JPS5530017A - Process for installing site pouring concrete beam by a moving support - Google Patents
Process for installing site pouring concrete beam by a moving supportInfo
- Publication number
- JPS5530017A JPS5530017A JP10127578A JP10127578A JPS5530017A JP S5530017 A JPS5530017 A JP S5530017A JP 10127578 A JP10127578 A JP 10127578A JP 10127578 A JP10127578 A JP 10127578A JP S5530017 A JPS5530017 A JP S5530017A
- Authority
- JP
- Japan
- Prior art keywords
- supporting
- transferred
- beams
- jacked
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
PURPOSE: In three supporting beams arranged above the bridge beam, a supporting bean having a central supporting beam suspended at both supporting beams as the guide extension beam is moved, a bridge beam is arranged per span and thereby a rapid and stable srranging operation is performed.
CONSTITUTION: Extension beam 2 is jacked down from such a condition as a bridge beam 1a of one span is added to the bridge beam 1, then the extension beam is transferred to the subsequent section by the moving boggies 5 and 6. The supporting part 2a of the transferred beam 2 is fixed on the pier 12, this supporting part 2a is fixed on the pier 12 and supported at three points by the supporting part 2a and the boggies 5 and 6. Subsequently, the supporting beams 3 and 4 are jacked down together with the supporting beam 14, a frame is removed, the supporting beams 3 and 4 are transferred to the subsequent arranging section as a guide of the beam 2. Then, the supporting column 11 is connected to the beams 3 and 4 and supported on the pier 12, then jacked up. Then, the beam 2 is transferred in such a way as the same is slightly projected into the subsequnet arranging section, the beam 2 is jacked up, the frame is assembled, iron reinforcements are applied, then the concrete is applied, cured and the bridge beam 1b is arranged.
COPYRIGHT: (C)1980,JPO&Japio
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10127578A JPS5530017A (en) | 1978-08-19 | 1978-08-19 | Process for installing site pouring concrete beam by a moving support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10127578A JPS5530017A (en) | 1978-08-19 | 1978-08-19 | Process for installing site pouring concrete beam by a moving support |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS5530017A true JPS5530017A (en) | 1980-03-03 |
JPS5713684B2 JPS5713684B2 (en) | 1982-03-18 |
Family
ID=14296321
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP10127578A Granted JPS5530017A (en) | 1978-08-19 | 1978-08-19 | Process for installing site pouring concrete beam by a moving support |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS5530017A (en) |
-
1978
- 1978-08-19 JP JP10127578A patent/JPS5530017A/en active Granted
Also Published As
Publication number | Publication date |
---|---|
JPS5713684B2 (en) | 1982-03-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE3370500D1 (en) | Method and apparatus for constructing a prestressed concrete superstructure of a bridge | |
BR8206789A (en) | STRUCTURAL MEMBER PROTENDED COMPOSITE AND PROCESS TO DO IT | |
ES508428A0 (en) | "A METHOD OF ERECTING A BUILDING". | |
ES458989A1 (en) | Bridge beam tower erection methods and apparatus | |
ES457068A1 (en) | Method and apparatus for rapid erection of offshore towers | |
GB2039581B (en) | Reinforcing bar support for joining concrete structures | |
DK154080C (en) | METHOD OF ANALOGUE FOR THE PREPARATION OF DIBENZO (B, D) -PYRANE COMPOUNDS AND 6-OXO-DIBENZO (B, D) PYRANE COMPOUNDS FOR USING THE PROCEDURAL MATERIAL | |
JPS5530017A (en) | Process for installing site pouring concrete beam by a moving support | |
GB1557095A (en) | Plant for producing reinforced concrete girders | |
GB1493316A (en) | Manufacture of pre-stressed concrete beams | |
DK39481A (en) | PROCEDURE FOR CARRYING OUT THE UNDERWOOD OF CONCRETE CONSTRUCTIONS AND PLACES TO EXERCISE THE PROCEDURE | |
ES503173A0 (en) | DEVICE TO MAKE A STRUCTURE CONSTITUTED BY A BACKGROUND AND VERTICAL CONCRETE WALLS | |
JPS57219A (en) | Method and apparatus for construction of support central pillar | |
JPS5789029A (en) | Reinforcing rod assembling method in inverted lining | |
JPS5357581A (en) | Method and apparatus for aligning cutting line of travelling shear | |
JPS57229A (en) | Lower structure of steel tower | |
SU672036A2 (en) | Apparatus for making reinforced-concrete articles | |
JPS5219453A (en) | Manhole | |
SU727446A1 (en) | Unit for making ferroconcrete blocks of bridge span structures | |
SU1650888A1 (en) | Sliding formwork of bridge pier | |
HU178777B (en) | Device for supporting bridging beam made of perefabricated concrete beams particularly for supporting superstructure as well as method for constructing the supporting device | |
JPS538907A (en) | Track for vehicle | |
JPS55152222A (en) | Mounting method of stage for structure | |
JPS54112009A (en) | Execution procedure of support installation for spherical tank | |
OA06115A (en) | Process for repairing 24.25-dihydroxy cholesterol. |