CN103437589B - A kind of inversion construction method of steel chimney cylinder - Google Patents
A kind of inversion construction method of steel chimney cylinder Download PDFInfo
- Publication number
- CN103437589B CN103437589B CN201310352163.1A CN201310352163A CN103437589B CN 103437589 B CN103437589 B CN 103437589B CN 201310352163 A CN201310352163 A CN 201310352163A CN 103437589 B CN103437589 B CN 103437589B
- Authority
- CN
- China
- Prior art keywords
- jacking
- steel chimney
- chimney cylinder
- jack
- joist
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/28—Chimney stacks, e.g. free-standing, or similar ducts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
- E04H12/342—Arrangements for stacking tower sections on top of each other
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
<b> the present invention discloses a kind of inversion construction method of steel chimney cylinder, belongs to steel stack technical field of construction.This </b><bGreatT.Gre aT.GT inversion construction method of </b><bGreatT.Gre aT.GT first </b><bGreatT.Gre aT.GT by by the arranged outside of the steel chimney cylinder of jacking annular joist, then hinged reinforcing device is set at the inwall of steel chimney cylinder, at the arranged outside </b><bGreatT.Gre aT.GT jacking post of ring-type joist, setting is carried </b><bGreatT.Gre aT.GT drawing device and is connected with ring-type joist, make ring-type joist together with cylindrical shell jacking six times, complete the jacking of a cylindrical shell, then make whole device get back to original position and carry out lifting operation again, such cycle jacking is until steel chimney cylinder is thus lifted to desired height.The inventive method is safe and reliable, it is high and can reduce construction cost to save duration, construction quality and efficiency.</b>
Description
Technical field
the invention belongs to steel stack technical field of construction, especially relate to a kind of inversion construction method of steel chimney cylinder.
Background technology
at present in industrial construction, the steel stack of more than 90m gets more and more, and the steel stack of existing more than 200 meters.Steel stack for more than 90m adopts traditional construction method of installation to be very difficult, its mounting steel chimney be accurate at the bottom of bit rate, the high and construction quality of construction cycle long construction cost is difficult to ensure.As certain sintering plant four post steel tower formula bitubular body assembly type 200m steel stack, chimney structure gross weight is 2500t, and installation code requires high, and the maximum TC-2000 type mobile crane in job site also can only be lifted into 115m.
Summary of the invention
the present invention is directed to the technical problem existed in existing steel chimney cylinder installation, a kind of inversion construction method of steel chimney cylinder is provided.
the inversion construction method particular content of a kind of steel chimney cylinder provided by the present invention is as follows:
(1) by by the arranged outside of the steel chimney cylinder 1 of jacking annular joist 2, described annular joist 2 is equipped with the jack of short stroke, described annular joist 2 is to described steel chimney cylinder 1 clamping and supporting role, and described annular joist 2 supports whole load of described steel chimney cylinder 1.
(2) arrange hinged reinforcing device 4 at the inwall of described steel chimney cylinder 1, described reinforcing device 4 is expansion under jack promotes, and makes described steel chimney cylinder 1 keep positive circle.
(3) at the arranged outside jacking post 5 of described ring-type joist 2, main jack is equipped with on the top of described jacking post 5, between described jacking post 5 and steel chimney cylinder 1, pulling apparatus 3 is set, described pulling apparatus 3 is connected with described ring-type joist 2, the impulse stroke location 900mm of described main jack, make described ring-type joist 2 together with cylindrical shell 1 jacking six times, complete the jacking of a cylindrical shell.
(4) after steel chimney cylinder 1 is by top to △ h height, locked by the jam nut 7 being arranged on described jacking post 5 top, now described cylindrical shell 1 rests on △ h height safely.
(5) another section of steel chimney cylinder is placed on transport jacking trolley 6, be pushed into the center of described cylindrical shell 1, six jack are had at described transport jacking trolley 6, described transport jacking trolley (6) and another section of steel chimney cylinder on it are carried out jacking, described another section of steel chimney cylinder centering butt welding mouth is welded with described steel chimney cylinder (1).
(6) described ring-type joist 2 is unclamped with the whole off-load of jack of reinforcing device 4, depart from described steel chimney cylinder 1, described main jack drives described ring-type joist 2 with 900mm backhaul six times, then make whole device get back to original position and carry out lifting operation again, such cycle jacking, until described steel chimney cylinder 1 is thus lifted to desired height.
the inventive method is by cylindrical shell upside-down method of hull-section construction, is exactly from bottom to up by the method got in cylindrical shell top, in place by the initial segment of crane lifting cylindrical shell, and all the other height component of cylindrical shell are divided into n section, and selected every section of height is 5400mm.After cylindrical shell jack-up 5400mm height, new one section of cylindrical shell 5400mm is pushed, after jack-up, carries out butt welding.Install the tower crane for building of a 80t.m in cylindrical shell upper end, this tower crane rises with stack shell, and after the some height of stack shell jacking, stop jacking, tower crane can install the component of epimere pylon and platform, and pylon is installed to certain altitude, and it is high that cylindrical shell can continue again jacking 5400mm.Repeat so alternately, cylindrical shell, pylon, elevator all can all fulfil assignment, until described steel chimney cylinder is thus lifted to the desired height of 200m.
the inventive method is safe and reliable, it is high and can reduce construction cost to save duration, construction quality and efficiency.
Accompanying drawing explanation
fig. 1 the inventive method mounting structure schematic diagram.
in figure: 1, steel chimney cylinder; 2, ring-type joist; 3, pulling apparatus; 4, reinforcing device; 5, jacking post; 6, jacking trolley is transported; 7, jam nut; 8, concrete foundation.
Detailed description of the invention
now in conjunction with the accompanying drawings and embodiments the construction method of a kind of steel chimney cylinder upside-down mounting that the present invention proposes is described further.
certain sintering plant four post steel tower formula double shell assembly type 200m steel stack, chimney structure gross weight is 2500t, and installation code requires high.Use the inventive method construction can safely, on schedule, the construction task of 200m steel stack of having guaranteed the quality, it is hundreds thousand of to save large-scale crane lifting machine-team expense, reduces construction cost and reaches more than 30 ten thousand yuan.
the inversion construction method of this 200m steel chimney cylinder is specific as follows:
(1) by by the arranged outside of the 200m steel chimney cylinder of jacking annular joist 2, annular joist 2 is equipped with the jack of 12 short strokes 20 tons, it rises cylindrical shell and clamps and supporting role, supports by whole load of the cylindrical shell of jacking.
(2) arrange hinged reinforcing device 4 at cylinder inboard wall, this reinforcing device 4 is expansion under 200 tons of jack promote, and makes cylindrical shell keep positive circular.
(3) at the arranged outside jacking post 5 of ring-type joist 2, main jack is equipped with at the top of jacking post 5, arranges pulling apparatus 3 between jacking post 5 and steel chimney cylinder 1, and pulling apparatus 3 is connected with ring-type joist 2.The impulse stroke location 900mm of main jack, can make ring-type joist 2 together with cylindrical shell 1 jacking six times, complete the jacking task of a cylindrical shell.
(4) after cylindrical shell is pushed up to △ h height, locked by jam nut 7, now cylindrical shell rests on △ h height safely.
(5) another section of cylindrical shell is placed on transport jacking trolley 6, be pushed into body centre position, 6 jack are had at transport jacking trolley 6, transport jacking trolley 6 and another section of steel chimney cylinder on it are carried out jacking, makes described another section of steel chimney cylinder centering butt welding mouth carry out welding centering butt welding mouth with described steel chimney cylinder 1 and weld.
(6) the jack whole off-load of ring-type joist 2 with reinforcing device 4 is unclamped, depart from cylindrical shell, main jack can drive ring-type joist 2 with 900mm backhaul six times, whole device is made to get back to original position, carry out lifting operation again, such cycle jacking, until steel chimney cylinder is thus lifted to required 200m height.
Claims (1)
1.
an inversion construction method for steel chimney cylinder, is characterized in that the method particular content is as follows:
(1) by the arranged outside of the steel chimney cylinder of jacking (1) annular joist (2), described annular joist (2) is equipped with the jack of short stroke, steel chimney cylinder (1) described in the jack pair of described short stroke plays clamping and supporting role, and the jack of described short stroke supports whole load of described steel chimney cylinder (1);
(2) arrange hinged reinforcing device (4) at the inwall of described steel chimney cylinder (1), described reinforcing device (4) is expansion under jack promotes, and makes described steel chimney cylinder (1) keep positive circular;
(3) at the arranged outside jacking post (5) of described ring-type joist (2), main jack is equipped with on the top of described jacking post (5), between described jacking post (5) and steel chimney cylinder (1), pulling apparatus (3) is set, described pulling apparatus (3) is connected with described ring-type joist (2), the impulse stroke location 900mm of described main jack, make described ring-type joist (2) together with cylindrical shell (1) jacking six times, complete the jacking of a cylindrical shell;
(4) after steel chimney cylinder (1) is by top to △ h height, locked by the jam nut (7) being arranged on described jacking post (5) top, now described cylindrical shell (1) rests on △ h height safely;
(5) another section of steel chimney cylinder is placed in transport jacking trolley (6), be pushed into the center of described cylindrical shell (1), six jack are had described transport jacking trolley (6), described transport jacking trolley (6) and another section of steel chimney cylinder on it are carried out jacking, described another section of steel chimney cylinder centering butt welding mouth is welded with described steel chimney cylinder (1);
(6) the jack whole off-load of described ring-type joist (2) with reinforcing device (4) is unclamped, depart from described steel chimney cylinder (1), described main jack drives described ring-type joist (2) with 900mm backhaul six times, then make whole device get back to original position and carry out lifting operation again, such cycle jacking, until described steel chimney cylinder (1) is thus lifted to desired height.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310352163.1A CN103437589B (en) | 2013-08-14 | 2013-08-14 | A kind of inversion construction method of steel chimney cylinder |
PCT/CN2013/085331 WO2015021693A1 (en) | 2013-08-14 | 2013-10-16 | Method of constructing steel chimney cylinder by upside-down mounting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310352163.1A CN103437589B (en) | 2013-08-14 | 2013-08-14 | A kind of inversion construction method of steel chimney cylinder |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103437589A CN103437589A (en) | 2013-12-11 |
CN103437589B true CN103437589B (en) | 2015-11-18 |
Family
ID=49691295
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310352163.1A Active CN103437589B (en) | 2013-08-14 | 2013-08-14 | A kind of inversion construction method of steel chimney cylinder |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN103437589B (en) |
WO (1) | WO2015021693A1 (en) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104563590B (en) * | 2015-01-16 | 2017-01-04 | 江西建工第二建筑有限责任公司 | Inner steel cylinder of chimney hydraulic pressure lift constructing device and method thereof |
CN105507652A (en) * | 2015-11-25 | 2016-04-20 | 中冶天工集团有限公司 | Hydraulic lifting and upside-down construction method for internal steel tube of chimney |
RU2648741C2 (en) * | 2016-03-15 | 2018-03-28 | Алексей Анатольевич Ладнушкин | Method for mounting gas-outlet bore of chimney without crane |
CN107747423A (en) * | 2017-08-30 | 2018-03-02 | 江苏铭远杆塔有限公司 | Replaceable fiber glass reinforced plastic chimney supports long-life steel tower |
CN108590322A (en) * | 2017-12-20 | 2018-09-28 | 中冶天工集团有限公司 | A kind of method of free-standing steel chimney upside-down method of hull-section construction assembling segmental hoisting |
CN108775081A (en) * | 2018-08-11 | 2018-11-09 | 中国电建集团贵州电力设计研究院有限公司 | A kind of hydraulic lifting inverted structure and its application method |
CN111957176A (en) * | 2020-09-04 | 2020-11-20 | 杨虹 | Research and development of construction process of internal component of boiler desulfurization tower |
CN113319525A (en) * | 2021-05-18 | 2021-08-31 | 希斯芮烟囱科技(连云港)有限公司 | Manufacturing process of D-shaped sleeve type steel chimney inner barrel |
CN114939289B (en) * | 2022-06-01 | 2023-12-19 | 中国化学工程第十四建设有限公司 | Flip-chip mounting method of filter press for squeezing and filtering production |
CN115897815A (en) * | 2022-12-29 | 2023-04-04 | 中冶建工集团有限公司 | Hydraulic synchronous jacking method for chimney construction |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0503749A1 (en) * | 1991-03-15 | 1992-09-16 | Walter Krämer GmbH Chemie- und Tankanlagenbau | Mounting device for sectional tubular smoke stacks in industrial chimneys |
CN201933613U (en) * | 2011-01-18 | 2011-08-17 | 东北电业管理局烟塔工程公司 | Hydraulic lifting inverting-construction device for chimney steel inner cylinder of fuel electric plant |
CN202100045U (en) * | 2011-05-25 | 2012-01-04 | 中建七局安装工程有限公司 | Inner steel cylinder and piston ring jacking device for chimney |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101748800A (en) * | 2009-12-30 | 2010-06-23 | 河南四建股份有限公司 | Hydraulic lifting reverse method of chimney steel inner cylinder |
CN102235107B (en) * | 2010-04-27 | 2013-02-06 | 中国华冶科工集团有限公司 | Hydraulic lifting construction method for chimney steel inner cylinder |
CN102108737A (en) * | 2011-01-18 | 2011-06-29 | 东北电业管理局烟塔工程公司 | Hydraulic lifting inverted construction method for steel inner cylinder of chimney in thermal power plant |
CN102121273A (en) * | 2011-01-27 | 2011-07-13 | 福建工程学院 | Hydraulic lifting inversion method for reinforced concrete chimney steel inner cylinder |
-
2013
- 2013-08-14 CN CN201310352163.1A patent/CN103437589B/en active Active
- 2013-10-16 WO PCT/CN2013/085331 patent/WO2015021693A1/en active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0503749A1 (en) * | 1991-03-15 | 1992-09-16 | Walter Krämer GmbH Chemie- und Tankanlagenbau | Mounting device for sectional tubular smoke stacks in industrial chimneys |
CN201933613U (en) * | 2011-01-18 | 2011-08-17 | 东北电业管理局烟塔工程公司 | Hydraulic lifting inverting-construction device for chimney steel inner cylinder of fuel electric plant |
CN202100045U (en) * | 2011-05-25 | 2012-01-04 | 中建七局安装工程有限公司 | Inner steel cylinder and piston ring jacking device for chimney |
Non-Patent Citations (1)
Title |
---|
大型火力发电厂烟囱钢内筒施工技术;彭孝雄;《建筑技术开发》;20000430;第27卷(第2期);第55-57页 * |
Also Published As
Publication number | Publication date |
---|---|
WO2015021693A1 (en) | 2015-02-19 |
CN103437589A (en) | 2013-12-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103437589B (en) | A kind of inversion construction method of steel chimney cylinder | |
CN101619630B (en) | Mounting method of steel chimney and implementary jacking device | |
CN203271243U (en) | Chimney titanium plate steel inner barrel reverse installation construction device of thermal power plant | |
CN109184189B (en) | Construction method for conical shell silo top structure of large-diameter silo | |
CN104016089B (en) | Sintering machine large flue slide installation method and track installation mechanism thereof | |
CN205772984U (en) | A kind of hanging apparatus of monolithic steel truss | |
CN103437563B (en) | Mounting method for steel skeleton of large steel structure factory building | |
CN102852095B (en) | Prefabricated bridge abutment multifunctional lifting system and construction procedure thereof | |
CN202000644U (en) | Movable bearing bracket platform | |
CN102720386A (en) | Inversing method of inner side clustering hoop of vertical storage tank | |
CN101838986A (en) | Disassembling tool type lattice column and construction method thereof | |
CN214090973U (en) | Bottom formwork supporting steel frame for pouring reinforced concrete cylindrical bin top concrete | |
CN202925975U (en) | Steel funnel for coal blending bunker | |
CN203238967U (en) | Large steel structure frame whole lifting device | |
CN102815609A (en) | Tank body assembling electric lifting system by flip chip method and hoisting method thereof | |
CN204402496U (en) | A kind of vertical shaft steel strand jack hangs slip-form lifting device | |
CN210659482U (en) | Inverted installation device for tower body of absorption tower | |
CN104564084B (en) | Vertical shaft sliding formwork and grouting platform steel strand wires jack lifting construction equipment | |
CN204281116U (en) | Wind power generation stepped leap self-crawling type translation loop wheel machine | |
CN203961318U (en) | A kind of underground nuclear power station reactor cavern containment dome installation structure | |
CN201433589Y (en) | Silo roof steel beam slip-form lifting device | |
CN203430062U (en) | Reinforcement device for steel stack barrel inverted installation | |
CN206220531U (en) | Secondary structure commerical ready-mixed concrete storage and transportation apparatus | |
CN209837768U (en) | Device for converting original structure column into support tire frame column | |
CN107288354B (en) | Construction method for overall displacement of gantry crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |