TWI410368B - Production line apparatus of notebook computer - Google Patents

Production line apparatus of notebook computer Download PDF

Info

Publication number
TWI410368B
TWI410368B TW99142830A TW99142830A TWI410368B TW I410368 B TWI410368 B TW I410368B TW 99142830 A TW99142830 A TW 99142830A TW 99142830 A TW99142830 A TW 99142830A TW I410368 B TWI410368 B TW I410368B
Authority
TW
Taiwan
Prior art keywords
track
areas
notebook computers
area
test
Prior art date
Application number
TW99142830A
Other languages
Chinese (zh)
Other versions
TW201223844A (en
Inventor
Ken Shan
hui-feng Gao
Yi Hung Liu
Original Assignee
Inventec Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inventec Corp filed Critical Inventec Corp
Priority to TW99142830A priority Critical patent/TWI410368B/en
Publication of TW201223844A publication Critical patent/TW201223844A/en
Application granted granted Critical
Publication of TWI410368B publication Critical patent/TWI410368B/en

Links

Landscapes

  • General Factory Administration (AREA)

Abstract

A production line apparatus of notebook computer includes two test areas, two first download areas, a conveyor track, and a run-in area. The test areas are disposed in parallel with each other. The test areas receive a plurality of notebook computers through two inlets and transport the notebook computers along a first direction. The first download areas provide a retaining space for the notebook computers. The conveyor track is capable of receiving the notebook computers from the test areas or from the first download areas, and transporting the notebook computers along the first direction and a second direction sequentially. The run-in area receives the notebook computers from the conveyor track transported along the second direction through another inlet. The notebook computers transported along the second direction are rotated to the first direction, so that the notebook computers are transported to two outlets.

Description

筆記型電腦的生產線機台Notebook computer production line machine

本發明是有關於一種生產線機台與生產線方法,且特別是有關於一種筆記型電腦的生產線機台與生產線方法。The invention relates to a production line machine and a production line method, and in particular to a production line machine and a production line method for a notebook computer.

目前生產筆記型電腦的廠商通常使用單迴圈線體的生產線機台,其使物料的進與出都在同一側。不過,由於筆記型電腦在包裝時必須和主線體分開,故會多一次搬運的機會。除此之外,由於主線體只有一個動力,故整個主線體無法分段作業,而有產能低落的缺點。Manufacturers currently producing notebook computers typically use a single loop body line machine that allows the material to enter and exit on the same side. However, since the notebook computer must be separated from the main body when it is packaged, there is an opportunity to carry it once more. In addition, since the main line body has only one power, the entire main line body cannot be segmented, and there is a disadvantage of low productivity.

另外,雖然有些廠商使用雙迴圈線體的生產線機台來解決包裝連線與物料同方向進出的問題,但因有線外卸載(download)區,以及三個轉彎合計浪費13米的線體空間,亦使得產能提升成為瓶頸。另外,再加上某些廠商要求筆記型電腦的生產商在生產線機台上增加作業系統(operation system,OS)解壓縮要求,故雙迴圈線體之生產線機台的現有空間已經不足。In addition, although some manufacturers use the double loop body line machine to solve the problem of the package connection and the material in the same direction, but the cable download space and the three turns waste 13 meters of space. It also makes capacity increase a bottleneck. In addition, some manufacturers require notebook manufacturers to increase the operating system (OS) decompression requirements on the production line machine, so the existing space of the double loop body line machine is insufficient.

本發明提供一種筆記型電腦的生產線機台,其有助於產能的提升,同時能保持物流之順暢。The invention provides a production line machine for a notebook computer, which contributes to the improvement of the production capacity while maintaining the smooth flow of the logistics.

本發明提供一種筆記型電腦的生產線方法,其有助於產之提升同時能保持物流之順暢。The invention provides a production line method for a notebook computer, which contributes to the improvement of production while maintaining the smoothness of the logistics.

本發明提出一種筆記型電腦的生產線機台,包括兩備料區域、兩組裝區域、兩測試區域、兩第一卸載區域、輸送軌道、試運轉區域以及兩包裝區域。兩備料區域彼此平行排列。兩備料區域透過兩第一入口接收多個筆記型電腦所需的組裝材料,並沿一第一方向傳遞筆記型電腦所需的組裝材料。兩組裝區域分別對應備料區域配置,將組裝材料組裝成筆記型電腦,並沿第一方向傳遞筆記型電腦。兩測試區域分別對應組裝區域配置,以接收筆記型電腦,並沿一第一方向傳送筆記型電腦。第一卸載區域配置於筆記型電腦的傳送路徑上,並提供停放空間給筆記型電腦。輸送軌道配置於第一卸載區域之間。輸送軌道適於接收來自測試區域的筆記型電腦或接收來自第一卸載區域的筆記型電腦,並依序沿第一方向與一第二方向傳送該些筆記型電腦。試運轉區域透過第二入口接收輸送軌道沿第二方向所傳送的筆記型電腦,且將沿第二方向傳送的筆記型電腦旋轉至沿第一方向傳送,以使試運轉區域將筆記型電腦傳送至兩第一出口。第一出口位於試運轉區域的相對兩側。兩包裝區域對應試運轉區域的第一出口排列,且卸載區域配置於包裝區域之間。包裝區域分別透過兩第三入口接收筆記型電腦,並沿第一方向將筆記型電腦傳送至兩第二出口。The invention provides a production line machine for a notebook computer, comprising two preparation areas, two assembly areas, two test areas, two first unloading areas, a conveying track, a trial running area and two packaging areas. The two stock areas are arranged parallel to each other. The two stocking areas receive the assembly materials required for the plurality of notebook computers through the two first inlets, and transfer the assembly materials required for the notebook computer in a first direction. The two assembly areas are respectively arranged corresponding to the preparation area, and the assembly materials are assembled into a notebook computer, and the notebook computer is transmitted in the first direction. The two test areas are respectively arranged corresponding to the assembly area to receive the notebook and transfer the notebook in a first direction. The first unloading area is disposed on the transfer path of the notebook computer and provides parking space to the notebook computer. The conveying track is disposed between the first unloading areas. The transport track is adapted to receive a notebook from the test area or receive a notebook from the first unloading area and sequentially transfer the notebooks in a first direction and a second direction. The test operation area receives the notebook computer transported along the second direction through the second entrance, and rotates the notebook computer transmitted in the second direction to transmit in the first direction, so that the test operation area transmits the notebook computer To the first exit. The first outlets are located on opposite sides of the test run area. The two packaging areas correspond to the first outlet arrangement of the test operation area, and the unloading area is disposed between the packaging areas. The packaging area receives the notebook computer through the two third entrances, and transmits the notebook computer to the two second outlets in the first direction.

在本發明之一實施例中,上述之輸送軌道包括第一軌道與第二軌道。第二軌道位於第一軌道的上方。第一軌道與第二軌道分別沿第一方向與第二方向傳送筆記型電腦,且試運轉區域透過第二軌道的一第二出口接收筆記型電腦。第一方向與第二方向彼此相反。In an embodiment of the invention, the transport track comprises a first track and a second track. The second track is located above the first track. The first track and the second track respectively transmit the notebook computer in the first direction and the second direction, and the test operation area receives the notebook computer through a second exit of the second track. The first direction and the second direction are opposite to each other.

在本發明之一實施例中,上述之第一卸載區域透過第一軌道接收來自測試區域的筆記型電腦。試運轉區域透過第二軌道接收來自第一卸載區域的筆記型電腦。In an embodiment of the invention, the first unloading area receives the notebook computer from the test area through the first track. The test operation area receives the notebook computer from the first unloading area through the second track.

在本發明之一實施例中,上述之筆記型電腦於第一卸載區域執行一作業系統的下載。In an embodiment of the invention, the notebook computer performs downloading of an operating system in the first unloading area.

在本發明之一實施例中,上述之筆記型電腦於試運轉區域執行作業系統的解壓縮。In an embodiment of the invention, the notebook computer performs decompression of the operating system in the commissioning area.

在本發明之一實施例中,上述之試運轉區域包括停放架以及旋轉軌道。旋轉軌道的形狀為類環形,其中停放架配置於旋轉軌道上,並適於沿著旋轉軌道移動。In an embodiment of the invention, the test run area includes a parking rack and a rotating track. The shape of the rotating track is an annular shape in which the parking rack is disposed on the rotating track and adapted to move along the rotating track.

在本發明之一實施例中,筆記型電腦的生產線機台更包括檢料架。檢料架配置於包裝區域之其一的旁邊。In an embodiment of the invention, the production line machine of the notebook computer further includes a sample rack. The sample rack is disposed beside one of the packaging areas.

在本發明之一實施例中,筆記型電腦的生產線機台更一第二卸載區域。第二卸載區域配置於輸送軌道的上方。In an embodiment of the invention, the production line machine of the notebook computer is further provided with a second unloading area. The second unloading area is disposed above the conveying track.

在本發明之一實施例中,筆記型電腦的生產線機台更包括兩傾斜軌道。兩傾斜軌道配置於測試區域的上方。傾斜軌道適於接收來自第一出口的筆記型電腦,並傳送筆記型電腦。In an embodiment of the invention, the production line machine of the notebook computer further includes two inclined tracks. Two inclined rails are disposed above the test area. The tilt track is adapted to receive a notebook from the first outlet and to transfer the notebook.

在本發明之一實施例中,上述之第一卸載區域包括一卸載架。In an embodiment of the invention, the first unloading area includes an unloading rack.

基於上述,本發明之筆記型電腦的生產線機台藉由於輸送軌道的鄰近處設置卸載區域,因而能減少作業員搬運筆記型電腦的距離,並保持物流的順暢。另外,由於筆記型電腦亦於試運轉區域進行作業系統之解壓縮,故能減少作業員搬運筆記型電腦的次數。除此之外,本發明之筆記型電腦的生產線機台包括兩測試區域、兩第一卸載區域,其雙投入生產線的架構有助於產能的提升。Based on the above, the production line machine of the notebook computer of the present invention can reduce the distance for the operator to carry the notebook computer and keep the logistics smooth by providing the unloading area in the vicinity of the transport track. In addition, since the notebook computer also decompresses the operating system in the test operation area, the number of times the operator carries the notebook computer can be reduced. In addition, the production line machine of the notebook computer of the present invention comprises two test areas and two first unloading areas, and the double-input production line structure contributes to the improvement of the production capacity.

為讓本發明之上述特徵和優點能更明顯易懂,下文特舉實施例,並配合所附圖式作詳細說明如下。The above described features and advantages of the present invention will be more apparent from the following description.

圖1為本發明一實施例之筆記型電腦的生產線機台。圖2A為圖1之區域A的放大立體圖。請同時參照圖1與圖2A,本實施例之筆記型電腦的生產線機台100包括兩備料區域(kitting area)160、兩組裝區域(assembly area)150、兩測試區域(test area)110、兩卸載區域(download area)120、輸送軌道130、試運轉區域(run-in area)140以及兩包裝區域(packing area)170。1 is a production line machine of a notebook computer according to an embodiment of the present invention. 2A is an enlarged perspective view of a region A of FIG. 1. Referring to FIG. 1 and FIG. 2A simultaneously, the production line machine 100 of the notebook computer of the embodiment includes two kitting areas 160, two assembly areas 150, two test areas 110, and two. A download area 120, a transport track 130, a run-in area 140, and a packing area 170 are provided.

兩備料區域160彼此平行排列,透過兩入口IP1接收測試元件TC所需的組裝材料M並沿一第一方向(例如為+X方向)傳遞組裝材料M。兩組裝區域150分別對應備料區域160配置,將組裝材料M組裝成測試元件TC,並沿+X方向傳遞測試元件TC,其中測試元件TC例如為筆記型電腦(notebook computer)。兩測試區域110分別對應組裝區域150配置,以接收測試元件TC,並沿+X方向傳送測試元件TC。測試區域110透過兩入口IP1’分別接收測試元件TC,並沿+X方向傳送測試元件TC。兩卸載區域120配置於測試元件TC的傳送路徑P1上,並提供停放空間122給測試元件TC。另外,卸載區域120例如為卸載架。The two stock areas 160 are arranged in parallel with each other, receive the assembly material M required for the test element TC through the two inlets IP1 and transfer the assembly material M in a first direction (for example, the +X direction). The two assembly areas 150 are respectively arranged corresponding to the stock preparation area 160, the assembly material M is assembled into the test element TC, and the test element TC is transmitted in the +X direction, wherein the test element TC is, for example, a notebook computer. The two test areas 110 are respectively configured corresponding to the assembly area 150 to receive the test element TC and transmit the test element TC in the +X direction. The test area 110 receives the test element TC through the two inlets IP1' and transmits the test element TC in the +X direction. The two unloading areas 120 are disposed on the transport path P1 of the test element TC and provide a parking space 122 to the test element TC. In addition, the unloading area 120 is, for example, an unloading rack.

輸送軌道130配置於卸載區域120之間。輸送軌道130適於接收來自測試區域110的測試元件TC或來自卸載區域120的測試元件TC,依序沿+X方向與一第二方向(例如為-X方向)傳送測試元件TC。在本實施例中,輸送軌道130的寬度例如為0.4公尺,且其長度例如為100公尺。試運轉區域140透過入口IP2接收輸送軌道130沿-X方向所傳送的測試元件TC,且沿-X方向繼續傳送測試元件TC。試運轉區域140將測試元件TC的傳送方向由-X方向旋轉至+X方向,並沿+X方向將測試元件TC傳送至兩出口OP1,其中兩出口OP1位於試運轉區域140的相對兩側。另外,本實施例之筆記型電腦的生產線機台100更包括卸載區域120’(繪示於圖2A)。如圖2A所示,卸載區域120’配置於輸送軌道130的上方。當生產線機台之產能提升時,卸載區域120,能提供更多的停放空間給測試元件TC。The transport track 130 is disposed between the unloading areas 120. The transport track 130 is adapted to receive the test element TC from the test area 110 or the test element TC from the unloading area 120, sequentially transmitting the test element TC in a +X direction and a second direction (eg, the -X direction). In the present embodiment, the width of the conveying rail 130 is, for example, 0.4 meters, and the length thereof is, for example, 100 meters. The trial operation area 140 receives the test element TC transported by the transport track 130 in the -X direction through the inlet IP2, and continues to transport the test element TC in the -X direction. The trial operation area 140 rotates the conveying direction of the test element TC from the -X direction to the +X direction, and transmits the test element TC to the two outlets OP1 in the +X direction, wherein the two outlets OP1 are located on opposite sides of the trial operation area 140. In addition, the production line machine 100 of the notebook computer of the present embodiment further includes an unloading area 120' (shown in Fig. 2A). As shown in Fig. 2A, the unloading area 120' is disposed above the conveying rail 130. When the production capacity of the production line machine is increased, the unloading area 120 can provide more parking space to the test component TC.

詳細來說,本實施例之組裝區域150分別對應測試區域110的入口IP1’排列,並透過兩出口OP3將測試元件TC沿+X方向傳送至測試區域110的入口IP1’,其中測試元件TC包括多個顯示模組。顯示模組例如為液晶模組(liquid crystal module,LCM)。另外,備料區域160分別對應組裝區域150的兩入口IP3排列,並提供顯示模組所需之組裝材料M。其中組裝材料M例如為顯示面板、背光模組、前框與後框之至少其中之一,且顯示面板例為液晶顯示面板(liquid crystal display panel)。如圖1所示,備料區域160透過兩出口OP4將組裝材料M沿+X方向傳送至組裝區域150的入口IP3,以使組裝材料M於組裝區域150內組裝成測試元件TC。舉例來說,本實施例之組裝區域150可例如為顯示模組組裝區域。In detail, the assembly area 150 of the present embodiment is respectively arranged corresponding to the inlet IP1' of the test area 110, and the test element TC is transmitted to the inlet IP1' of the test area 110 in the +X direction through the two outlets OP3, wherein the test element TC includes Multiple display modules. The display module is, for example, a liquid crystal module (LCM). In addition, the stocking area 160 is arranged corresponding to the two inlets IP3 of the assembly area 150, and provides the assembly material M required for the display module. The assembly material M is, for example, at least one of a display panel, a backlight module, a front frame and a rear frame, and the display panel is exemplified by a liquid crystal display panel. As shown in FIG. 1, the stock preparation area 160 transports the assembly material M in the +X direction to the inlet IP3 of the assembly area 150 through the two outlets OP4, so that the assembly material M is assembled into the test area TC in the assembly area 150. For example, the assembly area 150 of the present embodiment may be, for example, a display module assembly area.

另一方面,包裝區域170對應試運轉區域140的出口OP1排列,且卸載區域120配置於包裝區域170之間。包裝區域170分別透過兩入口IP4接收來自試運轉區域140的測試元件TC,並沿+X方向傳送將測試元件TC至兩出口OP5。由上述可知,在本實施例中,兩備料區域160的兩入口IP1與兩包裝區域170的兩出口OP5分別為筆記型電腦的生產線機台100的雙出口與雙入口。On the other hand, the packaging area 170 is aligned with the outlet OP1 of the trial operation area 140, and the unloading area 120 is disposed between the packaging areas 170. The packaging area 170 receives the test element TC from the trial operation area 140 through the two inlets IP4, respectively, and transmits the test element TC to the two outlets OP5 in the +X direction. As can be seen from the above, in the present embodiment, the two inlets IP1 of the two stock areas 160 and the two outlets OP5 of the two package areas 170 are respectively the double outlet and the double inlet of the production line machine 100 of the notebook computer.

