user interface 135 can walk a user through the steps of reservoir modeling, graphical user interface provides a simple user-friendly method to define reservoir models and to conduct simulations.Graphical user interface 135 also allows the user to define various models and simulation run definitions so that users can create a variety of reservoir models, allowing the user to experiment with reservoir characteristics and to plan for various contingencies. - FIG. 16 is a screen shot of yet another one embodiment of
graphical user interface 135 according to an embodiment of the present invention.Graphical user interface 135 can include a combined reservoir model andsimulation window 1620 and adisplay window 1640.Graphical user interface 135 can also include amenu toolbar 1650 for presenting pull-down menus and icons to represent the most commonly used functions from the menu bar. In one embodiment of the present invention, a user can click on various elements, such as geometry element 1657, to display a pop-up context menu relating to the associated element. For geometry element 1657, this might include a pop-up menu with “create new reservoir,” “cut,” “paste” or other such options.Window 1620 can include data elements provided by the user to define the reservoir model definition and a simulation run definition (e.g., the definition of reservoir model and how that model should be acted upon by modeler program 150). As one example, a user could provide data regarding the boundaries of a reservoir, which could be represented by theelement 1665 labeled “Reservoir Boundary 1.” As will be discussed in greater detail below, the user can provide other sets of model data relating to a reservoir or to a simulation run. It should be noted, that in this embodiment of the present invention,graphic user interface 135 no longer includes a mixed collection of model pieces that can be assembled into reservoir model definitions on an ad hoc basis, but instead contains a representation of complete or partially complete models that can be dragged and dropped between various simulation run definitions). - In
window 1620, amodel tree 1670 can be displayed.Model tree 1670 can be used to categorize and organize data relating to particular reservoir model definitions and simulation run definitions. It should be noted that in FIG. 16, only one reservoir model definition and simulation run definition are categorized. However, additional reservoir model definitions and simulation run definitions could be categorized in thesame model tree 1670. If a user wishes to define a particular reservoir model definition upon which a simulation could be based, the user can define an entirely new reservoir model definition or can populate the reservoir model definition using elements contained in other reservoir model definitions (e.g., by dragging and dropping elements from other reservoir model definitions in model tree 1670). Thus, for example, if a user wanted to run a simulation on a reservoir model having a zone boundary corresponding to “reservoir boundary 1,” the user could dragelement 1665 from one reservoir model definition to another inmodel tree 1670. In this example, after being dragged and dropped, the user will see element 1675 copied in another reservoir model definition. The user can similarly drag and drop other elements different reservoir model definitions to fully define additional reservoir model definition. This allows the user to use the elements contained in one reservoir model definition as the basic building blocks for other reservoir model definitions. - In addition to displaying reservoir model definitions,
graphical user interface 135 can display simulation run definition. Inmodel tree 1670, various simulation run definitions for modeling a reservoir can be displayed. In one embodiment of the present invention, the user can define a simulation run by dragging and dropping elements from one simulation run definition into another. In this manner, the user can use various reservoir model definitions and simulation run definitions to define other reservoir model definitions and simulation run definitions. This can be done simply by dragging and dropping elements from one reservoir model definition or simulation run definition into another without having to actually re-enter data. - Once a simulation run definition has been defined,
modeler program 150 can model the reservoir and return a set of results, which can be displayed in simulation window 1620 (e.g., element 1683). Additionally, the results can be archived, with the last set of results displayed inresults window 1684. The results can then be dragged intodisplay window 1640 and be shown in various formats, including a two-dimensional model, a three-dimensional model, or charts and graphs displaying various properties of the modeled reservoir. - In addition to displaying the results returned by
modeler program 150,display window 1640 can include a 2-D editor 1690. As will be discussed below, the user can use 2-D editor 1690 to define various elements for the reservoir model definitions displayed inmodel tree 1670.Display window 1640 can also include a 3-D viewer 1692. In one embodiment of the present invention, the user can drag a reservoir model definition into the 3-D viewer, and the 3-D viewer will display a three-dimensional view of the reservoir model. This can aid the user in visualizing the model and in correcting errors in the reservoir model definition. Additionally,display window 1640 can also include achart viewer 1694 which can be used to display various charts and graphs related to the reservoir model definition, the simulation run definition, or the results returned by the modeler program. The display inchart viewer 1694 can be prompted by the user clicking on a set of results displayed inmodel tree 1670. - As can be easily understood from the above discussion,
graphical user interface 135 provides an easy, user-friendly interface for users to provide a reservoir model definition and to display the results of modeling a reservoir. Becausegraphical user interface 135 can include drag-and-drop functionality, a user can easily build new reservoir model definitions from extant elements from a previously defined model and, likewise, can easily build new simulation runs from various reservoir model definitions or elements in the model tree. Thus, the user can easily create several reservoir model definitions and multiple simulation runs without having to enter new data. Furthermore,graphical user interface 135 can provide an aesthetic and well-organized system for displaying data related to the modeling of a reservoir. - To better aid in an understanding of the ease and simplicity of the present invention for defining and displaying a reservoir model, FIGS.17-22C illustrate screen shots of one embodiment of
graphical user interface 135 during various stages of a user defining and displaying the reservoir model definition and the results of a simulation run. - In one embodiment of the present invention, when a user is interested in creating a new project, the user can click on the file menu on the
menu toolbar 1650 and then click on “new” in the file pull-down menu. This functionality should be familiar to any computer user who has created a new document in common word processing applications such as Microsoft Word. After a user has clicked on the file and new options as previous described, the user can be given an option of naming his project and giving the project a directory location where the project file can be kept. In addition to naming the project, the user can be given the option in a dialog box (not shown) to select an appropriate physics module through a series of simple questions about the reservoir model and customize the module's global constraints if necessary. Physics modules can be used to define the internal physics of a reservoir and can include, for example, one phase gas 3D, one phase gas 4D, two phase 3D, etc. - FIG. 17 illustrates a screen shot of one embodiment of
graphical user interface 135 according to the present invention after the user has opened a new project and selected a name for the project. When the new project is created, window 1620 (e.g., the combined reservoir model definition window and simulation run definition window) can be initialized without any data. As can be seen in FIG. 17,model tree 1670 is empty (e.g. none of the elements inmodel tree 1670 have been populated with data). Thus, an empty model can be created and the user can subsequently be automatically lead through the steps necessary to define the model. To begin defining a reservoir model definition, 2-D editor 1690 can automatically be displayed indisplay window 240. - FIG. 18 shows a screen shot of one embodiment of
graphical user interface 135 according to the present invention with 2-D editor 1690 displayed indisplay window 1640. Using 2-D editor 1690, the user can create, edit, and display zone boundaries. Similar to other computer drawing tools, the user will be able to create poly-lines, by simply clicking on points in 2-D editor 1690. Alternatively, the user can create zone boundaries (e.g., boundaries for the reservoir) using ellipses, polygons, etc., or the user can load zone boundaries that are stored in a compatible file format such as a spreadsheet. When a user is finished defining a zone boundary, such aszone boundary 1801, a form or a pop-up dialog can prompt the user to name the new zone boundary. The name of the new zone boundary can then appear in graphical user interface 135 (e.g., element 1807 represents one zone or reservoir boundary). The user can then define additional zone boundaries for the reservoir model definition. Furthermore, the user could define a zone boundary inzone boundary fields 1811, which could be linked to 2-D editor 1690. - In addition to defining zone boundaries in 2-
D editor 1690, the user can provide well definitions. In one embodiment of the present invention, when the user clicks on well element 1810 ofmodel tree 1670, a context menu with a “create well” option could appear. After clicking on the “create well” option, a dialog box (not shown) could appear asking the user to input well properties, such as inner and outer radius of the well and other relevant information used bymodeler program 150 to create a finite elements mesh around the well. The user can specify whether the well is an injector or a producer and name the well. The well can be displayed as an element under well element 1810 ofmodel tree 1670. The user could then select the location of the well by placing an icon representing the well in the 2-D editor 1690 (e.g., well icon 1820). - From 2-
D editor 1690, the user can also create, edit and display zone points. Zone points are points that will be honored during the automatic meshing process. The user can click zone points into existence by clicking on points in 2-D editor 1690. In one embodiment of the present invention, the user can toggle 2-D editor 1690 into showing the mesh that modelerprogram 150 will apply to the reservoir model. Furthermore, the user can instantaneously see a re-mesh as the user adds or removes zone points from 2-D editor 1690. - In addition to using 2-
D editor 1690 to define zone boundaries, wells and zone points, a user can specify the reservoir properties at various points in the reservoir. Frommodel tree 1670, the user can click on property maps element 1615 and select a “create property maps” option from a pop-up context menu. After selecting “create property maps, ” a dialog box can prompt the user to name the new property map, as well as enter the units of the property being entered. The user could then click on points in 2-D editor 1690 to specify points associated with the new property map. For each point, the user can specify the property value for that point. Examples of reservoir properties that can be included in the property map include things such as permeability of the reservoir in the X direction, the porosity of the reservoir, or the thickness, etc. Thus, a user can define the porosity of the reservoir at different locations by clicking on various points in 2-D editor 1690 and assigning those points a porosity value. Alternatively, the user can assign constant porosity values to the reservoir (e.g., the reservoir could have a constant porosity throughout). - Along with defining zone boundaries, zone points, wells and property maps, the user can define zone layers (or reservoir layers) using
graphical user interface 135. A reservoir layer corresponds to the depth and thickness of a particular zone in a reservoir. Frommodel tree 1670, the user can click onflow unit element 1830 to call up a context menu. In the context menu, the user can select a “create reservoir layer” option, prompting a reservoir layer editor to appear indisplay window 1640. FIG. 19 is a screen shot of one embodiment ofreservoir layer editor 1900 according to the present invention. Inreservoir layer editor 1900, the user can create reservoir layers and specify the base and top depths of each layer. The user can either define the layers in layer graphic 1910 by moving the depth bars 1920 up and down or can directly enter the layer depth in the fields provided. Additionally, the user can drag property maps frommodel tree 1670 onto the layers to associate the property maps with the layers. For example, if a property map had been previously created named “Property Map 1,” and was stored under a property map element inmodel tree 1670,Property Map 1 could be dragged intolayer editor 1900 and dropped intolayer 2. This would associateProperty Map 1 withlayer 2. Alternatively, the user can also define zone layers by entering data in zone layer fields 1930. - A user can also define conditions for reservoir boundaries, wells and reservoir layers. The user can select the reservoir boundary, well or reservoir layer from
model tree 1670 to display a pop-up context menu. From the pop-up context menu the user can select a “create condition” option to create a new condition set. A condition editor dialog box can appear indisplay window 1640 that allows the user to create outer boundary conditions, well conditions, initial conditions, and interior conditions and then insert them into a selected condition set. FIGS. 20A and 20B show screen shots of one embodiment of the condition editor dialog box according to the present invention. FIG. 20A shows a dialog box for specifying initial conditions and boundary conditions, and FIG. 20C shows a dialog box for specifying well conditions. As can be seen in each of these figures, acondition name field 2010 can be used to specify the conditions set to which a particular condition belongs. The name of the conditions set can appear inwindow 1620 under conditions set element 1830 (see FIG. 18). - In one embodiment of the present invention, the user can also define fluid properties. In response to the user clicking on the “create pvt items” option in a context pop-up menu, a pvt edit dialog box can appear. FIG. 21 illustrates a screen shot of one embodiment of the pvt
edit dialog box 2100 according to the present invention. In pvtedit dialog box 2100, the user can specify such rock and fluid properties for a reservoir such as the pressure, volume, temperature, relative permeability and the capillary pressure. When data has been entered in the fields inwindow 2110, the user can create charts, such aschart 2120, to visualize what was just entered. - From
model tree 1670, the user can also create a simulation run definition (e.g., by clicking onelement 1670 to call up simulation run dialog boxes. FIGS. 22A through 22C show embodiments of screen shots for providing a simulation run definition. As can be seen in FIG. 22A, atarea 2200, the user can select time slices for a reservoir model definition. Similarly, as illustrated in FIG. 22B, indisplay window 1640, the user can define a time frame for a simulation run. Additionally, as can be seen from FIG. 22C, the user can define a set of solver parameters in display window 1640 (e.g., in solver parameters window 2240). - Returning again to FIG. 16, FIG. 16 illustrates one embodiment of the
graphical user interface 135 according to the present invention, in which themodel tree 1670 has been populated with data entered by a user. In one embodiment of the present invention, the data can be entered by the user in the manner described in conjunction with FIGS. 16 through 22C. - In order to view the reservoir model that is defined by the reservoir model definition, the user can drag the reservoir model definition into the 3-
D display window 1692. 3-D display window 1692 can be called up, for example, by the user clicking on the view option inmenu toolbar 1650 and then clicking on a 3-D viewer option in the corresponding pull-down menu. In one embodiment of the present invention, by dragging a reservoir model definition, such as the “reservoir 1” definition (e.g., element 1677) into 3-D viewer 1692, 3-D viewer 1692 will display a 3-D view of the reservoir defined byreservoir model definition 1. Furthermore, by dragging and dropping a different set of elements frommodel tree 1670, the user can define additional reservoir model definitions. On the other hand, the user could define additional reservoir model definitions by completely defining a new reservoir model definition (e.g., by repeating the steps discussed in conjunction with FIGS. 16 through 22C). It should be noted that this process can be carried out by the user selecting elements frommodel tree 1670 to call up appropriate dialog boxes, by the user automatically being presented with the dialog boxes to walk the user through providing the definitions, or a combination of both. Similarly, the user could define multiple simulation run definitions by dragging elements from one simulation run definition inmodel tree 1670 and dropping them into another simulation run definition or be defining an entirely new simulation run definition. - After defining a simulation run definition, the user can run the simulation run by, for example, selecting a run option from a simulation run context menu. The selected simulation runs can then be processed by
modeler program 150. Once a simulation run has been completed, the reservoir model, which was created by the simulation run, can be archived. For example, FIG. 16 shows thatreservoir 1 has been modeled and is archived underresults element 1683 ofmodel tree 1670. A user can then drag and drop the results into 3-D viewer 1692 to view the modeled reservoir. - In one embodiment of the present invention, the archived model can also be dragged and dropped into
chart viewer 1694 ofgraphical user interface 135.Chart viewer 1694 can display charts and graphs that are pertinent to field engineers, such as formation volume factor versus pressure, viscosity versus pressure, solution gas ratio versus pressure, relative permeability versus saturation, or capillary pressure versus saturation. Additionally,chart viewer 1694 can provide well production time series plots which can give the user insight into the production of a given well over time. Examples of well production time series plots include production of phase rates, ratios, and cumulative phase volume charts. Furthermore,chart viewer 1694 can allow the user to display user defined charts so that the user can plot one property of a given reservoir against another property. In addition, a user can drag and drop multiple archived reservoir solutions intochart viewer 1694 so that the results from various reservoir models can be directly compared by the user. To further aid in analysis of the archived model, the archived model can also be sliced with the predefined slice operations. Both time slices and well slices (e.g., slices of the reservoir model at some time t through the well) can be made by the user. - As can be understood from the foregoing discussion, the present invention can provide a user-friendly system and method for defining and displaying computer simulation models of reservoirs. The present invention can allow a user to define the basic building blocks for reservoir models and to then easily combine those building blocks into different reservoir models without having to re-enter large amounts of data. Additionally, the present invention can allow a user to define several sets of parameters for simulation run definitions and to then define multiple simulation run definitions using various sets of parameters and the different reservoir models defined by the user.
