CN108856989A CN201810791200.1A CN201810791200A CN108856989A CN 108856989 A CN108856989 A CN 108856989A CN 201810791200 A CN201810791200 A CN 201810791200A CN 108856989 A CN108856989 A CN 108856989A
Authority
CN
China
Prior art keywords
welding
point
weld
welded
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810791200.1A
Other languages
Chinese (zh)
Other versions
CN108856989B (en
Inventor
梁恩荣
王跃峰
何耀飞
鲁晓欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pangang Group Engineering Technology Co Ltd
Original Assignee
Pangang Group Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pangang Group Engineering Technology Co Ltd filed Critical Pangang Group Engineering Technology Co Ltd
Priority to CN201810791200.1A priority Critical patent/CN108856989B/en
Publication of CN108856989A publication Critical patent/CN108856989A/en
Application granted granted Critical
Publication of CN108856989B publication Critical patent/CN108856989B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/16Arc welding or cutting making use of shielding gas
    • B23K9/173Arc welding or cutting making use of shielding gas and of a consumable electrode
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/0026Arc welding or cutting specially adapted for particular articles or work
    • B23K9/0052Welding of pipe panels

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Plasma & Fusion (AREA)
  • Mechanical Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)
  • Arc Welding In General (AREA)

Abstract

本发明涉及一种熔化极MIG焊在管道焊接中的打底方法,属于管道焊接技术领域。焊接时,两根待焊接的管在对接端面分别设置焊接坡口,并呈相对布置以形成V型坡口,V型坡口的根部间隙为3mm~5mm,单边坡口角度为30°~35°,打底焊接的焊机采用半自动熔化极MAG焊接设备,保护气体采用氩气和二氧化碳的混合气体,按照体积百分比计算,氩气占比为95%,二氧化碳占比为5%。本发明采用普通的半自动熔化极MAG焊接设备来实现MIG焊的效果,可减少施工成本、提高施工效率、避免常规操作方法所出现的焊接缺陷。

The invention relates to a bottoming method for MIG welding in pipeline welding, which belongs to the technical field of pipeline welding. During welding, the two pipes to be welded are respectively provided with welding grooves on the butt end faces, and are arranged opposite to each other to form a V-shaped groove. 35°, the welding machine for bottom welding adopts semi-automatic melting electrode MAG welding equipment, and the shielding gas adopts a mixture of argon and carbon dioxide. Calculated according to volume percentage, argon accounts for 95% and carbon dioxide accounts for 5%. The invention adopts common semi-automatic melting electrode MAG welding equipment to realize the effect of MIG welding, can reduce construction cost, improve construction efficiency, and avoid welding defects in conventional operation methods.

Description

熔化极MIG焊在管道焊接中的打底方法The bottoming method of MIG welding in pipeline welding

技术领域technical field

本发明涉及一种熔化极MIG焊在管道焊接中的打底方法,属于管道焊接技术领域。The invention relates to a bottoming method for MIG welding in pipeline welding, which belongs to the technical field of pipeline welding.

背景技术Background technique

化工行业对管道及罐体的强度和致密性要求较高,因此对管道的焊接质量要求严格,部分管道的射线探伤要求达到一级。现有技术中,对管道要求高的施焊方法都是采用氩弧焊进行根部打底焊道的单面焊双面成型,手工焊进行填充盖面的焊接。但在大直径管道焊接时,大管道的下半圈几乎是处于仰焊和爬坡杨焊的位置,而氩弧焊的操作必须一手持焊枪,一手送焊丝,两个手必须配合协调才能保证焊缝质量。常规氩弧焊焊接管道送丝方法有内填丝(图1)和外填丝(图2)两种,而大直径管道若采用内填丝一个人无法完成操作,必须两个配合才能完成,并且对两个人配合的默契程度和操作熟练程度要求也很高,且对焊工的投入量明显增加,根据企业的状况以及人员的配制多方面考虑,我们都采用外填丝进行焊接。当采用外填丝法时,在仰焊部位焊接两手处于悬空位置,没有任何倚靠和支撑点可以保证双手的平稳性,并且头部还是处于长期仰视状态,这样的操作姿势自然给焊接增加了难度,操作者手的不稳定就无法保证焊丝正确送到焊缝的根部,如果焊丝只送到坡口中间,当焊丝熔化与母材结合时,由于仰焊部位熔化铁水的自重作用,形成焊缝会自然下塌,背面则出现了自然的凹陷状态,要避免这种现象必须保证坡口的间隙必须大于焊丝的直径,这样才能保证焊丝可以正常通过坡口送到近焊缝背面,当形成熔池后即使有一定的下塌也能保证焊缝背面余高和母材齐平和略高于母材,但由于焊接位置等多方面因素,操作难度增大,仰焊部位的焊接总是出现不同深浅的凹陷(如图3所示),使焊接质量无法得到保障。The chemical industry has high requirements on the strength and compactness of pipelines and tanks, so it has strict requirements on the welding quality of pipelines, and the requirements for radiographic flaw detection of some pipelines reach the first grade. In the prior art, argon arc welding is used for one-sided welding and double-sided forming of the root pass, and manual welding is used for filling and covering welding. However, when welding large-diameter pipes, the lower half of the large pipe is almost in the position of overhead welding and climbing Yang welding, and the operation of argon arc welding must hold the welding torch with one hand and feed the welding wire with the other. The two hands must cooperate and coordinate to ensure Weld quality. There are two wire feeding methods for conventional argon arc welding welding pipes: internal wire filling (Figure 1) and external wire filling (Figure 2). However, if a large-diameter pipeline uses internal filling wire, it cannot be completed by one person, and two people must cooperate to complete the operation. Moreover, the tacit understanding and operational proficiency of the two people are also very high, and the investment in welders has increased significantly. According to the situation of the enterprise and the preparation of personnel, we all use external filler wire for welding. When the external wire filling method is used, the hands are suspended in the overhead welding position, and there is no leaning and support point to ensure the stability of the hands, and the head is still in a long-term upward position. Such an operating posture naturally increases the difficulty of welding. If the operator's hands are unstable, the welding wire cannot be correctly sent to the root of the weld. If the welding wire is only sent to the middle of the groove, when the welding wire is melted and combined with the base metal, the welding seam will be formed due to the self-weight of the molten iron in the overhead welding position. It will collapse naturally, and there will be a natural depression on the back. To avoid this phenomenon, it is necessary to ensure that the gap between the grooves must be greater than the diameter of the welding wire, so as to ensure that the welding wire can be sent to the back of the weld through the groove normally. Even if there is a certain slump behind the pool, it can ensure that the reinforcement on the back of the weld is flush with the base metal and slightly higher than the base metal. However, due to various factors such as the welding position, the operation difficulty increases, and the welding of the overhead welding position always appears different. Deep and shallow depressions (as shown in Figure 3) make the welding quality unable to be guaranteed.

采用熔化极MIG焊代替手工钨极氩弧焊进行打底焊接,可以保证手的平稳性,因为熔化极MIG焊是半自动焊接,焊丝通过焊枪自动送进就不需要像氩弧焊一样需要单独送丝,这时就可以采用双手把持焊枪,一个手的手臂还可以倚靠管壁,这样大大增加了焊接操作的稳定性。并且熔化极MIG焊的焊丝细,很容易到达坡口的根部,焊接时熔池存在时间短也能避免熔池下塌的现象,可有效避免氩弧焊打底焊接仰焊部位的凹陷,而且还能显著提高施工效率,同时熔化极MIG焊的热影响区窄,焊缝冷却速度快,焊件变形小。Using molten electrode MIG welding instead of manual tungsten argon arc welding for bottom welding can ensure the stability of the hand, because molten electrode MIG welding is semi-automatic welding, and the welding wire is automatically fed through the welding torch, so it does not need to be sent separately like argon arc welding At this time, both hands can be used to hold the welding torch, and the arm of one hand can also lean against the pipe wall, which greatly increases the stability of the welding operation. In addition, the welding wire of MIG welding is thin, and it is easy to reach the root of the groove. The short existence time of the molten pool during welding can also avoid the phenomenon of molten pool collapse, which can effectively avoid the depression of the upward welding part of argon arc welding bottom welding, and also It can significantly improve the construction efficiency, and at the same time, the heat-affected zone of MIG welding is narrow, the cooling speed of the weld seam is fast, and the deformation of the weldment is small.

目前熔化极MIG焊工艺在国内外石油、天然气管道中已经开始大量运用,但从焊机本身的成本投入较大,一台专业的熔化极MIG焊焊机最低价格在5万以上,有些设备半自动焊设备一台高达几十万,而且设备比一般的熔化极设备复杂,对于一般行业施工成本投入和利润回报完全不成正比,而且对于施工场地比较复杂的地方该设备的使用还受到了局限。At present, the melting electrode MIG welding process has been widely used in oil and natural gas pipelines at home and abroad, but the cost of the welding machine itself is relatively large. The minimum price of a professional melting electrode MIG welding machine is more than 50,000 yuan, and some equipment is semi-automatic. One piece of welding equipment is worth hundreds of thousands, and the equipment is more complicated than ordinary melting electrode equipment. It is not directly proportional to the construction cost and profit return of general industries, and the use of this equipment is also limited in places where the construction site is relatively complicated.

发明内容Contents of the invention

本发明所要解决的技术问题是:提供一种熔化极MIG焊在管道焊接中的打底方法,采用普通的半自动熔化极MAG焊接设备来实现MIG焊的效果,以减少施工成本。The technical problem to be solved by the present invention is to provide a bottoming method for MIG welding in pipeline welding, which uses ordinary semi-automatic MIG welding equipment to achieve the effect of MIG welding, so as to reduce construction costs.

为解决上述技术问题本发明所采用的技术方案是:熔化极MIG焊在管道焊接中的打底方法,焊接时,两根待焊接的管在对接端面分别设置焊接坡口,并呈相对布置以形成V型坡口,V型坡口的根部间隙为3mm~5mm,单边坡口角度为30°~35°,打底焊接的焊机采用半自动熔化极MAG焊接设备,保护气体采用氩气和二氧化碳的混合气体,按照体积百分比计算,氩气占比为95%,二氧化碳占比为5%。In order to solve the above-mentioned technical problems, the technical solution adopted by the present invention is: the bottoming method of molten electrode MIG welding in pipeline welding. During welding, two pipes to be welded are respectively provided with welding grooves on the butt joint end faces, and are arranged in opposite directions so that Form a V-shaped groove, the root gap of the V-shaped groove is 3mm~5mm, and the angle of the single side groove is 30°~35°. The welding machine for bottom welding adopts semi-automatic melting electrode MAG welding equipment, and the shielding gas adopts argon and The mixed gas of carbon dioxide is calculated according to the volume percentage, the proportion of argon is 95%, and the proportion of carbon dioxide is 5%.

进一步的是:焊接管道处于水平固定位时,在焊缝的圆周方向上,将最低点标记为M,最高点标记为N,在直线MN的一侧焊缝上取一点标记为P,在直线MN的另一侧焊缝上取一点标记为Q,弧线MP的圆心角标记为a,a的取值为55°~65°,弧线MQ的圆心角标记为b,b的取值为55°~65°;Further: when the welded pipe is in the horizontal fixed position, in the circumferential direction of the weld, mark the lowest point as M, the highest point as N, take a point on the weld on one side of the straight line MN and mark it as P, and mark it on the straight line MN A point on the weld on the other side of MN is marked as Q, the central angle of arc MP is marked as a, the value of a is 55°~65°, the central angle of arc MQ is marked as b, and the value of b is 55°~65°;

打底焊接时,以直线MN作为分界线将焊缝分两半进行焊接,焊接时均以M点为起点;焊接电流为150A~180A,电压为14V~17V。When rooting welding, use the straight line MN as the dividing line to divide the weld into two halves for welding, and start from point M when welding; the welding current is 150A~180A, and the voltage is 14V~17V.

在M点至P点范围内的焊缝、M点至Q点范围内的焊缝,均采用焊枪前倾法焊接,焊枪与管皮的夹角为100°~105°,焊接方式为一点送丝,每次引弧在焊缝中间,观察熔池与两侧坡口熔合上立即熄弧,送丝位置在管皮根部;The welding seam within the range of point M to point P, and the welding seam within the range of point M to point Q are all welded by the forward tilting method of the welding torch. Each time the arc is struck in the middle of the weld, the arc is immediately extinguished after observing the fusion between the molten pool and the grooves on both sides, and the wire feeding position is at the root of the pipe skin;

在P点至N点范围内的焊缝、Q点至N点范围内的焊缝,均采用焊枪后倾法焊接,焊枪与管皮的夹角为80°~90°,焊接方式采用两侧引弧和两侧熄弧的方法,在管皮坡口一次引燃电弧立即向另一次坡口摆动,观察另一侧坡口熔合好立即熄弧,然后在熄弧处引燃电弧向另一侧坡口摆动熔合良好后熄弧,重复这样的动作直至完成整个焊缝的打底焊接。The welding seam between point P and point N, and the welding seam between point Q and point N are all welded by the backward tilting method of the welding torch. The method of arc ignition and arc extinguishing on both sides, the arc is ignited at the groove of the tube skin once and immediately swings to the other groove, and the arc is extinguished immediately after observing that the groove on the other side is fused, and then the arc is ignited at the arc extinguishing place and moves to the other groove. After the side groove swings and fuses well, the arc is extinguished, and this action is repeated until the bottoming welding of the entire weld seam is completed.

进一步的是:当管的外径Φ>400mm时,将焊缝分为M点至P点、M点至Q点、P点至N点、Q点至N点四段进行打底焊接。Further: when the outer diameter of the pipe is Φ>400mm, the weld is divided into four sections from point M to point P, from point M to point Q, from point P to point N, and from point Q to point N for backing welding.

进一步的是:焊接管道处于竖直固定位时,打底焊接的焊接电流为120A~130A,电压为13V~14V;引弧位置在靠近上坡口边缘,从上至下以斜圆圈的运枪方式焊接,运枪轨迹最终形成一个螺旋形;当管皮厚度>16mm时则采用连弧焊接,若管皮厚度≤16mm时则采用断弧焊接,断弧焊接每绕完一个斜圆圈即熄弧,再从熄弧位置引燃电弧又做下一个斜圆圈运作,这样依次完成打底焊道的焊接。Further, when the welding pipe is in the vertical fixed position, the welding current for bottom welding is 120A~130A, and the voltage is 13V~14V; When the thickness of the tube skin is more than 16mm, continuous arc welding is adopted, and when the thickness of the tube skin is less than or equal to 16mm, arc-breaking welding is used, and the arc is extinguished every time an oblique circle is completed. , and then ignite the arc from the arc extinguishing position and do the next oblique circle operation, so that the welding of the bottom bead is completed in turn.

进一步的是:打底焊接前,在焊缝处先进行定位焊接,定位焊缝长度为20mm~30mm,定位焊缝两端用角向砂轮机修磨出缓坡。A further step is: before bottoming welding, positioning welding is carried out at the welding seam, the length of the positioning welding seam is 20 mm to 30 mm, and the two ends of the positioning welding seam are ground with an angle grinder to form a gentle slope.

本发明的有益效果是:经实践表明,本发明的焊缝质量能满足使用性能。本发明采用适当的焊接方法配合有效的操作手法,采用普通的半自动熔化极MAG焊接设备即可实现MIG焊的效果,既解决了焊接质量问题,减小焊件的变形和应力,同时提高了焊接生产效率,不仅缩短了工期也节约了施工成本。本发明尤其适用于施工环境复杂,施工场地受限的部位,能达到钨极氩弧焊的施工要求,也能避免钨极氩弧焊焊接大直径管道时,在仰焊部位出现内凹的现象,适合所有冶金、建筑行业以及私营企业在大直径管道焊接中运用,有利于提高探伤合格率和施工效率,缩减人工成本。The beneficial effects of the present invention are: the practice shows that the quality of the welding seam of the present invention can meet the service performance. The present invention adopts appropriate welding methods and effective operation methods, and the effect of MIG welding can be realized by using ordinary semi-automatic melting electrode MAG welding equipment, which not only solves the welding quality problem, reduces the deformation and stress of the weldment, but also improves the welding efficiency. Production efficiency not only shortens the construction period but also saves construction costs. The invention is especially suitable for the complex construction environment and limited construction site, can meet the construction requirements of argon tungsten arc welding, and can also avoid the phenomenon of indentation in the overhead welding position when argon tungsten arc welding welds large-diameter pipes It is suitable for all metallurgical, construction industries and private enterprises to use in the welding of large-diameter pipes, which is conducive to improving the pass rate of flaw detection and construction efficiency, and reducing labor costs.

附图说明Description of drawings

图1为现有技术中的采用内填丝方式焊接时的结构示意图;Fig. 1 is a schematic structural view of welding in the prior art when using an inner wire filling method;

图2为现有技术中的采用外填丝方式焊接时的结构示意图;Fig. 2 is a structural schematic diagram when welding with external wire filling in the prior art;

图3为现有技术中的焊缝仰焊部位内凹缺陷的结构示意图;Fig. 3 is a structural schematic diagram of a concave defect in an overhead welding part of a weld seam in the prior art;

图4为本发明中的分段焊接结构示意图;Fig. 4 is the segmented welding structure schematic diagram among the present invention;

图5为本发明中的焊枪角度变化的结构示意图;Fig. 5 is the structural representation of the welding torch angle change among the present invention;

图6本发明中采用一点送丝的焊接方式示意图;Fig. 6 adopts the schematic diagram of the welding method of one-point wire feeding in the present invention;

图7本发明中采用两侧引弧和两侧熄弧的焊接方式示意图;Fig. 7 is a schematic diagram of the welding method adopting arc ignition on both sides and arc extinguishing on both sides in the present invention;

图8为本发明中斜圆圈运枪方式的示意图。Fig. 8 is a schematic diagram of the method of transporting the gun in an oblique circle in the present invention.

具体实施方式Detailed ways

下面结合附图及实施例对本发明作进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

熔化极MIG焊在管道焊接中的打底方法,焊接时,两根待焊接的管在对接端面分别设置焊接坡口,并呈相对布置以形成V型坡口,V型坡口的根部间隙为3mm~5mm,单边坡口角度为30°~35°,打底焊接的焊机采用半自动熔化极MAG焊接设备,保护气体采用氩气和二氧化碳的混合气体,按照体积百分比计算,氩气占比为95%,二氧化碳占比为5%。The bottoming method of molten electrode MIG welding in pipeline welding. During welding, two pipes to be welded are respectively provided with welding grooves on the butt end faces, and are arranged oppositely to form a V-shaped groove. The root gap of the V-shaped groove is 3mm to 5mm, single-side bevel angle is 30° to 35°, the welding machine for bottom welding adopts semi-automatic melting electrode MAG welding equipment, and the shielding gas is a mixture of argon and carbon dioxide. Calculated according to volume percentage, the proportion of argon 95% and 5% carbon dioxide.

打底焊接前,在焊缝处先进行定位焊接,定位焊缝长度为20mm~30mm,定位焊缝两端用角向砂轮机修磨出缓坡以保证接头质量。焊接前还应将焊缝坡口内外两侧10mm~20mm范围内的铁锈油污清理干净,焊丝采用ER49-1Ф1.2mm的焊丝,进行定位焊时应和正式焊缝一致。Before bottoming welding, position welding is carried out at the weld. The length of the position weld is 20mm~30mm. The two ends of the position weld are ground with an angle grinder to make a gentle slope to ensure the quality of the joint. Before welding, the rust and oil stains within the range of 10mm to 20mm on both sides of the weld groove should be cleaned up. The welding wire is ER49-1Ф1.2mm welding wire, which should be consistent with the formal weld when performing tack welding.

如图4至图7所示,焊接管道处于水平固定位时,在焊缝的圆周方向上,将最低点标记为M,最高点标记为N,在直线MN的一侧焊缝上取一点标记为P,在直线MN的另一侧焊缝上取一点标记为Q,弧线MP的圆心角标记为a,a的取值为55°~65°,弧线MQ的圆心角标记为b,b的取值为55°~65°;a和b的取值通常选取相同值;As shown in Figure 4 to Figure 7, when the welded pipe is in the horizontal fixed position, mark the lowest point as M and the highest point as N in the circumferential direction of the weld, and mark a point on the weld on one side of the straight line MN P, take a point on the weld on the other side of the straight line MN and mark it as Q, mark the central angle of the arc MP as a, the value of a is 55°~65°, mark the central angle of the arc MQ as b, The value of b is 55°~65°; the values of a and b are usually the same value;

打底焊接时,以直线MN作为分界线将焊缝分两半进行焊接,焊接时均以M点为起点;焊接电流为150A~180A,电压为14V~17V。When rooting welding, use the straight line MN as the dividing line to divide the weld into two halves for welding, and start from point M when welding; the welding current is 150A~180A, and the voltage is 14V~17V.

在M点至P点范围内的焊缝、M点至Q点范围内的焊缝,均采用焊枪前倾法焊接,焊枪与管皮的夹角为100°~105°,焊接方式为一点送丝,每次引弧在焊缝中间,观察熔池与两侧坡口熔合上立即熄弧,送丝位置在管皮根部;这里送丝位置不能只送到坡口中间,否则由于熔池的重力作用,易出现坡口内侧焊缝过高而焊缝背面凹陷过深现象。The welding seam within the range of point M to point P, and the welding seam within the range of point M to point Q are all welded by the forward tilting method of the welding torch. Each time the arc is struck in the middle of the weld, the arc is extinguished immediately after observing the fusion between the molten pool and the grooves on both sides, and the wire feeding position is at the root of the tube skin; here, the wire feeding position cannot only be sent to the middle of the groove, otherwise due to Due to the effect of gravity, it is easy to have the phenomenon that the weld seam on the inner side of the groove is too high and the back of the weld seam is too deep.

在P点至N点范围内的焊缝、Q点至N点范围内的焊缝,均采用焊枪后倾法焊接,焊枪与管皮的夹角为80°~90°,焊接方式采用两侧引弧和两侧熄弧的方法,在管皮坡口一次引燃电弧立即向另一次坡口摆动,观察另一侧坡口熔合好立即熄弧,然后在熄弧处引燃电弧向另一侧坡口摆动熔合良好后熄弧,重复这样的动作直至完成整个焊缝的打底焊接,这样可避免内部焊瘤现象。The welding seam between point P and point N, and the welding seam between point Q and point N are all welded by the backward tilting method of the welding torch. The method of arc ignition and arc extinguishing on both sides, the arc is ignited at the groove of the tube skin once and immediately swings to the other groove, and the arc is extinguished immediately after observing that the groove on the other side is fused, and then the arc is ignited at the arc extinguishing place and moves to the other groove. After the side groove swings and fuses well, the arc is extinguished. Repeat this action until the bottom welding of the entire weld seam is completed, so as to avoid the phenomenon of internal welding flash.

此外,为进一步保证焊接质量,当管径较大时,还可将焊缝分为多段焊接,本发明优选采用的实施方式为,当管的外径Φ>400mm时,将焊缝分为M点至P点、M点至Q点、P点至N点、Q点至N点四段进行打底焊接。In addition, in order to further ensure the welding quality, when the pipe diameter is large, the weld seam can also be divided into multi-stage welding. The four sections from point to point P, from point M to point Q, from point P to point N, and from point Q to point N are used for backing welding.

焊接管道处于竖直固定位时,打底焊接的焊接电流为120A~130A,电压为13V~14V;引弧位置在靠近上坡口边缘,从上至下以斜圆圈的运枪方式焊接,如图8所示,运枪轨迹最终形成一个螺旋形;当管皮厚度>16mm时则采用连弧焊接,若管皮厚度≤16mm时则采用断弧焊接,断弧焊接每绕完一个斜圆圈即熄弧,再从熄弧位置引燃电弧又做下一个斜圆圈运作,这样依次完成打底焊道的焊接。When the welding pipe is in the vertical fixed position, the welding current of the bottom welding is 120A~130A, and the voltage is 13V~14V; As shown in Figure 8, the trajectory of the gun movement finally forms a spiral; when the thickness of the tube skin is greater than 16mm, continuous arc welding is used, and when the thickness of the tube skin is ≤16mm, interrupted arc welding is used. The arc is extinguished, and then the arc is ignited from the arc extinguishing position and the next oblique circle operation is performed, so that the welding of the bottom bead is completed in sequence.

打底焊道焊接完毕后,为了避免层间出现夹渣和未熔合现象,应将接头和局部中间凸起两侧有夹槽的部位采用角向砂轮机修磨平整后再进行下一道工序的焊接,层间和盖面层的焊接可根据实际情况选择手工焊和熔化极气体保护焊的方法。After the bottoming bead is welded, in order to avoid slag inclusion and incomplete fusion between layers, the joint and the parts with clamping grooves on both sides of the local middle protrusion should be smoothed with an angle grinder before welding in the next process , The welding of the interlayer and the cover layer can choose manual welding and MIG welding according to the actual situation.

实施例一:Embodiment one:

焊接母材:管的材料为20,管的外径Φ为273mm,壁厚为8mm;两管之间为水平固定位焊接。Welding base material: the material of the pipe is 20, the outer diameter of the pipe is 273mm, and the wall thickness is 8mm; the horizontal fixed position welding is used between the two pipes.

焊接设备及材料:焊机采用常规用的NBC-350二氧化碳气体保护焊机,保护气体采用氩气和二氧化碳的混合气体,按照体积百分比计算,氩气占比为95%,二氧化碳占比为5%;焊丝采用ER49-1Ф1.2mm的焊丝。Welding equipment and materials: The welding machine adopts conventional NBC-350 carbon dioxide gas shielded welding machine, and the shielding gas adopts a mixture of argon and carbon dioxide. Calculated according to the volume percentage, the proportion of argon is 95%, and that of carbon dioxide is 5%. ; Welding wire adopts ER49-1Ф1.2mm welding wire.

坡口设置:采用V型坡口,根部间隙为4mm,单边坡口角度为30°。Groove setting: adopt V-shaped groove, the root gap is 4mm, and the single-side groove angle is 30°.

焊接设备的工作参数:焊接电流为150A~180A,电压为14V~17V。Working parameters of welding equipment: welding current is 150A~180A, voltage is 14V~17V.

焊接操作:在焊缝的圆周方向上,将最低点标记为M,最高点标记为N,在直线MN的一侧焊缝上取一点标记为P,在直线MN的另一侧焊缝上取一点标记为Q,弧线MP的圆心角标记为a,a的取值为60°,弧线MQ的圆心角标记为b,b的取值为60°;Welding operation: In the circumferential direction of the weld, mark the lowest point as M and the highest point as N, take a point on the weld on one side of the straight line MN and mark it as P, and take a point on the weld on the other side of the straight line MN One point is marked as Q, the central angle of arc MP is marked as a, the value of a is 60°, the central angle of arc MQ is marked as b, and the value of b is 60°;

打底焊接时,以直线MN作为分界线将焊缝分两半进行焊接,焊接时均以M点为起点;When bottoming welding, use the straight line MN as the dividing line to divide the welding seam into two halves for welding, and start from point M when welding;

在M点至P点范围内的焊缝、M点至Q点范围内的焊缝,均采用焊枪前倾法焊接,焊枪与管皮的夹角为100°~105°,焊接方式为一点送丝,每次引弧在焊缝中间,观察熔池与两侧坡口熔合上立即熄弧,送丝位置在管皮根部。The welding seam within the range of point M to point P, and the welding seam within the range of point M to point Q are all welded by the forward tilting method of the welding torch. Each time the arc is struck in the middle of the weld, the arc is immediately extinguished after observing the fusion between the molten pool and the grooves on both sides, and the wire feeding position is at the root of the pipe skin.

在P点至N点范围内的焊缝、Q点至N点范围内的焊缝,均采用焊枪后倾法焊接,焊枪与管皮的夹角为80°~90°,焊接方式采用两侧引弧和两侧熄弧的方法,在管皮坡口一次引燃电弧立即向另一次坡口摆动,观察另一侧坡口熔合好立即熄弧,然后在熄弧处引燃电弧向另一侧坡口摆动熔合良好后熄弧,重复这样的动作直至完成整个焊缝的打底焊接。The welding seam between point P and point N, and the welding seam between point Q and point N are all welded by the backward tilting method of the welding torch. The method of arc ignition and arc extinguishing on both sides, the arc is ignited at the groove of the tube skin once and immediately swings to the other groove, and the arc is extinguished immediately after observing that the groove on the other side is fused, and then the arc is ignited at the arc extinguishing place and moves to the other groove. After the side groove swings and fuses well, the arc is extinguished, and this action is repeated until the bottoming welding of the entire weld seam is completed.

焊接质量检查:外面采用目测无检查,无气孔、夹渣、未熔合、深度大于0.5mm的咬边为合格,采用射线探伤进行管道焊口的内部检查,所焊焊口均能达到二级以上射线探伤质量。Welding quality inspection: no visual inspection is adopted on the outside, no porosity, slag inclusion, unfused, and undercuts with a depth greater than 0.5mm are qualified, and radiographic flaw detection is used for internal inspection of pipe welds, and all welds can reach level two or above Radiographic quality.

实施例二:Embodiment two:

焊接母材:管的材料为20,管的外径Φ为600mm,壁厚为6mm;两管之间为水平固定位焊接。Welding base material: the material of the pipe is 20, the outer diameter of the pipe is 600mm, and the wall thickness is 6mm; the horizontal fixed position welding is used between the two pipes.

焊接设备及材料:焊机采用常规用的NBC-350二氧化碳气体保护焊机,保护气体采用氩气和二氧化碳的混合气体,按照体积百分比计算,氩气占比为95%,二氧化碳占比为5%;焊丝采用ER49-1Ф1.2mm的焊丝。Welding equipment and materials: The welding machine adopts conventional NBC-350 carbon dioxide gas shielded welding machine, and the shielding gas adopts a mixture of argon and carbon dioxide. Calculated according to the volume percentage, the proportion of argon is 95%, and that of carbon dioxide is 5%. ; Welding wire adopts ER49-1Ф1.2mm welding wire.

坡口设置:采用V型坡口,根部间隙为4mm,单边坡口角度为35°。Bevel setting: V-shaped bevel is adopted, the root gap is 4mm, and the bevel angle on one side is 35°.

焊接设备的工作参数:焊接电流为150A~180A,电压为14V~17V。Working parameters of welding equipment: welding current is 150A~180A, voltage is 14V~17V.

焊接操作:在焊缝的圆周方向上,将最低点标记为M,最高点标记为N,在直线MN的一侧焊缝上取一点标记为P,在直线MN的另一侧焊缝上取一点标记为Q,弧线MP的圆心角标记为a,a的取值为60°,弧线MQ的圆心角标记为b,b的取值为60°;Welding operation: In the circumferential direction of the weld, mark the lowest point as M and the highest point as N, take a point on the weld on one side of the straight line MN and mark it as P, and take a point on the weld on the other side of the straight line MN One point is marked as Q, the central angle of arc MP is marked as a, the value of a is 60°, the central angle of arc MQ is marked as b, and the value of b is 60°;

将焊缝分为M点至P点、M点至Q点、P点至N点、Q点至N点四段进行打底焊接,焊接时以M点为初始起点;Divide the weld seam into four sections from point M to point P, from point M to point Q, from point P to point N, and from point Q to point N for backing welding, with point M as the initial starting point for welding;

在M点至P点范围内的焊缝、M点至Q点范围内的焊缝,均采用焊枪前倾法焊接,焊枪与管皮的夹角为100°~105°,焊接方式为一点送丝,每次引弧在焊缝中间,观察熔池与两侧坡口熔合上立即熄弧,送丝位置在管皮根部。The welding seam within the range of point M to point P, and the welding seam within the range of point M to point Q are all welded by the forward tilting method of the welding torch. Each time the arc is struck in the middle of the weld, the arc is immediately extinguished after observing the fusion between the molten pool and the grooves on both sides, and the wire feeding position is at the root of the pipe skin.

在P点至N点范围内的焊缝、Q点至N点范围内的焊缝,均采用焊枪后倾法焊接,焊枪与管皮的夹角为80°~90°,焊接方式采用两侧引弧和两侧熄弧的方法,在管皮坡口一次引燃电弧立即向另一次坡口摆动,观察另一侧坡口熔合好立即熄弧,然后在熄弧处引燃电弧向另一侧坡口摆动熔合良好后熄弧,重复这样的动作直至完成整个焊缝的打底焊接。The welding seam between point P and point N, and the welding seam between point Q and point N are all welded by the backward tilting method of the welding torch. The method of arc ignition and arc extinguishing on both sides is to ignite the arc at the groove of the tube once and swing it to the other groove immediately, observe that the groove on the other side is fused and extinguish the arc immediately, and then ignite the arc at the arc extinguishing place and move to the other groove. After the side groove swings and fuses well, the arc is extinguished, and this action is repeated until the bottoming welding of the entire weld seam is completed.

焊接质量检查:外面采用目测无检查,无气孔、夹渣、未熔合、深度大于0.5mm的咬边为合格,采用超声波进行管道的内部质量检测,焊接质量均能达到超声波一级。Welding quality inspection: visual inspection is adopted on the outside, and undercuts with no pores, slag inclusions, unfused, and depths greater than 0.5mm are qualified. Ultrasonic is used to inspect the internal quality of the pipeline, and the welding quality can reach the ultrasonic level.

实施例三:Embodiment three:

焊接母材:管的材料为20,管的外径Φ为325mm,壁厚为6mm;两管之间为竖直固定位焊接。Welding base material: the material of the pipe is 20, the outer diameter of the pipe is 325mm, and the wall thickness is 6mm; the vertical fixed position welding is used between the two pipes.

焊接设备及材料:焊机采用常规用的NBC-350二氧化碳气体保护焊机,保护气体采用氩气和二氧化碳的混合气体,按照体积百分比计算,氩气占比为95%,二氧化碳占比为5%;焊丝采用ER49-1Ф1.2mm的焊丝。Welding equipment and materials: The welding machine adopts conventional NBC-350 carbon dioxide gas shielded welding machine, and the shielding gas adopts a mixture of argon and carbon dioxide. Calculated according to the volume percentage, the proportion of argon is 95%, and that of carbon dioxide is 5%. ; Welding wire adopts ER49-1Ф1.2mm welding wire.

坡口设置:采用V型坡口,根部间隙为4mm,单边坡口角度为30°。Groove setting: adopt V-shaped groove, the root gap is 4mm, and the single-side groove angle is 30°.

焊接设备的工作参数:焊接电流为120A~130A,电压为13V~14V。Working parameters of welding equipment: welding current is 120A~130A, voltage is 13V~14V.

焊接操作:引弧位置在靠近上坡口边缘,从上至下以斜圆圈的运枪方式焊接,如图8所示,运枪轨迹最终形成一个螺旋形;采用断弧焊接。Welding operation: The arc starting position is close to the edge of the upper bevel, and welding is carried out in an inclined circle from top to bottom. As shown in Figure 8, the trajectory of the torch finally forms a spiral; arc-breaking welding is adopted.

焊接质量检查:外面采用目测无检查,无气孔、夹渣、未熔合、深度大于0.5mm的咬边为合格,采用射线探伤进行管道焊口的内部检查,所焊焊口均能达到二级以上射线探伤质量。Welding quality inspection: no visual inspection is adopted on the outside, no porosity, slag inclusion, unfused, and undercuts with a depth greater than 0.5mm are qualified, and radiographic flaw detection is used for internal inspection of pipe welds, and all welds can reach level two or above Radiographic quality.

Claims (5)

1. consumable electrode MIG is welded in the method for priming in pipeline welding, when welding, two pipes to be welded are set respectively in docking end face Welding groove is set, and in positioned opposite to form double V-groove, it is characterised in that:The root gap of double V-groove is 3mm~5mm, Angle of bevel is 30 °~35 °, and the welding machine of bottom welding uses semi-automatic consumable electrode MAG welding equipment, and protective gas uses The mixed gas of argon gas and carbon dioxide, calculates according to percent by volume, and argon gas accounting is 95%, and carbon dioxide accounting is 5%.
2. consumable electrode MIG as described in claim 1 is welded in the method for priming in pipeline welding, it is characterised in that:Welded pipe line In horizontal busy hour fixed, on the circumferencial direction of weld seam, minimum point is labeled as M, highest point is labeled as N, straight line MN's It takes a little labeled as P, is taken on another side weld of straight line MN a little labeled as Q, the center of circle footmark of camber line MP on one side weld It is denoted as a, the value of a is 55 °~65 °, and the central angle of camber line MQ is labeled as b, and the value of b is 55 °~65 °;
When bottom welding, two halves are divided to weld weld seam using straight line MN as line of demarcation, using M point as starting point when welding;Weldering Connecing electric current is 150A~180A, and voltage is 14V~17V.
In the weld seam in M point to P point range, the weld seam in M point to Q point range, it is all made of welding gun and leans forward method welding, welding gun and pipe The angle of skin is 100 °~105 °, and welding manner is some wire feeds, and each striking is among weld seam, observation molten bath and two sides groove Blow-out immediately in fusion, wire feed position is in pipe dermatome portion;
In the weld seam in P point to N point range, the weld seam in Q point to N point range, it is all made of the welding of welding gun hypsokinesis method, welding gun and pipe The angle of skin is 80 °~90 °, and the method that welding manner uses two sides striking and two sides blow-out is once ignited electricity in pipe skin groove Arc is swung to another secondary groove immediately, observes the fused blow-out immediately of other side groove, and the electric arc that then ignites at blow-out is to another Side groove swings blow-out after fusion well, repeats bottom welding of such movement up to completing entire weld seam.
3. consumable electrode MIG as claimed in claim 2 is welded in the method for priming in pipeline welding, it is characterised in that:When outside pipe Diameter Φ>When 400mm, M point is divided the weld into P point, M point to Q point, P point to N point, Q point to four sections of progress bottom weldings of N point.
4. consumable electrode MIG as described in claim 1 is welded in the method for priming in pipeline welding, it is characterised in that:Welded pipe line In vertical busy hour fixed, the welding current of bottom welding is 120A~130A, and voltage is 13V~14V;Striking position is close Upper bevelled edge is welded in a manner of the fortune rifle of oblique circle from top to bottom, and fortune rifle track ultimately forms a spiral shape;When pipe skin depth Degree>When 16mm then using even arc welding, when pipe skin thickness≤16mm if use current interruption to weld, current interruption welding often around complete one tiltedly Circle, that is, blow-out, then next oblique circle running is done again from the blow-out position electric arc that ignites, it is sequentially completed the weldering of backing run in this way It connects.
5. the consumable electrode MIG as described in any one of Claims 1-4 is welded in the method for priming in pipeline welding, feature It is:Before bottom welding, positioning welding is first carried out in commissure, tack weld length is 20mm~30mm, tack weld both ends Go out gentle slope with electric angle grinder reconditioning.
CN201810791200.1A 2018-07-18 2018-07-18 The bottoming method of molten electrode MIG welding in pipeline welding Active CN108856989B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810791200.1A CN108856989B (en) 2018-07-18 2018-07-18 The bottoming method of molten electrode MIG welding in pipeline welding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810791200.1A CN108856989B (en) 2018-07-18 2018-07-18 The bottoming method of molten electrode MIG welding in pipeline welding

Publications (2)

Publication Number Publication Date
CN108856989A true CN108856989A (en) 2018-11-23
CN108856989B CN108856989B (en) 2020-11-10

Family

ID=64303015

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810791200.1A Active CN108856989B (en) 2018-07-18 2018-07-18 The bottoming method of molten electrode MIG welding in pipeline welding

Country Status (1)

Country Link
CN (1) CN108856989B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110102861A (en) * 2019-05-08 2019-08-09 中石化第十建设有限公司 A kind of metal transfer of MIG/MAG accurately controls one side welding with back formation method
CN110640274A (en) * 2019-09-27 2020-01-03 中车长江车辆有限公司 MAG inverted butt joint single-side welding and double-side forming welding method
CN110732747A (en) * 2019-09-16 2020-01-31 广州文冲船厂有限责任公司 Welding method
CN112372107A (en) * 2020-11-06 2021-02-19 攀钢集团工程技术有限公司 Application method of consumable electrode pulse TG5 inverter welding machine in pipeline welding

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110102861A (en) * 2019-05-08 2019-08-09 中石化第十建设有限公司 A kind of metal transfer of MIG/MAG accurately controls one side welding with back formation method
CN110732747A (en) * 2019-09-16 2020-01-31 广州文冲船厂有限责任公司 Welding method
CN110640274A (en) * 2019-09-27 2020-01-03 中车长江车辆有限公司 MAG inverted butt joint single-side welding and double-side forming welding method
CN110640274B (en) * 2019-09-27 2022-03-22 中车株洲车辆有限公司 MAG inverted butt joint single-side welding and double-side forming welding method
CN112372107A (en) * 2020-11-06 2021-02-19 攀钢集团工程技术有限公司 Application method of consumable electrode pulse TG5 inverter welding machine in pipeline welding

Also Published As

Publication number Publication date
CN108856989B (en) 2020-11-10

Similar Documents

Publication Publication Date Title
CN102528237B (en) Welding process for carbon steel process pipeline
CN110899904B (en) All-position welding method for small-caliber pipe
CN104014909B (en) Method for welding pipeline
CN108856989B (en) The bottoming method of molten electrode MIG welding in pipeline welding
US9808876B2 (en) Stainless steel weldment and pad combined welding method
CN103801796B (en) The all-position automatic soldering method of pipeline girth weld
CN102009251B (en) Full-position welding method for pipeline by full-automatic external welding machine
CN101417364B (en) Semi-automatic welding method of metal flux cored filler rod conduit root
CN106695079B (en) The welding method of composite bimetal pipe
CN106903399B (en) The high strength pipe semiautomatic welding method of X80 or more grade of steel
CN106270933A (en) A kind of complex welding method of large aperture pipe end built-up welding corrosion resistant alloy composite steel tube
CN103212913A (en) Fitting up and welding method of major-diameter thin-wall stainless steel bellows
CN102744499B (en) Double-side double-arc welding process for root layer of pipeline
CN104339123A (en) Bimetal composite pipe welding method
CN108856965B (en) Method for welding inclined tube plate by using MAG welding
CN108080773A (en) All-position ultra-narrow gap high-frequency hot wire TIG welding method for composite pipe
CN105583503A (en) Carbon steel tube welding process
CN106862787A (en) The process of the motor-driven welder nickel-base alloy tube panel of membrane wall
CN108890092B (en) Method of single-sided welding and double-sided forming of molten electrode MAG welding tube sheet
CN103273177B (en) A kind of double T IG welding system for slab part and welding method thereof
CN105364272A (en) Carbon steel tube welding process
CN108015394A (en) A kind of stainless steel tube welding method
CN101323041B (en) Narrow-gap pulse melting extreme gas shielded automatic welding method for petroleum kelly
CN105195866B (en) A kind of full-automatic root bead method of the pipe end of composite bimetal pipe
CN106825877A (en) stainless steel square tube welding process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant