CN107741536A - Line no-load charging vector inspection method - Google Patents
Line no-load charging vector inspection method Download PDFInfo
- Publication number
- CN107741536A CN107741536A CN201711091653.5A CN201711091653A CN107741536A CN 107741536 A CN107741536 A CN 107741536A CN 201711091653 A CN201711091653 A CN 201711091653A CN 107741536 A CN107741536 A CN 107741536A
- Authority
- CN
- China
- Prior art keywords
- line
- transformer stations
- circuit
- vector
- protection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R29/00—Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
- G01R29/20—Measuring number of turns; Measuring transformation ratio or coupling factor of windings
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
- G01R31/62—Testing of transformers
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
- G01R31/72—Testing of electric windings
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明适用于高压输电线路继电保护技术领域,提供了一种线路空载充电向量检查方法,设置L变电站、M变电站和N变电站,通过更改变电站间的连接方式确定单回线路空载充电、线路在变电站破口空载充电、双回线路空载充电和线路带高抗空载充电时的线路保护和断路器保护的向量;变电站的接线方式均为3/2接线方式;L和N变电站均包括一个完整串,M变电站包括两个完整串,一个完整串上设置三个断路器;L与M变电站之间通过线路I相连,M与N变电站之间通过线路II相连,线路I和线路II的两端均设置有可控制投切的并联电抗器。上述线路空载充电向量检查方法可以将空载充电过程中可能发生的充电类型集成到一个模拟系统中,快速准确的完成向量检查。
The invention is applicable to the technical field of relay protection of high-voltage transmission lines, and provides a line no-load charging vector inspection method, setting L substations, M substations and N substations, and determining the no-load charging of single-circuit lines by changing the connection mode between substations. The line protection and circuit breaker protection vectors when the line is charged at the break of the substation, the double-circuit line is charged at no-load, and the line is charged with high resistance to no-load; the wiring mode of the substation is 3/2 wiring mode; L and N substations Both include a complete string, M substation includes two complete strings, and three circuit breakers are set on a complete string; L and M substations are connected through line I, and M and N substations are connected through line II, and line I and line Both ends of II are equipped with shunt reactors that can control switching. The above method for checking the vector of no-load charging on the line can integrate the charging types that may occur during the no-load charging process into a simulation system, and quickly and accurately complete the vector checking.
Description
技术领域technical field
本发明属于高压输电线路继电保护领域,具体涉及一种线路空载充电向量检查方法。The invention belongs to the field of relay protection of high-voltage transmission lines, and in particular relates to a method for checking a no-load charging vector of a line.
背景技术Background technique
向量检查是继电保护工作中主要项目,向量检查主要是检查电流互感器变比选取和极性的正确性,电压与电流二次回路接线的正确性。向量检查错误将导致正常运行状态或故障状态的继电保护误动或拒动。因此,继电保护正式投运前必须严格保证向量的正确性。Vector inspection is the main item in relay protection work. Vector inspection is mainly to check the correctness of current transformer ratio selection and polarity, and the correctness of voltage and current secondary circuit wiring. Vector check error will lead to malfunction or refusal of relay protection in normal operation state or fault state. Therefore, the correctness of the vector must be strictly guaranteed before the relay protection is officially put into operation.
3/2接线的500kV超高压新线路和1000kV特高压新线路投运时,都需要空载充电向量检查。发明人在实现本发明的过程中发现,在进行空载向量检查时,检查人员每次都通过画系统主接线图来分析电压电流角度,再与现场实际向量检查结果比对,从而使得检定过程花费时间太长且不能确定检定结果的正确性。When the 500kV EHV new line and the 1000kV UHV new line of 3/2 connection are put into operation, no-load charging vector inspection is required. In the process of implementing the present invention, the inventor found that during the no-load vector inspection, the inspectors draw the main wiring diagram of the system to analyze the voltage and current angles every time, and then compare with the actual vector inspection results on site, so that the verification process Takes too long and cannot be sure the veracity of the check result.
发明内容Contents of the invention
有鉴于此,本发明实施例提供了线路空载充电向量检查方法,以解决现有技术中向量检定过程花费时间太长且不能确定检定结果的正确性的问题。In view of this, the embodiment of the present invention provides a method for checking the line no-load charging vector to solve the problem in the prior art that the vector verification process takes too long and the correctness of the verification result cannot be determined.
本发明实施例提供了一种线路空载充电向量检查方法,包括:设置L变电站、M变电站和N变电站;其中,所述L变电站、M变电站和N变电站的接线方式为3/2接线方式;所述L变电站与M变电站通过线路I相连,所述M变电站与N变电站通过线路II相连,所述线路I和线路II的两端均设置有可控制投切的并联电抗器;An embodiment of the present invention provides a method for checking the no-load charging vector of a line, including: setting an L substation, an M substation, and an N substation; wherein, the wiring mode of the L substation, M substation, and N substation is a 3/2 wiring mode; The L substation is connected to the M substation through a line I, and the M substation is connected to the N substation through a line II, and both ends of the line I and the line II are provided with shunt reactors that can control switching;
通过改变L变电站、M变电站和N变电站之间的连接方式,确定单回线路空载充电、线路在变电站破口空载充电、双回线路空载充电和线路带高抗空载充电时的线路保护和断路器保护的向量。By changing the connection mode between L substation, M substation and N substation, determine the no-load charging of single-circuit lines, no-load charging of lines in substation breaches, no-load charging of double-circuit lines and lines with high resistance to no-load charging Vector of protection and circuit breaker protection.
可选的,所述L变电站包括一个完整串,M变电站包括两个完整串,N变电站包括一个完整串;线路I分别连接所述L变电站和所述M变电站,II线路分别连接所述M变电站和所述N变电站;所述一个完整串上设置三个依次连接的断路器。Optionally, the L substation includes one complete string, the M substation includes two complete strings, and the N substation includes one complete string; the line I is respectively connected to the L substation and the M substation, and the II line is respectively connected to the M substation and the N substation; three sequentially connected circuit breakers are set on the one complete string.
可选的,所述通过改变L变电站、M变电站和N变电站之间的连接方式确定单回线路空载充电时的线路保护和断路器保护的向量,具体包括:Optionally, the determination of the line protection and circuit breaker protection vectors during no-load charging of the single circuit line by changing the connection mode between the L substation, the M substation and the N substation specifically includes:
通过线路I将所述L变电站与M变电站相连,所述M变电站包括一个完整串,所述线路I中切断并联电抗器;The L substation is connected to the M substation through the line I, the M substation includes a complete string, and the shunt reactor is cut off in the line I;
L变电站为M变电站充电,根据充电情况确定I线L侧线路保护的向量;其中,I线L侧线路表示为线路I的L侧线路;The substation L charges the substation M, and determines the line protection vector of the L side of the I line according to the charging situation; where, the L side line of the I line is represented as the L side line of the line I;
根据线路I的长度确定I线L侧空充电流的大小;Determine the size of the empty charging current on the L side of the I line according to the length of the line I;
根据断路器保护的CT线圈的极性,确定L变电站的断路器保护的向量。According to the polarity of the CT coil protected by the circuit breaker, the vector of the circuit breaker protection of the L substation is determined.