- In one embodiment of the present invention, the defining of the reservoir model definitions and simulation run definitions can be done through a series of user-friendly dialog boxes and graphics tools. Furthermore, the reservoir model definition and simulation run definition can easily be defined by dragging and dropping various components of the respective definitions.
- Because the actual modeling of the reservoir occurs in the background, a user does not need extensive knowledge of modeling techniques. Furthermore, the type of data entered is the type of data that would be generally known and understandable to petroleum engineers or workers out in the field, making the present invention exceptionally easy to use. Thus, the present invention provides substantial advantages over the prior art by allowing the user to define and display a computer simulation of a reservoir in a user-friendly manner. Furthermore, the present invention provides another advantage because the present invention allows the quick display of the type of information that is directly useful by reservoir engineers working in the field.
- Although the present invention has been described in detail, it should be understood that various changes, substitutions and alterations can be made hereto without departing from the spirit and scope of the invention as described in the appended claims.
Claims (48)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US09/895,137 US20020067373A1 (en) | 2000-06-29 | 2001-06-29 | System and method for defining and displaying a reservoir model |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US21569700P | 2000-06-29 | 2000-06-29 | |
US09/895,137 US20020067373A1 (en) | 2000-06-29 | 2001-06-29 | System and method for defining and displaying a reservoir model |
Publications (1)
Publication Number | Publication Date |
---|---|
US20020067373A1 true US20020067373A1 (en) | 2002-06-06 |
Family
ID=22804003
Family Applications (8)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US09/896,147 Expired - Lifetime US7043413B2 (en) | 2000-06-29 | 2001-06-29 | Method for modeling an arbitrary well path in a hydrocarbon reservoir using adaptive meshing |
US09/896,136 Expired - Lifetime US7260508B2 (en) | 2000-06-29 | 2001-06-29 | Method and system for high-resolution modeling of a well bore in a hydrocarbon reservoir |
US09/896,104 Expired - Lifetime US6674432B2 (en) | 2000-06-29 | 2001-06-29 | Method and system for modeling geological structures using an unstructured four-dimensional mesh |
US09/896,137 Expired - Lifetime US7027964B2 (en) | 2000-06-29 | 2001-06-29 | Method and system for solving finite element models using multi-phase physics |
US09/896,101 Expired - Lifetime US7149671B2 (en) | 2000-06-29 | 2001-06-29 | Method and system for coordinate transformation to model radial flow near a singularity |
US09/895,137 Abandoned US20020067373A1 (en) | 2000-06-29 | 2001-06-29 | System and method for defining and displaying a reservoir model |
US09/895,820 Expired - Lifetime US7006951B2 (en) | 2000-06-29 | 2001-06-29 | Method for solving finite element models using time slabbing |
US09/896,132 Expired - Lifetime US6941255B2 (en) | 2000-06-29 | 2001-06-29 | Feature modeling in a finite element model |
Family Applications Before (5)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US09/896,147 Expired - Lifetime US7043413B2 (en) | 2000-06-29 | 2001-06-29 | Method for modeling an arbitrary well path in a hydrocarbon reservoir using adaptive meshing |
US09/896,136 Expired - Lifetime US7260508B2 (en) | 2000-06-29 | 2001-06-29 | Method and system for high-resolution modeling of a well bore in a hydrocarbon reservoir |
US09/896,104 Expired - Lifetime US6674432B2 (en) | 2000-06-29 | 2001-06-29 | Method and system for modeling geological structures using an unstructured four-dimensional mesh |
US09/896,137 Expired - Lifetime US7027964B2 (en) | 2000-06-29 | 2001-06-29 | Method and system for solving finite element models using multi-phase physics |
US09/896,101 Expired - Lifetime US7149671B2 (en) | 2000-06-29 | 2001-06-29 | Method and system for coordinate transformation to model radial flow near a singularity |
Family Applications After (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US09/895,820 Expired - Lifetime US7006951B2 (en) | 2000-06-29 | 2001-06-29 | Method for solving finite element models using time slabbing |
US09/896,132 Expired - Lifetime US6941255B2 (en) | 2000-06-29 | 2001-06-29 | Feature modeling in a finite element model |
Country Status (14)
Country | Link |
---|---|
US (8) | US7043413B2 (en) |
EP (5) | EP1301812B1 (en) |
JP (2) | JP2004502999A (en) |
CN (2) | CN1235062C (en) |
AT (5) | ATE535827T1 (en) |
AU (8) | AU7162801A (en) |
BR (2) | BR0106991A (en) |
CA (5) | CA2383711C (en) |
DE (1) | DE60114012D1 (en) |
EA (2) | EA200200257A1 (en) |
EC (2) | ECSP024230A (en) |
MX (2) | MXPA02002151A (en) |
NO (5) | NO322925B1 (en) |
WO (8) | WO2002003265A2 (en) |
Cited By (76)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020032550A1 (en) * | 2000-06-29 | 2002-03-14 | Ward Steven B. | Method for modeling an arbitrary well path in a hydrocarbon reservoir using adaptive meshing |
US20020177955A1 (en) * | 2000-09-28 | 2002-11-28 | Younes Jalali | Completions architecture |
US20030144751A1 (en) * | 2002-01-29 | 2003-07-31 | Sundeep Chandhoke | System and method for previewing a sequence of motion control operations |
US20040084180A1 (en) * | 2002-11-04 | 2004-05-06 | Shah Piyush C. | System and method for estimating multi-phase fluid rates in a subterranean well |
US20040148566A1 (en) * | 2003-01-24 | 2004-07-29 | Jp Morgan Chase Bank | Method to evaluate project viability |
US20040153298A1 (en) * | 2003-01-31 | 2004-08-05 | Landmark Graphics Corporation, A Division Of Halliburton Energy Services, Inc. | System and method for automated reservoir targeting |
US20040153299A1 (en) * | 2003-01-31 | 2004-08-05 | Landmark Graphics Corporation, A Division Of Halliburton Energy Services, Inc. | System and method for automated platform generation |
US20040220790A1 (en) * | 2003-04-30 | 2004-11-04 | Cullick Alvin Stanley | Method and system for scenario and case decision management |
US20040239582A1 (en) * | 2001-05-01 | 2004-12-02 | Seymour Bruce David | Information display |
US20040268338A1 (en) * | 2003-06-25 | 2004-12-30 | Omer Gurpinar | Method and apparatus and program storage device for generating a workflow in response to a user objective and generating software modules in response to the workflow and executing the software modules to produce a product |
US20050060131A1 (en) * | 2003-07-31 | 2005-03-17 | Reichenthal Steven W. | Logistics simulator |
US20050119911A1 (en) * | 2003-12-02 | 2005-06-02 | Schlumberger Technology Corporation | Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model |
US20060025976A1 (en) * | 2000-06-29 | 2006-02-02 | Object Reservoir, Inc. | Method and system for representing reservoir systems |
US20070255779A1 (en) * | 2004-06-07 | 2007-11-01 | Watts James W Iii | Method For Solving Implicit Reservoir Simulation Matrix |
US20080060005A1 (en) * | 2006-06-30 | 2008-03-06 | Shanks David E | User-selectable audio feed for video programming |
US20080086287A1 (en) * | 2004-12-06 | 2008-04-10 | Shiyu Xu | Integrated Anisotropic Rock Physics Model |
US7359841B1 (en) | 2001-06-21 | 2008-04-15 | Hixon Technologies, Ltd. | Method and system for the efficient calculation of unsteady processes on arbitrary space-time domains |
US20080165202A1 (en) * | 2007-01-08 | 2008-07-10 | Rainer Brodersen | Monitor Configuration for Media Device |
US20080192069A1 (en) * | 2007-01-22 | 2008-08-14 | Wanzke Detlev | Data analysis |
US20080218534A1 (en) * | 2007-03-09 | 2008-09-11 | Lg Electronics Inc. | Displaying of item through electronic apparatus |
US20080306803A1 (en) * | 2007-06-05 | 2008-12-11 | Schlumberger Technology Corporation | System and method for performing oilfield production operations |
US7509279B2 (en) | 2000-07-31 | 2009-03-24 | Riskmetrics Group, Inc. | Method and system for computing path dependent probabilities of attaining financial goals |
US7542921B1 (en) | 1999-09-30 | 2009-06-02 | Jpmorgan Chase Bank, N.A. | Network-based financial planning system and method |
US20090177989A1 (en) * | 2008-01-04 | 2009-07-09 | Jeffrey Ma | User Interface for Selection from Media Collection |
US20090222246A1 (en) * | 2005-06-28 | 2009-09-03 | Do Linh N | High-Level, Graphical Programming Language and Tool for Well Management Programming |
US20090299638A1 (en) * | 2005-07-13 | 2009-12-03 | Saltzer Rebecca L | Method for Predicting the Best and Worst in a Set of Non-Unique Solutions |
US20100045601A1 (en) * | 1999-08-01 | 2010-02-25 | Pure Depth Limited | Interaction with a multi-component display |
US20100082509A1 (en) * | 2008-09-30 | 2010-04-01 | Ilya Mishev | Self-Adapting Iterative Solver |
US20100082724A1 (en) * | 2008-09-30 | 2010-04-01 | Oleg Diyankov | Method For Solving Reservoir Simulation Matrix Equation Using Parallel Multi-Level Incomplete Factorizations |
US7707192B1 (en) | 2006-05-23 | 2010-04-27 | Jp Morgan Chase Bank, N.A. | Confidence index for assets |
US20100115391A1 (en) * | 1999-08-19 | 2010-05-06 | Pure Depth Limited | Method and system for assigning screen designation codes |
US20100115439A1 (en) * | 1999-08-19 | 2010-05-06 | Pure Depth Limited | Assigning screen designation codes to images |
US7724208B1 (en) | 1999-08-19 | 2010-05-25 | Puredepth Limited | Control of depth movement for visual display with layered screens |
US20100155078A1 (en) * | 2008-12-23 | 2010-06-24 | Walters Clifford C | Method For Predicting Composition of Petroleum |
US20100161302A1 (en) * | 2008-12-23 | 2010-06-24 | Walters Clifford C | Method For Predicting Petroleum Expulsion |
US7756896B1 (en) | 2002-03-11 | 2010-07-13 | Jp Morgan Chase Bank | System and method for multi-dimensional risk analysis |
US20100217574A1 (en) * | 2007-12-13 | 2010-08-26 | Usadi Adam K | Parallel Adaptive Data Partitioning On A Reservoir Simulation Using An Unstructured Grid |
US20100235154A1 (en) * | 2008-01-22 | 2010-09-16 | Mary Ellen Meurer | Dynamic Connectivity Analysis |
US20100252270A1 (en) * | 2007-12-18 | 2010-10-07 | Chul-Sung Kim | Determining Connectivity Architecture In 2-D and 3-D Heterogeneous Data |
US7890343B1 (en) | 2005-01-11 | 2011-02-15 | Jp Morgan Chase Bank | System and method for generating risk management curves |
US7895098B2 (en) | 2001-03-01 | 2011-02-22 | Jpmorgan Chase Bank, N.A. | System and method for measuring and utilizing pooling analytics |
US7925583B2 (en) | 2003-08-18 | 2011-04-12 | Jpmorgan Chase Bank, N.A. | Method and system for dynamically adjusting discount rates for a card transaction |
US7962396B1 (en) | 2006-02-03 | 2011-06-14 | Jpmorgan Chase Bank, N.A. | System and method for managing risk |
US7962391B2 (en) | 2000-12-20 | 2011-06-14 | Jpmorgan Chase Bank, N.A. | System and method for determining elegibility and enrolling members in various programs |
US7974895B1 (en) | 2004-07-16 | 2011-07-05 | Jp Morgan Chase Bank | System and method for developing finance rate information |
US8146277B2 (en) | 2002-09-20 | 2012-04-03 | Puredepth Limited | Multi-view display |
US8154473B2 (en) | 2003-05-16 | 2012-04-10 | Pure Depth Limited | Display control system |
US20120136636A1 (en) * | 2010-11-26 | 2012-05-31 | Adrian Kleine | Finite element adjustment for basin faults |
US8370122B2 (en) | 2007-12-21 | 2013-02-05 | Exxonmobil Upstream Research Company | Method of predicting connectivity between parts of a potential hydrocarbon reservoir and analyzing 3D data in a subsurface region |
US20130144583A1 (en) * | 2011-09-02 | 2013-06-06 | Saudi Arabia Oil Company | Hyper-dimensional simulation for reservoir engineering and geosciences |
US8478637B1 (en) | 2008-04-08 | 2013-07-02 | Jpmorgan Chase Bank, N.A. | Index for assessing discount potential |
US8612857B2 (en) | 2007-01-08 | 2013-12-17 | Apple Inc. | Monitor configuration for media device |
US8676556B2 (en) | 2007-11-27 | 2014-03-18 | Exxonmobil Upstream Research Company | Method for determining the properties of hydrocarbon reservoirs from geophysical data |
US8751391B2 (en) | 2002-03-29 | 2014-06-10 | Jpmorgan Chase Bank, N.A. | System and process for performing purchase transactions using tokens |
US8793110B2 (en) | 2009-03-13 | 2014-07-29 | Exxonmobil Upstream Research Company | Method for predicting fluid flow |
US20140303964A1 (en) * | 2013-04-04 | 2014-10-09 | Wayne M. Kennard | System and method for generating ethnic and cultural emoticon language dictionaries |
US20140310634A1 (en) * | 2013-04-12 | 2014-10-16 | Schlumberger Technology Corporation | Dynamic fluid behavior display system |
US9026418B2 (en) | 2008-03-10 | 2015-05-05 | Exxonmobil Upstream Research Company | Method for determining distinct alternative paths between two object sets in 2-D and 3-D heterogeneous data |
US9057795B2 (en) | 2013-06-21 | 2015-06-16 | Exxonmobil Upstream Research Company | Azimuthal cement density image measurements |
US9169726B2 (en) | 2009-10-20 | 2015-10-27 | Exxonmobil Upstream Research Company | Method for quantitatively assessing connectivity for well pairs at varying frequencies |
US20160038665A1 (en) * | 2013-03-15 | 2016-02-11 | Gambro Lundia Ab | Extracorporeal blood treatment fluids interface |
US9367564B2 (en) | 2010-03-12 | 2016-06-14 | Exxonmobil Upstream Research Company | Dynamic grouping of domain objects via smart groups |
US9594186B2 (en) | 2010-02-12 | 2017-03-14 | Exxonmobil Upstream Research Company | Method and system for partitioning parallel simulation models |
US9733388B2 (en) | 2008-05-05 | 2017-08-15 | Exxonmobil Upstream Research Company | Systems and methods for connectivity analysis using functional objects |
US9864098B2 (en) | 2013-09-30 | 2018-01-09 | Exxonmobil Upstream Research Company | Method and system of interactive drill center and well planning evaluation and optimization |
US10318663B2 (en) | 2011-01-26 | 2019-06-11 | Exxonmobil Upstream Research Company | Method of reservoir compartment analysis using topological structure in 3D earth model |
US10422922B2 (en) | 2012-05-24 | 2019-09-24 | Exxonmobil Upstream Research Company | Method for predicting rock strength by inverting petrophysical properties |
WO2020041146A1 (en) * | 2018-08-20 | 2020-02-27 | Landmark Graphics Corporation | Cloud-native reservoir simulation |
US10584570B2 (en) | 2013-06-10 | 2020-03-10 | Exxonmobil Upstream Research Company | Interactively planning a well site |
WO2020047671A1 (en) * | 2018-09-06 | 2020-03-12 | Aquanty Inc. | Method and system of integrated surface water and groundwater modelling using a dynamic mesh evolution |
US20200174157A1 (en) * | 2018-11-29 | 2020-06-04 | Schlumberger Technology Corporation | Volumetric Well Production User Interface Components |
US20200409665A1 (en) * | 2019-06-28 | 2020-12-31 | ASG Technologies Group, Inc. dba ASG Technologies | Systems and Methods for Seamlessly Integrating Multiple Products by Using a Common Visual Modeler |
US10961826B2 (en) * | 2016-12-19 | 2021-03-30 | Conocophillips Company | Subsurface modeler workflow and tool |
US11132477B1 (en) * | 2012-01-18 | 2021-09-28 | Msc.Software Corporation | Interactive simulation and solver for mechanical, fluid, and electro-mechanical systems |
US11385769B2 (en) | 2014-03-31 | 2022-07-12 | Gambro Lundia Ab | Extracorporeal blood treatment flow rate adjustment |
US11449202B1 (en) * | 2012-06-01 | 2022-09-20 | Ansys, Inc. | User interface and method of data navigation in the user interface of engineering analysis applications |
Families Citing this family (167)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6835207B2 (en) * | 1996-07-22 | 2004-12-28 | Fred Zacouto | Skeletal implant |
US7349838B2 (en) * | 1998-07-31 | 2008-03-25 | Summers Gary J | Management training simulation method and system |
US20020194056A1 (en) * | 1998-07-31 | 2002-12-19 | Summers Gary J. | Management training simulation method and system |
US8428923B2 (en) | 1999-04-29 | 2013-04-23 | Schlumberger Technology Corporation | Method system and program storage device for simulating a multilayer reservoir and partially active elements in a hydraulic fracturing simulator |
US7509245B2 (en) * | 1999-04-29 | 2009-03-24 | Schlumberger Technology Corporation | Method system and program storage device for simulating a multilayer reservoir and partially active elements in a hydraulic fracturing simulator |
JP4720964B2 (en) * | 2001-05-31 | 2011-07-13 | 日本電気株式会社 | FEM analysis method, program, and system |
US7363198B2 (en) * | 2001-10-29 | 2008-04-22 | The Board Of Trustees Of The Leland Stanford Junior University | Long elements method for simulation of deformable objects |
US7194124B2 (en) | 2002-04-09 | 2007-03-20 | University Of Iowa Research Foundation | Reconstruction and motion analysis of an embryo |
US7027048B2 (en) * | 2002-05-31 | 2006-04-11 | Ugs Corp. | Computerized deformation analyzer |
US7222057B2 (en) * | 2002-05-31 | 2007-05-22 | Ugs Corp. | Topology modeler |
US7358121B2 (en) * | 2002-08-23 | 2008-04-15 | Intel Corporation | Tri-gate devices and methods of fabrication |
JP3840173B2 (en) * | 2002-11-15 | 2006-11-01 | キヤノン株式会社 | 3D analysis mesh generation method, 3D analysis mesh generation device, program, and storage medium |
GB2398900A (en) * | 2003-02-27 | 2004-09-01 | Schlumberger Holdings | Identification of best production potential oil wells and identification of drilling strategy to maximise production potential |
US7117138B2 (en) * | 2003-03-14 | 2006-10-03 | Seiko Epson Corporation | Coupled quadrilateral grid level set scheme for piezoelectric ink-jet simulation |
US7254523B2 (en) * | 2003-03-14 | 2007-08-07 | Seiko Epson Corporation | Selectively reduced bi-cubic interpolation for ink-jet simulations on quadrilateral grids |
WO2004081879A1 (en) * | 2003-03-14 | 2004-09-23 | Castanon Fernandez Cesar | Method of determining the physicochemical properties of a three-dimensional body |
FI20030550A0 (en) * | 2003-04-11 | 2003-04-11 | Pajunen Petri | Procedure for estimating the accuracy of a numerical solution |
US7251591B2 (en) * | 2003-08-29 | 2007-07-31 | Seiko Epson Corporation | Consistent back pressure for piezoelectric ink-jet simulation |
CN100590637C (en) | 2003-09-30 | 2010-02-17 | 埃克森美孚上游研究公司 | Characterizing connectivity in reservoir models using paths of least resistance |
US7069148B2 (en) * | 2003-11-25 | 2006-06-27 | Thambynayagam Raj Kumar Michae | Gas reservoir evaluation and assessment tool method and apparatus and program storage device |
JP3889394B2 (en) * | 2003-12-16 | 2007-03-07 | 株式会社スクウェア・エニックス | Image drawing apparatus and method, program, and recording medium |
GB2409304B (en) * | 2003-12-19 | 2007-11-14 | Westerngeco Ltd | Processing geophysical data |
US7379852B2 (en) * | 2004-02-18 | 2008-05-27 | Chevron U.S.A. Inc. | N-phase interface tracking method utilizing unique enumeration of microgrid cells |
US7657414B2 (en) * | 2005-02-23 | 2010-02-02 | M-I L.L.C. | Three-dimensional wellbore visualization system for hydraulics analyses |
US7596481B2 (en) * | 2004-03-16 | 2009-09-29 | M-I L.L.C. | Three-dimensional wellbore analysis and visualization |
WO2005104002A1 (en) * | 2004-03-31 | 2005-11-03 | Exxonmobil Upstream Research Company | Method for simulating and estimating sandstone properties |
US7418370B2 (en) * | 2004-03-31 | 2008-08-26 | International Business Machines Corporation | Method, apparatus and computer program providing broadband preconditioning based on reduced coupling for numerical solvers |
FR2870621B1 (en) * | 2004-05-21 | 2006-10-27 | Inst Francais Du Petrole | METHOD FOR GENERATING A THREE-DIMENSIONALLY THREADED HYBRID MESH OF A HETEROGENEOUS FORMATION CROSSED BY ONE OR MORE GEOMETRIC DISCONTINUITIES FOR THE PURPOSE OF MAKING SIMULATIONS |
US20080167849A1 (en) * | 2004-06-07 | 2008-07-10 | Brigham Young University | Reservoir Simulation |
US7516055B2 (en) * | 2004-08-20 | 2009-04-07 | Chevron U.S.A. Inc | Multiple-point statistics (MPS) simulation with enhanced computational efficiency |
JP4714444B2 (en) * | 2004-08-31 | 2011-06-29 | 国立大学法人北海道大学 | Tetrahedral mesh generation method and program |
GB2464856B (en) * | 2004-09-24 | 2010-06-30 | Vision Rt Ltd | Image processing system for use with a patient positioning device |
US20070036434A1 (en) * | 2005-08-15 | 2007-02-15 | Peter Saveliev | Topology-Based Method of Partition, Analysis, and Simplification of Dynamical Images and its Applications |
US8145463B2 (en) | 2005-09-15 | 2012-03-27 | Schlumberger Technology Corporation | Gas reservoir evaluation and assessment tool method and apparatus and program storage device |
FR2891383B1 (en) * | 2005-09-26 | 2008-07-11 | Inst Francais Du Petrole | METHOD FOR SIMULATING FLUID FLOWS WITHIN A DISCRETE MEDIA BY A HYBRID MESH |
US8065088B2 (en) * | 2006-06-21 | 2011-11-22 | Terraspark Geosciences, Llc | Extraction of depositional systems |
US8078437B2 (en) | 2006-07-07 | 2011-12-13 | Exxonmobil Upstream Research Company | Upscaling reservoir models by reusing flow solutions from geologic models |
EP2057577A4 (en) * | 2006-08-14 | 2009-07-22 | Exxonmobil Upstream Res Co | Enriched multi-point flux approximation |
US7536285B2 (en) * | 2006-08-14 | 2009-05-19 | Seiko Epson Corporation | Odd times refined quadrilateral mesh for level set |
US7657407B2 (en) * | 2006-08-15 | 2010-02-02 | Landmark Graphics Corporation | Method and system of planning hydrocarbon extraction from a hydrocarbon formation |
GB2442496A (en) * | 2006-10-02 | 2008-04-09 | Univ Sheffield | Evaluating displacements at discontinuities within a body |
US20080088578A1 (en) * | 2006-10-16 | 2008-04-17 | Immersion Corporation | Flexible object simulator |
US7565278B2 (en) * | 2006-12-04 | 2009-07-21 | Chevron U.S.A. Inc. | Method, system and apparatus for simulating fluid flow in a fractured reservoir utilizing a combination of discrete fracture networks and homogenization of small fractures |
EP2118738A4 (en) * | 2006-12-28 | 2014-07-02 | Chevron Usa Inc | Method, system and program storage device for history matching and forecasting of hydrocarbon-bearing reservoirs utilizing proxies for likelihood functions |
US8346695B2 (en) * | 2007-03-29 | 2013-01-01 | Schlumberger Technology Corporation | System and method for multiple volume segmentation |
GB0706659D0 (en) * | 2007-04-05 | 2007-05-16 | Statoil Asa | Reduction of airwave contribution in marine electromagnetic data |
CA2686130A1 (en) * | 2007-05-24 | 2008-12-11 | Exxonmobil Upstream Research Company | Method of improved reservoir simulation of fingering systems |
WO2009035737A2 (en) * | 2007-06-13 | 2009-03-19 | United States Of America As Represented By The Administrator Of The National Aeronautics And Space Administration | Adaptive refinement tools for tetrahedral unstructured grids |
US7813907B2 (en) * | 2007-07-12 | 2010-10-12 | Seiko Epson Corporation | Hybrid method for enforcing curvature related boundary conditions in solving one-phase fluid flow over a deformable domain |
US8244509B2 (en) * | 2007-08-01 | 2012-08-14 | Schlumberger Technology Corporation | Method for managing production from a hydrocarbon producing reservoir in real-time |
US8768672B2 (en) * | 2007-08-24 | 2014-07-01 | ExxonMobil. Upstream Research Company | Method for predicting time-lapse seismic timeshifts by computer simulation |
WO2009029135A1 (en) * | 2007-08-24 | 2009-03-05 | Exxonmobil Upstream Research Company | Method for predicting well reliability by computer simulation |
US8548782B2 (en) | 2007-08-24 | 2013-10-01 | Exxonmobil Upstream Research Company | Method for modeling deformation in subsurface strata |
WO2009029133A1 (en) * | 2007-08-24 | 2009-03-05 | Exxonmobil Upstream Research Company | Method for multi-scale geomechanical model analysis by computer simulation |
US8495911B2 (en) | 2007-08-31 | 2013-07-30 | Vestas Wind Systems A/S | Wind turbine siting and maintenance prediction |
CA2822231A1 (en) * | 2007-11-14 | 2009-05-22 | Terraspark Geosciences, Llc | Seismic data processing |
GB0724366D0 (en) * | 2007-12-14 | 2008-01-23 | Univ York | Environment modelling |
WO2009079088A1 (en) * | 2007-12-14 | 2009-06-25 | Exxonmobil Upstream Research Company | Modeling subsurface processes on unstructured grid |
CA2706482A1 (en) * | 2007-12-21 | 2009-07-02 | Exxonmobil Upstream Research Company | Modeling in sedimentary basins |
CA2710607A1 (en) * | 2008-02-28 | 2009-09-03 | Exxonmobil Upstream Research Company | Rock physics model for simulating seismic response in layered fractured rocks |
US7899654B2 (en) * | 2008-03-06 | 2011-03-01 | Seiko Epson Corporation | Hybrid front tracking algorithm for solving single phase fluid equations with a moving boundary on a quadrilateral grid |
US8000944B2 (en) * | 2008-03-13 | 2011-08-16 | Seiko Epson Corporation | Non-finite element implementation of the finite element projection in two dimensions |
US8190414B2 (en) * | 2008-03-26 | 2012-05-29 | Exxonmobil Upstream Research Company | Modeling of hydrocarbon reservoirs containing subsurface features |
AU2009229194B2 (en) * | 2008-03-28 | 2014-10-02 | Exxonmobil Upstream Research Company | Computing a consistent velocity vector field from a set of fluxes |
US8803878B2 (en) * | 2008-03-28 | 2014-08-12 | Schlumberger Technology Corporation | Visualizing region growing in three dimensional voxel volumes |
CA2721008A1 (en) * | 2008-04-11 | 2009-10-15 | Terraspark Geosciences, Llc | Visulation of geologic features using data representations thereof |
BRPI0909440A2 (en) * | 2008-04-17 | 2015-12-15 | Exxonmobil Upstream Res Co | methods for reservoir development planning, decision support with respect to petroleum resource development, optimization development planning for a computer-based reservoir, and for producing hydrocarbons from an underground reservoir. |
BRPI0909446A2 (en) * | 2008-04-18 | 2015-12-22 | Exxonmobil Upstream Res Co | reservoir development planning methods, decision support for petroleum resource development, development planning optimization, and hydrocarbon production. |
EP2291799A4 (en) * | 2008-04-21 | 2013-01-16 | Exxonmobil Upstream Res Co | Stochastic programming-based decision support tool for reservoir development planning |
US7930155B2 (en) * | 2008-04-22 | 2011-04-19 | Seiko Epson Corporation | Mass conserving algorithm for solving a solute advection diffusion equation inside an evaporating droplet |
US20090276192A1 (en) * | 2008-05-05 | 2009-11-05 | Uri Avraham | Method and Computer Program Product for Visualizing Feature Model Information |
US8095349B2 (en) * | 2008-05-30 | 2012-01-10 | Kelkar And Associates, Inc. | Dynamic updating of simulation models |
EP2189918A1 (en) * | 2008-11-07 | 2010-05-26 | Dassault Systèmes | Computer-implemented method of computing, in a computer aided design system, of a boundary of a modeled object. |
AU2009314461B2 (en) | 2008-11-14 | 2015-11-05 | Exxonmobil Upstream Research Company | Forming a model of a subsurface region |
BRPI0922705A2 (en) * | 2008-12-03 | 2016-01-05 | Chevron Usa Inc | computer-implemented method and system for predicting fluid flow characteristics within a fractured underground reservoir |
CN102239507B (en) * | 2008-12-03 | 2016-02-24 | 雪佛龙美国公司 | For the mess generation system and method for discrete fracture modeling |
CN102246060B (en) * | 2008-12-16 | 2014-07-30 | 埃克森美孚上游研究公司 | Systems and methods for hydrocarbon reservoir development and management optimization |
BRPI0923011B1 (en) | 2008-12-18 | 2019-10-22 | Exxonmobil Upstream Res Co | method to model a turbidity current in a fluid |
EP2406750B1 (en) | 2009-03-11 | 2020-04-01 | Exxonmobil Upstream Research Company | Adjoint-based conditioning of process-based geologic models |
WO2010104536A1 (en) | 2009-03-11 | 2010-09-16 | Exxonmobil Upstream Research Company | Gradient-based workflows for conditioning of process-based geologic models |
BRPI0900908B1 (en) * | 2009-03-31 | 2017-06-06 | Faculdades Católicas Mantenedora Da Pontifícia Univ Católica Do Rio De Janeiro - Puc Rio | Partial coupling method between a stress analysis system and a conventional reservoir simulator and system for approximation of the flow equation |
WO2010123596A1 (en) | 2009-04-20 | 2010-10-28 | Exxonmobil Upstream Research Company | Method for predicting fluid flow |
US8600708B1 (en) | 2009-06-01 | 2013-12-03 | Paradigm Sciences Ltd. | Systems and processes for building multiple equiprobable coherent geometrical models of the subsurface |
US9418182B2 (en) | 2009-06-01 | 2016-08-16 | Paradigm Sciences Ltd. | Systems and methods for building axes, co-axes and paleo-geographic coordinates related to a stratified geological volume |
US8711140B1 (en) | 2009-06-01 | 2014-04-29 | Paradigm Sciences Ltd. | Systems and methods for building axes, co-axes and paleo-geographic coordinates related to a stratified geological volume |
US9536022B1 (en) | 2009-06-01 | 2017-01-03 | Paradigm Sciences Ltd. | Systems and methods for modeling faults in the subsurface |
FR2948215B1 (en) * | 2009-07-16 | 2011-06-24 | Inst Francais Du Petrole | METHOD FOR GENERATING A HEXA-DOMINANT MESHING OF A FAILLED UNDERGROUND MEDIUM |
GB2470241A (en) * | 2009-09-21 | 2010-11-17 | Statoilhydro Asa | Forming a grid model of a geological structure having discontinuities |
US20110071799A1 (en) * | 2009-09-21 | 2011-03-24 | Per Arne Slotte | Grid models |
US8494827B2 (en) * | 2009-09-25 | 2013-07-23 | Exxonmobil Upstream Research Company | Method of predicting natural fractures and damage in a subsurface region |
WO2011043862A1 (en) | 2009-10-07 | 2011-04-14 | Exxonmobil Upstream Research Company | Discretized physics-based models and simulations of subterranean regions, and methods for creating and using the same |
US8743115B1 (en) | 2009-10-23 | 2014-06-03 | Paradigm Sciences Ltd. | Systems and methods for coordinated editing of seismic data in dual model |
US8855987B2 (en) | 2009-10-23 | 2014-10-07 | Exxonmobil Upstream Research Company | Method for optimization with gradient information |
CN102612682B (en) * | 2009-11-12 | 2016-04-27 | 埃克森美孚上游研究公司 | For the method and apparatus of reservoir modeling and simulation |
EP2504789A1 (en) * | 2009-11-23 | 2012-10-03 | ExxonMobil Upstream Research Company | Method and system for modeling geologic properties using homogenized mixed finite elements |
US8271237B2 (en) * | 2010-02-02 | 2012-09-18 | Livermore Software Technology Corporation | Fully-integrated hexahedral elements configured for reducing shear locking in finite element method |
US8428922B2 (en) * | 2010-02-05 | 2013-04-23 | Seiko Epson Corporation | Finite difference level set projection method on multi-staged quadrilateral grids |
US9703006B2 (en) | 2010-02-12 | 2017-07-11 | Exxonmobil Upstream Research Company | Method and system for creating history matched simulation models |
US8727017B2 (en) * | 2010-04-22 | 2014-05-20 | Exxonmobil Upstream Research Company | System and method for obtaining data on an unstructured grid |
US8583410B2 (en) * | 2010-05-28 | 2013-11-12 | Ingrain, Inc. | Method for obtaining consistent and integrated physical properties of porous media |
WO2011159372A1 (en) | 2010-06-15 | 2011-12-22 | Exxonmobil Upstream Research Company | Method and system for stabilizing formulation methods |
US9593558B2 (en) | 2010-08-24 | 2017-03-14 | Exxonmobil Upstream Research Company | System and method for planning a well path |
US8393393B2 (en) | 2010-12-17 | 2013-03-12 | Halliburton Energy Services, Inc. | Coupler compliance tuning for mitigating shock produced by well perforating |
US8397814B2 (en) | 2010-12-17 | 2013-03-19 | Halliburton Energy Serivces, Inc. | Perforating string with bending shock de-coupler |
US8985200B2 (en) | 2010-12-17 | 2015-03-24 | Halliburton Energy Services, Inc. | Sensing shock during well perforating |
US8397800B2 (en) | 2010-12-17 | 2013-03-19 | Halliburton Energy Services, Inc. | Perforating string with longitudinal shock de-coupler |
WO2012148429A1 (en) | 2011-04-29 | 2012-11-01 | Halliburton Energy Services, Inc. | Shock load mitigation in a downhole perforation tool assembly |
WO2012091775A1 (en) | 2010-12-30 | 2012-07-05 | Exxonmobil Upstream Research Company | Systems and methods for subsurface reservoir simulation |
WO2012108917A1 (en) | 2011-02-09 | 2012-08-16 | Exxonmobil Upstream Research Company | Methods and systems for upscaling mechanical properties of geomaterials |
US20120241169A1 (en) | 2011-03-22 | 2012-09-27 | Halliburton Energy Services, Inc. | Well tool assemblies with quick connectors and shock mitigating capabilities |
WO2012158218A1 (en) * | 2011-05-17 | 2012-11-22 | Exxonmobil Upstream Research Company | Method for partitioning parallel reservoir simulations in the presence of wells |
CN102184298B (en) * | 2011-05-18 | 2013-06-19 | 山东大学 | Method for storing and generating stiffness matrix for finite-element analysis in metal bulk plastic forming |
US9279314B2 (en) | 2011-08-11 | 2016-03-08 | Conocophillips Company | Heat front capture in thermal recovery simulations of hydrocarbon reservoirs |
US9091152B2 (en) | 2011-08-31 | 2015-07-28 | Halliburton Energy Services, Inc. | Perforating gun with internal shock mitigation |
US9183328B2 (en) | 2011-10-26 | 2015-11-10 | Engine Simulation Partners, Llc | Method and apparatus for modeling interactions of the fluid with system boundaries in fluid dynamic systems |
EP2597253B1 (en) * | 2011-11-25 | 2015-10-07 | Services Pétroliers Schlumberger | Dynamic prediction of downhole temperature distributions |
US9055289B2 (en) * | 2011-11-23 | 2015-06-09 | Korea Institute Of Science And Technology | 3D display system |
US9405026B2 (en) | 2011-12-12 | 2016-08-02 | Exxonmobil Upstream Research Company | Estimation of production sweep efficiency utilizing geophysical data |
US10114134B2 (en) | 2012-03-02 | 2018-10-30 | Emerson Paradigm Holding Llc | Systems and methods for generating a geological model honoring horizons and faults |
FR2987903B1 (en) * | 2012-03-09 | 2014-05-09 | Schlumberger Services Petrol | GEOLOGICAL FAILURE STRUCTURES CONTAINING NONCONFORMITIES. |
US9297228B2 (en) | 2012-04-03 | 2016-03-29 | Halliburton Energy Services, Inc. | Shock attenuator for gun system |
US9759826B2 (en) | 2012-04-03 | 2017-09-12 | Paradigm Sciences Ltd. | System and method for generating an implicit model of geological horizons |
JP2015035006A (en) * | 2012-04-26 | 2015-02-19 | インターナショナル・ビジネス・マシーンズ・コーポレーションInternational Business Machines Corporation | Information processing device for discriminating coupling result of a plurality of elements, program, and method |
CA2874978C (en) | 2012-06-15 | 2022-05-31 | Landmark Graphics Corporation | Methods and systems for non-physical attribute management in reservoir simulation |
AU2012387158B2 (en) * | 2012-08-07 | 2016-04-21 | Halliburton Energy Services, Inc. | Methods of predicting a reservoir fluid behavior using an equation of state |
US8978749B2 (en) | 2012-09-19 | 2015-03-17 | Halliburton Energy Services, Inc. | Perforation gun string energy propagation management with tuned mass damper |
MX356089B (en) | 2012-09-19 | 2018-05-14 | Halliburton Energy Services Inc | Perforation gun string energy propagation management system and methods. |
US10578767B2 (en) | 2012-09-26 | 2020-03-03 | Exxonmobil Upstream Research Company | Conditional process-aided multiple-points statistics modeling |
WO2014084868A1 (en) | 2012-12-01 | 2014-06-05 | Halliburton Energy Services, Inc. | Protection of electronic devices used with perforating guns |
EP3418778B1 (en) | 2013-03-15 | 2020-07-15 | Emerson Paradigm Holding LLC | Systems and methods to build sedimentary attributes |
WO2014177906A1 (en) * | 2013-04-30 | 2014-11-06 | Dassault Systèmes Simulia Corp. | Generating a cad model from a finite element mesh |
US10294774B2 (en) | 2013-06-12 | 2019-05-21 | Schlumberger Technology Corporation | Well trajectory planning using bounding box scan for anti-collision analysis |
EP3030888B1 (en) * | 2013-08-06 | 2023-07-05 | BP Corporation North America Inc. | Image-based direct numerical simulation of petrophysical properties under simulated stress and strain conditions |
EP3039230A4 (en) * | 2013-10-08 | 2018-02-28 | Landmark Graphics Corporation | Predefining elements of a cemented wellbore |
EP2869096B1 (en) | 2013-10-29 | 2019-12-04 | Emerson Paradigm Holding LLC | Systems and methods of multi-scale meshing for geologic time modeling |
WO2015117116A1 (en) * | 2014-02-03 | 2015-08-06 | Halliburton Energy Services, Inc. | Optimizing a grid for finite element solutions for subterranean region simulations |
US10422923B2 (en) | 2014-03-28 | 2019-09-24 | Emerson Paradigm Holding Llc | Systems and methods for modeling fracture networks in reservoir volumes from microseismic events |
US10319143B2 (en) * | 2014-07-30 | 2019-06-11 | Exxonmobil Upstream Research Company | Volumetric grid generation in a domain with heterogeneous material properties |
US9934339B2 (en) | 2014-08-15 | 2018-04-03 | Wichita State University | Apparatus and method for simulating machining and other forming operations |
US10108762B2 (en) * | 2014-10-03 | 2018-10-23 | International Business Machines Corporation | Tunable miniaturized physical subsurface model for simulation and inversion |
CA2963928C (en) * | 2014-11-12 | 2019-06-25 | Halliburton Energy Services, Inc. | Reservoir mesh creation using extended anisotropic, geometry-adaptive refinement of polyhedra |
US10242136B2 (en) * | 2015-05-20 | 2019-03-26 | Saudi Arabian Oil Company | Parallel solution for fully-coupled fully-implicit wellbore modeling in reservoir simulation |
US9690002B2 (en) | 2015-06-18 | 2017-06-27 | Paradigm Sciences Ltd. | Device, system and method for geological-time refinement |
CN104915216A (en) * | 2015-07-03 | 2015-09-16 | 中国电力工程顾问集团东北电力设计院有限公司 | System and method for converting data from PDMS software to MIDAS software |
JP6034936B1 (en) * | 2015-09-28 | 2016-11-30 | 富士重工業株式会社 | Load characteristic analysis method and analysis model generation apparatus |
WO2017068382A1 (en) | 2015-10-21 | 2017-04-27 | Lemma | Method for determining at least one characteristic value of a multiphase flow at each instant, associated system and computer product program |
US10176631B2 (en) | 2015-11-10 | 2019-01-08 | Landmark Graphics Corporation | Target object simulation using undulating surfaces |
EP3374596B1 (en) * | 2015-11-10 | 2023-06-07 | Landmark Graphics Corporation | Fracture network triangle mesh adjustment |
AU2015414108A1 (en) | 2015-11-10 | 2018-04-19 | Landmark Graphics Corporation | Target object simulation using orbit propagation |
CN105677965B (en) * | 2016-01-04 | 2018-09-18 | 北京航空航天大学 | A kind of board-like satellite structure conode grid rapid generation |
EP3455655B1 (en) * | 2016-05-13 | 2021-09-29 | Chevron U.S.A. Inc. | System and method for 3d restoration of complex subsurface models |
CN106055768A (en) * | 2016-05-26 | 2016-10-26 | 秦晓亮 | High-safety number simulation method, solver and system based on cloud computing |
CN106126794B (en) * | 2016-06-17 | 2019-07-05 | 北京航空航天大学 | A kind of ray autonomous tracing in intelligent vehicle of triangle mesh curved surface bottom cutting surface dynamic adjustment |
US10803661B1 (en) * | 2016-09-06 | 2020-10-13 | Ansys, Inc. | Adaptive polyhedra mesh refinement and coarsening |
US10466388B2 (en) | 2016-09-07 | 2019-11-05 | Emerson Paradigm Holding Llc | System and method for editing geological models by switching between volume-based models and surface-based structural models augmented with stratigraphic fiber bundles |
CN106443824B (en) * | 2016-09-19 | 2018-05-11 | 中国地质大学(北京) | Heterogeneous reservoir geology-mechanical modeling method based on FInite Element |
CN108228938A (en) * | 2016-12-21 | 2018-06-29 | 欢鼎科技成都有限公司 | A kind of Time Domain Electromagnetic computational methods and device |
US11041976B2 (en) | 2017-05-30 | 2021-06-22 | Exxonmobil Upstream Research Company | Method and system for creating and using a subsurface model in hydrocarbon operations |
US10520644B1 (en) | 2019-01-10 | 2019-12-31 | Emerson Paradigm Holding Llc | Imaging a subsurface geological model at a past intermediate restoration time |
US11156744B2 (en) | 2019-01-10 | 2021-10-26 | Emerson Paradigm Holding Llc | Imaging a subsurface geological model at a past intermediate restoration time |
US11699008B2 (en) * | 2019-08-23 | 2023-07-11 | Ansys, Inc. | Non-conformal domain decomposition with imprints at interfaces with boundaries for finite element analysis |
US11353622B2 (en) * | 2020-01-06 | 2022-06-07 | Saudi Arabian Oil Company | Systems and methods for hydrocarbon reservoir three dimensional unstructured grid generation and development |
CN111274530B (en) * | 2020-01-19 | 2021-12-31 | 北京理工大学 | Container cloud resource prediction method |
CN111814384B (en) * | 2020-09-01 | 2020-12-11 | 北京应用物理与计算数学研究所 | High-performance numerical simulation pre-and-post-processing low-overhead connection data structure and method |
US11852774B2 (en) * | 2020-11-11 | 2023-12-26 | Halliburton Energy Services, Inc. | Evaluation and visualization of well log data in selected three-dimensional volume |
CN112949135B (en) * | 2021-03-12 | 2022-04-12 | 湖南科技大学 | Gridding division method for diamond-set drill model embedded on surface of double-inclined working lip |
CN116486022B (en) * | 2023-03-23 | 2024-06-28 | 北京山水美生态环境科技有限公司 | Construction method of three-dimensional geological model |
Citations (50)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3029018A (en) * | 1955-02-21 | 1962-04-10 | Dresser Ind | Two dimensional analog of a three dimensional phenomenon |
US3302710A (en) * | 1964-02-07 | 1967-02-07 | Mobil Oil Corp | Method for recovering hydrocarbons |
US4742743A (en) * | 1986-04-24 | 1988-05-10 | Scarpone William J | Radial saw accessory for preventing sawdust buildup |
US4821164A (en) * | 1986-07-25 | 1989-04-11 | Stratamodel, Inc. | Process for three-dimensional mathematical modeling of underground geologic volumes |
US5255212A (en) * | 1990-03-27 | 1993-10-19 | Yoshiomi Kondoh | Method of predicting a physical quantity of a fluid or a magnetofluid |
US5432718A (en) * | 1990-07-12 | 1995-07-11 | Massachusetts Institute Of Technology | Particle interaction processing system |
US5553009A (en) * | 1993-09-10 | 1996-09-03 | International Business Machines Corporation | Parallel method for subdivision of arbitrary curved solids |
US5572634A (en) * | 1994-10-26 | 1996-11-05 | Silicon Engines, Inc. | Method and apparatus for spatial simulation acceleration |
US5574908A (en) * | 1993-08-25 | 1996-11-12 | Asymetrix Corporation | Method and apparatus for generating a query to an information system specified using natural language-like constructs |
US5604911A (en) * | 1991-09-19 | 1997-02-18 | Hitachi, Ltd. | Method of and apparatus for preconditioning of a coefficient matrix of simultaneous linear equations |
US5617322A (en) * | 1994-01-31 | 1997-04-01 | Nec Corporation | Mesh generator and generating method |
US5675521A (en) * | 1994-02-11 | 1997-10-07 | The United States Of America As Represented By The Secretary Of The Air Force | Multichip module analyzer |
US5699271A (en) * | 1987-08-28 | 1997-12-16 | Hitachi, Ltd. | Method of automatically generating program for solving simultaneous partial differential equations by use of finite element method |
US5710726A (en) * | 1995-10-10 | 1998-01-20 | Atlantic Richfield Company | Semi-compositional simulation of hydrocarbon reservoirs |
US5740342A (en) * | 1995-04-05 | 1998-04-14 | Western Atlas International, Inc. | Method for generating a three-dimensional, locally-unstructured hybrid grid for sloping faults |
US5754181A (en) * | 1993-02-08 | 1998-05-19 | International Business Machines Corporation | Computer aided design system |
US5821937A (en) * | 1996-02-23 | 1998-10-13 | Netsuite Development, L.P. | Computer method for updating a network design |
US5891131A (en) * | 1993-02-01 | 1999-04-06 | Arizona Board Of Regents | Method and apparatus for automated simulation and design of corneal refractive procedures |
US5966524A (en) * | 1997-07-24 | 1999-10-12 | Lucent Technologies Inc. | 3-D electromagnetic infinite element |
US5977971A (en) * | 1994-12-13 | 1999-11-02 | Microsoft Corporation | Tree view control |
US5999187A (en) * | 1996-06-28 | 1999-12-07 | Resolution Technologies, Inc. | Fly-through computer aided design method and apparatus |
US6014473A (en) * | 1996-02-29 | 2000-01-11 | Acuson Corporation | Multiple ultrasound image registration system, method and transducer |
US6018497A (en) * | 1997-02-27 | 2000-01-25 | Geoquest | Method and apparatus for generating more accurate earth formation grid cell property information for use by a simulator to display more accurate simulation results of the formation near a wellbore |
US6028607A (en) * | 1998-01-15 | 2000-02-22 | Sun Microsystems, Inc. | Method of producing a sequence of triangles from a vertex raster with and without half resolution edges while decompressing a compressed geometry stream |
US6041017A (en) * | 1996-08-05 | 2000-03-21 | Fred L. Goldsberry | Method for producing images of reservoir boundaries |
US6052520A (en) * | 1998-02-10 | 2000-04-18 | Exxon Production Research Company | Process for predicting behavior of a subterranean formation |
US6054992A (en) * | 1997-09-19 | 2000-04-25 | Mitsubishi Electric Information Technology Center America, Inc. | cutting, jointing and tearing volumetric objects |
US6064810A (en) * | 1996-09-27 | 2000-05-16 | Southern Methodist University | System and method for predicting the behavior of a component |
US6070125A (en) * | 1997-12-01 | 2000-05-30 | Schlumberger Technology Corporation | Apparatus for creating, testing, and modifying geological subsurface models |
US6106561A (en) * | 1997-06-23 | 2000-08-22 | Schlumberger Technology Corporation | Simulation gridding method and apparatus including a structured areal gridder adapted for use by a reservoir simulator |
US6189012B1 (en) * | 1998-01-23 | 2001-02-13 | Melting Point Limited | Apparatus and method for storing, navigating among and adding links between data items |
US6191796B1 (en) * | 1998-01-21 | 2001-02-20 | Sensable Technologies, Inc. | Method and apparatus for generating and interfacing with rigid and deformable surfaces in a haptic virtual reality environment |
US6219049B1 (en) * | 1995-12-20 | 2001-04-17 | Solidworks Corporation | Mate inferencing |
US6219055B1 (en) * | 1995-12-20 | 2001-04-17 | Solidworks Corporation | Computer based forming tool |
US6230101B1 (en) * | 1999-06-03 | 2001-05-08 | Schlumberger Technology Corporation | Simulation method and apparatus |
US6313837B1 (en) * | 1998-09-29 | 2001-11-06 | Schlumberger Technology Corporation | Modeling at more than one level of resolution |
US20020032550A1 (en) * | 2000-06-29 | 2002-03-14 | Ward Steven B. | Method for modeling an arbitrary well path in a hydrocarbon reservoir using adaptive meshing |
US6366279B1 (en) * | 1998-12-29 | 2002-04-02 | Intel Corporation | Triangle mesh compression |
US6445390B1 (en) * | 1997-12-29 | 2002-09-03 | The United States Of America As Represented By The Adminstrator Of The National Aeronautics And Space Administration | Triangle geometry processing for surface modeling and cartesian grid generation |
US6448788B1 (en) * | 1999-05-26 | 2002-09-10 | Microwave Imaging System Technologies, Inc. | Fixed array microwave imaging apparatus and method |
US6516080B1 (en) * | 2000-04-05 | 2003-02-04 | The Board Of Trustees Of The Leland Stanford Junior University | Numerical method of estimating physical properties of three-dimensional porous media |
US6552724B1 (en) * | 1999-05-06 | 2003-04-22 | Carl S. Marshall | Triangle strip merging for length maximization |
US6587104B1 (en) * | 1999-09-30 | 2003-07-01 | Microsoft Corporation | Progressive hulls |
US6608628B1 (en) * | 1998-11-06 | 2003-08-19 | The United States Of America As Represented By The Administrator Of The National Aeronautics And Space Administration (Nasa) | Method and apparatus for virtual interactive medical imaging by multiple remotely-located users |
US6633837B1 (en) * | 1999-10-14 | 2003-10-14 | Object Reservoir | Method and system for generating software code using a symbolic language translator |
US6757000B2 (en) * | 1996-06-28 | 2004-06-29 | Fujitsu Limited | Object-oriented programming apparatus, object-oriented programming supporting apparatus, component builder apparatus, object-oriented program storage medium, program storage medium for use in object-oriented programming, component storage medium, and object-between-network display method |
US6816820B1 (en) * | 1999-09-24 | 2004-11-09 | Moldflow Ireland, Ltd. | Method and apparatus for modeling injection of a fluid in a mold cavity |
US20050015231A1 (en) * | 1998-05-04 | 2005-01-20 | Schlumberger Technology Corporation | Near wellbore modeling method and apparatus |
US6871325B1 (en) * | 1999-09-21 | 2005-03-22 | Ameranth Wireless, Inc. | Information management and synchronous communications system with menu generation |
US6983227B1 (en) * | 1995-01-17 | 2006-01-03 | Intertech Ventures, Ltd. | Virtual models of complex systems |
Family Cites Families (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4742473A (en) * | 1985-07-16 | 1988-05-03 | Shugar Joel K | Finite element modeling system |
US4783730A (en) * | 1986-09-19 | 1988-11-08 | Datapoint Corporation | Input/output control technique utilizing multilevel memory structure for processor and I/O communication |
US5121383A (en) * | 1990-11-16 | 1992-06-09 | Bell Communications Research, Inc. | Duration limited statistical multiplexing in packet networks |
JP3034433B2 (en) | 1994-10-31 | 2000-04-17 | 核燃料サイクル開発機構 | Thermal design method for structures and numerical calculation device optimal for the design |
US5533009A (en) * | 1995-02-03 | 1996-07-02 | Bell Communications Research, Inc. | Bandwidth management and access control for an ATM network |
US5802278A (en) * | 1995-05-10 | 1998-09-01 | 3Com Corporation | Bridge/router architecture for high performance scalable networking |
US5838915A (en) * | 1995-06-21 | 1998-11-17 | Cisco Technology, Inc. | System for buffering data in the network having a linked list for each of said plurality of queues |
US5828003A (en) * | 1996-01-29 | 1998-10-27 | Dowell -- A Division of Schlumberger Technology Corporation | Composite coiled tubing apparatus and methods |
FR2747490B1 (en) | 1996-04-12 | 1998-05-22 | Inst Francais Du Petrole | METHOD FOR GENERATING A 3D MESH RESPECTING THE GEOMETRY OF A BODY, WITH THE PURPOSE OF REALIZING A REPRESENTATIVE MODEL OF THIS BODY |
US5988862A (en) * | 1996-04-24 | 1999-11-23 | Cyra Technologies, Inc. | Integrated system for quickly and accurately imaging and modeling three dimensional objects |
US5844318A (en) * | 1997-02-18 | 1998-12-01 | Micron Technology, Inc. | Aluminum film for semiconductive devices |
GB2326747B (en) | 1997-06-23 | 2000-01-19 | Schlumberger Holdings | Seismic simulation methods and apparatus |
US6226680B1 (en) * | 1997-10-14 | 2001-05-01 | Alacritech, Inc. | Intelligent network interface system method for protocol processing |
FR2775094B1 (en) | 1998-02-18 | 2000-03-24 | Elf Exploration Prod | SIMULATION METHOD FOR PREDICTING A DETAILED COMPOSITION OF A FLUID PRODUCED BY A RESERVOIR AS A FUNCTION OF TIME |
GB2336008B (en) | 1998-04-03 | 2000-11-08 | Schlumberger Holdings | Simulation system including a simulator and a case manager adapted for organizing data files |
US6246691B1 (en) * | 1998-08-14 | 2001-06-12 | Siemens Aktiengesellschaft | Method and circuit configuration for the transmission of message units in message streams of different priority |
US6193647B1 (en) * | 1999-04-08 | 2001-02-27 | The Board Of Trustees Of The University Of Illinois | Microfluidic embryo and/or oocyte handling device and method |
GB0007063D0 (en) | 2000-03-23 | 2000-05-10 | Simsci Limited | Mulitvariate statistical process monitors |
-
2001
- 2001-06-29 WO PCT/US2001/020908 patent/WO2002003265A2/en active Application Filing
- 2001-06-29 CN CNB018022200A patent/CN1235062C/en not_active Expired - Lifetime
- 2001-06-29 WO PCT/US2001/020910 patent/WO2002001251A2/en active IP Right Grant
- 2001-06-29 AU AU71628/01A patent/AU7162801A/en not_active Abandoned
- 2001-06-29 AT AT01953398T patent/ATE535827T1/en active
- 2001-06-29 MX MXPA02002151A patent/MXPA02002151A/en unknown
- 2001-06-29 AT AT01950747T patent/ATE306677T1/en active
- 2001-06-29 CN CN01802219A patent/CN1386200A/en active Pending
- 2001-06-29 JP JP2002508111A patent/JP2004502999A/en not_active Withdrawn
- 2001-06-29 US US09/896,147 patent/US7043413B2/en not_active Expired - Lifetime
- 2001-06-29 AT AT01948836T patent/ATE527560T1/en not_active IP Right Cessation
- 2001-06-29 WO PCT/US2001/020814 patent/WO2002003263A2/en active Application Filing
- 2001-06-29 WO PCT/US2001/020742 patent/WO2002003103A2/en active Application Filing
- 2001-06-29 EA EA200200257A patent/EA200200257A1/en unknown
- 2001-06-29 AU AU2001273110A patent/AU2001273110A1/en not_active Abandoned
- 2001-06-29 EP EP01950747A patent/EP1301812B1/en not_active Expired - Lifetime
- 2001-06-29 AU AU2001271629A patent/AU2001271629A1/en not_active Abandoned
- 2001-06-29 AU AU2001270265A patent/AU2001270265A1/en not_active Abandoned
- 2001-06-29 US US09/896,136 patent/US7260508B2/en not_active Expired - Lifetime
- 2001-06-29 US US09/896,104 patent/US6674432B2/en not_active Expired - Lifetime
- 2001-06-29 CA CA2383711A patent/CA2383711C/en not_active Expired - Lifetime
- 2001-06-29 AU AU75852/01A patent/AU7585201A/en not_active Abandoned
- 2001-06-29 AT AT01950660T patent/ATE520045T1/en not_active IP Right Cessation
- 2001-06-29 WO PCT/US2001/020905 patent/WO2002003264A2/en active Application Filing
- 2001-06-29 US US09/896,137 patent/US7027964B2/en not_active Expired - Lifetime
- 2001-06-29 CA CA002415257A patent/CA2415257A1/en not_active Abandoned
- 2001-06-29 WO PCT/US2001/020749 patent/WO2002003262A2/en active Application Filing
- 2001-06-29 US US09/896,101 patent/US7149671B2/en not_active Expired - Lifetime
- 2001-06-29 WO PCT/US2001/020741 patent/WO2002002901A2/en active Application Filing
- 2001-06-29 AU AU2001271710A patent/AU2001271710A1/en not_active Abandoned
- 2001-06-29 CA CA2383710A patent/CA2383710C/en not_active Expired - Lifetime
- 2001-06-29 CA CA002413165A patent/CA2413165A1/en not_active Abandoned
- 2001-06-29 US US09/895,137 patent/US20020067373A1/en not_active Abandoned
- 2001-06-29 US US09/895,820 patent/US7006951B2/en not_active Expired - Lifetime
- 2001-06-29 EA EA200200256A patent/EA200200256A1/en unknown
- 2001-06-29 CA CA2414405A patent/CA2414405C/en not_active Expired - Lifetime
- 2001-06-29 EP EP01948836A patent/EP1299749B1/en not_active Expired - Lifetime
- 2001-06-29 DE DE60114012T patent/DE60114012D1/en not_active Expired - Lifetime
- 2001-06-29 US US09/896,132 patent/US6941255B2/en not_active Expired - Lifetime
- 2001-06-29 AU AU2001271633A patent/AU2001271633A1/en not_active Abandoned
- 2001-06-29 EP EP01952346A patent/EP1299751B1/en not_active Expired - Lifetime
- 2001-06-29 BR BR0106991-8A patent/BR0106991A/en not_active Application Discontinuation
- 2001-06-29 MX MXPA02002150A patent/MXPA02002150A/en unknown
- 2001-06-29 AT AT01952346T patent/ATE551679T1/en active
- 2001-06-29 JP JP2002507137A patent/JP2004502255A/en not_active Withdrawn
- 2001-06-29 WO PCT/US2001/020744 patent/WO2002003101A2/en active Application Filing
- 2001-06-29 EP EP01950660A patent/EP1299750B1/en not_active Expired - Lifetime
- 2001-06-29 EP EP01953398A patent/EP1299752B1/en not_active Expired - Lifetime
- 2001-06-29 BR BR0106990-0A patent/BR0106990A/en not_active Application Discontinuation
- 2001-07-29 AU AU7171201A patent/AU7171201A/en active Pending
-
2002
- 2002-02-28 EC EC2002004230A patent/ECSP024230A/en unknown
- 2002-02-28 EC EC2002004229A patent/ECSP024229A/en unknown
- 2002-02-28 NO NO20020994A patent/NO322925B1/en not_active IP Right Cessation
- 2002-02-28 NO NO20020995A patent/NO324002B1/en not_active IP Right Cessation
- 2002-12-20 NO NO20026173A patent/NO323470B1/en not_active IP Right Cessation
- 2002-12-27 NO NO20026266A patent/NO323471B1/en not_active IP Right Cessation
- 2002-12-27 NO NO20026267A patent/NO322437B1/en not_active IP Right Cessation
Patent Citations (58)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3029018A (en) * | 1955-02-21 | 1962-04-10 | Dresser Ind | Two dimensional analog of a three dimensional phenomenon |
US3302710A (en) * | 1964-02-07 | 1967-02-07 | Mobil Oil Corp | Method for recovering hydrocarbons |
US4742743A (en) * | 1986-04-24 | 1988-05-10 | Scarpone William J | Radial saw accessory for preventing sawdust buildup |
US4821164A (en) * | 1986-07-25 | 1989-04-11 | Stratamodel, Inc. | Process for three-dimensional mathematical modeling of underground geologic volumes |
US5699271A (en) * | 1987-08-28 | 1997-12-16 | Hitachi, Ltd. | Method of automatically generating program for solving simultaneous partial differential equations by use of finite element method |
US5255212A (en) * | 1990-03-27 | 1993-10-19 | Yoshiomi Kondoh | Method of predicting a physical quantity of a fluid or a magnetofluid |
US5432718A (en) * | 1990-07-12 | 1995-07-11 | Massachusetts Institute Of Technology | Particle interaction processing system |
US5604911A (en) * | 1991-09-19 | 1997-02-18 | Hitachi, Ltd. | Method of and apparatus for preconditioning of a coefficient matrix of simultaneous linear equations |
US5891131A (en) * | 1993-02-01 | 1999-04-06 | Arizona Board Of Regents | Method and apparatus for automated simulation and design of corneal refractive procedures |
US5754181A (en) * | 1993-02-08 | 1998-05-19 | International Business Machines Corporation | Computer aided design system |
US5574908A (en) * | 1993-08-25 | 1996-11-12 | Asymetrix Corporation | Method and apparatus for generating a query to an information system specified using natural language-like constructs |
US5553009A (en) * | 1993-09-10 | 1996-09-03 | International Business Machines Corporation | Parallel method for subdivision of arbitrary curved solids |
US5617322A (en) * | 1994-01-31 | 1997-04-01 | Nec Corporation | Mesh generator and generating method |
US5675521A (en) * | 1994-02-11 | 1997-10-07 | The United States Of America As Represented By The Secretary Of The Air Force | Multichip module analyzer |
US5572634A (en) * | 1994-10-26 | 1996-11-05 | Silicon Engines, Inc. | Method and apparatus for spatial simulation acceleration |
US5977971A (en) * | 1994-12-13 | 1999-11-02 | Microsoft Corporation | Tree view control |
US6983227B1 (en) * | 1995-01-17 | 2006-01-03 | Intertech Ventures, Ltd. | Virtual models of complex systems |
US5740342A (en) * | 1995-04-05 | 1998-04-14 | Western Atlas International, Inc. | Method for generating a three-dimensional, locally-unstructured hybrid grid for sloping faults |
US5710726A (en) * | 1995-10-10 | 1998-01-20 | Atlantic Richfield Company | Semi-compositional simulation of hydrocarbon reservoirs |
US6219055B1 (en) * | 1995-12-20 | 2001-04-17 | Solidworks Corporation | Computer based forming tool |
US6219049B1 (en) * | 1995-12-20 | 2001-04-17 | Solidworks Corporation | Mate inferencing |
US5821937A (en) * | 1996-02-23 | 1998-10-13 | Netsuite Development, L.P. | Computer method for updating a network design |
US6229540B1 (en) * | 1996-02-23 | 2001-05-08 | Visionael Corporation | Auditing networks |
US6014473A (en) * | 1996-02-29 | 2000-01-11 | Acuson Corporation | Multiple ultrasound image registration system, method and transducer |
US5999187A (en) * | 1996-06-28 | 1999-12-07 | Resolution Technologies, Inc. | Fly-through computer aided design method and apparatus |
US6757000B2 (en) * | 1996-06-28 | 2004-06-29 | Fujitsu Limited | Object-oriented programming apparatus, object-oriented programming supporting apparatus, component builder apparatus, object-oriented program storage medium, program storage medium for use in object-oriented programming, component storage medium, and object-between-network display method |
US6041017A (en) * | 1996-08-05 | 2000-03-21 | Fred L. Goldsberry | Method for producing images of reservoir boundaries |
US6064810A (en) * | 1996-09-27 | 2000-05-16 | Southern Methodist University | System and method for predicting the behavior of a component |
US6078869A (en) * | 1997-02-27 | 2000-06-20 | Geoquest Corp. | Method and apparatus for generating more accurate earth formation grid cell property information for use by a simulator to display more accurate simulation results of the formation near a wellbore |
US6018497A (en) * | 1997-02-27 | 2000-01-25 | Geoquest | Method and apparatus for generating more accurate earth formation grid cell property information for use by a simulator to display more accurate simulation results of the formation near a wellbore |
US6106561A (en) * | 1997-06-23 | 2000-08-22 | Schlumberger Technology Corporation | Simulation gridding method and apparatus including a structured areal gridder adapted for use by a reservoir simulator |
US5966524A (en) * | 1997-07-24 | 1999-10-12 | Lucent Technologies Inc. | 3-D electromagnetic infinite element |