另外,本實施例之筆記型電腦的生產線機台100還包括檢料架180。檢料架180配置於包裝區域170之其一的旁邊。在本實施例中,檢料架180的個數例如為兩個,且分別配置於兩包裝區域170的旁邊。進一步而言,檢料架180例如為機器附件的檢料架,其用以提供測試元件TC的說明書或光碟等相關附件。In addition, the production line machine 100 of the notebook computer of the embodiment further includes a sample rack 180. The sample rack 180 is disposed beside one of the packaging areas 170. In the present embodiment, the number of the sample racks 180 is, for example, two, and is disposed beside the two packaging areas 170, respectively. Further, the sample rack 180 is, for example, a sample rack of a machine accessory for providing instructions for the test component TC or related accessories such as a compact disc.

圖2B為圖2A之試運轉區域140與輸送軌道130沿Y方向的正視圖。請同時參照圖2A與圖2B,輸送軌道130包括軌道132與軌道134。軌道134位於軌道132的上方,其中軌道132與軌道134分別沿+X方向與-X方向傳送測試元件TC。試運轉區域140透過134軌道的出口OP2接收測試元件TC。另外,卸載區域120透過軌道132接收來自測試區域110的測試元件TC,且試運轉區域140透過軌道134接收來自卸載區域120的測試元件TC。其中測試元件TC於軌道132的行進方向與於軌道134的行進方向彼此相反。舉例來說,測試元件TC於軌道132的行進方向例如為+X方向,而測試元件TC於軌道134的行進方向例如為-X方向方向。2B is a front elevational view of the trial run area 140 and the transport track 130 of FIG. 2A in the Y direction. 2A and 2B, the transport track 130 includes a track 132 and a track 134. The track 134 is located above the track 132, wherein the track 132 and the track 134 carry the test element TC in the +X direction and the -X direction, respectively. The trial operation area 140 receives the test element TC through the outlet OP2 of the 134 track. Additionally, the unloading region 120 receives the test element TC from the test area 110 through the track 132, and the test run area 140 receives the test element TC from the unloading area 120 through the track 134. The direction in which the test element TC travels in the track 132 and the direction in which the track 134 travels are opposite to each other. For example, the direction of travel of the test element TC in the track 132 is, for example, the +X direction, and the direction of travel of the test element TC in the track 134 is, for example, the -X direction.

在本實施例中,測試元件TC係於卸載區域120執行作業系統(operation system,OS)的下載。舉例而言,卸載區域120上附有電源線和網路線,以便下載作業系統的影像檔至測試元件TC。詳細來說,當作業員將待下載作業系統的測試元件TC從測試區域110移至軌道132時(步驟S1),軌道132會沿+X方向傳送測試元件TC。應注意的是,由於測試區域110至軌道132的距離很近(例如在2公尺之內),故便於作業員的搬運作業。In the present embodiment, the test component TC is connected to the unloading area 120 to perform downloading of an operation system (OS). For example, the unloading area 120 is attached with a power cord and a network route for downloading the image file of the operating system to the test component TC. In detail, when the operator moves the test component TC of the operating system to be downloaded from the test area 110 to the track 132 (step S1), the track 132 transmits the test element TC in the +X direction. It should be noted that since the distance from the test area 110 to the track 132 is very close (for example, within 2 meters), it is convenient for the operator to carry out the work.

再來,作業員會將送達面前的測試元件TC從軌道132拿起,並搬運到卸載區域120上以進行作業系統的下載。詳細而言,本實施例之卸載區域120係對應輸送軌道130所設置,其中輸送軌道130的長度例如約30公尺,且輸送軌道130旁每隔一段距離便有作業員。因此,當測試元件TC傳送到各作業員所負責的區域時,每人只要將負責區域內的測試元件TC放在卸載區域120即可。由於卸載區域120就在輸送軌道130的旁邊,故能夠縮短作業員的搬運時間,且有助於物流的順暢。亦即,作業員在搬運時測試元件TC不須離開主線體,而是藉軌道132就能將測試元件TC傳送到各個定點。本實施例之卸載區域120例如可容納1000個測試元件TC,其中測試元件TC例如為待下載或正在下載作業系統的筆記型電腦。Further, the operator picks up the test element TC in front of the delivery from the track 132 and transports it to the unloading area 120 for downloading of the operating system. In detail, the unloading area 120 of the present embodiment is provided corresponding to the conveying rail 130, wherein the length of the conveying rail 130 is, for example, about 30 meters, and there is an operator at every other distance beside the conveying rail 130. Therefore, when the test element TC is transferred to the area in which each worker is responsible, each person only needs to place the test element TC in the area of responsibility in the unloading area 120. Since the unloading area 120 is located beside the conveyance rail 130, it is possible to shorten the transportation time of the worker and contribute to the smoothness of the flow. That is, the operator tests the component TC without leaving the main body during transportation, but the track 132 can transmit the test component TC to each fixed point. The unloading area 120 of the present embodiment can accommodate, for example, 1000 test elements TC, such as a notebook computer to be downloaded or downloading an operating system.

接著,作業員會把已下載好作業系統的測試元件TC從卸載區域120取下,並放到軌道134上,以使軌道134將測試元件TC沿-X方向傳送至試運轉區域140(步驟S2)。最後,試運轉區域140會透過軌道134的出口OP2接收測試元件TC。如圖2A所示,試運轉區域140包括停放架142以及旋轉軌道144,旋轉軌道144的形狀為一類環形,其中停放架142配置於旋轉軌道144上,並適於沿著旋轉軌道144移動。詳細來說,停放架142會在旋轉軌道144進行旋轉。Next, the operator will remove the test component TC of the downloaded operating system from the unloading area 120 and place it on the track 134 so that the track 134 transmits the test element TC in the -X direction to the trial operation area 140 (step S2). ). Finally, the test run area 140 receives the test element TC through the outlet OP2 of the track 134. As shown in FIG. 2A, the trial operation area 140 includes a parking rack 142 and a rotating track 144. The rotating rail 144 is shaped like a ring, wherein the parking rack 142 is disposed on the rotating rail 144 and adapted to move along the rotating rail 144. In detail, the parking rack 142 will rotate on the rotating track 144.

圖2C為圖2A之試運轉區域140、包裝區域170與傾斜軌道182沿Y方向的正視圖。請同時參照圖2A與圖2C,在本實施例中,測試元件TC係於試運轉區域140執行作業系統的解壓縮。當停放架142旋轉至靠近出口OP1且作業系統之解壓縮已完成時,作業員便能於靠進出口OP1之處將停放架142上的測試元件TC取下,並透過傾斜軌道182將測試元件TC傳送至包裝區域170(步驟S3)。詳細而言,傾斜軌道182配置於測試區域110的上方。傾斜軌道182適於接收來自出口OP1的測試元件TC,並傳送測試元件TC至包裝區域170。其中測試元件TC例如為待執行或正在執行作業系統之解壓縮的筆記型電腦。另外,本實施例之傾斜軌道182的傾斜角度θ例如為20度,且傳送方向例如為+X方向。2C is a front elevational view of the trial operation region 140, the packaging region 170, and the inclined rail 182 of FIG. 2A in the Y direction. Referring to FIG. 2A and FIG. 2C simultaneously, in the present embodiment, the test element TC is subjected to decompression of the operating system in the test operation area 140. When the parking rack 142 is rotated close to the outlet OP1 and the decompression of the operating system is completed, the operator can remove the test component TC on the parking rack 142 from the inlet and outlet OP1 and pass the test component through the inclined rail 182. The TC is transferred to the packaging area 170 (step S3). In detail, the inclined track 182 is disposed above the test area 110. The inclined track 182 is adapted to receive the test element TC from the outlet OP1 and to transfer the test element TC to the packaging area 170. The test component TC is, for example, a notebook computer to be executed or is being decompressed by the operating system. In addition, the inclination angle θ of the inclined rail 182 of the present embodiment is, for example, 20 degrees, and the conveying direction is, for example, the +X direction.

在習知技藝中,由於停放架142是位於主線體(即生產線機台)之外,故作業員必須搬運很遠的距離才能將測試元件TC放在停放架142上。然而在本實施例中,由於作業系統的解壓縮是在試運轉區域140完成,故作業員不需要另外將測試元件TC移到別區才能進行系統的解壓縮,進而可以減少搬運測試元件TC的次數。除此之外,在本實施例中,停放架142之層與層之間的高度h例如為230毫米(mm),且總層數例如為8層,整體而言共可容納約有3000個測試元件TC。因此,相較於習知技藝而言,本實施例之停放架142可放置較多的測試元件TC,進而可以提升產能。In the prior art, since the parking rack 142 is located outside the main line body (i.e., the production line machine), the operator must carry a long distance to place the test component TC on the parking rack 142. However, in this embodiment, since the decompression of the operating system is completed in the trial operation area 140, the operator does not need to separately move the test component TC to another region to perform decompression of the system, thereby reducing the handling of the test component TC. frequency. In addition, in the present embodiment, the height h between the layers of the parking rack 142 is, for example, 230 millimeters (mm), and the total number of layers is, for example, 8 layers, and a total of about 3,000 can be accommodated as a whole. Test component TC. Therefore, compared with the prior art, the parking rack 142 of the embodiment can place more test components TC, thereby increasing the productivity.

另一方面,由圖1與圖2A也可清楚得知,本實施例之筆記型電腦的生產線機台100是採用雙投入而非單投入的生產線,故具有物料一進一出的優點。進一步而言,本實施例的備料區域160、組裝區域150、測試區域110、卸載區域120與包裝區域170的個數皆是兩個以上,且組裝材料M透過兩入口IP3進入組裝區域150以於組裝區域150組裝成測試元件TC。最後,測試元件TC於完成作業系統之解壓縮後,再經由兩包裝區域170的兩出口OP5輸出。由此可知,本實施例之筆記型電腦的生產線機台100不但便於作業員的分段作業,且相較於單投入的生產線具有較高的產能。舉例而言,本實施例之雙投入線體的總長度例如為105公尺,其比單投入線體的總長度還短。On the other hand, as can be clearly seen from FIG. 1 and FIG. 2A, the production line machine 100 of the notebook computer of the present embodiment adopts a double-input rather than a single-input production line, so that the material has the advantages of one-in-one-out. Further, the number of the preparation area 160, the assembly area 150, the test area 110, the unloading area 120, and the packaging area 170 of the embodiment is two or more, and the assembly material M enters the assembly area 150 through the two inlets IP3. The assembly area 150 is assembled into a test element TC. Finally, after the decompression of the operating system is completed, the test component TC is output via the two outlets OP5 of the two packaging area 170. It can be seen that the production line machine 100 of the notebook computer of the present embodiment not only facilitates the operator's segmentation operation, but also has higher productivity than the single-input production line. For example, the total length of the double-input line body of the present embodiment is, for example, 105 meters, which is shorter than the total length of the single-input line body.

圖3為圖1之組裝區域150沿剖面線RR’的剖面圖,其中組裝區域150的寬度W1例如為0.8公尺,且其長度L1例如為2.8公尺。圖4為圖1之包裝區域170與輸送軌道130沿剖面線SS’的剖面圖,其中包裝區域170的寬度W2例如為0.6公尺,且其長度L2例如為4公尺。圖5為圖1之檢料架180與包裝區域170沿剖面線TT’的剖面圖。在圖4中,在包裝區域170的上方具有光源194以提供照明,其中光源194例如為單管日光燈,且兩包裝區域170例如係透過鋁條192連接在一起。另外,區域B為作業員的通道,以便於作業員將測試元件TC從軌道132搬運至卸載區域120或從卸載區域120搬運至軌道134。3 is a cross-sectional view of the assembly region 150 of FIG. 1 along a section line RR', wherein the width W1 of the assembly region 150 is, for example, 0.8 meters, and the length L1 thereof is, for example, 2.8 meters. 4 is a cross-sectional view of the packaging region 170 and the conveying rail 130 of FIG. 1 along a section line SS', wherein the width W2 of the packaging region 170 is, for example, 0.6 meters, and the length L2 thereof is, for example, 4 meters. Figure 5 is a cross-sectional view of the sample holder 180 of Figure 1 and the package region 170 along section line TT'. In FIG. 4, a light source 194 is provided above the packaging area 170 to provide illumination, wherein the light source 194 is, for example, a single tube fluorescent lamp, and the two package areas 170 are joined together, for example, by aluminum strips 192. In addition, the area B is a passage for the operator to facilitate the operator carrying the test element TC from the rail 132 to the unloading area 120 or from the unloading area 120 to the rail 134.

從另一個角度觀看,本實施例亦提供一種筆記型電腦的生產線方法。圖6為本實施例之筆記型電腦的生產線方法的流程圖。請參照圖6,首先,透過兩入口分別接收多個測試元件,並沿一第一方向傳送測試元件(步驟S110)。繼之,透過輸送軌道依序沿第一方向與一第二方向傳送測試元件(步驟S120)。接著,將輸送軌道上沿第一方向傳送的測試元件分別放置於兩第一卸載區域(步驟S130)。再來,自第一卸載區域將測試元件放置於輸送軌道,使測試元件沿第二方向傳送(步驟S140)。最後,接收來自輸送軌道上沿第二方向傳送的測試元件,並將測試元件的傳送方向旋轉至第一方向,以沿第一方向將測試元件傳送至兩出口(步驟S150)。在本實施例中,步驟S110的兩入口例如為圖1的入口IP1’,測試元件例如為圖1的測試元件TC,第一方向例如為+X方向。步驟S120的傳輸軌道例如為圖2A的輸送軌道130,第二方向例如為-X方向,且步驟S130的第一卸載區域例如為圖2A的卸載區域120。步驟S150的出口例如為圖2A的出口OP1。由於本實施例之筆記型電腦的生產線方法可以由圖1~圖2C之相關敘述中獲致足夠的教示、建議與實施說明,因此不再贅述。Viewed from another perspective, the embodiment also provides a production line method for a notebook computer. FIG. 6 is a flow chart of a method for producing a notebook computer according to the embodiment. Referring to FIG. 6, first, a plurality of test elements are respectively received through the two inlets, and the test elements are transmitted in a first direction (step S110). Then, the test elements are sequentially transported in the first direction and the second direction through the transport track (step S120). Next, the test elements transported in the first direction on the transport track are placed in the two first unloading areas, respectively (step S130). Further, the test element is placed on the transport track from the first unloading area, and the test element is transported in the second direction (step S140). Finally, the test element transmitted from the transport track in the second direction is received and the transfer direction of the test element is rotated to the first direction to transfer the test element to the two exits in the first direction (step S150). In the present embodiment, the two entries of step S110 are, for example, the inlet IP1' of Fig. 1, and the test element is, for example, the test element TC of Fig. 1, the first direction being, for example, the +X direction. The transport track of step S120 is, for example, the transport track 130 of FIG. 2A, the second direction is, for example, the -X direction, and the first unloading area of step S130 is, for example, the unloading area 120 of FIG. 2A. The exit of step S150 is, for example, the outlet OP1 of FIG. 2A. Since the production line method of the notebook computer of the embodiment can obtain sufficient teaching, suggestion and implementation description from the related descriptions of FIG. 1 to FIG. 2C, details are not described herein again.

綜上所述,本發明之筆記型電腦的生產線機台藉由卸載區域與主線體整合,於輸送軌道的鄰近處設置卸載區域,因而能減少作業員搬運測試元件的距離,並保持物流的順暢。另外,由於測試元件亦於試運轉區域進行作業系統之解壓縮,故能減少作業員搬運測試元件的次數。除此之外,本實施例之筆記型電腦的生產線機台的雙投入生產線具有物料一進一出的優點,且有助於產能的提升。In summary, the production line machine of the notebook computer of the present invention integrates the unloading area with the main line body, and provides an unloading area adjacent to the conveying rail, thereby reducing the distance for the operator to carry the test components and keeping the logistics smooth. . In addition, since the test element is also decompressed in the test operation area, the number of times the operator carries the test element can be reduced. In addition, the double-input production line of the production line machine of the notebook computer of the embodiment has the advantages of materials entering and leaving, and contributes to the improvement of the production capacity.

雖然本發明已以實施例揭露如上,然其並非用以限定本發明,任何所屬技術領域中具有通常知識者,在不脫離本發明之精神和範圍內,當可作些許之更動與潤飾,故本發明之保護範圍當視後附之申請專利範圍所界定者為準。Although the present invention has been disclosed in the above embodiments, it is not intended to limit the invention, and any one of ordinary skill in the art can make some modifications and refinements without departing from the spirit and scope of the invention. The scope of the invention is defined by the scope of the appended claims.

100...筆記型電腦的生產線機台100. . . Notebook computer production line machine

110...測試區域110. . . Test area

120、120’...卸載區域120, 120’. . . Unloading area

122...停放空間122. . . Parking space

130...輸送軌道130. . . Transport track

132、134...軌道132, 134. . . track

140...試運轉區域140. . . Commissioning area

142...停放架142. . . Parking rack

144...旋轉軌道144. . . Rotating track

150...組裝區域150. . . Assembly area

160...備料區域160. . . Preparation area

170...包裝區域170. . . Packaging area

180...檢料架180. . . Inspection rack

182...傾斜軌道182. . . Tilted track

192...鋁條192. . . Aluminum

194...光源194. . . light source

A、B...區域A, B. . . region

IP1’、IP1~IP4...入口IP1’, IP1~IP4. . . Entrance

h、L1~L2...長度h, L1~L2. . . length

OP1~OP5...出口OP1~OP5. . . Export

P1...傳送路徑P1. . . Transfer path

S1~S3、S110~S150...步驟S1~S3, S110~S150. . . step

TC...測試元件TC. . . Test component

W1~W2...寬度W1~W2. . . width

θ...角度θ. . . angle

M...組裝材料M. . . Assembly material

圖1為本發明一實施例之筆記型電腦的生產線機台。1 is a production line machine of a notebook computer according to an embodiment of the present invention.

圖2A為圖1之區域A的放大立體圖。2A is an enlarged perspective view of a region A of FIG. 1.

圖2B為圖2A之試運轉區域與輸送軌道沿Y方向的正視圖。Figure 2B is a front elevational view of the test run area and transport track of Figure 2A in the Y direction.

圖2C為圖2A之試運轉區域、包裝區域與傾斜軌道沿Y方向的正視圖。2C is a front elevational view of the trial operation area, the packaging area, and the inclined track of FIG. 2A in the Y direction.

圖3為圖1之組裝區域沿剖面線RR’的剖面圖。Figure 3 is a cross-sectional view of the assembled region of Figure 1 taken along section line RR'.

圖4為圖1之包裝區域與輸送軌道沿剖面線SS’的剖面圖。Figure 4 is a cross-sectional view of the packaging area and the conveying track of Figure 1 taken along section line SS'.

圖5為圖1之檢料架與包裝區域沿剖面線TT’的剖面圖。Figure 5 is a cross-sectional view of the sample holder and packaging area of Figure 1 taken along section line TT'.

圖6為本發明一實施例之筆記型電腦的生產線方法的流程圖。6 is a flow chart showing a method of a production line of a notebook computer according to an embodiment of the present invention.

110...測試區域110. . . Test area

120、120’...卸載區域120, 120’. . . Unloading area

122...停放空間122. . . Parking space

130...輸送軌道130. . . Transport track

132、134...軌道132, 134. . . track

140...試運轉區域140. . . Commissioning area

142...停放架142. . . Parking rack

144...旋轉軌道144. . . Rotating track

170...包裝區域170. . . Packaging area

182...傾斜軌道182. . . Tilted track

IP2、IP4...入口IP2, IP4. . . Entrance

OP1、OP2...出口OP1, OP2. . . Export

S1、S2、S3...步驟S1, S2, S3. . . step

θ...角度θ. . . angle

Claims (10)

一種筆記型電腦的生產線機台,包括:兩備料區域,彼此平行排列,透過兩第一入口接收並沿一第一方向傳遞多個筆記型電腦所需的組裝材料;兩組裝區域,分別對應該些備料區域配置,將該些組裝材料組裝成該些筆記型電腦,並沿該第一方向傳遞該些筆記型電腦;兩測試區域,分別對應該些組裝區域配置,以接收該些筆記型電腦,並沿該第一方向傳送該些筆記型電腦;兩第一卸載區域,配置於該些筆記型電腦的傳送路徑上,並提供一停放空間給該些筆記型電腦;一輸送軌道,配置於該些第一卸載區域之間,其中該輸送軌道適於接收來自該些測試區域的該些筆記型電腦或接收來自該些第一卸載區域的該些筆記型電腦,並依序沿該第一方向與一第二方向傳送該些筆記型電腦;一試運轉區域,透過一第二入口接收該輸送軌道沿該第二方向所傳送的該些筆記型電腦,且將沿該第二方向傳送的該些筆記型電腦旋轉至沿該第一方向傳送,以使該試運轉區域將該些筆記型電腦傳送至兩第一出口,其中該些第一出口位於該試運轉區域的相對兩側,且該試運轉區域配置於該些測試區域之間;以及兩包裝區域,對應該試運轉區域的該些第一出口排列,且該些卸載區域配置於該些包裝區域之間,該些包裝區域分別透過兩第三入口接收該些筆記型電腦,並沿該第一方向將該些筆記型電腦傳送至兩第二出口。 A production line machine for a notebook computer, comprising: two stocking areas arranged in parallel with each other, receiving the assembly materials required by the plurality of notebook computers in a first direction through the two first inlets; the two assembly areas respectively corresponding to each other The preparation area is configured to assemble the assembly materials into the notebook computers, and transmit the notebook computers along the first direction; the two test areas are respectively configured corresponding to the assembly areas to receive the notebook computers And transmitting the notebook computers along the first direction; the two first unloading areas are disposed on the transmission paths of the notebook computers, and provide a parking space for the notebook computers; Between the first unloading areas, wherein the transport track is adapted to receive the notebook computers from the test areas or receive the notebook computers from the first unloading areas, and sequentially follow the first Transmitting the notebook computers in a direction and a second direction; a test operation area receiving the conveyance tracks in the second direction through a second inlet Recording the computer, and rotating the notebook computers in the second direction to transmit in the first direction, so that the test operation area transmits the notebook computers to the two first outlets, wherein the An outlet is located on opposite sides of the test operation area, and the test operation area is disposed between the test areas; and two packaging areas, the first outlets corresponding to the test operation area are arranged, and the unloading area is configured Between the packaging areas, the packaging areas receive the notebook computers through the two third inlets, and transmit the notebook computers to the two second outlets along the first direction. 如申請專利範圍第1項所述之筆記型電腦的生產線機台,其中該輸送軌道包括一第一軌道與一第二軌道,該第二軌道位於該第一軌道的上方,且該第一軌道與該第二軌道分別沿該第一方向與該第二方向傳送該些筆記型電腦,該試運轉區域透過該第二軌道的一第三出口接收該些筆記型電腦,其中該第一方向與該第二方向彼此相反。 The production line machine of the notebook computer of claim 1, wherein the transport track comprises a first track and a second track, the second track is located above the first track, and the first track Transmitting the notebook computers in the first direction and the second direction respectively with the second track, the test operation area receiving the notebook computers through a third exit of the second track, wherein the first direction is The second directions are opposite to each other. 如申請專利範圍第2項所述之筆記型電腦的生產線機台,其中該些第一卸載區域透過該第一軌道接收來自該些測試區域的該些筆記型電腦,且該試運轉區域透過該第二軌道接收來自該些第一卸載區域的該些筆記型電腦。 The production line machine of the notebook computer of claim 2, wherein the first unloading areas receive the notebook computers from the test areas through the first track, and the test operation area passes through the The second track receives the notebook computers from the first unloading areas. 如申請專利範圍第1項所述之筆記型電腦的生產線機台,其中該些筆記型電腦於該些第一卸載區域執行一作業系統的下載。 The production line machine of the notebook computer according to claim 1, wherein the notebook computers perform downloading of an operating system in the first unloading areas. 如申請專利範圍第4項所述之筆記型電腦的生產線機台,其中該些筆記型電腦於該試運轉區域執行該作業系統的解壓縮。 The production line machine of the notebook computer of claim 4, wherein the notebook computers perform decompression of the operating system in the test operation area. 如申請專利範圍第1項所述之筆記型電腦的生產線機台,其中該試運轉區域包括一停放架以及一旋轉軌道,該旋轉軌道的形狀為一類環形,其中該停放架配置於該旋轉軌道上,並適於沿著該旋轉軌道移動。 The production line machine of the notebook computer of claim 1, wherein the test operation area comprises a parking rack and a rotating track, the rotating track is shaped like a ring, wherein the parking rack is disposed on the rotating track. Up and adapted to move along the rotating track. 如申請專利範圍第1項所述之筆記型電腦的生產線機台,更包括一檢料架,配置於該些包裝區域之其一的旁邊。 The production line machine of the notebook computer according to claim 1, further comprising a sample rack disposed beside one of the packaging areas. 如申請專利範圍第1項所述之筆記型電腦的生產 線機台,更包括一第二卸載區域,配置於該輸送軌道的上方。 Production of a notebook computer as described in claim 1 The line machine further includes a second unloading area disposed above the conveying track. 如申請專利範圍第1項所述之筆記型電腦的生產線機台,更包括兩傾斜軌道,配置於該測試區域的上方,該些傾斜軌道適於接收來自該些第一出口的該些筆記型電腦,並傳送該些筆記型電腦。 The production line machine of the notebook computer according to claim 1, further comprising two inclined tracks disposed above the test area, the inclined tracks being adapted to receive the notebook types from the first outlets Computer and transfer the notebooks. 如申請專利範圍第1項所述之筆記型電腦的生產線機台,該第一卸載區域包括一卸載架。 The production line machine of the notebook computer according to claim 1, wherein the first unloading area comprises an unloading rack.
TW99142830A 2010-12-08 2010-12-08 Production line apparatus of notebook computer TWI410368B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW99142830A TWI410368B (en) 2010-12-08 2010-12-08 Production line apparatus of notebook computer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW99142830A TWI410368B (en) 2010-12-08 2010-12-08 Production line apparatus of notebook computer

Publications (2)

Publication Number Publication Date
TW201223844A TW201223844A (en) 2012-06-16
TWI410368B true TWI410368B (en) 2013-10-01

Family

ID=46725697

Family Applications (1)

Application Number Title Priority Date Filing Date
TW99142830A TWI410368B (en) 2010-12-08 2010-12-08 Production line apparatus of notebook computer

Country Status (1)

Country Link
TW (1) TWI410368B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI748598B (en) * 2020-08-14 2021-12-01 力山工業股份有限公司 Conveyor system for conveying objects
CN114074815A (en) * 2020-08-17 2022-02-22 力山工业股份有限公司 Three-dimensional conveying device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5353495A (en) * 1992-11-16 1994-10-11 Pfu Limited Parts supply system applied to a versatile production line
US20010041947A1 (en) * 2000-01-18 2001-11-15 Dell Products L.P. System and method for manufacturing products according to customer orders
US20020116087A1 (en) * 2000-01-18 2002-08-22 Dell Usa, L.P. Method and apparatus for consolidating manufacturing of computing devices

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5353495A (en) * 1992-11-16 1994-10-11 Pfu Limited Parts supply system applied to a versatile production line
US20010041947A1 (en) * 2000-01-18 2001-11-15 Dell Products L.P. System and method for manufacturing products according to customer orders
US20020116087A1 (en) * 2000-01-18 2002-08-22 Dell Usa, L.P. Method and apparatus for consolidating manufacturing of computing devices

Also Published As

Publication number Publication date
TW201223844A (en) 2012-06-16

Similar Documents

Publication Publication Date Title
US7380654B2 (en) Conveyor track drive
TWI430932B (en) The workpiece is moved into the system and the handling device
WO2018059201A1 (en) Combination transport device used for containerized cargo inspection system, and containerized cargo inspection system
KR101869813B1 (en) Conveyor device
TWI410368B (en) Production line apparatus of notebook computer
WO2020147592A1 (en) Dual-layer linear sorter
CN107462794A (en) A kind of automatic test device
KR101704473B1 (en) Window Glass Inspection Equipment
CN210604674U (en) Sample analysis system and sample on-shelf analysis system
JP7099367B2 (en) Inspection system
KR20090022323A (en) Vision inspection device to inspect both sides of the object
US9399532B2 (en) System for filling pharmaceutical products into bottle-shaped containers
JP4324288B2 (en) Sample transport device
CN102530506B (en) Laptop Production Line Machines
KR20160142222A (en) Break system
CN202033742U (en) Laptop Production Line Machines
CN209554338U (en) A kind of detection system
JP6668123B2 (en) Sample transport system
CN216945170U (en) Electronic equipment gets blowing device
CN110395533A (en) Retainer conveyer
JP2007193747A (en) Work carrier system
CN104641239A (en) Specimen transportation system
KR101435750B1 (en) Automatic vision testing device for reducing lcd panel movement and checking time
JP2002114365A (en) Inspecting machine for container
JP7398064B2 (en) Plate member appearance inspection unit on both sides

Legal Events

Date Code Title Description
MM4A Annulment or lapse of patent due to non-payment of fees