可选的,所述通过改变L变电站、M变电站和N变电站之间的连接方式确定线路在变电站破口空载充电时的线路保护和断路器保护的向量,具体包括:Optionally, the vector of line protection and circuit breaker protection when the line is charged at the break of the substation by changing the connection mode between the L substation, the M substation and the N substation is determined, specifically including:
通过线路I将所述L变电站与M变电站相连,通过线路II将所述M变电站与N变电站相连,所述M变电站包括第一完整串和第二完整串,所述M变电站的第一完整串与线路I相连,所述M变电站的第二完整串与线路II相连,所述线路I中切断并联电抗器,所述线路II中切断并联电抗器;The L substation is connected to the M substation through the line I, and the M substation is connected to the N substation through the line II. The M substation includes a first complete string and a second complete string, and the first complete string of the M substation It is connected to the line I, the second complete string of the M substation is connected to the line II, the shunt reactor is cut off in the line I, and the shunt reactor is cut off in the line II;
L变电站为M变电站充电,根据充电情况确定Ⅰ线L侧线路保护的向量;根据线路I和线路II的总长度确定I线L侧空充电流的大小;根据L变电站中断路器保护的CT线圈的极性,确定L变电站的断路器保护的向量;Substation L is charging for substation M, and the vector of line protection on the L side of line I is determined according to the charging situation; the size of the empty charging current on the L side of line I is determined according to the total length of line I and line II; according to the CT coil protected by the circuit breaker in substation L The polarity of the L substation determines the protection vector of the circuit breaker;
M变电站为N变电站充电,根据充电情况确定I线M侧线路保护的向量,根据线路II的长度确定I线M侧空充电流的大小;根据M变电站的第一完整串中的断路器保护的CT线圈的极性,确定M变电站的第一完整串中的断路器保护的向量;M substation is charging for N substation, according to the charging situation, determine the protection vector of I-line M-side line, and determine the size of empty charging current on I-line M-side according to the length of line II; according to the circuit breaker protection in the first complete string of M substation The polarity of the CT coils, determining the vector for circuit breaker protection in the first complete string of substation M;
M变电站为N变电站充电,根据充电情况确定II线M侧线路保护的向量,根据线路II的长度确定II线M侧空充电流的大小;根据M变电站的第二完整串中的断路器保护的CT线圈的极性,确定M变电站的第二完整串中的断路器保护的向量。M substation is charging for N substation, according to the charging situation, determine the vector of line protection on M side of line II, and determine the size of empty charging current on M side of line II according to the length of line II; according to the circuit breaker protection in the second complete string of substation M The polarity of the CT coils, determines the vector for circuit breaker protection in the second complete string of substation M.
可选的,所述通过改变L变电站、M变电站和N变电站之间的连接方式确定双回线路空载充电时的线路保护和断路器保护的向量,具体包括:Optionally, the determination of the line protection and circuit breaker protection vectors during no-load charging of the double-circuit line by changing the connection mode between the L substation, the M substation and the N substation specifically includes:
通过线路I将所述L变电站与M变电站相连,通过线路II将所述M变电站与N变电站相连;将所述N变电站设置到L变电站上,所述M变电站包括第一完整串和第二完整串,所述M变电站的第一完整串与线路I相连,所述M变电站的第二完整串与线路II相连,所述线路I中切断并联电抗器,所述线路II中切断并联电抗器;The L substation is connected to the M substation through the line I, and the M substation is connected to the N substation through the line II; the N substation is set on the L substation, and the M substation includes the first complete string and the second complete string The first complete string of the M substation is connected to the line I, the second complete string of the M substation is connected to the line II, the shunt reactor is cut off in the line I, and the shunt reactor is cut off in the line II;
L变电站为M变电站充电,根据充电情况确定Ⅰ线L侧线路保护的向量;根据线路I和线路II的总长度确定I线L侧空充电流的大小;根据L变电站中的断路器保护的CT线圈的极性,确定L变电站的断路器保护的向量;L substation is charging for M substation, and the vector of line protection on the L side of line I is determined according to the charging situation; the size of the empty charging current on the L side of line I is determined according to the total length of line I and line II; according to the CT of the circuit breaker protection in the L substation The polarity of the coil, which determines the vector of the circuit breaker protection of the L substation;
M变电站为L变电站充电,根据充电情况确定I线M侧线路保护的向量,根据线路II的长度确定I线M侧空充电流的大小;根据M变电站的第一完整串中的断路器保护的CT线圈的极性,确定M变电站的第一完整串中的断路器保护的向量;Substation M charges substation L, determines the line protection vector of I-line M side according to the charging situation, and determines the empty charging current of I-line M side according to the length of line II; according to the circuit breaker protection in the first complete string of M substation The polarity of the CT coils, determining the vector for circuit breaker protection in the first complete string of substation M;
M变电站为L变电站充电,根据充电情况确定II线M侧线路保护的向量,根据线路II的长度确定II线M侧的空充电流大小;根据M变电站的第二完整串中的断路器保护的CT线圈的极性,确定M变电站的第二完整串中的断路器保护的向量。Substation M charges for substation L, determines the line protection vector of line II on the M side according to the charging situation, and determines the empty charging current on the M side of line II according to the length of line II; according to the circuit breaker protection in the second complete string of substation M The polarity of the CT coils, determines the vector for circuit breaker protection in the second complete string of substation M.
可选的,所述通过改变L变电站、M变电站和N变电站之间的连接方式确定线路带高抗空载充电时的线路保护和断路器保护的向量,具体包括:Optionally, the determination of the line protection and circuit breaker protection vectors when the line is charged with high resistance to no-load by changing the connection mode between the L substation, the M substation and the N substation specifically includes:
通过线路I将所述L变电站与M变电站相连,通过线路II将所述M变电站与N变电站相连,所述M变电站涉及第一完整串和第二完整串,所述M变电站的第一完整串与线路I相连,所述M变电站的第二完整串与线路II相连,所述线路I中投入并联电抗器,所述线路II中投入并联电抗器;The L substation is connected to the M substation by line I, the M substation is connected to the N substation by line II, the M substation involves a first complete string and a second complete string, the first complete string of the M substation Connected to the line I, the second complete string of the M substation is connected to the line II, a shunt reactor is put into the line I, and a shunt reactor is put into the line II;
L变电站为M变电站充电,根据充电情况确定Ⅰ线L侧线路保护的向量;根据线路I和线路II的总长度以及线路I和线路II中投入的并联电抗器的容量确定I线L侧空充电流的大小;根据L变电站中断路器保护的CT线圈的极性,确定L变电站的断路器保护的向量;Substation L is charged for substation M, and the vector of line protection on the L side of line I is determined according to the charging situation; the empty charging on the L side of line I is determined according to the total length of line I and line II and the capacity of the shunt reactors put into line I and line II The size of the flow; according to the polarity of the CT coil of the circuit breaker protection in the L substation, determine the vector of the circuit breaker protection of the L substation;
M变电站为N变电站充电,根据充电情况确定I线M侧线路保护的向量,根据线路II的长度以及线路II中投入的并联电抗器的容量确定I线M侧空充电流的大小;根据M变电站的第一完整串中的断路器保护的CT线圈的极性,确定M变电站的第一完整串中的断路器保护的向量;The M substation charges the N substation, and determines the line protection vector of the M side of the I line according to the charging situation, and determines the empty charging current of the M side of the I line according to the length of the line II and the capacity of the shunt reactor put into the line II; according to the M substation The polarity of the CT coil protected by the circuit breaker in the first complete string of M substation determines the vector of the circuit breaker protection in the first complete string of M substation;
M变电站为N变电站充电,根据充电情况确定II线M侧线路保护的向量,根据线路II的长度以及线路II中投入的并联电抗器的容量确定II线M侧空充电流的大小;根据M变电站的第二完整串中的断路器保护的CT线圈的极性,确定M变电站的第二完整串中的断路器保护的向量。The M substation charges the N substation, and determines the line protection vector of the M side of the II line according to the charging situation, and determines the empty charging current of the M side of the II line according to the length of the line II and the capacity of the shunt reactor put into the line II; according to the M substation The polarities of the CT coils protected by the circuit breakers in the second complete string of the M substation determine the vectors protected by the circuit breakers in the second complete string of the substation M.