US6054992A (en) * | 1997-09-19 | 2000-04-25 | Mitsubishi Electric Information Technology Center America, Inc. | cutting, jointing and tearing volumetric objects |
US6070125A (en) * | 1997-12-01 | 2000-05-30 | Schlumberger Technology Corporation | Apparatus for creating, testing, and modifying geological subsurface models |
US6445390B1 (en) * | 1997-12-29 | 2002-09-03 | The United States Of America As Represented By The Adminstrator Of The National Aeronautics And Space Administration | Triangle geometry processing for surface modeling and cartesian grid generation |
US6028607A (en) * | 1998-01-15 | 2000-02-22 | Sun Microsystems, Inc. | Method of producing a sequence of triangles from a vertex raster with and without half resolution edges while decompressing a compressed geometry stream |
US6191796B1 (en) * | 1998-01-21 | 2001-02-20 | Sensable Technologies, Inc. | Method and apparatus for generating and interfacing with rigid and deformable surfaces in a haptic virtual reality environment |
US6189012B1 (en) * | 1998-01-23 | 2001-02-13 | Melting Point Limited | Apparatus and method for storing, navigating among and adding links between data items |
US6052520A (en) * | 1998-02-10 | 2000-04-18 | Exxon Production Research Company | Process for predicting behavior of a subterranean formation |
US20050015231A1 (en) * | 1998-05-04 | 2005-01-20 | Schlumberger Technology Corporation | Near wellbore modeling method and apparatus |
US6313837B1 (en) * | 1998-09-29 | 2001-11-06 | Schlumberger Technology Corporation | Modeling at more than one level of resolution |
US6608628B1 (en) * | 1998-11-06 | 2003-08-19 | The United States Of America As Represented By The Administrator Of The National Aeronautics And Space Administration (Nasa) | Method and apparatus for virtual interactive medical imaging by multiple remotely-located users |
US6366279B1 (en) * | 1998-12-29 | 2002-04-02 | Intel Corporation | Triangle mesh compression |
US6552724B1 (en) * | 1999-05-06 | 2003-04-22 | Carl S. Marshall | Triangle strip merging for length maximization |
US6448788B1 (en) * | 1999-05-26 | 2002-09-10 | Microwave Imaging System Technologies, Inc. | Fixed array microwave imaging apparatus and method |
US6230101B1 (en) * | 1999-06-03 | 2001-05-08 | Schlumberger Technology Corporation | Simulation method and apparatus |
US6871325B1 (en) * | 1999-09-21 | 2005-03-22 | Ameranth Wireless, Inc. | Information management and synchronous communications system with menu generation |
US6816820B1 (en) * | 1999-09-24 | 2004-11-09 | Moldflow Ireland, Ltd. | Method and apparatus for modeling injection of a fluid in a mold cavity |
US6587104B1 (en) * | 1999-09-30 | 2003-07-01 | Microsoft Corporation | Progressive hulls |
US6633837B1 (en) * | 1999-10-14 | 2003-10-14 | Object Reservoir | Method and system for generating software code using a symbolic language translator |
US6516080B1 (en) * | 2000-04-05 | 2003-02-04 | The Board Of Trustees Of The Leland Stanford Junior University | Numerical method of estimating physical properties of three-dimensional porous media |
US20020082813A1 (en) * | 2000-06-29 | 2002-06-27 | Kok-Thye Lim | Method and system for coordinate transformation to model radial flow near a singularity |
US20020072883A1 (en) * | 2000-06-29 | 2002-06-13 | Kok-Thye Lim | Method and system for high-resolution modeling of a well bore in a hydrocarbon reservoir |
US20020046014A1 (en) * | 2000-06-29 | 2002-04-18 | Kennon Stephen R. | Method and system for solving finite element models using multi-phase physics |
US6674432B2 (en) * | 2000-06-29 | 2004-01-06 | Object Reservoir, Inc. | Method and system for modeling geological structures using an unstructured four-dimensional mesh |
US20020035453A1 (en) * | 2000-06-29 | 2002-03-21 | Pond Stuart W. | Method for solving finite element models using time slabbing |
US20020032494A1 (en) * | 2000-06-29 | 2002-03-14 | Kennon Stephen R. | Feature modeling in a finite element model |
US20020032550A1 (en) * | 2000-06-29 | 2002-03-14 | Ward Steven B. | Method for modeling an arbitrary well path in a hydrocarbon reservoir using adaptive meshing |
Cited By (123)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100045601A1 (en) * | 1999-08-01 | 2010-02-25 | Pure Depth Limited | Interaction with a multi-component display |
US20100115439A1 (en) * | 1999-08-19 | 2010-05-06 | Pure Depth Limited | Assigning screen designation codes to images |
US20100115391A1 (en) * | 1999-08-19 | 2010-05-06 | Pure Depth Limited | Method and system for assigning screen designation codes |
US8179338B2 (en) | 1999-08-19 | 2012-05-15 | Igt | Method and system for displaying information |
US7730413B1 (en) | 1999-08-19 | 2010-06-01 | Puredepth Limited | Display method for multiple layered screens |
US7724208B1 (en) | 1999-08-19 | 2010-05-25 | Puredepth Limited | Control of depth movement for visual display with layered screens |
US7542921B1 (en) | 1999-09-30 | 2009-06-02 | Jpmorgan Chase Bank, N.A. | Network-based financial planning system and method |
US7260508B2 (en) | 2000-06-29 | 2007-08-21 | Object Reservoir, Inc. | Method and system for high-resolution modeling of a well bore in a hydrocarbon reservoir |
US7043413B2 (en) | 2000-06-29 | 2006-05-09 | Object Reservoir, Inc. | Method for modeling an arbitrary well path in a hydrocarbon reservoir using adaptive meshing |
US20020082813A1 (en) * | 2000-06-29 | 2002-06-27 | Kok-Thye Lim | Method and system for coordinate transformation to model radial flow near a singularity |
US20020072883A1 (en) * | 2000-06-29 | 2002-06-13 | Kok-Thye Lim | Method and system for high-resolution modeling of a well bore in a hydrocarbon reservoir |
US20020032550A1 (en) * | 2000-06-29 | 2002-03-14 | Ward Steven B. | Method for modeling an arbitrary well path in a hydrocarbon reservoir using adaptive meshing |
US20020046014A1 (en) * | 2000-06-29 | 2002-04-18 | Kennon Stephen R. | Method and system for solving finite element models using multi-phase physics |
US7369973B2 (en) | 2000-06-29 | 2008-05-06 | Object Reservoir, Inc. | Method and system for representing reservoir systems |
US20020032494A1 (en) * | 2000-06-29 | 2002-03-14 | Kennon Stephen R. | Feature modeling in a finite element model |
US20020035453A1 (en) * | 2000-06-29 | 2002-03-21 | Pond Stuart W. | Method for solving finite element models using time slabbing |
US7149671B2 (en) | 2000-06-29 | 2006-12-12 | Object Reservoir, Inc. | Method and system for coordinate transformation to model radial flow near a singularity |
US6941255B2 (en) | 2000-06-29 | 2005-09-06 | Object Reservoir, Inc. | Feature modeling in a finite element model |
US20060025976A1 (en) * | 2000-06-29 | 2006-02-02 | Object Reservoir, Inc. | Method and system for representing reservoir systems |
US7006951B2 (en) | 2000-06-29 | 2006-02-28 | Object Reservoir, Inc. | Method for solving finite element models using time slabbing |
US7509279B2 (en) | 2000-07-31 | 2009-03-24 | Riskmetrics Group, Inc. | Method and system for computing path dependent probabilities of attaining financial goals |
US20020177955A1 (en) * | 2000-09-28 | 2002-11-28 | Younes Jalali | Completions architecture |
US7962391B2 (en) | 2000-12-20 | 2011-06-14 | Jpmorgan Chase Bank, N.A. | System and method for determining elegibility and enrolling members in various programs |
US7895098B2 (en) | 2001-03-01 | 2011-02-22 | Jpmorgan Chase Bank, N.A. | System and method for measuring and utilizing pooling analytics |
US8577770B2 (en) | 2001-03-01 | 2013-11-05 | Jpmorgan Chase, N.A. | System and method for measuring and utilizing pooling analytics |
US8255307B1 (en) | 2001-03-01 | 2012-08-28 | Jpmorgan Chase Bank, N.A. | System and method for measuring and utilizing pooling analytics |
US8711058B2 (en) | 2001-05-01 | 2014-04-29 | Puredepth Limited | Information display |
US8120547B2 (en) * | 2001-05-01 | 2012-02-21 | Puredepth Limited | Information display |
US20040239582A1 (en) * | 2001-05-01 | 2004-12-02 | Seymour Bruce David | Information display |
US20080300835A1 (en) * | 2001-06-21 | 2008-12-04 | H2 Advanced Concepts, Inc. | Method and system for the efficient calculation of unsteady processes on arbitrary space-time domains |
US7359841B1 (en) | 2001-06-21 | 2008-04-15 | Hixon Technologies, Ltd. | Method and system for the efficient calculation of unsteady processes on arbitrary space-time domains |
US8000943B2 (en) | 2001-06-21 | 2011-08-16 | Hixon Technologies, Ltd. | Method and system for the efficient calculation of unsteady processes on arbitrary space-time domains |
US7930643B2 (en) * | 2002-01-29 | 2011-04-19 | National Instruments Corporation | System and method for previewing a sequence of motion control operations |
US20030144751A1 (en) * | 2002-01-29 | 2003-07-31 | Sundeep Chandhoke | System and method for previewing a sequence of motion control operations |
US7756896B1 (en) | 2002-03-11 | 2010-07-13 | Jp Morgan Chase Bank | System and method for multi-dimensional risk analysis |
US8751391B2 (en) | 2002-03-29 | 2014-06-10 | Jpmorgan Chase Bank, N.A. | System and process for performing purchase transactions using tokens |
US8146277B2 (en) | 2002-09-20 | 2012-04-03 | Puredepth Limited | Multi-view display |
US20040084180A1 (en) * | 2002-11-04 | 2004-05-06 | Shah Piyush C. | System and method for estimating multi-phase fluid rates in a subterranean well |
US7725301B2 (en) * | 2002-11-04 | 2010-05-25 | Welldynamics, B.V. | System and method for estimating multi-phase fluid rates in a subterranean well |
US20040148566A1 (en) * | 2003-01-24 | 2004-07-29 | Jp Morgan Chase Bank | Method to evaluate project viability |
US20040153298A1 (en) * | 2003-01-31 | 2004-08-05 | Landmark Graphics Corporation, A Division Of Halliburton Energy Services, Inc. | System and method for automated reservoir targeting |
US20040153299A1 (en) * | 2003-01-31 | 2004-08-05 | Landmark Graphics Corporation, A Division Of Halliburton Energy Services, Inc. | System and method for automated platform generation |
US7096172B2 (en) * | 2003-01-31 | 2006-08-22 | Landmark Graphics Corporation, A Division Of Halliburton Energy Services, Inc. | System and method for automated reservoir targeting |
US7835893B2 (en) * | 2003-04-30 | 2010-11-16 | Landmark Graphics Corporation | Method and system for scenario and case decision management |
US20040220790A1 (en) * | 2003-04-30 | 2004-11-04 | Cullick Alvin Stanley | Method and system for scenario and case decision management |
US8154473B2 (en) | 2003-05-16 | 2012-04-10 | Pure Depth Limited | Display control system |
US7876705B2 (en) | 2003-06-25 | 2011-01-25 | Schlumberger Technology Corporation | Method and apparatus and program storage device for generating a workflow in response to a user objective and generating software modules in response to the workflow and executing the software modules to produce a product |
US20040268338A1 (en) * | 2003-06-25 | 2004-12-30 | Omer Gurpinar | Method and apparatus and program storage device for generating a workflow in response to a user objective and generating software modules in response to the workflow and executing the software modules to produce a product |
US20050060131A1 (en) * | 2003-07-31 | 2005-03-17 | Reichenthal Steven W. | Logistics simulator |
US7287231B2 (en) * | 2003-07-31 | 2007-10-23 | The Boeing Company | Logistics simulator |
US7925583B2 (en) | 2003-08-18 | 2011-04-12 | Jpmorgan Chase Bank, N.A. | Method and system for dynamically adjusting discount rates for a card transaction |
US7725302B2 (en) * | 2003-12-02 | 2010-05-25 | Schlumberger Technology Corporation | Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model |
US20050119911A1 (en) * | 2003-12-02 | 2005-06-02 | Schlumberger Technology Corporation | Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model |
US20070255779A1 (en) * | 2004-06-07 | 2007-11-01 | Watts James W Iii | Method For Solving Implicit Reservoir Simulation Matrix |
US7672818B2 (en) | 2004-06-07 | 2010-03-02 | Exxonmobil Upstream Research Company | Method for solving implicit reservoir simulation matrix equation |
EP1782263A1 (en) * | 2004-06-08 | 2007-05-09 | Schlumberger Technology Corporation | Generating an swpm-mdt workflow |
EP2479626A1 (en) * | 2004-06-08 | 2012-07-25 | Schlumberger Technology Corporation | Generating an SWPM-MDT workflow |
EP1782263A4 (en) * | 2004-06-08 | 2009-11-04 | Schlumberger Technology Corp | Generating an swpm-mdt workflow |
US7974895B1 (en) | 2004-07-16 | 2011-07-05 | Jp Morgan Chase Bank | System and method for developing finance rate information |
US20080086287A1 (en) * | 2004-12-06 | 2008-04-10 | Shiyu Xu | Integrated Anisotropic Rock Physics Model |
US7676349B2 (en) | 2004-12-06 | 2010-03-09 | Exxonmobil Upstream Research Co. | Integrated anisotropic rock physics model |
US7890343B1 (en) | 2005-01-11 | 2011-02-15 | Jp Morgan Chase Bank | System and method for generating risk management curves |
US20090222246A1 (en) * | 2005-06-28 | 2009-09-03 | Do Linh N | High-Level, Graphical Programming Language and Tool for Well Management Programming |
US8126648B2 (en) | 2005-07-13 | 2012-02-28 | Exxonmobil Upstream Research Co. | Method for predicting the best and worst in a set of non-unique solutions |
US20090299638A1 (en) * | 2005-07-13 | 2009-12-03 | Saltzer Rebecca L | Method for Predicting the Best and Worst in a Set of Non-Unique Solutions |
US7962396B1 (en) | 2006-02-03 | 2011-06-14 | Jpmorgan Chase Bank, N.A. | System and method for managing risk |
US7707192B1 (en) | 2006-05-23 | 2010-04-27 | Jp Morgan Chase Bank, N.A. | Confidence index for assets |
US20080060005A1 (en) * | 2006-06-30 | 2008-03-06 | Shanks David E | User-selectable audio feed for video programming |
US20080165202A1 (en) * | 2007-01-08 | 2008-07-10 | Rainer Brodersen | Monitor Configuration for Media Device |
US8607144B2 (en) | 2007-01-08 | 2013-12-10 | Apple Inc. | Monitor configuration for media device |
US8612857B2 (en) | 2007-01-08 | 2013-12-17 | Apple Inc. | Monitor configuration for media device |
US20080192069A1 (en) * | 2007-01-22 | 2008-08-14 | Wanzke Detlev | Data analysis |
US7995061B2 (en) * | 2007-03-09 | 2011-08-09 | Lg Electronics Inc. | Displaying of item through electronic apparatus |
US20080218534A1 (en) * | 2007-03-09 | 2008-09-11 | Lg Electronics Inc. | Displaying of item through electronic apparatus |
US20080306803A1 (en) * | 2007-06-05 | 2008-12-11 | Schlumberger Technology Corporation | System and method for performing oilfield production operations |
US9175547B2 (en) * | 2007-06-05 | 2015-11-03 | Schlumberger Technology Corporation | System and method for performing oilfield production operations |
US8676556B2 (en) | 2007-11-27 | 2014-03-18 | Exxonmobil Upstream Research Company | Method for determining the properties of hydrocarbon reservoirs from geophysical data |
US20100217574A1 (en) * | 2007-12-13 | 2010-08-26 | Usadi Adam K | Parallel Adaptive Data Partitioning On A Reservoir Simulation Using An Unstructured Grid |
US8437996B2 (en) | 2007-12-13 | 2013-05-07 | Exxonmobil Upstream Research Company | Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid |
US20100252270A1 (en) * | 2007-12-18 | 2010-10-07 | Chul-Sung Kim | Determining Connectivity Architecture In 2-D and 3-D Heterogeneous Data |
US8365831B2 (en) | 2007-12-18 | 2013-02-05 | Exxonmobil Upstream Research Company | Determining connectivity architecture in 2-D and 3-D heterogeneous data |
US8370122B2 (en) | 2007-12-21 | 2013-02-05 | Exxonmobil Upstream Research Company | Method of predicting connectivity between parts of a potential hydrocarbon reservoir and analyzing 3D data in a subsurface region |
US8230360B2 (en) * | 2008-01-04 | 2012-07-24 | Apple Inc. | User interface for selection from media collection |
US20090177989A1 (en) * | 2008-01-04 | 2009-07-09 | Jeffrey Ma | User Interface for Selection from Media Collection |
US8437997B2 (en) | 2008-01-22 | 2013-05-07 | Exxonmobil Upstream Research Company | Dynamic connectivity analysis |
US20100235154A1 (en) * | 2008-01-22 | 2010-09-16 | Mary Ellen Meurer | Dynamic Connectivity Analysis |
US9026418B2 (en) | 2008-03-10 | 2015-05-05 | Exxonmobil Upstream Research Company | Method for determining distinct alternative paths between two object sets in 2-D and 3-D heterogeneous data |
US8478637B1 (en) | 2008-04-08 | 2013-07-02 | Jpmorgan Chase Bank, N.A. | Index for assessing discount potential |
US8719078B1 (en) | 2008-04-08 | 2014-05-06 | Jpmorgan Chase Bank, N.A. | Index for assessing discount potential |
US9733388B2 (en) | 2008-05-05 | 2017-08-15 | Exxonmobil Upstream Research Company | Systems and methods for connectivity analysis using functional objects |
US20100082724A1 (en) * | 2008-09-30 | 2010-04-01 | Oleg Diyankov | Method For Solving Reservoir Simulation Matrix Equation Using Parallel Multi-Level Incomplete Factorizations |
US20100082509A1 (en) * | 2008-09-30 | 2010-04-01 | Ilya Mishev | Self-Adapting Iterative Solver |
US9552462B2 (en) | 2008-12-23 | 2017-01-24 | Exxonmobil Upstream Research Company | Method for predicting composition of petroleum |
US8352228B2 (en) | 2008-12-23 | 2013-01-08 | Exxonmobil Upstream Research Company | Method for predicting petroleum expulsion |
US20100161302A1 (en) * | 2008-12-23 | 2010-06-24 | Walters Clifford C | Method For Predicting Petroleum Expulsion |
US20100155078A1 (en) * | 2008-12-23 | 2010-06-24 | Walters Clifford C | Method For Predicting Composition of Petroleum |
US8793110B2 (en) | 2009-03-13 | 2014-07-29 | Exxonmobil Upstream Research Company | Method for predicting fluid flow |
US9169726B2 (en) | 2009-10-20 | 2015-10-27 | Exxonmobil Upstream Research Company | Method for quantitatively assessing connectivity for well pairs at varying frequencies |
US9594186B2 (en) | 2010-02-12 | 2017-03-14 | Exxonmobil Upstream Research Company | Method and system for partitioning parallel simulation models |
US9367564B2 (en) | 2010-03-12 | 2016-06-14 | Exxonmobil Upstream Research Company | Dynamic grouping of domain objects via smart groups |
US20120136636A1 (en) * | 2010-11-26 | 2012-05-31 | Adrian Kleine | Finite element adjustment for basin faults |
US10318663B2 (en) | 2011-01-26 | 2019-06-11 | Exxonmobil Upstream Research Company | Method of reservoir compartment analysis using topological structure in 3D earth model |
US20130144583A1 (en) * | 2011-09-02 | 2013-06-06 | Saudi Arabia Oil Company | Hyper-dimensional simulation for reservoir engineering and geosciences |
US11132477B1 (en) * | 2012-01-18 | 2021-09-28 | Msc.Software Corporation | Interactive simulation and solver for mechanical, fluid, and electro-mechanical systems |
US10422922B2 (en) | 2012-05-24 | 2019-09-24 | Exxonmobil Upstream Research Company | Method for predicting rock strength by inverting petrophysical properties |
US11449202B1 (en) * | 2012-06-01 | 2022-09-20 | Ansys, Inc. | User interface and method of data navigation in the user interface of engineering analysis applications |
US20160038665A1 (en) * | 2013-03-15 | 2016-02-11 | Gambro Lundia Ab | Extracorporeal blood treatment fluids interface |
US9613023B2 (en) * | 2013-04-04 | 2017-04-04 | Wayne M. Kennard | System and method for generating ethnic and cultural emoticon language dictionaries |
US20140303964A1 (en) * | 2013-04-04 | 2014-10-09 | Wayne M. Kennard | System and method for generating ethnic and cultural emoticon language dictionaries |
US20140310634A1 (en) * | 2013-04-12 | 2014-10-16 | Schlumberger Technology Corporation | Dynamic fluid behavior display system |
US10584570B2 (en) | 2013-06-10 | 2020-03-10 | Exxonmobil Upstream Research Company | Interactively planning a well site |
US9057795B2 (en) | 2013-06-21 | 2015-06-16 | Exxonmobil Upstream Research Company | Azimuthal cement density image measurements |
US9864098B2 (en) | 2013-09-30 | 2018-01-09 | Exxonmobil Upstream Research Company | Method and system of interactive drill center and well planning evaluation and optimization |
US11740767B2 (en) | 2014-03-31 | 2023-08-29 | Gambro Lundia Ab | Extracorporeal blood treatment flow rate adjustment |
US11385769B2 (en) | 2014-03-31 | 2022-07-12 | Gambro Lundia Ab | Extracorporeal blood treatment flow rate adjustment |
US10961826B2 (en) * | 2016-12-19 | 2021-03-30 | Conocophillips Company | Subsurface modeler workflow and tool |
GB2589502A (en) * | 2018-08-20 | 2021-06-02 | Landmark Graphics Corp | Cloud-native reservoir simulation |
WO2020041146A1 (en) * | 2018-08-20 | 2020-02-27 | Landmark Graphics Corporation | Cloud-native reservoir simulation |
WO2020047671A1 (en) * | 2018-09-06 | 2020-03-12 | Aquanty Inc. | Method and system of integrated surface water and groundwater modelling using a dynamic mesh evolution |
US20200174157A1 (en) * | 2018-11-29 | 2020-06-04 | Schlumberger Technology Corporation | Volumetric Well Production User Interface Components |
US11719855B2 (en) * | 2018-11-29 | 2023-08-08 | Schlumberger Technology Corporation | Volumetric well production user interface components |
US20200409665A1 (en) * | 2019-06-28 | 2020-12-31 | ASG Technologies Group, Inc. dba ASG Technologies | Systems and Methods for Seamlessly Integrating Multiple Products by Using a Common Visual Modeler |
US11762634B2 (en) * | 2019-06-28 | 2023-09-19 | Asg Technologies Group, Inc. | Systems and methods for seamlessly integrating multiple products by using a common visual modeler |
Also Published As
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20020067373A1 (en) | System and method for defining and displaying a reservoir model | |
JP2509309B2 (en) | How to automatically interface a concept design tool and a project management tool | |
US8677279B2 (en) | Visual hierarchy explorer | |
US7734619B2 (en) | Method of presenting lineage diagrams representing query plans | |
US7571392B2 (en) | User definable task based interface | |
US20110320182A1 (en) | Method and system for dynamic, three-dimensional geological interpretation and modeling | |
JP2009064469A (en) | Method of providing access to object parameter within simulation model | |
US20170010787A1 (en) | Graphical model explorer | |
US10705806B1 (en) | Managing an application variable using variable attributes | |
WO2009018525A2 (en) | Method and system for dynamic, three-dimensional geological interpretation and modeling | |
CN108573112B (en) | Space flight test emission two-dimensional layout analysis method based on digital simulation | |
WO2009035993A1 (en) | Method for semi-automatic quantity takeoff from computer aided design drawings | |
US9708897B2 (en) | Oilfield application framework | |
US9335760B2 (en) | Template framework for automated process routing | |
US10437210B2 (en) | Interactive feedback for variable equation specifications | |
US20150294050A1 (en) | Method, Apparatus and System for Improved Groundwater Modeling | |
Alzraiee | Cost estimate system using structured query language in BIM | |
EP3427167B1 (en) | Method for providing details to a computer aided design (cad) model, a computer program product and a server therefore | |
Nezamaldin | Parametric design with Visual programming in Dynamo with Revit: The conversion from CAD models to BIM and the design of analytical applications | |
Shapiro et al. | A graphical-user interface for the US Geological Survey modular three-dimensional finite-difference ground-water flow model (MODFLOW-96) using Argus Numerical Environments | |
CN114117645A (en) | Ship overall performance prediction integrated application system | |
US20120203521A1 (en) | Method, appartus and system for improved groundwater modeling | |
CN117669038A (en) | Multidisciplinary optimization model construction system and method | |
CN115357300A (en) | Batch packaging and step-by-step loading system and method for associalbundle resources | |
CN114529629A (en) | Geological topic chart generation method and system based on template and rule customization |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: OBJECT RESERVIOR, INC., TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ROE, ERIC;POND JR., STUART W.;REEL/FRAME:012461/0066;SIGNING DATES FROM 20010928 TO 20011001 |
|
AS | Assignment |
Owner name: SILICON VALLEY BANK, CALIFORNIA Free format text: SECURITY INTEREST;ASSIGNOR:OBJECT RESERVOIR, INC.;REEL/FRAME:016470/0654 Effective date: 20050324 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |
|
AS | Assignment |
Owner name: OBJECT RESERVOIR, INC., TEXAS Free format text: RELEASE;ASSIGNOR:SILICON VALLEY BANK;REEL/FRAME:027545/0129 Effective date: 20111230 |