CN108360562A - Pipe gallery - Google Patents
Pipe gallery Download PDFInfo
- Publication number
- CN108360562A CN108360562A CN201810178151.4A CN201810178151A CN108360562A CN 108360562 A CN108360562 A CN 108360562A CN 201810178151 A CN201810178151 A CN 201810178151A CN 108360562 A CN108360562 A CN 108360562A
- Authority
- CN
- China
- Prior art keywords
- pipe gallery
- liquid level
- sewage
- sump
- point
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000010865 sewage Substances 0.000 claims abstract description 73
- 238000004891 communication Methods 0.000 claims abstract description 15
- 238000007689 inspection Methods 0.000 claims abstract description 13
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 73
- 239000007788 liquid Substances 0.000 claims description 48
- 238000009434 installation Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 6
- 238000001514 detection method Methods 0.000 abstract description 3
- 108010066057 cabin-1 Proteins 0.000 description 3
- 238000007726 management method Methods 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 2
- 108010066114 cabin-2 Proteins 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000008054 signal transmission Effects 0.000 description 1
- 239000000779 smoke Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000001502 supplementing effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/10—Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01F—MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
- G01F23/00—Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Water Supply & Treatment (AREA)
- Environmental & Geological Engineering (AREA)
- General Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Sewage (AREA)
- Pipeline Systems (AREA)
Abstract
本发明公开了一种综合管廊,包括多个舱室,多个舱室之间沿着该综合管廊的宽度方向并排设置,在各个所述舱室内分别设有集水坑,相邻的所述舱室的集水坑之间开设有连通孔,各个舱室的集水坑经相应的所述连通孔彼此连通。该综合管廊通过在各个舱室内设置集水坑,并将集水坑彼此连通,各个集水坑之间形成一个连通的污水收集坑,便于污水的统一收集,增大了集水坑的有效容积,以及有效利用率。统一便于排污泵、检测单元的统一布设和控制,也便于各种管线的布管,便于统一管控,在大大降低综合管廊建造成本的同时,减少了巡检人员的工作量。
The invention discloses a comprehensive pipe gallery, which includes a plurality of cabins, and the multiple cabins are arranged side by side along the width direction of the comprehensive pipe gallery, and sump pits are respectively arranged in each of the cabins. Communication holes are opened between the sumps of the compartments, and the sumps of each compartment communicate with each other through the corresponding communication holes. The comprehensive pipe gallery sets up sumps in each cabin and connects the sumps to each other, forming a connected sewage collection pit between the sumps, which facilitates the unified collection of sewage and increases the effective use of the sumps. volume, and effective utilization. Unification facilitates the unified layout and control of sewage pumps and detection units, as well as the layout of various pipelines, and facilitates unified management and control. While greatly reducing the construction cost of the comprehensive pipe gallery, it also reduces the workload of inspection personnel.
Description
技术领域technical field
本发明涉及城市基础设施技术领域,尤其涉及一种综合管廊。The invention relates to the technical field of urban infrastructure, in particular to a comprehensive pipe corridor.
背景技术Background technique
所谓综合管廊,就是“地下城市管道综合走廊”,即在城市道路下面建造一个市政共用隧道,将电力、通讯、供排水、供热等各种市政工程管线集于一体,实行“统一规划、统一建设、统一管理”,以做到地下空间的综合利用和资源的共享。The so-called comprehensive pipe corridor is the "underground urban pipeline comprehensive corridor", that is, to build a municipal shared tunnel under the urban road, integrating various municipal engineering pipelines such as power, communication, water supply and drainage, and heating, and implementing "unified planning, Unified construction and unified management" to achieve comprehensive utilization of underground space and sharing of resources.
综合管廊设有专门的检修口、吊装口和监测系统,是保障城市运行的重要基础设施和“生命线”。综合管廊可以有效的避免道路反复开挖,集约化的利用地上、地下的空间资源,减少各种管道腐蚀,延长管线的使用寿命,并且管线增设、扩容比较方便。保障道路交通通畅,同时保证地下管线安全运营。The integrated pipe gallery is equipped with special inspection openings, hoisting openings and monitoring systems, which are important infrastructure and "lifelines" to ensure the operation of the city. The comprehensive pipe gallery can effectively avoid repeated excavation of roads, intensively use above-ground and underground space resources, reduce various pipeline corrosion, prolong the service life of pipelines, and it is more convenient to add and expand pipelines. Ensure smooth road traffic and ensure safe operation of underground pipelines.
目前综合管廊的集水坑技术中,综合管廊内的积水不能自排。需要设置集水坑。集水坑主要收集的水主要来源于管廊廊体的渗水、管道零星漏水、以及各种市政管道短时间内放空水及清扫地坪喷洒用水后的污水。每个综合管廊的每个舱体均设置一个集水坑,即综合管廊设置几个舱体,设计相同数量的集水坑,每个集水坑内均设置两台潜水排污泵。所有集水坑设置在每个管廊舱体防火分区内最低处或者防火分区内防火墙附近。综合管廊若干防火分区的管廊内设置大量的集水坑及潜水排污泵,潜水泵数量多达几十个或者上百个,给综合管廊整个系统的运行、维护增加难度。并且为保证管廊集水坑潜水排污泵泵启停次数不超过6次,单个集水坑容积设置较大,给土建施工造成较大困难,增加管廊投资。In the current sump technology of the comprehensive pipe gallery, the accumulated water in the comprehensive pipe gallery cannot be self-drained. A sump is required. The water collected by the sump mainly comes from the water seepage of the pipe gallery, the sporadic water leakage of the pipes, and the sewage after the water is emptied in a short period of time by various municipal pipes and the floor is cleaned and sprayed with water. Each cabin of each integrated utility gallery is equipped with a sump, that is, the integrated utility gallery is equipped with several cabins, and the same number of sumps is designed, and two submersible sewage pumps are installed in each sump. All sumps are set at the lowest point in the fire compartment of each pipe gallery cabin or near the firewall in the fire compartment. A large number of sumps and submersible sewage pumps are installed in the pipe corridors of several fire protection zones in the comprehensive pipe gallery. The number of submersible pumps is as many as dozens or hundreds, which makes the operation and maintenance of the entire system of the comprehensive pipe gallery more difficult. In addition, in order to ensure that the number of starts and stops of the submersible sewage pump in the sump of the pipe gallery does not exceed 6 times, the volume of a single sump is set to be large, which causes great difficulties in the civil construction and increases the investment in the pipe gallery.
发明内容Contents of the invention
有鉴如此,本发明提供一种在大大降低综合管廊建造成本的同时,减少了巡检人员的工作量的综合管廊,以解决现有技术中存在的问题。In view of this, the present invention provides a comprehensive utility gallery which greatly reduces the construction cost of the utility utility gallery and at the same time reduces the workload of inspection personnel, so as to solve the problems existing in the prior art.
根据本发明,提供一种综合管廊,包括多个舱室,多个舱室之间沿着该综合管廊的宽度方向并排设置,在各个所述舱室内分别设有集水坑,相邻的所述舱室的集水坑之间开设有连通孔,各个舱室的集水坑经相应的所述连通孔彼此连通。According to the present invention, a comprehensive pipe gallery is provided, which includes a plurality of cabins, and the multiple cabins are arranged side by side along the width direction of the comprehensive pipe gallery, and sump pits are respectively arranged in each of the cabins, and the adjacent ones Communication holes are opened between the sumps of the compartments, and the sumps of each compartment communicate with each other through the corresponding communication holes.
优选地,在所述多个舱室的其中一个舱室内的集水井中设有排污泵,用于排出所述多个舱室内的污水。Preferably, a sewage pump is provided in a sump in one of the plurality of compartments to discharge the sewage in the plurality of compartments.
优选地,所述管廊的外部设有室外排水检查井,所述室外排水检查井与所述排污泵连通。Preferably, an outdoor drainage inspection well is provided outside the pipe gallery, and the outdoor drainage inspection well communicates with the sewage pump.
优选地,还包括补水管道,所述补水管道的一端下伸至所述集水坑内,另一端与外部供水源连通。Preferably, it also includes a water supply pipeline, one end of the water supply pipeline extends down into the sump, and the other end communicates with an external water supply source.
优选地,所述补水管道上分别设有手动蝶阀和电动蝶阀,用于控制所述补水管道的通断。Preferably, the water supply pipeline is provided with a manual butterfly valve and an electric butterfly valve respectively for controlling the on-off of the water supply pipeline.
优选地,设有所述排污泵的积水坑内设有超声波液位计,所述超声波液位计设有多个报警连锁点。Preferably, an ultrasonic liquid level gauge is installed in the sump where the sewage pump is installed, and the ultrasonic liquid level gauge is provided with a plurality of alarm chain points.
优选地,所述排污泵的数目为两台。Preferably, the number of the sewage pumps is two.
优选地,所述报警连锁点自下而上依次包括:最低液位报警连锁点、水封最低液位连锁点、水封最高液位连锁点、排污泵自动停止运行连锁点、一台排污泵启动运行连锁点、两台排污泵同时启动运行连锁点、最高液位报警水位连锁点。Preferably, the alarm interlocking points sequentially include from bottom to top: the lowest liquid level alarm interlocking point, the lowest liquid level interlocking point of the water seal, the highest liquid level interlocking point of the water seal, the interlocking point for automatically stopping the operation of the sewage pump, and a sewage pump Start operation chain point, two sewage pumps start operation chain point at the same time, the highest liquid level alarm water level chain point.
优选地,所述水封最低液位连锁点的设置高度高度所述连通孔的设置高度。Preferably, the setting height of the lowest liquid level interlocking point of the water seal is higher than the setting height of the communication hole.
优选地,各个所述舱室的底部分别设有排水边沟,所述排水边沟沿着各自舱室的延伸方向设置,所述排水边沟与所述集水坑连通。Preferably, the bottom of each of the compartments is respectively provided with drainage gutters, the drainage gutters are arranged along the extension direction of the respective compartments, and the drainage gutters communicate with the sump.
本发明提供的综合管廊通过在各个舱室内设置集水坑,并将集水坑彼此连通,各个集水坑之间形成一个连通的污水收集坑,便于污水的统一收集,增大了集水坑的有效容积,以及有效利用率。统一便于排污泵、检测单元的统一布设和控制,也便于各种管线的布管,便于统一管控,在大大降低综合管廊建造成本的同时,减少了巡检人员的工作量。The comprehensive pipe gallery provided by the present invention sets sump pits in each cabin and connects the sump pits with each other to form a connected sewage collection pit between the sump pits, which facilitates the unified collection of sewage and increases the water collection capacity. The effective volume of the pit and the effective utilization rate. Unification facilitates the unified layout and control of sewage pumps and detection units, as well as the layout of various pipelines, and facilitates unified management and control. While greatly reducing the construction cost of the comprehensive pipe gallery, it also reduces the workload of inspection personnel.
附图说明Description of drawings
为了更清楚地说明本发明具体实施方式或现有技术中的技术方案,下面将对具体实施方式或现有技术描述中所需要使用的附图作简单地介绍。在所有附图中,类似的元件或部分一般由类似的附图标记标识。附图中,各元件或部分并不一定按照实际的比例绘制。In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following will briefly introduce the drawings that need to be used in the description of the specific embodiments or the prior art. Throughout the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, elements or parts are not necessarily drawn in actual scale.
图1示出了根据本发明实施例的综合管廊的俯视结构示意图。Fig. 1 shows a schematic top view of a utility tunnel according to an embodiment of the present invention.
图2示出了根据本发明实施例的综合管廊的纵向剖面图。Fig. 2 shows a longitudinal sectional view of a comprehensive utility gallery according to an embodiment of the present invention.
图3示出了根据本发明实施例的综合管廊的进水仓的管道系统图。Fig. 3 shows the piping system diagram of the water inlet chamber of the comprehensive utility gallery according to the embodiment of the present invention.
图中:综合舱1、强电力舱2、弱电力舱3、集水坑4、连通孔5、室外排水检查井6、排污管7、补水管道8、电动阀门91、手动阀门92排污泵10、电动蝶阀11、超声波液位计19、最低液位报警连锁点18、水封最低液位连锁点17、水封最高液位连锁点16、排污泵自动停止运行连锁点15、一台排污泵启动运行连锁点14、两台排污泵同时启动运行连锁点13、最高液位报警水位连锁点12。In the figure: comprehensive cabin 1, strong electric cabin 2, weak electric cabin 3, sump 4, communication hole 5, outdoor drainage inspection well 6, sewage pipe 7, water supply pipeline 8, electric valve 91, manual valve 92 sewage pump 10 , electric butterfly valve 11, ultrasonic liquid level gauge 19, minimum liquid level alarm chain point 18, water seal minimum liquid level chain point 17, water seal maximum liquid level chain point 16, sewage pump automatic stop operation chain point 15, a sewage pump Start operation chain point 14, two sewage pumps simultaneously start operation chain point 13, maximum liquid level alarm water level chain point 12.
具体实施方式Detailed ways
下面将结合附图对本发明技术方案的实施例进行详细的描述。以下实施例仅用于更加清楚地说明本发明的技术方案,因此只作为示例,而不能以此来限制本发明的保护范围。Embodiments of the technical solutions of the present invention will be described in detail below in conjunction with the accompanying drawings. The following examples are only used to illustrate the technical solution of the present invention more clearly, so they are only examples, and should not be used to limit the protection scope of the present invention.
如图1至图3所示,本发明提供一种综合管廊,该综合管廊包括多个舱室,多个舱室之间沿着该综合管廊的宽度方向并排设置,在各个所述舱室内分别设有集水坑4,相邻的所述舱室的集水坑4之间开设有连通孔5,各个舱室的集水坑4经相应的所述连通孔5彼此连通。As shown in Figures 1 to 3, the present invention provides a comprehensive pipe gallery, which includes a plurality of cabins, and the multiple cabins are arranged side by side along the width direction of the comprehensive pipe gallery, and in each of the cabins Water sumps 4 are respectively provided, and communication holes 5 are opened between the sumps 4 of adjacent compartments, and the sumps 4 of each compartment communicate with each other through the corresponding communication holes 5 .
在所述多个舱室的其中一个舱室内的集水井中设有排污泵,用于排出所述多个舱室内的污水。A sewage pump is provided in a sump well in one of the multiple compartments to discharge the sewage in the multiple compartments.
该实施例中,舱室的个数为三个,分别为沿着综合管廊的宽度方向并排设置的综合舱1、强电力舱2和弱电力舱3。排污泵设于综合舱1内,其数目为两个,该排污泵具体选为潜水式排污泵。所述管廊的外部设有室外排水检查井6,所述室外排水检查井6与所述排污泵之间经排污管7连通。排污管7上设有阀门,该实施例中分别设有电动阀门91和手动阀门,用于手动或者电控控制集水坑4内的污水外排。集水坑4的长度为整个管廊的内壁宽度,集水坑4宽度为800mm,集水坑4深度为1m。集水坑4主要收集来自管廊的结构渗水、管廊漏水、管道放空水、地面清扫水等。集水坑4的上端设有钢格栅板,潜污泵连接有排污管7线,集水坑4的侧壁上设有爬梯。各个所述舱室的底部分别设有排水边沟,所述排水边沟沿着各自舱室的延伸方向设置,排水边沟沿各舱纵向设置,坡度同管廊各舱室坡度,所述排水边沟与所述集水坑4连通。In this embodiment, the number of cabins is three, which are the comprehensive cabin 1, the strong electric cabin 2 and the weak electric cabin 3 arranged side by side along the width direction of the integrated pipe gallery. The sewage pump is arranged in the integrated cabin 1, and its number is two, and the sewage pump is specifically selected as a submersible sewage pump. An outdoor drainage inspection well 6 is provided outside the pipe gallery, and the outdoor drainage inspection well 6 communicates with the sewage pump through a sewage pipe 7 . The sewage pipe 7 is provided with a valve, and in this embodiment, an electric valve 91 and a manual valve are respectively provided for manually or electronically controlling the discharge of sewage in the sump 4 . The length of the sump 4 is the width of the inner wall of the entire pipe gallery, the width of the sump 4 is 800mm, and the depth of the sump 4 is 1m. The sump 4 mainly collects structural water seepage from the pipe gallery, water leakage from the pipe gallery, pipe emptying water, ground cleaning water, etc. The upper end of the sump 4 is provided with a steel grid plate, the submersible sewage pump is connected with a sewage pipe 7, and the side wall of the sump 4 is provided with a ladder. The bottoms of each of the cabins are respectively provided with drain side ditches, the drainage side ditches are arranged along the extension direction of the respective cabins, the drainage side ditches are arranged longitudinally along each cabin, and the slope is the same as that of each cabin in the pipe gallery, and the drainage side ditch and the The sump 4 is connected.
进一步地,该综合管廊还包括补水管道8,所述补水管道8的一端下伸至所述集水坑4内,另一端与外部供水源连通。所述补水管道8上分别设有手动蝶阀(图中未示)和电动蝶阀11,手动蝶阀和电动蝶阀11串联使用,用于通过手动方式或者电控方式控制所述补水管道8的通断。手动蝶阀在调试或电动蝶阀11出线问题时候,现场可根据手动蝶阀开启,保证系统运行的稳定。Further, the integrated pipe gallery also includes a water replenishment pipeline 8, one end of which extends down into the sump 4, and the other end communicates with an external water supply source. The water supply pipeline 8 is provided with a manual butterfly valve (not shown in the figure) and an electric butterfly valve 11 respectively. The manual butterfly valve and the electric butterfly valve 11 are used in series to control the on-off of the water supply pipeline 8 manually or electronically. When the manual butterfly valve is being debugged or the electric butterfly valve 11 is out of line, the site can be opened according to the manual butterfly valve to ensure the stable operation of the system.
设有所述排污泵的积水坑内设有超声波液位计19,所述超声波液位计19设有多个报警连锁点。所述报警连锁点自下而上依次包括:最低液位报警连锁点18、水封最低液位连锁点17、水封最高液位连锁点16、排污泵自动停止运行连锁点15、一台排污泵启动运行连锁点14、两台排污泵同时启动运行连锁点13、最高液位报警水位连锁点12。An ultrasonic liquid level gauge 19 is provided in the sump pit provided with the sewage pump, and the ultrasonic liquid level gauge 19 is provided with multiple alarm chain points. The alarm chain points from bottom to top include: minimum liquid level alarm chain point 18, water seal minimum liquid level chain point 17, water seal maximum liquid level chain point 16, sewage pump automatic stop operation chain point 15, a sewage pump Pump start operation interlock point 14, two sewage pumps simultaneously start operation interlock point 13, maximum liquid level alarm water level interlock point 12.
排污泵、电动蝶阀11、电动阀门91和超声波液位计19分别与控制室进行信号传输。排污管7上的电动阀门91具体选为蝶式止回阀,其可防止污水倒流,手动阀门选为手动蝶阀,该手动蝶阀为常开状态,当需要检修水泵或者蝶式止回阀时,现场操作手动蝶阀。The sewage pump, the electric butterfly valve 11, the electric valve 91 and the ultrasonic liquid level gauge 19 carry out signal transmission with the control room respectively. The electric valve 91 on the sewage pipe 7 is specifically selected as a butterfly check valve, which can prevent sewage from flowing backwards. The manual valve is selected as a manual butterfly valve, which is normally open. Field operated manual butterfly valve.
超声波液位计19将采集到的信号传输至控制室,由控制室内的控制装置(例如控制柜)做出分析后外输控制信号,控制相应的执行件,例如排污泵、电动蝶阀11或者电动阀门91动作。当然,控制室内的工作人员,以及管廊内的巡检人员也可根据需要进行手动控制各个阀门。上述的各个连锁点为控制室发出控制信号的临界点。The ultrasonic liquid level gauge 19 transmits the collected signal to the control room, and the control device (such as a control cabinet) in the control room makes an analysis and then transmits the control signal to control the corresponding actuators, such as the sewage pump, the electric butterfly valve 11 or the electric valve. Valve 91 moves. Of course, the staff in the control room and the inspection personnel in the pipe gallery can also manually control each valve as needed. The above-mentioned interlocking points are critical points for the control room to send out control signals.
其中,最低液位报警连锁点18位于连通孔5的下方,为排污泵排污的最低水位点控制点,当低于该水位时,控制室进行报警提示。水封最低液位连锁点17位于连通孔5的上方,当集水坑4内的水封液位低于此液位时,启动外部的供水源,由供水源进行补水,从而使得集水坑4内的液封水位高于水封最低液位连锁点17,从而形成水封,防止着火状态下烟气散逸、火苗串至相邻舱体内。水封最高液位连锁点16为进行液封水位补充的最高水位标记点,当补水至该液位时,供水源关闭,停止液封补水。Wherein, the minimum liquid level alarm interlocking point 18 is located below the communicating hole 5, and is the minimum water level control point for sewage pump discharge. When the water level is lower than this level, the control room will give an alarm prompt. The lowest liquid level interlocking point 17 of the water seal is located above the communication hole 5. When the water seal liquid level in the sump 4 is lower than this level, the external water supply source is started, and the water supply source replenishes water, so that the sump pit The water level of the liquid seal in 4 is higher than the minimum liquid level interlocking point 17 of the water seal, thereby forming a water seal, preventing smoke from escaping and flames from being strung into adjacent cabins under the state of being on fire. The highest liquid level interlocking point 16 of the water seal is the highest water level marking point for supplementing the water level of the liquid seal. When replenishing water to this liquid level, the water supply source is closed, and the replenishment of the liquid seal is stopped.
排污泵自动停止运行连锁点15、一台排污泵启动运行连锁点14、两台排污泵同时启动运行连锁点13均为控制排污泵运行状态的连锁点。其中,一台排污泵启动运行连锁点14为集水坑4内水位上涨至排污要求的临界点,此时一台水泵启动进行排污,直至水位下降至排污泵自动停止运行连锁点15,控制室控制该台排污泵关闭,停止排污。当在排污过程中,集水坑4内的污水水位上涨至两台排污泵同时启动运行连锁点13时,控制室控制两台排污泵启动进行污水外排。如水位继续上升至最高液位报警水位连锁点12时,向主控室发出报警信号,需提示操作人员查看是否水泵出现问题或者出现管道爆管等问题,需要现场巡查人员对现场情况做出调查和分析,尽快恢复自动工作状态。The automatic stop operation interlock point 15 of the sewage pump, the start operation interlock point 14 of one sewage pump, and the simultaneous start operation interlock point 13 of two sewage pumps are all interlock points for controlling the operation state of the sewage pump. Among them, the start-up operation chain point 14 of a sewage pump is the critical point when the water level in the sump 4 rises to the sewage discharge requirement. Control the sewage pump to shut down and stop sewage discharge. When the sewage water level in the sump 4 rises to the point 13 when the two sewage pumps start running at the same time during the sewage discharge process, the control room controls the two sewage pumps to start to discharge the sewage. If the water level continues to rise to the highest level alarm water level chain point 12, an alarm signal will be sent to the main control room, and the operator will be prompted to check whether there is a problem with the water pump or a pipe burst. And analysis, restore the automatic working state as soon as possible.
最高液位报警水位连锁点12用于控制集水坑4内的最高液位,当集水坑4内的液位高于最高液位报警水位连锁点12时,控制室进行报警提示,提醒相关工作人员及时解决问题。The highest liquid level alarm water level interlock point 12 is used to control the highest liquid level in the sump 4. When the liquid level in the sump 4 is higher than the highest liquid level alarm water level interlock point 12, the control room will give an alarm prompt to remind relevant Staff resolved issues in a timely manner.
最低液位报警连锁点18距离集水坑4底板高度为100mm,集水坑4连通孔5高度为距离底板高度120mm(高于最低液位报警连锁点1820mm),水封最低液位连锁点17距离底板200mm(高于连通孔5高度标高80mm),水封最高液位连锁点16距离底板300mm(高于水封最低水位连锁点100mm),排污泵自动停止运行连锁点15距离底板330mm(高于水封最高水位30mm),一台排污泵启动运行连锁点14为距离底板800mm(高于排污泵停泵水位470mm),两台排污泵同时启动运行连锁点13为距离底板900mm(高于一台排污泵启动运行连锁点14液位100mm),最高液位报警水位连锁点12距底板970mm(高于两台排污泵同时启动运行连锁点13液位200mm)。整个集水坑4高度为1000mm。所有的液位信息均在远传控制室电脑,可随时观察集水坑4液位情况。The minimum liquid level alarm interlocking point 18 is 100mm from the bottom plate of the sump 4, the height of the sump 4 communication hole 5 is 120mm from the bottom plate (1820mm higher than the minimum liquid level alarm interlocking point), and the minimum liquid level interlocking point of the water seal is 17 200mm from the bottom plate (80mm higher than the height of the connecting hole 5), the highest liquid level interlocking point of the water seal 16 is 300mm away from the bottom plate (100mm higher than the lowest water level interlocking point of the water seal), the sewage pump automatically stops running and the interlock point 15 is 330mm away from the bottom plate (height The maximum water level of the water seal is 30mm), the start-up and operation interlocking point 14 of one sewage pump is 800mm from the bottom plate (470mm higher than the sewage pump stop water level), and the two sewage pumps start and run at the same time interlock point 13 is 900mm from the bottom plate (higher than one The interlocking point 14 of the first sewage pump starts to run, the liquid level is 100mm), and the interlocking point 12 of the highest liquid level alarm water level is 970mm away from the bottom plate (higher than the interlocking point 13, which is 200mm when two sewage pumps start and run at the same time). The height of the whole sump 4 is 1000mm. All the liquid level information is in the computer in the remote control room, and the liquid level of the sump 4 can be observed at any time.
该申请中的综合管廊通过在各个舱室内设置集水坑4,并将集水坑4彼此连通,各个集水坑4之间形成一个连通的污水收集坑,便于污水的统一收集,增大了集水坑4的有效容积,以及有效利用率。统一便于排污泵、检测单元的统一布设和控制,也便于各种管线的布管,便于统一管控,在大大降低综合管廊建造成本的同时,减少了巡检人员的工作量。The comprehensive pipe gallery in this application sets up sump pits 4 in each cabin, and connects sump pits 4 to each other, forming a connected sewage collection pit between each sump pit 4, which facilitates the unified collection of sewage and increases the The effective volume of the sump 4 and the effective utilization rate are determined. Unification facilitates the unified layout and control of sewage pumps and detection units, as well as the layout of various pipelines, and facilitates unified management and control. While greatly reducing the construction cost of the comprehensive pipe gallery, it also reduces the workload of inspection personnel.
需要注意的是,除非另有说明,本申请使用的技术术语或者科学术语应当为本发明所属领域技术人员所理解的通常意义。It should be noted that, unless otherwise specified, the technical terms or scientific terms used in this application shall have the usual meanings understood by those skilled in the art to which the present invention belongs.
此外,术语“第一”、“第二”等仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。在本发明的描述中,“多个”的含义是两个以上,除非另有明确具体的限定。In addition, the terms "first", "second", etc. are used for descriptive purposes only, and should not be understood as indicating or implying relative importance or implicitly specifying the quantity of the indicated technical features. In the description of the present invention, "plurality" means two or more, unless otherwise specifically defined.
在本申请中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。In this application, terms such as "installation", "connection", "connection" and "fixation" should be interpreted in a broad sense, for example, it can be a fixed connection or a detachable connection, unless otherwise clearly specified and limited. , or integrated; it can be mechanically connected or electrically connected; it can be directly connected or indirectly connected through an intermediary, and it can be the internal communication of two components or the interaction relationship between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention according to specific situations.
最后应说明的是:以上各实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述各实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的范围,其均应涵盖在本发明的权利要求和说明书的范围当中。尤其是,只要不存在结构冲突,各个实施例中所提到的各项技术特征均可以任意方式组合起来。本发明并不局限于文中公开的特定实施例,而是包括落入权利要求的范围内的所有技术方案。Finally, it should be noted that: the above embodiments are only used to illustrate the technical solutions of the present invention, rather than limiting them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: It is still possible to modify the technical solutions described in the foregoing embodiments, or perform equivalent replacements for some or all of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the technical solutions of the various embodiments of the present invention. All of them should be covered by the scope of the claims and description of the present invention. In particular, as long as there is no structural conflict, the technical features mentioned in the various embodiments can be combined in any manner. The present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810178151.4A CN108360562B (en) | 2018-03-05 | 2018-03-05 | Comprehensive pipe gallery |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810178151.4A CN108360562B (en) | 2018-03-05 | 2018-03-05 | Comprehensive pipe gallery |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108360562A true CN108360562A (en) | 2018-08-03 |
CN108360562B CN108360562B (en) | 2020-09-11 |
Family
ID=63003517
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810178151.4A Active CN108360562B (en) | 2018-03-05 | 2018-03-05 | Comprehensive pipe gallery |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108360562B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109610521A (en) * | 2018-12-19 | 2019-04-12 | 苏州规划设计研究院股份有限公司 | A kind of drainage system and method improving piping lane space utilization |
CN111619732A (en) * | 2020-06-11 | 2020-09-04 | 上海外高桥造船有限公司 | Liquid cargo ship and method for discharging residual liquid in liquid cargo tank of liquid cargo ship |
CN111733870A (en) * | 2019-03-25 | 2020-10-02 | 中冶京诚工程技术有限公司 | Inspection, sludge discharge and emptying system and method for corridor water supply pipeline |
CN114439039A (en) * | 2022-02-24 | 2022-05-06 | 中冶建筑研究总院有限公司 | Light prefabricated underground comprehensive pipe gallery |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008121253A (en) * | 2006-11-10 | 2008-05-29 | Sekisui Chem Co Ltd | Vacuum type draining system |
CN203878651U (en) * | 2014-06-11 | 2014-10-15 | 张移生 | Vertical deep rainwater storage and collection system |
CN206158752U (en) * | 2016-10-19 | 2017-05-10 | 上海市隧道工程轨道交通设计研究院 | A waste water pump house arrangement structure for quasi -rectangular shield tunnel |
CN206279554U (en) * | 2016-12-02 | 2017-06-27 | 中冶京诚工程技术有限公司 | Natural gas cabin of utility tunnel |
CN106988341A (en) * | 2017-05-11 | 2017-07-28 | 广东首汇蓝天工程科技有限公司 | Multifunctional shield piping lane integrates well |
-
2018
- 2018-03-05 CN CN201810178151.4A patent/CN108360562B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008121253A (en) * | 2006-11-10 | 2008-05-29 | Sekisui Chem Co Ltd | Vacuum type draining system |
CN203878651U (en) * | 2014-06-11 | 2014-10-15 | 张移生 | Vertical deep rainwater storage and collection system |
CN206158752U (en) * | 2016-10-19 | 2017-05-10 | 上海市隧道工程轨道交通设计研究院 | A waste water pump house arrangement structure for quasi -rectangular shield tunnel |
CN206279554U (en) * | 2016-12-02 | 2017-06-27 | 中冶京诚工程技术有限公司 | Natural gas cabin of utility tunnel |
CN106988341A (en) * | 2017-05-11 | 2017-07-28 | 广东首汇蓝天工程科技有限公司 | Multifunctional shield piping lane integrates well |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109610521A (en) * | 2018-12-19 | 2019-04-12 | 苏州规划设计研究院股份有限公司 | A kind of drainage system and method improving piping lane space utilization |
CN111733870A (en) * | 2019-03-25 | 2020-10-02 | 中冶京诚工程技术有限公司 | Inspection, sludge discharge and emptying system and method for corridor water supply pipeline |
CN111619732A (en) * | 2020-06-11 | 2020-09-04 | 上海外高桥造船有限公司 | Liquid cargo ship and method for discharging residual liquid in liquid cargo tank of liquid cargo ship |
CN114439039A (en) * | 2022-02-24 | 2022-05-06 | 中冶建筑研究总院有限公司 | Light prefabricated underground comprehensive pipe gallery |
CN114439039B (en) * | 2022-02-24 | 2022-09-02 | 中冶建筑研究总院有限公司 | Light prefabricated underground integrated pipe gallery |
Also Published As
Publication number | Publication date |
---|---|
CN108360562B (en) | 2020-09-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108360562B (en) | Comprehensive pipe gallery | |
CN206737105U (en) | A kind of integrated prefabricated pumping station system of fiber reinforced plastic barrel | |
CN106400839B (en) | Natural gas cabin of utility tunnel | |
CN201297181Y (en) | Water discharge device moved with pipe in coal mine gas extraction pipeline | |
CN204662649U (en) | A kind of integral intelligent pumping plant | |
CN106351254A (en) | Multilayer urban underground comprehensive pipe gallery | |
CN206279554U (en) | Natural gas cabin of utility tunnel | |
CN114594802A (en) | A deep foundation pit automatic precipitation and recharge operation system and control method | |
CN104294908A (en) | Intelligent type integrated airtight sewage lifting pump station | |
CN106245676A (en) | A kind of body and pipe gallery | |
CA2789624A1 (en) | Wastewater pumping system | |
CN110374124B (en) | Subway construction drainage system | |
CN113863373A (en) | Novel utility tunnel structure | |
CN220080074U (en) | Automatic drainage control device for municipal road cable working well | |
CN105220763B (en) | A kind of integrated prefabricated pumping plant of intelligent direct burial lasted a long time | |
CN202187414U (en) | Water sealing drainer | |
CN208501733U (en) | A kind of integrated drainage system of Urban Underground pipe gallery | |
CN117051789A (en) | Drainage overhauling channel of water diversion branch pipe plug of pumped storage power station | |
CN206873610U (en) | The unattended duct type unit combination pumping plant in underground | |
CN209509155U (en) | A kind of drainage system improving piping lane space utilization | |
CN110173019A (en) | It is a kind of to overlap inlet water lifting pumps room of forming a team | |
CN206289663U (en) | A kind of body and pipe gallery | |
CN110578367A (en) | Prefabricated vatch basin | |
CN210737725U (en) | Underground stepped water storage pool group for ski field | |
CN102297340A (en) | Water lute drainer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 26th Floor, MCC Building, No. 11 Alishan Road, Huangdao District, Qingdao City, Shandong Province, China 266555 Patentee after: BERIS ENGINEERING AND RESEARCH Corp. Country or region after: China Address before: 266555 unit 1, block 27, No.27 Alishan Road, Qingdao Economic and Technological Development Zone, Shandong Province Patentee before: BERIS ENGINEERING AND RESEARCH Corp. Country or region before: China |