本发明实施例与现有技术相比存在的有益效果是:本发明实施例通过设置L变电站、M变电站和N变电站并改变三个变电站间的连接方式来确定单回线路空载充电、线路在变电站破口空载充电、双回线路空载充电和线路带高抗空载充电时的线路保护和断路器保护的向量;其中,变电站的接线方式均为3/2接线方式,L和N变电站均包括一个完整串,M变电站包括两个完整串,一个完整串上设置三个断路器;L与M变电站之间通过线路I相连,M与N变电站之间通过线路II相连,线路I和线路II的两端均设置有可控制投切的并联电抗器;通过改变变电站的连接方式来模拟空载充电过程可能出现多种充电类型,以提高线路检定的效率和检定结果的正确性。Compared with the prior art, the embodiment of the present invention has the following beneficial effects: the embodiment of the present invention determines the no-load charging of the single-circuit line by setting the L substation, the M substation and the N substation and changing the connection mode between the three substations. The vectors of line protection and circuit breaker protection for substation breach no-load charging, double-circuit line no-load charging and line with high resistance no-load charging; among them, the wiring mode of the substation is 3/2 wiring mode, and the L and N substations Both include a complete string, M substation includes two complete strings, and three circuit breakers are set on a complete string; L and M substations are connected through line I, and M and N substations are connected through line II, and line I and line Both ends of the II are equipped with shunt reactors that can be switched on and off; by changing the connection mode of the substation to simulate a variety of charging types that may occur during the no-load charging process, in order to improve the efficiency of line verification and the correctness of verification results.
附图说明Description of drawings
为了更清楚地说明本发明实施例中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following will briefly introduce the accompanying drawings that need to be used in the descriptions of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only of the present invention. For some embodiments, those of ordinary skill in the art can also obtain other drawings based on these drawings without paying creative efforts.
图1是本发明实施例提供的线路空载充电向量检查方法的实现流程示意图;Fig. 1 is a schematic diagram of the implementation flow of the line no-load charging vector inspection method provided by the embodiment of the present invention;
图2是本发明实施例提供的线路空载充电向量检查的线路图;Fig. 2 is a circuit diagram of the line no-load charging vector inspection provided by the embodiment of the present invention;
图3是本发明实施例提供的单回线路空载充电向量检查的线路图;Fig. 3 is a circuit diagram of a single-circuit line no-load charging vector inspection provided by an embodiment of the present invention;
图4是本发明实施例提供的线路在中间变电站破口空载充电向量检查的线路图;Fig. 4 is a circuit diagram of the no-load charging vector inspection of the line provided by the embodiment of the present invention at the break in the intermediate substation;
图5是本发明实施例提供的双回线路空载充电向量检查的线路图;Fig. 5 is a circuit diagram of the no-load charging vector inspection of the double-circuit line provided by the embodiment of the present invention;
图6是本发明实施例提供的线路带高抗空载充电向量检查的线路图。Fig. 6 is a circuit diagram of a circuit with high anti-no-load charging vector inspection provided by an embodiment of the present invention.
具体实施方式detailed description
以下描述中,为了说明而不是为了限定,提出了诸如特定系统结构、技术之类的具体细节,以便透彻理解本发明实施例。然而,本领域的技术人员应当清楚,在没有这些具体细节的其它实施例中也可以实现本发明。在其它情况中,省略对众所周知的系统、装置、电路以及方法的详细说明,以免不必要的细节妨碍本发明的描述。In the following description, specific details such as specific system structures and technologies are presented for the purpose of illustration rather than limitation, so as to thoroughly understand the embodiments of the present invention. It will be apparent, however, to one skilled in the art that the invention may be practiced in other embodiments without these specific details. In other instances, detailed descriptions of well-known systems, devices, circuits, and methods are omitted so as not to obscure the description of the present invention with unnecessary detail.
为了说明本发明所述的技术方案,下面通过具体实施例来进行说明。In order to illustrate the technical solutions of the present invention, specific examples are used below to illustrate.
图1示出了本发明实施例提供的线路空载充电向量检查方法的实现流程示意图,详述如下:Fig. 1 shows a schematic diagram of the implementation flow of the line no-load charging vector inspection method provided by the embodiment of the present invention, which is described in detail as follows:
步骤S101:设置L变电站、M变电站和N变电站。Step S101: setting L substation, M substation and N substation.
参见图2,示出了本发明实施例提供的线路空载充电向量检查的线路图,所述L变电站、M变电站和N变电站的接线方式为3/2接线方式;所述L变电站与M变电站通过线路I相连,所述M变电站与N变电站通过线路II相连,所述线路I和线路II的两端均设置有可控制投切的并联电抗器。Referring to Fig. 2, it shows the circuit diagram of the line no-load charging vector inspection provided by the embodiment of the present invention, the wiring mode of the L substation, the M substation and the N substation is a 3/2 wiring mode; the L substation and the M substation The M substation is connected to the N substation through a line II, and both ends of the line I and the line II are provided with shunt reactors capable of controlling switching.
值得注意的是,图2中在断路器5012和断路器5013之间还设有一条线路用于连接其他线路或变电站,从而使L变电站形成3/2接线方式。然而,断路器5012和断路器5013间的线路不影响线路空载向量检查时的检查结果,因此,在图中并未画出断路器5012和断路器5013间的出线连接关系。同样地,在M变电站的断路器5032和断路器5033之间、断路器5042和断路器5043之间及N变电站的断路器5052和断路器5053之间分别设置有一条出线,用于连接其它线路或变电站。It is worth noting that in FIG. 2 there is also a line between the circuit breaker 5012 and the circuit breaker 5013 for connecting other lines or substations, so that the L substation forms a 3/2 connection mode. However, the line between the circuit breaker 5012 and the circuit breaker 5013 does not affect the inspection result of the circuit no-load vector inspection, therefore, the outgoing connection relationship between the circuit breaker 5012 and the circuit breaker 5013 is not shown in the figure. Similarly, between the circuit breaker 5032 and the circuit breaker 5033 of the M substation, between the circuit breaker 5042 and the circuit breaker 5043, and between the circuit breaker 5052 and the circuit breaker 5053 of the N substation, there is an outgoing line for connecting other lines or substations.
步骤S102:通过改变L变电站、M变电站和N变电站之间的连接方式确定单回线路空载充电、线路在变电站破口空载充电、双回线路空载充电和线路带高抗空载充电时的线路保护和断路器保护的向量。Step S102: By changing the connection mode between the L substation, the M substation and the N substation, determine the no-load charging of the single-circuit line, the no-load charging of the line at the break of the substation, the no-load charging of the double-circuit line, and the no-load charging of the line with high resistance Vector of Line Protection and Circuit Breaker Protection.
在采用线路空载充电向量检查的线路图来模拟不同充电类型对应的线路保护和断路器保护的向量时,需要改变三种变电站之间的连接方式,再按照常规的向量判断标准判断线路保护和断路器保护的向量。When using the line diagram of line no-load charging vector inspection to simulate the vectors of line protection and circuit breaker protection corresponding to different charging types, it is necessary to change the connection mode between the three substations, and then judge the line protection and circuit breaker protection according to the conventional vector judgment standard. Vector of circuit breaker protection.
容易理解的,线路的电容与线路的长度和线路的半径有关,且线路的电容与线路的长度成正比,线路的电容还与线路的半径成正比。对于500kV超高压新线路输电线的距离一般为几十公里到一百公里以上,对于1000kV特高压新线路输电线的距离一般为几百公里以上,因此,输电线路的长度较长。同时,对于500kV超高压新线路和1000kV特高压新线路为了抑制电晕放电和减少线路电抗,通常采取分裂导线的架设方式,而采用分裂导线的架设方式可以等效于增大了输电线路的半径。由于输电线路的长度较长,且输电线路半径较大,使得线路的电容较大,使得线路呈现为大量容性功率。当大量容性功率通过系统变压器和输电线路等感性元件时,末端电压将会升高,即所谓的“容升”现象,进而判断不同充电类型对应的线路保护和断路器保护的向量。It is easy to understand that the capacitance of the line is related to the length of the line and the radius of the line, and the capacitance of the line is proportional to the length of the line, and the capacitance of the line is also proportional to the radius of the line. The distance of transmission lines for 500kV ultra-high voltage new lines is generally tens of kilometers to more than one hundred kilometers, and the distance of transmission lines for 1000kV UHV new lines is generally more than hundreds of kilometers. Therefore, the length of transmission lines is relatively long. At the same time, for new 500kV ultra-high voltage lines and new 1000kV ultra-high voltage lines, in order to suppress corona discharge and reduce line reactance, the erection method of split conductors is usually adopted, and the erection method of split conductors can be equivalent to increasing the radius of transmission lines . Due to the long length of the transmission line and the large radius of the transmission line, the capacitance of the line is large, so that the line presents a large amount of capacitive power. When a large amount of capacitive power passes through inductive components such as system transformers and transmission lines, the terminal voltage will increase, which is the so-called "capacity rise" phenomenon, and then determine the vectors of line protection and circuit breaker protection corresponding to different charging types.
可选的,所述L变电站包括一个完整串,M变电站包括两个完整串,N变电站包括一个完整串;线路I分别连接所述L变电站和所述M变电站,II线路分别连接所述M变电站和所述N变电站;所述一个完整串上设置三个依次连接的断路器。Optionally, the L substation includes one complete string, the M substation includes two complete strings, and the N substation includes one complete string; the line I is respectively connected to the L substation and the M substation, and the II line is respectively connected to the M substation and the N substation; three sequentially connected circuit breakers are set on the one complete string.
上述连接方式为空载充电向量检查系统的一般连接方式,对于不同充电类型的向量检查只需在上述连接方式的基础上做一定的修改即可。The above connection method is the general connection method of the no-load charging vector inspection system. For the vector inspection of different charging types, only certain modifications need to be made on the basis of the above connection method.
可选的,通过改变L变电站、M变电站和N变电站之间的连接方式确定单回线路空载充电时的线路保护和断路器保护的向量,具体包括:Optionally, by changing the connection mode between L substation, M substation and N substation, determine the vector of line protection and circuit breaker protection during no-load charging of single circuit line, specifically including:
通过线路I将所述L变电站与M变电站相连,所述M变电站包括一个完整串,所述线路I中切断并联电抗器;The L substation is connected to the M substation through the line I, the M substation includes a complete string, and the shunt reactor is cut off in the line I;
L变电站为M变电站充电,根据充电情况确定I线L侧线路保护的向量;其中,I线L侧线路表示为线路I的L侧线路;The substation L charges the substation M, and determines the line protection vector of the L side of the I line according to the charging situation; where, the L side line of the I line is represented as the L side line of the line I;
根据线路I的长度确定I线L侧空充电流的大小;Determine the size of the empty charging current on the L side of the I line according to the length of the line I;
根据断路器保护的CT线圈的极性,确定L变电站的断路器保护的向量。According to the polarity of the CT coil protected by the circuit breaker, the vector of the circuit breaker protection of the L substation is determined.
参见图3,示出了单回线路空载充电向量检查的线路图,仅需设置L变电站与M变电站,L变电站与M变电站都仅需一个完整串即可模拟单回线路空载充电向量检查。其中,L变电站的线路10表示为#1母线,M变电站的线路11表示为#1母线,L变电站的线路13表示为#2母线,M变电站的线路14表示为#2母线,L变电站与M变电站之间的线路16表示为线路I。向量检查分析结果如下:See Figure 3, which shows the circuit diagram of the no-load charging vector inspection of a single-circuit line. It is only necessary to set up the L substation and the M substation, and both the L substation and the M substation only need a complete string to simulate the no-load charging vector inspection of a single-circuit line. . Among them, line 10 of L substation is represented as #1 bus, line 11 of M substation is represented as #1 bus, line 13 of L substation is represented as #2 bus, and line 14 of M substation is represented as #2 bus. The line 16 between the substations is indicated as line I. The vector check analysis results are as follows:
第一,当L变电站通过#1母线10经过断路器5011为线路I充电时,对I线L侧线路保护和断路器5011进行向量检查。通过对上述输电线路的分析,线路出现“容升”现象时,I线线路保护的电压与电流的关系为:电流超前电压90°,发出纯容性无功功率。再根据线路I的长度计算出电容电流的大小。对于L变电站的断路器5011的向量判断为:由于断路器5011为边开关断路器,边开关断路器的CT极性和I线线路保护的CT极性一致,所以断路器5011保护的向量也为电流超前电压90°。First, when the L substation is charging the line I through the #1 bus 10 through the circuit breaker 5011, a vector check is performed on the line protection on the L side of the I line and the circuit breaker 5011. Through the analysis of the above-mentioned transmission lines, when the "capacity rise" phenomenon occurs on the line, the relationship between the voltage and current of the I-line line protection is: the current leads the voltage by 90°, and pure capacitive reactive power is generated. Then calculate the size of the capacitive current according to the length of the line I. For the vector judgment of the circuit breaker 5011 in the L substation: Since the circuit breaker 5011 is a side switch circuit breaker, the CT polarity of the side switch circuit breaker is consistent with the CT polarity of the I-line line protection, so the protection vector of the circuit breaker 5011 is also The current leads the voltage by 90°.
第二,当L变电站通过#2母线13经过断路器5012为线路I充电时,对I线L侧线路保护和断路器5012进行向量检查。其中,I线线路保护的电压与电流关系与L变电站通过#1母线10经过断路器5012为线路I充电时I线线路保护的电压与电流的关系相同。同样地,根据线路I的长度计算出电容电流的大小。对于L变电站的断路器5012的向量判断为:由于断路器5012为中开关断路器,中开关断路器保护的向量与中开关断路器采用的CT线圈的位置有关。具体的,当指定中开关断路器5012保护的CT线圈处于靠近线路I的一侧时,中开关断路器5012保护的向量与线路I保护的向量方向相反,为电压超前电流90°;当指定中开关断路器5012保护的CT线圈处于远离线路I的一侧时,中开关断路器5012保护的向量与线路I保护的向量方向相同,为电流超前电压90°。Second, when the L substation is charging the line I via the #2 bus 13 via the circuit breaker 5012 , a vector check is performed on the line protection on the L side of the I line and the circuit breaker 5012 . Wherein, the relationship between the voltage and current of the I-line line protection is the same as that of the I-line line protection when the L substation charges the line I through the #1 bus 10 through the circuit breaker 5012 . Similarly, the size of the capacitive current is calculated according to the length of the line I. For the vector of the circuit breaker 5012 in the L substation, it is judged that: since the circuit breaker 5012 is a medium switch circuit breaker, the protection vector of the medium switch circuit breaker is related to the position of the CT coil used by the medium switch circuit breaker. Specifically, when the CT coil protected by the middle switch circuit breaker 5012 is on the side close to the line I, the vector direction of the protection vector of the middle switch circuit breaker 5012 is opposite to that of the line I protection, and the voltage leads the current by 90°; When the CT coil protected by the switch circuit breaker 5012 is on the side away from the line I, the vector protected by the switch circuit breaker 5012 is in the same direction as the vector protected by the line I, and the current leads the voltage by 90°.
可选的,通过改变L变电站、M变电站和N变电站之间的连接方式确定线路在变电站破口空载充电时的线路保护和断路器保护的向量,具体包括:Optionally, by changing the connection mode between L substation, M substation and N substation, determine the vector of line protection and circuit breaker protection when the line is charged at the break of the substation without load, specifically including:
通过线路I将所述L变电站与M变电站相连,通过线路II将所述M变电站与N变电站相连,所述M变电站包括第一完整串和第二完整串,所述M变电站的第一完整串与线路I相连,所述M变电站的第二完整串与线路II相连,所述线路I中切断并联电抗器,所述线路II中切断并联电抗器;The L substation is connected to the M substation through the line I, and the M substation is connected to the N substation through the line II. The M substation includes a first complete string and a second complete string, and the first complete string of the M substation It is connected to the line I, the second complete string of the M substation is connected to the line II, the shunt reactor is cut off in the line I, and the shunt reactor is cut off in the line II;
L变电站为M变电站充电,根据充电情况确定Ⅰ线L侧线路保护的向量;根据线路I和线路II的总长度确定I线L侧空充电流的大小;根据L变电站中断路器保护的CT线圈的极性,确定L变电站的断路器保护的向量;Substation L is charging for substation M, and the vector of line protection on the L side of line I is determined according to the charging situation; the size of the empty charging current on the L side of line I is determined according to the total length of line I and line II; according to the CT coil protected by the circuit breaker in substation L The polarity of the L substation determines the protection vector of the circuit breaker;
M变电站为N变电站充电,根据充电情况确定I线M侧线路保护的向量,根据线路II的长度确定I线M侧空充电流的大小;根据M变电站的第一完整串中的断路器保护的CT线圈的极性,确定M变电站的第一完整串中的断路器保护的向量;M substation is charging for N substation, according to the charging situation, determine the protection vector of I-line M-side line, and determine the size of empty charging current on I-line M-side according to the length of line II; according to the circuit breaker protection in the first complete string of M substation The polarity of the CT coils, determining the vector for circuit breaker protection in the first complete string of substation M;
M变电站为N变电站充电,根据充电情况确定II线M侧线路保护的向量,根据线路II的长度确定II线M侧空充电流的大小;根据M变电站的第二完整串中的断路器保护的CT线圈的极性,确定M变电站的第二完整串中的断路器保护的向量。M substation is charging for N substation, according to the charging situation, determine the vector of line protection on M side of line II, and determine the size of empty charging current on M side of line II according to the length of line II; according to the circuit breaker protection in the second complete string of substation M The polarity of the CT coils, determines the vector for circuit breaker protection in the second complete string of substation M.
参见图4,示出了线路在变电站破口空载充电时向量检查的线路图,需要设置L变电站、M变电站和N变电站,同时,L变电站与N变电站需设置一个完整串,M变电站需要设置两个完整串即可模拟线路在变电站破口空载充电的向量检查。其中,L变电站的线路10表示为#1母线,M变电站的线路11表示为#1母线,N变电站的线路12表示为#1母线;L变电站的线路13表示为#2母线,M变电站的线路14表示为#2母线,N变电站的线路15表示为#2母线;L变电站与M变电站的第一完整串之间的线路16表示为线路I,M变电站的第二完整串与N变电站之间的线路17表示为线路II。具体地,在判断I线L侧、I线M侧和II线M侧线路保护的向量及线路保护对应的断路器保护的向量时可以详细的分为以下四种情况:Refer to Figure 4, which shows the circuit diagram of the vector inspection when the line is charged with no load at the break of the substation. It is necessary to set up the L substation, the M substation and the N substation. At the same time, a complete string needs to be set up between the L substation and the N substation, and M needs to be set Two complete strings can simulate the vector inspection of no-load charging of the line at the substation breach. Among them, the line 10 of L substation is represented as #1 bus, the line 11 of M substation is represented as #1 bus, the line 12 of N substation is represented as #1 bus; the line 13 of L substation is represented as #2 bus, the line of M substation 14 represents the #2 bus, and the line 15 of the N substation is represented as the #2 bus; the line 16 between the L substation and the first complete string of the M substation is represented as the line I, and the second complete string of the M substation and the N substation Line 17 of is denoted as Line II. Specifically, when judging the vectors of the line protection on the L side of the I line, the M side of the I line, and the M side of the II line, and the vectors of the circuit breaker protection corresponding to the line protection, it can be divided into the following four situations in detail:
第一:L侧用#1母线10经过断路器5011为线路I充电,M侧用#1母线11经过断路器5031和断路器5041为线路II充电,此时对I线两端、II线M侧线路保护进行向量检查,同时对断路器5011、5031和5041保护的向量进行检查。First: the L side uses the #1 bus 10 to charge the line I through the circuit breaker 5011, and the M side uses the #1 bus 11 to charge the line II through the circuit breaker 5031 and the circuit breaker 5041. At this time, the two ends of the I line and the II line M Check the vector of side line protection, and check the vectors protected by circuit breakers 5011, 5031 and 5041 at the same time.
与单回线路空载充电向量检查的结果类似,I线L侧线路保护的电压与电流的关系也为:电流超前电压90°,发出纯容性无功功率。线路空充电流与断路器后边的线路长度有关,因此,需要根据线路I和线路II的总长度来计算I线L侧电容电流的大小。I线L侧断路器5011保护向量与I线L侧线路保护的向量一致,也为电流超前电压90°。Similar to the result of the no-load charging vector inspection of single-circuit lines, the relationship between the voltage and current of the line protection on the L side of the I line is also: the current leads the voltage by 90°, and pure capacitive reactive power is generated. The empty charging current of the line is related to the length of the line behind the circuit breaker. Therefore, it is necessary to calculate the capacitive current on the L side of the line I according to the total length of the line I and the line II. The protection vector of the I-line L-side circuit breaker 5011 is consistent with the vector of the I-line L-side circuit protection, and the current leads the voltage by 90°.
II线M侧线路保护的电压与电流的关系同样为:电流超前电压90°,发出纯容性无功功率。根据线路II的长度来计算II线M侧电容电流的大小。II线M侧断路器5041保护向量与II线M侧线路保护的向量一致,也为电流超前电压90°。The relationship between the voltage and current of the line protection on the M side of the II line is also: the current leads the voltage by 90°, and generates pure capacitive reactive power. Calculate the magnitude of the capacitive current on the M side of the line II according to the length of the line II. The protection vector of the circuit breaker 5041 on the M side of the II line is consistent with the line protection vector on the M side of the II line, and the current leads the voltage by 90°.
I线M侧线路保护的电压与电流的关系与II线M侧线路保护的电压与电流的关系相反,为电压超前电流90°,吸收纯容性无功功率。同样的,根据线路II的长度来计算I线M侧电容电流的大小。I线M侧断路器5031保护向量与I线M侧线路保护的向量一致,也为电压超前电流90°。The relationship between the voltage and current of the line protection on the M side of the I line is opposite to the relationship between the voltage and current of the line protection on the M side of the II line. The voltage leads the current by 90° and absorbs pure capacitive reactive power. Similarly, the magnitude of the capacitive current on the side M of line I is calculated according to the length of line II. The protection vector of the I-line M-side circuit breaker 5031 is consistent with the vector of the I-line M-side circuit protection, and the voltage leads the current by 90°.
第二:L侧用#1母线10经过断路器5011为线路I充电,M侧用#2母线14经过断路器5032和断路器5042为线路II充电,此时对I线两端、II线M侧线路保护进行向量检查,同时对断路器5011、5031和5041保护的向量进行检查。Second: the L side uses the #1 bus 10 to charge the line I through the circuit breaker 5011, and the M side uses the #2 bus 14 to charge the line II through the circuit breaker 5032 and the circuit breaker 5042. At this time, both ends of the I line and the II line M Check the vector of side line protection, and check the vectors protected by circuit breakers 5011, 5031 and 5041 at the same time.
当M变电站采用#2母线为线路II充电时,I线线路两侧、II线M侧线路保护向量以及断路器5011保护的向量与第一种情况下的I线线路两侧、II线M侧线路保护向量以及断路器5011保护的向量一致,区别在于M变电站的中开关断路器5032和5042的向量检查,对于中开关断路器5032和5042的向量与对应的线路保护向量及中开关断路器采用的CT线圈的位置有关。当断路器5032采用的CT线圈为靠近线路I的一侧时,断路器5032向量与I线线路M侧保护的向量相反,即为电流超前电压90°;当断路器5032采用的CT线圈为远离线路I的一侧时,断路器5032向量与I线线路M侧保护的向量相同,即为电压超前电流90°。对于断路器5042的分析方式与5032相同,当断路器5042采用的CT线圈为靠近线路II的一侧时,断路器5042向量与II线线路M侧保护的向量相反,即为电压超前电流90°;当断路器5042采用的CT线圈为远离线路II的一侧时,断路器5042向量与II线线路M侧保护的向量相同,即为电流超前电压90°。When M substation uses #2 busbar to charge line II, the protection vectors on both sides of line I, line II on M side and the vector protected by circuit breaker 5011 are the same as those on both sides of line I and line II on M side in the first case The line protection vector and the vector protected by circuit breaker 5011 are the same, the difference lies in the vector inspection of the medium switch circuit breaker 5032 and 5042 of the M substation, the vectors of the medium switch circuit breaker 5032 and 5042 and the corresponding line protection vector and the medium switch circuit breaker adopt The position of the CT coil is related. When the CT coil used by the circuit breaker 5032 is close to the side of the line I, the vector of the circuit breaker 5032 is opposite to the vector protected on the M side of the line I, that is, the current leads the voltage by 90°; when the CT coil used by the circuit breaker 5032 is far away from On one side of the line I, the vector of the circuit breaker 5032 is the same as the vector protected on the line M side of the line I, that is, the voltage leads the current by 90°. The analysis method for the circuit breaker 5042 is the same as that of the circuit breaker 5032. When the CT coil used by the circuit breaker 5042 is on the side close to the line II, the vector of the circuit breaker 5042 is opposite to the protection vector of the line M side of the line II, that is, the voltage leads the current by 90° ; When the CT coil used by the circuit breaker 5042 is on the side away from the line II, the vector of the circuit breaker 5042 is the same as the vector protected on the M side of the line II, that is, the current leads the voltage by 90°.
第三:L侧用#2母线13经过断路器5012为线路I充电,M侧用#1母线11经过断路器5031和断路器5041为线路II充电,此时对I线两侧、II线M侧线路保护进行向量检查,同时对断路器5012、5031和5041保护的向量进行检查。Third: The L side uses the #2 bus 13 to charge the line I through the circuit breaker 5012, and the M side uses the #1 bus 11 to charge the line II through the circuit breaker 5031 and the circuit breaker 5041. At this time, both sides of the I line and II line M The side line protection carries out vector inspection, and the vectors protected by circuit breakers 5012, 5031 and 5041 are checked at the same time.
此时I线两侧、II线M侧保护的向量及断路器5031、断路器5041保护的向量与第一种情况下的I线两侧、II线M侧保护的向量及断路器5031、断路器5041保护的向量完全一致。对于断路器5012保护的向量与对应的I线线路保护的向量和采用的CT线圈的位置有关,这里不再赘述。At this time, the protection vectors on both sides of the I line and the M side of the II line and the protection vectors of the circuit breaker 5031 and the circuit breaker 5041 are the same as the protection vectors on both sides of the I line and the M side of the II line in the first case, and the circuit breaker 5031 and the circuit breaker The vector protected by the device 5041 is exactly the same. The protection vector of the circuit breaker 5012 is related to the protection vector of the corresponding I-line line and the position of the CT coil used, and will not be repeated here.
第四:L侧用#2母线13经过断路器5012为线路I充电,M侧用#2母线14经过断路器5032和断路器5042为线路II充电,此时对I线两侧、II线M侧线路保护进行向量检查,同时对断路器5012、5032和5042保护的向量进行检查。Fourth: The L side uses the #2 bus 13 to charge the line I through the circuit breaker 5012, and the M side uses the #2 bus 14 to charge the line II through the circuit breaker 5032 and the circuit breaker 5042. At this time, both sides of the I line and II line M The side circuit protection carries out vector inspection, and the vectors protected by circuit breakers 5012, 5032 and 5042 are checked at the same time.
此时I线两侧、II线M侧保护的向量与第一种情况下的I线两侧、II线M侧保护的向量完全一致。对于断路器5012、断路器5032和断路器5042保护的向量分别与其对应的线路保护的向量和采用的CT线圈的位置有关,这里不再赘述。At this time, the protection vectors on both sides of the I line and the M side of the II line are completely consistent with the protection vectors on both sides of the I line and the M side of the II line in the first case. The protection vectors of the circuit breaker 5012 , the circuit breaker 5032 and the circuit breaker 5042 are respectively related to the corresponding line protection vectors and the positions of the CT coils used, and will not be repeated here.
容易理解的,在上述四种情况下I线两侧及II线M侧线路保护向量均相同,断路器保护的向量则与采用的断路器为边开关断路器还是中开关断路器有关,当采用边开关断路器时,断路器保护的向量与对应一侧的线路保护向量一致;当采用中开关断路器时,断路器保护的向量与采用的CT线圈的位置有关,若采用的CT线圈的位置靠近线路一侧时,与对应的线路向量相反,采用的CT线圈的位置远离线路一侧时,与对应的线路向量相同。It is easy to understand that in the above four cases, the line protection vectors on both sides of the I line and the M side of the II line are the same, and the vector of the circuit breaker protection is related to whether the circuit breaker is a side switch circuit breaker or a middle switch circuit breaker. When using When the side switch circuit breaker is used, the protection vector of the circuit breaker is consistent with the line protection vector of the corresponding side; when the middle switch circuit breaker is used, the protection vector of the circuit breaker is related to the position of the CT coil used. If the position of the CT coil used When it is close to one side of the line, it is opposite to the corresponding line vector, and when the position of the adopted CT coil is far away from the line side, it is the same as the corresponding line vector.
可选的,通过改变L变电站、M变电站和N变电站之间的连接方式确定双回线路空载充电时的线路保护和断路器保护的向量,具体包括:Optionally, by changing the connection mode among L substation, M substation and N substation, the vectors of line protection and circuit breaker protection during double-circuit line no-load charging are determined, specifically including:
通过线路I将所述L变电站与M变电站相连,通过线路II将所述M变电站与N变电站相连;将所述N变电站设置到L变电站上,所述M变电站包括第一完整串和第二完整串,所述M变电站的第一完整串与线路I相连,所述M变电站的第二完整串与线路II相连,所述线路I中切断并联电抗器,所述线路II中切断并联电抗器;The L substation is connected to the M substation through the line I, and the M substation is connected to the N substation through the line II; the N substation is set on the L substation, and the M substation includes the first complete string and the second complete string The first complete string of the M substation is connected to the line I, the second complete string of the M substation is connected to the line II, the shunt reactor is cut off in the line I, and the shunt reactor is cut off in the line II;
L变电站为M变电站充电,根据充电情况确定Ⅰ线L侧线路保护的向量;根据线路I和线路II的总长度确定I线L侧空充电流的大小;根据L变电站中的断路器保护的CT线圈的极性,确定L变电站的断路器保护的向量;L substation is charging for M substation, and the vector of line protection on the L side of line I is determined according to the charging situation; the size of the empty charging current on the L side of line I is determined according to the total length of line I and line II; according to the CT of the circuit breaker protection in the L substation The polarity of the coil, which determines the vector of the circuit breaker protection of the L substation;
M变电站为L变电站充电,根据充电情况确定I线M侧线路保护的向量,根据线路II的长度确定I线M侧空充电流的大小;根据M变电站的第一完整串中的断路器保护的CT线圈的极性,确定M变电站的第一完整串中的断路器保护的向量;Substation M charges substation L, determines the line protection vector of I-line M side according to the charging situation, and determines the empty charging current of I-line M side according to the length of line II; according to the circuit breaker protection in the first complete string of M substation The polarity of the CT coils, determining the vector for circuit breaker protection in the first complete string of substation M;
M变电站为L变电站充电,根据充电情况确定II线M侧线路保护的向量,根据线路II的长度确定II线M侧的空充电流大小;根据M变电站的第二完整串中的断路器保护的CT线圈的极性,确定M变电站的第二完整串中的断路器保护的向量。Substation M charges for substation L, determines the line protection vector of line II on the M side according to the charging situation, and determines the empty charging current on the M side of line II according to the length of line II; according to the circuit breaker protection in the second complete string of substation M The polarity of the CT coils, determines the vector for circuit breaker protection in the second complete string of substation M.
参见图5,示出了双回线路空载充电向量检查的线路图,双回线路空载充电向量检查线路图可以认为是将线路在变电站破口空载充电向量检查线路图中的N变电站设置在L变电站中得到的。L变电站通过Ⅰ线14向M变电站空载充电,M变电站通过Ⅱ线15再向L变电站空载充电。Referring to Fig. 5, it shows the circuit diagram of the no-load charging vector inspection of the double-circuit line. Obtained in L substation. The L substation charges the M substation with no-load through the I line 14, and the M substation charges the L substation with no-load through the II line 15.
在此种情况下,L变电站可能采用#1母线10或#2母线12为线路I充电,M变电站同样可能采用#1母线11或#2母线13位线路II充电,无论采用何种母线为线路充电,同样需要对I线两侧、II线M侧线路保护进行向量检查,同时对断路器保护的向量进行检查。具体的向量检查结果与线路在变电站破口空载充电向量检查时的检查结果一致,这里不再赘述。In this case, substation L may use #1 bus 10 or #2 bus 12 to charge line I, and M substation may also use #1 bus 11 or #2 bus 13 to charge line II, no matter which bus is used for the line For charging, it is also necessary to check the vectors of the line protection on both sides of the I line and the M side of the II line, and at the same time check the vector of the circuit breaker protection. The specific vector inspection results are consistent with the inspection results of the no-load charging vector inspection of the line at the break of the substation, and will not be repeated here.
可选的,所述通过改变L变电站、M变电站和N变电站之间的连接方式确定线路带高抗空载充电时的线路保护和断路器保护的向量,具体包括:Optionally, the determination of the line protection and circuit breaker protection vectors when the line is charged with high resistance to no-load by changing the connection mode between the L substation, the M substation and the N substation specifically includes:
通过线路I将所述L变电站与M变电站相连,通过线路II将所述M变电站与N变电站相连,所述M变电站涉及第一完整串和第二完整串,所述M变电站的第一完整串与线路I相连,所述M变电站的第二完整串与线路II相连,所述线路I中投入并联电抗器,所述线路II中投入并联电抗器;The L substation is connected to the M substation by line I, the M substation is connected to the N substation by line II, the M substation involves a first complete string and a second complete string, the first complete string of the M substation Connected to the line I, the second complete string of the M substation is connected to the line II, a shunt reactor is put into the line I, and a shunt reactor is put into the line II;
L变电站为M变电站充电,根据充电情况确定Ⅰ线L侧线路保护的向量;根据线路I和线路II的总长度以及线路I和线路II中投入的并联电抗器的容量确定I线L侧空充电流的大小;根据L变电站中断路器保护的CT线圈的极性,确定L变电站的断路器保护的向量;Substation L is charged for substation M, and the vector of line protection on the L side of line I is determined according to the charging situation; the empty charging on the L side of line I is determined according to the total length of line I and line II and the capacity of the shunt reactors put into line I and line II The size of the flow; according to the polarity of the CT coil of the circuit breaker protection in the L substation, determine the vector of the circuit breaker protection of the L substation;
M变电站为N变电站充电,根据充电情况确定I线M侧线路保护的向量,根据线路II的长度以及线路II中投入的并联电抗器的容量确定I线M侧空充电流的大小;根据M变电站的第一完整串中的断路器保护的CT线圈的极性,确定M变电站的第一完整串中的断路器保护的向量;The M substation charges the N substation, and determines the line protection vector of the M side of the I line according to the charging situation, and determines the empty charging current of the M side of the I line according to the length of the line II and the capacity of the shunt reactor put into the line II; according to the M substation The polarity of the CT coil protected by the circuit breaker in the first complete string of M substation determines the vector of the circuit breaker protection in the first complete string of M substation;
M变电站为N变电站充电,根据充电情况确定II线M侧线路保护的向量,根据线路II的长度以及线路II中投入的并联电抗器的容量确定II线M侧空充电流的大小;根据M变电站的第二完整串中的断路器保护的CT线圈的极性,确定M变电站的第二完整串中的断路器保护的向量。The M substation charges the N substation, and determines the line protection vector of the M side of the II line according to the charging situation, and determines the empty charging current of the M side of the II line according to the length of the line II and the capacity of the shunt reactor put into the line II; according to the M substation The polarities of the CT coils protected by the circuit breakers in the second complete string of the M substation determine the vectors protected by the circuit breakers in the second complete string of the substation M.
参见图6,示出了线路带高抗空载充电向量检查的线路图,线路带高抗空载充电向量检查线路图是在变电站破口空载充电时向量检查线路图的基础上做的进一步改动,变电站之间的线路I和线路II上投入并联电抗器,一条线路中投入的并联电抗器的数量只能为一个,在线路I上可以指定投入并联电抗器18或并联电抗器19,在线路II上指定投入并联电抗器20或并联电抗器21,并且对于投入并联电抗器的容量可以进行设置。同样地,线路带高抗空载充电向量检查的I线两侧、II线M侧线路保护及断路器的向量保护的检查结果与线路在变电站破口空载充电向量检查时的检查结果一致,这里不再赘述。Referring to Figure 6, it shows the circuit diagram of the line with high anti-no-load charging vector inspection. Change, put shunt reactors on line I and line II between substations, the number of shunt reactors put into a line can only be one, and shunt reactor 18 or shunt reactor 19 can be specified on line I, in The parallel reactor 20 or the parallel reactor 21 is specified on the line II, and the capacity of the parallel reactor can be set. Similarly, the inspection results of line protection on both sides of line I, line M side of line II, line protection of line II and vector protection of the circuit breaker with high anti-no-load charging vector inspection are consistent with the inspection results of the no-load charging vector inspection of the line at the substation breach. I won't go into details here.
区别之处在于,当线路设置有并联电抗器后,并联电抗器可以补充并联电抗器所在线路的无功电流,线路I的并联电抗器18或并联电抗器19可以补偿I线的无功电流,线路II的并联电抗器20或并联电抗器21可以补偿线路II的无功电流。其中,根据投入并联电抗器的容量,确定并联电抗器补偿的I线电流的大小。The difference is that when the line is equipped with a shunt reactor, the shunt reactor can supplement the reactive current of the line where the shunt reactor is located, and the shunt reactor 18 or shunt reactor 19 of line I can compensate the reactive current of line I, The shunt reactor 20 or shunt reactor 21 of the line II can compensate the reactive current of the line II. Among them, according to the capacity of the input shunt reactor, determine the magnitude of the I-line current compensated by the shunt reactor.
示例性的,对于500kV的超高压新线路,当投入线路中的并联电抗器的容量为50Mvar时,高抗补偿的电容电流可以计算为:其中,525kV表示为500kV的实际电压,则高抗补偿电容电流55A。对于500kV的超高压新线路,每公里的空充电容电流为1.25,因此,当线路长度为80km时,无功电流可以计算为:80×1.25=100A;当在线路中投入50Mvar并联电抗器时,无功电流为80×1.25-55=45A。由此可见,在线路中设置并联电抗器后可以补偿线路的无功电流。Exemplarily, for a new ultra-high voltage line of 500kV, when the capacity of the shunt reactor put into the line is 50Mvar, the capacitive current for high-resistance compensation can be calculated as: Among them, 525kV represents the actual voltage of 500kV, and the high resistance compensation capacitor current is 55A. For the 500kV ultra-high voltage new line, the empty charging capacity current per kilometer is 1.25, therefore, when the line length is 80km, the reactive current can be calculated as: 80×1.25=100A; when a 50Mvar shunt reactor is put into the line , The reactive current is 80×1.25-55=45A. It can be seen that the reactive current of the line can be compensated after setting the shunt reactor in the line.
上述线路空载充电向量检查方法通过设置L变电站、M变电站和N变电站并改变三个变电站间的连接方式来确定单回线路空载充电、线路在变电站破口空载充电、双回线路空载充电和线路带高抗空载充电时的线路保护和断路器保护的向量;其中,变电站的接线方式均为3/2接线方式,L和N变电站均包括一个完整串,M变电站包括两个完整串,一个完整串上设置三个断路器;L与M变电站之间通过线路I相连,M与N变电站之间通过线路II相连,线路I和线路II的两端均设置有可控制投切的并联电抗器;通过改变变电站的连接方式来模拟空载充电过程可能出现多种充电类型,以提高线路检定的效率和检定结果的正确性。The above line no-load charging vector inspection method determines the no-load charging of single-circuit lines, no-load charging of lines at substation breaks, and no-load charging of double-circuit lines by setting L substation, M substation and N substation and changing the connection mode between the three substations. The vector of line protection and circuit breaker protection when charging and line with high resistance to no-load charging; among them, the wiring mode of the substation is 3/2 wiring mode, the L and N substations include a complete string, and the M substation includes two complete strings Three circuit breakers are set on a complete string; L and M substations are connected through line I, and M and N substations are connected through line II, and both ends of line I and line II are equipped with controllable switching Shunt reactor; by changing the connection mode of the substation to simulate a variety of charging types in the no-load charging process, so as to improve the efficiency of line verification and the correctness of verification results.
以上所述实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的精神和范围,均应包含在本发明的保护范围之内。The above-described embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: it can still implement the foregoing embodiments Modifications to the technical solutions recorded in the examples, or equivalent replacement of some of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the various embodiments of the present invention, and should be included in within the protection scope of the present invention.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711091653.5A CN107741536B (en) | 2017-11-08 | 2017-11-08 | Line no-load charging vector inspection method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711091653.5A CN107741536B (en) | 2017-11-08 | 2017-11-08 | Line no-load charging vector inspection method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107741536A true CN107741536A (en) | 2018-02-27 |
CN107741536B CN107741536B (en) | 2019-12-31 |
Family
ID=61234197
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711091653.5A Active CN107741536B (en) | 2017-11-08 | 2017-11-08 | Line no-load charging vector inspection method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107741536B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0775399A (en) * | 1993-09-03 | 1995-03-17 | Meidensha Corp | Variable speed device |
CN102201700A (en) * | 2011-04-27 | 2011-09-28 | 广西电网公司电力科学研究院 | Transmission line status grading diagnosis system based on multi-parameter fusion |
CN202217999U (en) * | 2010-01-04 | 2012-05-09 | 帕西·西姆公司 | Electrical wiring apparatus with plurality of modes for getting rid of error wiring |
CN203224579U (en) * | 2013-04-02 | 2013-10-02 | 国家电网公司 | System for testing protection vectors before commissioning of substation |
CN103855691A (en) * | 2012-11-30 | 2014-06-11 | 余杭供电局 | Method, device and system for fault diagnosis of transformer substation |
-
2017
- 2017-11-08 CN CN201711091653.5A patent/CN107741536B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0775399A (en) * | 1993-09-03 | 1995-03-17 | Meidensha Corp | Variable speed device |
CN202217999U (en) * | 2010-01-04 | 2012-05-09 | 帕西·西姆公司 | Electrical wiring apparatus with plurality of modes for getting rid of error wiring |
CN102201700A (en) * | 2011-04-27 | 2011-09-28 | 广西电网公司电力科学研究院 | Transmission line status grading diagnosis system based on multi-parameter fusion |
CN103855691A (en) * | 2012-11-30 | 2014-06-11 | 余杭供电局 | Method, device and system for fault diagnosis of transformer substation |
CN203224579U (en) * | 2013-04-02 | 2013-10-02 | 国家电网公司 | System for testing protection vectors before commissioning of substation |
Non-Patent Citations (2)
Title |
---|
王澎 等: "利用线路空充电流测试保护向量", 《天津电力技术》 * |
谢民: "空载及轻载线路继电保护向量试验新方法", 《安徽电气工程职业技术学院学报》 * |
Also Published As
Publication number | Publication date |
---|---|
CN107741536B (en) | 2019-12-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Jacobson | Examples of ferroresonance in a high voltage power system | |
CN108594071B (en) | Single-phase earth fault detection method for neutral point small-resistance earth distribution network | |
CN101958530A (en) | Main transformer differential protection CT polarity check method of pumped storage power station | |
CN104730408B (en) | A kind of method for verifying high-power transformer differential circuit correctness | |
CN102593737B (en) | Test method for relay protection vector inspection before commissioning of substation with capacitance compensation | |
CN105044560A (en) | Fault-adaptive-technology-based fault judgment method of power distribution network | |
CN103293446A (en) | Small-current grounding fault line selection method based on arc suppression coil | |
Paul et al. | Transient overvoltage protection of shore-to-ship power supply system | |
Dallas et al. | Teleprotection in multi-terminal HVDC supergrids | |
CN105785157A (en) | Double main transformer longitudinal differential protection loop closing testing method | |
CN110879330A (en) | Power distribution network single-phase earth fault development situation discrimination method based on zero sequence volt-ampere curve area | |
CN103887777A (en) | Automatic feeder protecting method for overhead line four-section three-contact structure | |
CN103259259B (en) | A kind of high resistance configuration-system and method suppressing 750kV many FACTS circuit electromagnetic transient problems | |
CN106501674A (en) | Medium voltage distribution network single-phase earth fault positioning device and its Fault Locating Method | |
CN107741536B (en) | Line no-load charging vector inspection method | |
CN107255765B (en) | A method for locating single-phase grounding fault section of resonant grounding system | |
CN203813436U (en) | Distribution grid wiring structure | |
Kokor et al. | Effects of neutral point grounding methods on single-phase short circuit fault characteristics | |
CN204046277U (en) | On-pole switch station | |
CN105807172A (en) | Ultrahigh voltage substation simulated operation verifying system | |
CN201887437U (en) | Two-point grounding protective device for iron core of resistance type transformer | |
CN113437795B (en) | Mobile box transformer substation vehicle with input voltage automatic switching function | |
CN103872686A (en) | Power distribution network rack wiring structure | |
Hosseinzadeh et al. | A fast fault detection method for protection of HVDC transmission using voltage of the PMFCL | |
Lambert et al. | Long line single-phase switching transients and their effect on station equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |