CN204703582U - 110kV double back becomes single time steel pipe pole - Google Patents
110kV double back becomes single time steel pipe pole Download PDFInfo
- Publication number
- CN204703582U CN204703582U CN201520365989.6U CN201520365989U CN204703582U CN 204703582 U CN204703582 U CN 204703582U CN 201520365989 U CN201520365989 U CN 201520365989U CN 204703582 U CN204703582 U CN 204703582U
- Authority
- CN
- China
- Prior art keywords
- arm
- cross
- group
- cross arm
- circuit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
本实用新型涉及一种110kV双回变单回钢管杆,包括杆体、地线横担和导线横担组,地线横担和导线横担组均与杆体垂直,导线横担组包括第一横担、第二横担、第三横担、第四横担、第五横担和第六横担,第三横担和第四横担的长度大于第一横担、第二横担、第五横担和第六横担的长度;第五横担与第六横担在同一个平面上且相互夹角为90°,第三横担与第四横担在同一个平面上且相互夹角为90°;第一横担与第二横担在同一个平面上且相互夹角为180°,第四横担与第五横担平行且相对杆体向相反方向延伸,第三横担与第六横担平行且相对杆体向相反方向延伸。本实用新型对于导线成三角排列的输电线路,可以直接进行π接,施工方便,节约停电时间,造价低廉。
The utility model relates to a 110kV double-circuit variable single-circuit steel pipe rod, which includes a rod body, a ground wire cross arm and a wire cross arm group, both the ground wire cross arm and the wire cross arm group are perpendicular to the rod body, and the wire cross arm group includes a first cross arm group arm, the second cross-arm, the third cross-arm, the fourth cross-arm, the fifth cross-arm and the sixth cross-arm, the length of the third cross-arm and the fourth cross-arm is longer than that of the first, second and sixth cross-arm The length of the fifth cross arm and the sixth cross arm; the fifth cross arm and the sixth cross arm are on the same plane and the angle between each other is 90°; the third cross arm and the fourth cross arm are on the same plane and are sandwiched between each other The angle is 90°; the first cross-arm and the second cross-arm are on the same plane and the angle between them is 180°; the fourth cross-arm is parallel to the fifth cross-arm and extends in the opposite direction relative to the rod body; The sixth cross arm is parallel and extends in opposite directions relative to the rod body. The utility model can directly carry out π-connection for the transmission lines with triangular arrangement of conductors, which is convenient for construction, saves power failure time and is low in cost.
Description
技术领域technical field
本实用新型涉及高压输电线路技术领域,特别涉及一种110kV双回变单回钢管杆。The utility model relates to the technical field of high-voltage transmission lines, in particular to a 110kV double-circuit to single-circuit steel pipe rod.
背景技术Background technique
在电网建设中,有时需将一条单回架空线路开断,分别π入一新建变电站,以分担电力负荷,优化电网供电系统。In the construction of the power grid, sometimes it is necessary to disconnect a single-circuit overhead line and connect it to a new substation respectively to share the power load and optimize the power supply system of the power grid.
对于导线成三角排列的输电线路,在进行π接时,现有的方案是需要对原线路的杆塔进行改造,将三角排列改为垂直排列后,再进行π接,从而造成停电时间长,造价高昂。For transmission lines with triangular arrangement of wires, when carrying out π connection, the existing scheme is to transform the tower of the original line, change the triangular arrangement to vertical arrangement, and then perform π connection, resulting in long power outage time and high cost. high.
实用新型内容Utility model content
本实用新型要解决的技术问题是:为了克服现有技术的不足,本实用新型提供一种110kV双回变单回钢管杆。The technical problem to be solved by the utility model is: in order to overcome the deficiencies of the prior art, the utility model provides a 110kV double-circuit to single-circuit steel pipe rod.
本实用新型解决其技术问题所采用的技术方案是:一种110kV双回变单回钢管杆,包括杆体、地线横担和导线横担组,地线横担和导线横担组均与杆体垂直,所述导线横担组包括第一横担、第二横担、第三横担、第四横担、第五横担和第六横担,所述第三横担和第四横担的长度大于第一横担、第二横担、第五横担和第六横担的长度;第五横担与第六横担在同一个平面上且相互夹角为90°,第三横担与第四横担在同一个平面上且相互夹角为90°;第一横担与第二横担在同一个平面上且相互夹角为180°,第四横担与第五横担平行且相对杆体向相反方向延伸,第三横担与第六横担平行且相对杆体向相反方向延伸。The technical solution adopted by the utility model to solve the technical problem is: a 110kV double-circuit variable single-circuit steel pipe rod, including a rod body, a ground wire cross arm and a wire cross arm group, and the ground wire cross arm and the wire cross arm group are all connected to the rod body Vertically, the wire cross-arm set includes a first cross-arm, a second cross-arm, a third cross-arm, a fourth cross-arm, a fifth cross-arm and a sixth cross-arm, and the third cross-arm and the fourth cross-arm The length of the cross arm is greater than the length of the first cross arm, the second cross arm, the fifth cross arm and the sixth cross arm; the fifth cross arm and the sixth cross arm are on the same plane and the angle between each other is 90°, the third cross arm The cross-arm and the fourth cross-arm are on the same plane with a mutual angle of 90°; the first cross-arm and the second cross-arm are on the same plane with a mutual angle of 180°; the fourth cross-arm and the fifth cross-arm parallel to and extend in opposite directions relative to the rod body, the third cross arm is parallel to the sixth cross arm and extend in opposite directions relative to the rod body.
所述第一横担、第二横担、第五横担和第六横担的长度为4米,所述第三横担和第四横担的长度为7.3米。The length of the first cross arm, the second cross arm, the fifth cross arm and the sixth cross arm is 4 meters, and the length of the third cross arm and the fourth cross arm is 7.3 meters.
所述地线横担为双侧横担。The ground wire cross arm is a double side cross arm.
第一横担和第二横担组成A组横担,第五横担与第六横担组成B组横担,第三横担与第四横担组成C组横担,A组横担、B组横担和C组横担依次上下设置,A组横担和B组横担之间,以及B组横担和C组横担之间的间距为4米。The first cross-arm and the second cross-arm form group A cross-arm, the fifth cross-arm and sixth cross-arm form B group cross-arm, the third cross-arm and fourth cross-arm form C group cross-arm, A group cross-arm, The cross-arms of group B and group C are set up and down in sequence, and the distance between the cross-arms of group A and group B, and the distance between the cross-arms of group B and group C is 4 meters.
本实用新型的有益效果是,采用本实用新型的110kV双回变单回钢管杆,对于导线成三角排列的输电线路,可以直接进行π接,施工方便,节约停电时间,造价低廉。The beneficial effect of the utility model is that, by adopting the 110kV double-circuit to single-circuit steel pipe rod of the utility model, the transmission lines with triangular arrangement of conductors can be directly connected by π, which is convenient for construction, saves power outage time, and is low in cost.
附图说明Description of drawings
下面结合附图和实施例对本实用新型进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.
图1是本实用新型的110kV双回变单回钢管杆最优实施例的结构示意图。Fig. 1 is a structural schematic diagram of an optimal embodiment of a 110kV double-circuit substation single-circuit steel pipe rod of the present invention.
图2是本实用新型的110kV双回变单回钢管杆的输电线路接线示意图。Fig. 2 is a schematic diagram of the transmission line wiring of the 110kV double-circuit single-circuit steel pipe pole of the utility model.
图中1、杆体,2、地线横担,3、第一横担,4、第二横担,5、第三横担,6、第四横担,7、第五横担,8、第六横担。In the figure 1, rod body, 2, ground cross arm, 3, first cross arm, 4, second cross arm, 5, third cross arm, 6, fourth cross arm, 7, fifth cross arm, 8, The sixth crossarm.
具体实施方式Detailed ways
现在结合附图对本实用新型作进一步详细的说明。这些附图均为简化的示意图,仅以示意方式说明本实用新型的基本结构,因此其仅显示与本实用新型有关的构成。Now in conjunction with accompanying drawing, the utility model is described in further detail. These drawings are all simplified schematic diagrams, and only schematically illustrate the basic structure of the utility model, so they only show the configurations related to the utility model.
如图1、图2所示,本实用新型的一种110kV双回变单回钢管杆,包括杆体1、地线横担2和导线横担组,所述地线横担2为双侧横担。地线横担2和导线横担组均与杆体1垂直。图2中地线横担未画出。As shown in Figure 1 and Figure 2, a 110kV double-circuit single-circuit steel pipe rod of the present invention includes a rod body 1, a ground wire cross arm 2 and a wire cross arm group, and the ground wire cross arm 2 is a double-sided cross arm bear. Both the ground wire cross arm 2 and the wire cross arm group are perpendicular to the rod body 1 . The ground wire crossarm is not shown in Fig. 2.
所述导线横担组包括第一横担3、第二横担4、第三横担5、第四横担6、第五横担7和第六横担8,所述第三横担5和第四横担6的长度大于第一横担3、第二横担4、第五横担7和第六横担8的长度,所述第一横担3、第二横担4、第五横担7和第六横担8的长度为4米,所述第三横担5和第四横担6的长度为7.3米。第一横担3和第二横担4组成A组横担,第五横担7与第六横担8组成B组横担,第三横担5与第四横担6组成C组横担,A组横担、B组横担和C组横担依次上下设置,A组横担和B组横担之间,以及B组横担和C组横担之间的间距为4米。The wire cross-arm group includes a first cross-arm 3, a second cross-arm 4, a third cross-arm 5, a fourth cross-arm 6, a fifth cross-arm 7 and a sixth cross-arm 8, and the third cross-arm 5 And the length of the fourth cross-arm 6 is greater than the length of the first cross-arm 3, the second cross-arm 4, the fifth cross-arm 7 and the sixth cross-arm 8, the first cross-arm 3, the second cross-arm 4, the first cross-arm The length of the fifth cross arm 7 and the sixth cross arm 8 is 4 meters, and the length of the third cross arm 5 and the fourth cross arm 6 is 7.3 meters. The first cross arm 3 and the second cross arm 4 form group A cross arm, the fifth cross arm 7 and the sixth cross arm 8 form group B cross arm, the third cross arm 5 and the fourth cross arm 6 form group C cross arm , Group A cross-arm, Group B cross-arm and Group C cross-arm are set up and down in sequence, and the distance between Group A cross-arm and Group B cross-arm, and between Group B cross-arm and Group C cross-arm is 4 meters.
第五横担7与第六横担8在同一个平面上且相互夹角为90°,第三横担5与第四横担6在同一个平面上且相互夹角为90°;第一横担3与第二横担4在同一个平面上且相互夹角为180°,第四横担6与第五横担7平行且相对杆体1向相反方向延伸,第三横担5与第六横担8平行且相对杆体1向相反方向延伸。The fifth cross arm 7 and the sixth cross arm 8 are on the same plane with a mutual angle of 90°, the third cross arm 5 and the fourth cross arm 6 are on the same plane with a mutual angle of 90°; the first The cross arm 3 and the second cross arm 4 are on the same plane with a mutual angle of 180°, the fourth cross arm 6 is parallel to the fifth cross arm 7 and extends in opposite directions relative to the pole body 1, the third cross arm 5 and the fifth cross arm are The six cross arms 8 are parallel and extend in opposite directions relative to the rod body 1 .
原甲变电站到乙变电站的单回架空线路开断,分别接至丙变电站,以形成甲丙、乙丙两个新的线路通道。本实用新型的钢管杆设置于原甲乙线路的线路中心位置。甲变电站单回架空线路三相导线A相、B相和C相分别接至第五横担7、第一横担3和第三横担5,乙变电站单回架空线路三相导线A相、B相和C相分别接至第六横担8、第二横担4和第四横担6,通过跳线的连接方式接入至丙变电站的双回线路。The single-circuit overhead line from the original substation A to substation B is disconnected and connected to substation C respectively to form two new line passages of substation A and substation B. The steel pipe rod of the utility model is arranged at the line center position of the original line A and line B. Phase A, phase B and phase C of the three-phase conductors of the single-circuit overhead line in substation A are respectively connected to the fifth cross-arm 7, the first cross-arm 3 and the third cross-arm 5, and the three-phase conductors of the single-circuit overhead line in substation B Phase B and phase C are respectively connected to the sixth cross arm 8, the second cross arm 4 and the fourth cross arm 6, and are connected to the double-circuit line of the C substation through jumper connection.
以上述依据本实用新型的理想实施例为启示,通过上述的说明内容,相关工作人员完全可以在不偏离本项实用新型技术思想的范围内,进行多样的变更以及修改。本项实用新型的技术性范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。Inspired by the above ideal embodiment according to the utility model, through the above description content, relevant staff can completely make various changes and modifications within the scope of not deviating from the technical idea of the utility model. The technical scope of this utility model is not limited to the content in the description, but must be determined according to the scope of the claims.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520365989.6U CN204703582U (en) | 2015-05-29 | 2015-05-29 | 110kV double back becomes single time steel pipe pole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520365989.6U CN204703582U (en) | 2015-05-29 | 2015-05-29 | 110kV double back becomes single time steel pipe pole |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204703582U true CN204703582U (en) | 2015-10-14 |
Family
ID=54283208
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520365989.6U Expired - Lifetime CN204703582U (en) | 2015-05-29 | 2015-05-29 | 110kV double back becomes single time steel pipe pole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204703582U (en) |
-
2015
- 2015-05-29 CN CN201520365989.6U patent/CN204703582U/en not_active Expired - Lifetime
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203352105U (en) | A wire arrangement mode converting rod | |
CN105155916A (en) | Single-loop angle steel tower with positive and negative phase-sequence transformation | |
CN204645805U (en) | Double back becomes single time angle steel tower | |
CN204645798U (en) | Double back becomes single time steel pipe pole | |
CN102684134A (en) | Lightning protection system of extra-high voltage alternating current double-circuit straight-line tower | |
CN201574616U (en) | 35 kV four-circuit steel pipe pole | |
CN104763208A (en) | 110kV dual-loop novel butterfly-shaped penetrating and spanning tower in high-altitude area | |
CN204703582U (en) | 110kV double back becomes single time steel pipe pole | |
CN205046930U (en) | Positive negative phase sequence of single loop transform angle -steel tower | |
CN204691370U (en) | The novel butterfly in 110kV double loop, high altitude localities bores more tower | |
CN203891557U (en) | Compact insulation support | |
CN206313190U (en) | A kind of adjustable pitch pipe bus telescoping wire clamp | |
CN210858200U (en) | A single-circuit multi-purpose tower | |
CN202076754U (en) | Double split conductor adjustable composite insulation alternate spacer | |
CN203603578U (en) | Extra-high-voltage double-loop tension support | |
CN103354320A (en) | 110kV outdoor GIS double-dragonfly-type outlet wire arrangement structure | |
CN203531486U (en) | Steel pipe rod for loop disconnection | |
CN203787789U (en) | A T, π mixed grid connection structure for high voltage power distribution | |
CN203377382U (en) | Connection structure of grounding wires and grounding lead wire | |
CN203066578U (en) | 220kV-500kV variable tension resistant power transmission tower | |
CN204441721U (en) | A kind of GIL structure | |
CN207603164U (en) | A kind of Distributed Power Flow controller suitable for arbitrary shaft tower | |
CN204944529U (en) | A kind of composite insulator hardware string waves experimental provision | |
CN204152289U (en) | With the two-level architecture terminal steel pipe tower of lightning rod | |
CN105136192A (en) | Composite insulator hardware string waving experimental device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 213000 No. 3 sail Road, Wujin Economic Development Zone, Jiangsu, Changzhou Patentee after: SUWEN ELECTRIC ENERGY TECHNOLOGY CO.,LTD. Address before: 213000 Jiangsu city of Changzhou province Wujin Dragon Road Economic Development Zone No. 2 Patentee before: SUWEN ELECTRIC ENERGY TECHNOLOGY CO.,LTD. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20151014 |