CN1769623A - 可升降液压爬升模板及其施工方法 - Google Patents
可升降液压爬升模板及其施工方法 Download PDFInfo
- Publication number
- CN1769623A CN1769623A CN 200510117709 CN200510117709A CN1769623A CN 1769623 A CN1769623 A CN 1769623A CN 200510117709 CN200510117709 CN 200510117709 CN 200510117709 A CN200510117709 A CN 200510117709A CN 1769623 A CN1769623 A CN 1769623A
- Authority
- CN
- China
- Prior art keywords
- template
- cramp bar
- hoisting frame
- concrete
- jack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 42
- 230000009194 climbing Effects 0.000 title claims abstract description 41
- 239000004567 concrete Substances 0.000 claims description 60
- 238000009415 formwork Methods 0.000 claims description 52
- 230000009191 jumping Effects 0.000 claims description 22
- 229910000831 Steel Inorganic materials 0.000 claims description 21
- 239000010959 steel Substances 0.000 claims description 21
- 230000002787 reinforcement Effects 0.000 claims description 13
- 230000003014 reinforcing effect Effects 0.000 claims description 13
- 229910001208 Crucible steel Inorganic materials 0.000 claims description 7
- 239000000725 suspension Substances 0.000 claims description 7
- 238000013519 translation Methods 0.000 claims description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims description 2
- 241000357293 Leptobrama muelleri Species 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 9
- 238000000034 method Methods 0.000 description 5
- 238000004140 cleaning Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 238000009416 shuttering Methods 0.000 description 4
- 238000006073 displacement reaction Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 230000000630 rising effect Effects 0.000 description 3
- 230000007306 turnover Effects 0.000 description 3
- 241000196324 Embryophyta Species 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 230000003028 elevating effect Effects 0.000 description 2
- 239000012467 final product Substances 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000001360 synchronised effect Effects 0.000 description 2
- 241000220317 Rosa Species 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000001680 brushing effect Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000009193 crawling Effects 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 239000011120 plywood Substances 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005101177090A CN100351484C (zh) | 2005-11-07 | 2005-11-07 | 可升降液压爬升模板及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005101177090A CN100351484C (zh) | 2005-11-07 | 2005-11-07 | 可升降液压爬升模板及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1769623A true CN1769623A (zh) | 2006-05-10 |
CN100351484C CN100351484C (zh) | 2007-11-28 |
Family
ID=36751135
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2005101177090A Expired - Fee Related CN100351484C (zh) | 2005-11-07 | 2005-11-07 | 可升降液压爬升模板及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100351484C (zh) |
Cited By (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100387796C (zh) * | 2006-08-28 | 2008-05-14 | 杨秋利 | 自动液压爬升模板 |
CN101892742A (zh) * | 2010-06-21 | 2010-11-24 | 陕西省第三建筑工程公司 | 一种高低跨楼变形缝处低段剪力墙的施工方法 |
CN102345381A (zh) * | 2011-10-12 | 2012-02-08 | 四川路桥建设股份有限公司 | 液压爬模系统及爬模施工方法 |
CN102587644A (zh) * | 2012-03-19 | 2012-07-18 | 中国水利水电第十四工程局有限公司 | 单面边墙滑模及施工方法 |
CN102873748A (zh) * | 2012-09-22 | 2013-01-16 | 王炳贞 | 大型混凝土构件预制装置及大型混凝土构件的预制方法 |
CN103556816A (zh) * | 2008-03-25 | 2014-02-05 | Peri有限公司 | 包括爬升导轨接长件的导轨导向的自爬升模板系统 |
CN103635643A (zh) * | 2012-06-11 | 2014-03-12 | 浙江省建工集团有限责任公司 | 高层钢结构建筑钢筋砼筒体的施工方法 |
CN103821340A (zh) * | 2014-03-10 | 2014-05-28 | 成都嘉泽正达科技有限公司 | 附着升降多层施工平台的安装方法 |
CN105421740A (zh) * | 2015-11-09 | 2016-03-23 | 天津一建建筑工程有限公司 | 建筑施工中主体结构施工用的模架结构及施工方法 |
CN105862600A (zh) * | 2016-04-29 | 2016-08-17 | 钟爱华 | 一种多段桥梁浇筑设备及其施工方法 |
CN106088582A (zh) * | 2016-07-08 | 2016-11-09 | 广州市第四建筑工程有限公司 | 滑模平台及其应用于钢筋混凝土筒体滑模施工方法 |
CN107190650A (zh) * | 2017-07-26 | 2017-09-22 | 中交路桥华东工程有限公司 | 桁架式无拉杆液压爬模系统及其施工工艺 |
CN108425319A (zh) * | 2018-05-29 | 2018-08-21 | 上海宝冶集团有限公司 | 一种立柱的施工系统及施工方式 |
CN108979112A (zh) * | 2018-08-23 | 2018-12-11 | 中国建筑第二工程局有限公司 | 电梯井多功能操作平台系统及其施工方法 |
CN109399432A (zh) * | 2018-11-23 | 2019-03-01 | 燕山大学 | 一种自爬升井道作业平台 |
CN109898848A (zh) * | 2018-10-11 | 2019-06-18 | 上海建工一建集团有限公司 | 一种爬升式整体钢平台模架体系及其施工方法 |
CN110807275A (zh) * | 2019-10-14 | 2020-02-18 | 中国建筑一局(集团)有限公司 | 一种液压爬升模板监测分析方法 |
CN110821155A (zh) * | 2019-12-10 | 2020-02-21 | 荆门市佰思机械科技有限公司 | 一种起吊翻转的翻模模板 |
CN110821153A (zh) * | 2019-12-06 | 2020-02-21 | 荆门市佰思机械科技有限公司 | 一种爬模装置的翻模模板 |
CN110984563A (zh) * | 2019-12-31 | 2020-04-10 | 荆门市佰思机械科技有限公司 | 一种自动对位自动爬升的爬升装置 |
CN111501562A (zh) * | 2020-04-21 | 2020-08-07 | 中交一公局集团有限公司 | 一种索塔操作平台模板分离提升系统 |
CN111809866A (zh) * | 2020-08-25 | 2020-10-23 | 惠玉清 | 一种混凝土剪力墙大型钢模板悬空校正固定支模法 |
CN111877777A (zh) * | 2020-08-25 | 2020-11-03 | 惠玉清 | 一种预设定位块及其施工法 |
CN111926998A (zh) * | 2020-09-22 | 2020-11-13 | 上海建工集团股份有限公司 | 一种超高层结构外框钢管柱施工方法 |
CN111996918A (zh) * | 2020-08-27 | 2020-11-27 | 绍兴其顺桥梁设备有限公司 | 一种空心高墩的模板系统及其安装施工方法 |
CN112177321A (zh) * | 2020-10-09 | 2021-01-05 | 浙大宁波理工学院 | 建筑物外墙及楼板的爬模施工设备和施工方法 |
CN114232486A (zh) * | 2021-12-15 | 2022-03-25 | 江西省交通工程集团有限公司 | 薄壁墩模板爬架及物料提升架的施工方法 |
CN115306136A (zh) * | 2022-10-12 | 2022-11-08 | 上海建工一建集团有限公司 | 一种斜墙外翻爬升式钢平台施工装置及方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2339037A1 (fr) * | 1976-01-23 | 1977-08-19 | Proco Projets Procedes Const | Procede de guidage de coffrages auto-grimpants, coffrages permettant sa mise en oeuvre et constructions en resultant |
DE3935076A1 (de) * | 1989-10-20 | 1991-04-25 | Erwin Wrede | Gleit- oder kletterschalung |
CN2208076Y (zh) * | 1994-04-09 | 1995-09-20 | 电力工业部电力建设研究所 | 液压滑模提升架 |
JPH08144514A (ja) * | 1994-11-17 | 1996-06-04 | Hory Corp | 昇降機能を備えた足場付型枠装置及び足場付型枠装置を利用したコンクリート壁等の構築方法 |
CN2275615Y (zh) * | 1996-01-25 | 1998-03-04 | 张良杰 | 液压爬升模板装置 |
CN2660028Y (zh) * | 2003-09-18 | 2004-12-01 | 山东省路桥集团有限公司 | 液压自升爬模 |
CN1230599C (zh) * | 2003-11-25 | 2005-12-07 | 上海市第一建筑有限公司 | 双作用液压爬模系统 |
-
2005
- 2005-11-07 CN CNB2005101177090A patent/CN100351484C/zh not_active Expired - Fee Related
Cited By (44)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100387796C (zh) * | 2006-08-28 | 2008-05-14 | 杨秋利 | 自动液压爬升模板 |
CN103556816B (zh) * | 2008-03-25 | 2016-06-22 | Peri有限公司 | 包括爬升导轨接长件的导轨导向的自爬升模板系统 |
CN103556816A (zh) * | 2008-03-25 | 2014-02-05 | Peri有限公司 | 包括爬升导轨接长件的导轨导向的自爬升模板系统 |
CN101892742A (zh) * | 2010-06-21 | 2010-11-24 | 陕西省第三建筑工程公司 | 一种高低跨楼变形缝处低段剪力墙的施工方法 |
CN101892742B (zh) * | 2010-06-21 | 2011-10-26 | 陕西省第三建筑工程公司 | 一种高低跨楼变形缝处低段剪力墙的施工方法 |
CN102345381A (zh) * | 2011-10-12 | 2012-02-08 | 四川路桥建设股份有限公司 | 液压爬模系统及爬模施工方法 |
CN102345381B (zh) * | 2011-10-12 | 2013-08-14 | 四川路桥建设股份有限公司 | 液压爬模系统及爬模施工方法 |
CN102587644A (zh) * | 2012-03-19 | 2012-07-18 | 中国水利水电第十四工程局有限公司 | 单面边墙滑模及施工方法 |
CN102587644B (zh) * | 2012-03-19 | 2014-07-09 | 中国水利水电第十四工程局有限公司 | 单面边墙滑模及施工方法 |
CN103635643A (zh) * | 2012-06-11 | 2014-03-12 | 浙江省建工集团有限责任公司 | 高层钢结构建筑钢筋砼筒体的施工方法 |
CN102873748A (zh) * | 2012-09-22 | 2013-01-16 | 王炳贞 | 大型混凝土构件预制装置及大型混凝土构件的预制方法 |
CN102873748B (zh) * | 2012-09-22 | 2014-09-17 | 王炳贞 | 大型混凝土构件预制装置及大型混凝土构件的预制方法 |
CN103821340B (zh) * | 2014-03-10 | 2016-02-10 | 成都嘉泽正达科技有限公司 | 附着升降多层施工平台的安装方法 |
CN103821340A (zh) * | 2014-03-10 | 2014-05-28 | 成都嘉泽正达科技有限公司 | 附着升降多层施工平台的安装方法 |
CN105421740A (zh) * | 2015-11-09 | 2016-03-23 | 天津一建建筑工程有限公司 | 建筑施工中主体结构施工用的模架结构及施工方法 |
CN105862600A (zh) * | 2016-04-29 | 2016-08-17 | 钟爱华 | 一种多段桥梁浇筑设备及其施工方法 |
CN106088582A (zh) * | 2016-07-08 | 2016-11-09 | 广州市第四建筑工程有限公司 | 滑模平台及其应用于钢筋混凝土筒体滑模施工方法 |
CN106088582B (zh) * | 2016-07-08 | 2019-02-01 | 广州市第四建筑工程有限公司 | 滑模平台及其应用于钢筋混凝土筒体滑模施工方法 |
CN107190650A (zh) * | 2017-07-26 | 2017-09-22 | 中交路桥华东工程有限公司 | 桁架式无拉杆液压爬模系统及其施工工艺 |
CN107190650B (zh) * | 2017-07-26 | 2023-12-15 | 中交路桥华东工程有限公司 | 桁架式无拉杆液压爬模系统及其施工工艺 |
CN108425319A (zh) * | 2018-05-29 | 2018-08-21 | 上海宝冶集团有限公司 | 一种立柱的施工系统及施工方式 |
CN108425319B (zh) * | 2018-05-29 | 2024-04-05 | 上海宝冶集团有限公司 | 一种立柱的施工系统及施工方式 |
CN108979112B (zh) * | 2018-08-23 | 2023-04-14 | 中国建筑第二工程局有限公司 | 电梯井多功能操作平台系统及其施工方法 |
CN108979112A (zh) * | 2018-08-23 | 2018-12-11 | 中国建筑第二工程局有限公司 | 电梯井多功能操作平台系统及其施工方法 |
CN109898848A (zh) * | 2018-10-11 | 2019-06-18 | 上海建工一建集团有限公司 | 一种爬升式整体钢平台模架体系及其施工方法 |
CN109898848B (zh) * | 2018-10-11 | 2024-02-13 | 上海建工一建集团有限公司 | 一种爬升式整体钢平台模架体系及其施工方法 |
CN109399432A (zh) * | 2018-11-23 | 2019-03-01 | 燕山大学 | 一种自爬升井道作业平台 |
CN109399432B (zh) * | 2018-11-23 | 2019-12-03 | 燕山大学 | 一种自爬升井道作业平台 |
CN110807275A (zh) * | 2019-10-14 | 2020-02-18 | 中国建筑一局(集团)有限公司 | 一种液压爬升模板监测分析方法 |
CN110821153A (zh) * | 2019-12-06 | 2020-02-21 | 荆门市佰思机械科技有限公司 | 一种爬模装置的翻模模板 |
CN110821155A (zh) * | 2019-12-10 | 2020-02-21 | 荆门市佰思机械科技有限公司 | 一种起吊翻转的翻模模板 |
CN110984563A (zh) * | 2019-12-31 | 2020-04-10 | 荆门市佰思机械科技有限公司 | 一种自动对位自动爬升的爬升装置 |
CN111501562A (zh) * | 2020-04-21 | 2020-08-07 | 中交一公局集团有限公司 | 一种索塔操作平台模板分离提升系统 |
CN111809866A (zh) * | 2020-08-25 | 2020-10-23 | 惠玉清 | 一种混凝土剪力墙大型钢模板悬空校正固定支模法 |
CN111877777A (zh) * | 2020-08-25 | 2020-11-03 | 惠玉清 | 一种预设定位块及其施工法 |
CN111996918A (zh) * | 2020-08-27 | 2020-11-27 | 绍兴其顺桥梁设备有限公司 | 一种空心高墩的模板系统及其安装施工方法 |
CN111996918B (zh) * | 2020-08-27 | 2022-02-01 | 绍兴其顺桥梁设备有限公司 | 一种空心高墩的模板系统及其安装施工方法 |
CN111926998B (zh) * | 2020-09-22 | 2020-12-18 | 上海建工集团股份有限公司 | 一种超高层结构外框钢管柱施工方法 |
CN111926998A (zh) * | 2020-09-22 | 2020-11-13 | 上海建工集团股份有限公司 | 一种超高层结构外框钢管柱施工方法 |
CN112177321A (zh) * | 2020-10-09 | 2021-01-05 | 浙大宁波理工学院 | 建筑物外墙及楼板的爬模施工设备和施工方法 |
CN114232486A (zh) * | 2021-12-15 | 2022-03-25 | 江西省交通工程集团有限公司 | 薄壁墩模板爬架及物料提升架的施工方法 |
CN114232486B (zh) * | 2021-12-15 | 2024-04-02 | 江西省交通工程集团有限公司 | 薄壁墩模板爬架及物料提升架的施工方法 |
CN115306136B (zh) * | 2022-10-12 | 2022-12-16 | 上海建工一建集团有限公司 | 一种斜墙外翻爬升式钢平台施工装置及方法 |
CN115306136A (zh) * | 2022-10-12 | 2022-11-08 | 上海建工一建集团有限公司 | 一种斜墙外翻爬升式钢平台施工装置及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN100351484C (zh) | 2007-11-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100351484C (zh) | 可升降液压爬升模板及其施工方法 | |
CN202090591U (zh) | 一种建筑施工升降式爬升模板 | |
CN201962944U (zh) | 一种建筑施工液压爬升模板 | |
CN105464216B (zh) | 基于整体提升式模板加固系统超高超大截面斜柱的施工方法 | |
CN111119060A (zh) | 一种滨海环境高墩液压自爬模施工方法 | |
CN212176540U (zh) | 液压爬模系统模架 | |
CN104372947A (zh) | 一种电梯井整体模板进退模施工方法 | |
CN1975069A (zh) | 一种往复自爬式爬模系统及其爬模方法 | |
CN2275615Y (zh) | 液压爬升模板装置 | |
CN111113628B (zh) | 喷淋预制t梁的施工方法 | |
CN103485574A (zh) | 一种造粒塔塔顶钢筋混凝土结构施工方法 | |
CN113896124B (zh) | 超高层塔吊底部附着式液压自爬升硬防护平台、其安装工艺和爬升方法 | |
CN101457587B (zh) | 模板互升式爬模装置及方法 | |
CN109252656B (zh) | 高层建筑爬升模板及组装、灌注和提升方法 | |
CN210216478U (zh) | 一种沉井施工作业平台 | |
CN1111705A (zh) | 建筑工程中使用的组件及其使用方法 | |
CN216616802U (zh) | 一种用于竖井的三层液压自升施工平台 | |
CN1048426A (zh) | 建筑现浇墙体无爬架升模工艺及模具 | |
CN104453217A (zh) | 一种电梯井整体模板升模施工方法 | |
CN211368398U (zh) | 架体爬升结构 | |
CN111519895A (zh) | 楼梯间梯、墙整体钢模板浇筑施工方法 | |
CN118007536A (zh) | 一种土建翻模工艺 | |
CN217580002U (zh) | 一种小断面竖井整体式筒模 | |
CN211421802U (zh) | 一种高层建筑施工机械 | |
CN216239713U (zh) | 一种液压式自动升降模板支撑及防护一体架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: CHINA CONSTRUCTION FIRST DIVISION GROUP CONSTRUCTI Free format text: FORMER NAME OR ADDRESS: ZHONGJIAN NO.1 BUREAU CONSTRUCTION DEVELOPMENT CO., LTD. |
|
CP01 | Change in the name or title of a patent holder |
Address after: Beijing City, Chaoyang District Road No. 17 building, Wanghua Patentee after: CHINA CONSTRUCTION FIRST DIVISION GROUP CONSTRUCTION & DEVELOPMENT Co.,Ltd. Address before: Beijing City, Chaoyang District Road No. 17 building, Wanghua Patentee before: China Construction First Division Construction & Development Co. |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20071128 |