[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN110080543A - Rope net roofing hanging object and its pre-add support method - Google Patents

Rope net roofing hanging object and its pre-add support method Download PDF

Info

Publication number
CN110080543A
CN110080543A CN201910251122.0A CN201910251122A CN110080543A CN 110080543 A CN110080543 A CN 110080543A CN 201910251122 A CN201910251122 A CN 201910251122A CN 110080543 A CN110080543 A CN 110080543A
Authority
CN
China
Prior art keywords
rope net
container
roofing
hanging object
liquid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910251122.0A
Other languages
Chinese (zh)
Inventor
王哲
白光波
陈彬磊
王泽强
朱忠义
王毅
邢珏蕙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Institute of Architectural Design Group Co Ltd
Beijing Building Construction Research Institute Co Ltd
Original Assignee
Beijing Institute of Architectural Design Group Co Ltd
Beijing Building Construction Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Institute of Architectural Design Group Co Ltd, Beijing Building Construction Research Institute Co Ltd filed Critical Beijing Institute of Architectural Design Group Co Ltd
Priority to CN201910251122.0A priority Critical patent/CN110080543A/en
Publication of CN110080543A publication Critical patent/CN110080543A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/14Suspended roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Bag Frames (AREA)

Abstract

The present invention provides a kind of rope net roofing hanging object and its pre-add support method, includes the suspended portion and counterweight part being connected in structure, and counterweight part includes the container for containing liquid, and inlet is arranged on the top of container, and liquid outlet is arranged in the lower part of container;The setting flag scale on container;The reinforcement structure of a cage shape is made in external container with reinforcing bar, and extends to form the structure of suspended portion.During the construction of rope net, required amount of hoist cable is suspended on corresponding cord clip node;As needed, rope net roofing hanging object is arranged in corresponding position, is then hung;As needed, the liquid that corresponding amount is injected in each container, completes the preloading of corresponding cord clip node.The present invention uses weight core part of the liquid container as hanging object, and the rope net before rope net roofing construction is realized by liquid filling in container preloads, load and flexible, easy to operate, the easy implementation of uninstall process, and avoids pollution environment.

Description

Rope net roofing hanging object and its pre-add support method
Technical field
The present invention relates to cable net structure construction field, particularly a kind of rope net roofing hanging object and its preloading side Method.
Background technique
In the roof structure work progress of rope net top, as load increases, the deformation of rope net continues to increase.Due to Suo Wangjie Structure belongs to flexible structure, and deflection is larger, and when deforming more than the adaptability of roof structure, the structure first constructed is possible to send out It is raw to destroy.It during rope net roofing construction needs to use to reduce rope net continuous deformation to the adverse effect of roof structure The mode of preloading carries out counterweight preloading to roofing first, in accordance with the weight such as roof load hanging object, then with roof structure Hanging object is gradually replaced in construction, and rope net is made to maintain to avoid generating the deformation continued to increase in situ during roofing construction.
Existing preloading hanging object mostly uses sandbag or steel ingot.Since the gross mass of counterweight is larger, using sandbag counterweight When, a large amount of sands of carrying-in/carrying-out at the construction field (site) are needed, there are sand leakage contaminated site, sand stacking occupancy are larger for this method The problems such as place, sand pollution environment;When using steel ingot as hanging object, need to purchase a large amount of steel, working measure expense It is higher.
Summary of the invention
In view of this, rope net roofing hanging object of the invention and its pre-add support method, using liquid container as hanging object Weight core part, realize preloading by liquid filling in container, uninstall process can be according to the needs of each construction step Discharging quantities at different levels are flexibly grasped, implement and remove all easy implementation, and is at low cost.
To achieve the above object, according to an aspect of the present invention, a kind of rope net roofing hanging object is provided.
Rope net roofing hanging object of the invention, including the suspended portion and counterweight part being connected, the suspended portion is used Connect in cord clip node, the counterweight part includes the container for containing liquid, the top of the container have inlet, Lower part has liquid outlet.
Optionally, the suspended portion further includes hoist cable, and the hoist cable is connected with the cord clip node.
Optionally, the counterweight part further includes that the reinforcement structure in cage shape of the external container is arranged in.
Optionally, the suspended portion is connected with the reinforcement structure.
Optionally, the suspended portion is an integral molding structure with the reinforcement structure.
Optionally, the container is equipped with reference mark.
Optionally, liquid valve is provided at the liquid outlet.
According to another aspect of the present invention, a kind of pre-add support method using rope net roofing hanging object is provided.
Pre-add support method using rope net roofing hanging object of the invention, comprising: 1., rope net construction during, will Required amount of hoist cable is suspended on corresponding cord clip node;2., as needed, rope net roofing hanging object is arranged in corresponding Then position is hung;3., as needed, in each container inject corresponding amount liquid, complete corresponding cord clip node Preloading.
Optionally, during rope net roofing construction, discharging quantity needed for being walked according to each construction, several times by liquid from correspondence The container in be discharged, until entire roofing construction complete.
Optionally, before discharge liquid every time, advance demand flag needs the liquid level retained on container.
According to the technique and scheme of the present invention, the weight core part using liquid container as hanging object, by container Interior filling liquid come realize the rope net before rope net roofing construction preload, the device and method implementation cost is low, while can keep away Exempt to pollute environment, and easy to operate, easily implement.
Detailed description of the invention
Attached drawing for a better understanding of the present invention, does not constitute an undue limitation on the present invention.Wherein:
Fig. 1 is the rope net roofing hanging object of the invention hanging schematic diagram online in rope.
Specific embodiment
Below with reference to attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that institute The embodiment of description is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, Every other embodiment obtained by those of ordinary skill in the art without making creative efforts, belongs to this hair The range of bright protection.
Fig. 1 is the rope net roofing hanging object of the invention hanging schematic diagram online in rope.
As shown in Figure 1, several cord clip nodes 2 are arranged on rope net 1, rope net roofing hanging object includes the suspension part being connected Divide 4 and counterweight part, for suspended portion 4 for connecting with cord clip node 2, counterweight part includes the container 9 for containing liquid, is held The top of device 9 has liquid outlet 7 with inlet 6, lower part.
Wherein, suspended portion 4 may include hoist cable 3, and hoist cable 3 is connected with cord clip node 2.
Further, counterweight part further includes the reinforcement structure 5 in cage shape being arranged in outside container 9, suspension part Points 4 are connected with reinforcement structure 5, alternatively, suspended portion 4 is an integral molding structure with reinforcement structure 5, integrated formed structure it is strong Degree is big, and can reduce the shaking of hanging object, guarantees the accuracy that liquid level is read in work progress.
Suspended portion 4 may each be with reinforcement structure 5 and be made of reinforcing bar.
In addition, container 9 is equipped with reference mark 10, liquid valve 8 is provided at liquid outlet 7.
The method that rope net preloads is implemented using above-mentioned rope net roofing hanging object, comprising: 1., in the process of rope net construction In, required amount of hoist cable is suspended on corresponding cord clip node;2., as needed, rope net roofing hanging object is arranged in Corresponding position, is then hung;3., as needed, in each container inject corresponding amount liquid, complete corresponding rope Press from both sides the preloading of node.
During rope net roofing construction, discharging quantity needed for being walked according to each construction, several times by liquid from corresponding It is discharged in container, until entire roofing construction is completed, it is high that the good liquid level of advance demand flag can be drained in uninstall process as needed Degree realizes that substep unloads, also, before discharge liquid every time, the liquid level that retains can be needed high by advance demand flag on container Degree.
Liquid in the above method can using tap water, the rainwater of recycling, underground water or river water etc., and this several person at This even more successively successively decreases.
The technical solution of embodiment according to the present invention, the weight core part using liquid container as hanging object lead to Filling liquid is crossed in container to realize that the rope net before rope net roofing construction preloads, the device and method implementation cost is low, adds Load and flexible, easy to operate, the easy implementation of uninstall process, while can be avoided pollution environment.
Above-mentioned specific embodiment, does not constitute a limitation on the scope of protection of the present invention.Those skilled in the art should be bright It is white, design requirement and other factors are depended on, various modifications, combination, sub-portfolio and substitution can occur.It is any Made modifications, equivalent substitutions and improvements etc. within the spirit and principles in the present invention, should be included in the scope of the present invention Within.

Claims (10)

1. a kind of rope net roofing hanging object, which is characterized in that including the suspended portion and counterweight part being connected, the suspension part Point for connect with cord clip node, the counterweight part includes the container for containing liquid, the top of the container with into Liquid mouth, lower part have liquid outlet.
2. rope net roofing hanging object according to claim 1, which is characterized in that the suspended portion further includes hoist cable, institute Hoist cable is stated to be connected with the cord clip node.
3. rope net roofing hanging object according to claim 1, which is characterized in that the counterweight part further includes being arranged in institute State the reinforcement structure in cage shape of external container.
4. rope net roofing hanging object according to claim 3, which is characterized in that the suspended portion and the reinforcement structure It is connected.
5. rope net roofing hanging object according to claim 3, which is characterized in that the suspended portion and the reinforcement structure It is an integral molding structure.
6. rope net roofing hanging object according to any one of claim 1 to 5, which is characterized in that the container is equipped with For observing the scale of water level.
7. rope net roofing hanging object according to any one of claim 1 to 5, which is characterized in that set at the liquid outlet It is equipped with liquid valve.
8. a kind of pre-add support method using rope net roofing hanging object as described in any one of claim 1 to 7, feature exist In, comprising:
1., rope net construction during, required amount of hoist cable is suspended on corresponding cord clip node;
2., as needed, rope net roofing hanging object is arranged in corresponding position, is then hung;
3., as needed, in each container inject corresponding amount liquid, complete the preloading of corresponding cord clip node.
9. pre-add support method according to claim 8, which is characterized in that during rope net roofing construction, according to respectively applying Liquid is discharged from the corresponding container several times for discharging quantity needed for work step, until entire roofing construction is completed.
10. pre-add support method according to claim 9, which is characterized in that before discharge liquid every time, above mentioned in container The liquid level that preceding label needs to retain.
CN201910251122.0A 2019-03-29 2019-03-29 Rope net roofing hanging object and its pre-add support method Pending CN110080543A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910251122.0A CN110080543A (en) 2019-03-29 2019-03-29 Rope net roofing hanging object and its pre-add support method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910251122.0A CN110080543A (en) 2019-03-29 2019-03-29 Rope net roofing hanging object and its pre-add support method

Publications (1)

Publication Number Publication Date
CN110080543A true CN110080543A (en) 2019-08-02

Family

ID=67413928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910251122.0A Pending CN110080543A (en) 2019-03-29 2019-03-29 Rope net roofing hanging object and its pre-add support method

Country Status (1)

Country Link
CN (1) CN110080543A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714580A (en) * 2019-11-12 2020-01-21 北京市建筑设计研究院有限公司 A suspension circular horse track system with springs suitable for flexible cable net roofs
CN111364775A (en) * 2020-03-09 2020-07-03 北京城建集团有限责任公司 Cable net hanging load replacement method
CN113756488A (en) * 2021-09-14 2021-12-07 五矿瑞和(上海)建设有限公司 Large-span hanging type glass curtain wall installation method
CN115593804A (en) * 2022-10-14 2023-01-13 国家电网有限公司(Cn) A flexible counterweight device for replacement of through-wall bushings in flexible DC converter stations

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200954013Y (en) * 2006-09-15 2007-10-03 梁汉民 Lifting clothing-airing hanger capable of fast lifting
CN103015474A (en) * 2012-12-28 2013-04-03 广州文冲船厂有限责任公司 Energy-saving grab dredger
US9885174B2 (en) * 2014-02-25 2018-02-06 Larry Ray Buck Sound abatement system and method
CN108518008A (en) * 2018-03-23 2018-09-11 中建钢构有限公司 Rigid roof structure in flexible cable structure and its installation method
CN208039587U (en) * 2018-03-23 2018-11-02 中建钢构有限公司 A kind of purlin structure in flexible cable structure
CN210105348U (en) * 2019-03-29 2020-02-21 北京市建筑设计研究院有限公司 Cable net roof hanging article

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200954013Y (en) * 2006-09-15 2007-10-03 梁汉民 Lifting clothing-airing hanger capable of fast lifting
CN103015474A (en) * 2012-12-28 2013-04-03 广州文冲船厂有限责任公司 Energy-saving grab dredger
US9885174B2 (en) * 2014-02-25 2018-02-06 Larry Ray Buck Sound abatement system and method
CN108518008A (en) * 2018-03-23 2018-09-11 中建钢构有限公司 Rigid roof structure in flexible cable structure and its installation method
CN208039587U (en) * 2018-03-23 2018-11-02 中建钢构有限公司 A kind of purlin structure in flexible cable structure
CN210105348U (en) * 2019-03-29 2020-02-21 北京市建筑设计研究院有限公司 Cable net roof hanging article

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄镇雄: "支承于柔性索网上刚性金属屋面施工工艺研究", 《施工技术》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714580A (en) * 2019-11-12 2020-01-21 北京市建筑设计研究院有限公司 A suspension circular horse track system with springs suitable for flexible cable net roofs
CN111364775A (en) * 2020-03-09 2020-07-03 北京城建集团有限责任公司 Cable net hanging load replacement method
CN113756488A (en) * 2021-09-14 2021-12-07 五矿瑞和(上海)建设有限公司 Large-span hanging type glass curtain wall installation method
CN115593804A (en) * 2022-10-14 2023-01-13 国家电网有限公司(Cn) A flexible counterweight device for replacement of through-wall bushings in flexible DC converter stations

Similar Documents

Publication Publication Date Title
CN110080543A (en) Rope net roofing hanging object and its pre-add support method
CN104975719A (en) Novel material distribution device and construction method for pouring floor concrete by using same
CN105696546A (en) Low-consumption underground diaphragm wall and construction method thereof
CN111042013A (en) Pollution discharge box culvert, box culvert construction method and box culvert repair method
CN210105348U (en) Cable net roof hanging article
CN103711196B (en) Grout recovering system
CN204725676U (en) A kind of cement pulping device
JP5820651B2 (en) Cement slurry with fiber
CN104264720A (en) Surcharge load test method
CN211815676U (en) Novel blowdown box culvert
CN206625324U (en) Easy desilting piping shaft
CN202351238U (en) Slump testing device convenient for charging
EP2267244A1 (en) Temporary drainage facility and temporary drainage method
CN102797287B (en) Slurry-water recovery method
CN205062841U (en) Steel construction polyurethane material underground pipe gallery or worker's well
CN108147747B (en) A kind of environment-friendly and clean type high-volume copper tailings washing machine counterweight block and preparation method thereof
CN205975620U (en) Underwater concrete pours device
CN206693628U (en) A kind of building machinery engineering hopper
CN106149853A (en) A kind of box collection reuse cistern
CN217257321U (en) Stirring system of UHPC wet mixing production line
CN206204729U (en) A kind of new chute of highway engineering
CN215441908U (en) Visual concrete hopper with capacity scales
CN204825974U (en) Inspection shaft is with connecing native umbrella
CN209145084U (en) A kind of shear wall steel bracket
JP7371313B2 (en) Fluidized soil supply system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190802

RJ01 Rejection of invention patent application after publication