[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN105391051A - Intelligent substation energy efficiency enhancement transformation energy saving amount calculation method - Google Patents

Intelligent substation energy efficiency enhancement transformation energy saving amount calculation method Download PDF

Info

Publication number
CN105391051A
CN105391051A CN201510719062.2A CN201510719062A CN105391051A CN 105391051 A CN105391051 A CN 105391051A CN 201510719062 A CN201510719062 A CN 201510719062A CN 105391051 A CN105391051 A CN 105391051A
Authority
CN
China
Prior art keywords
power
transformation
transformer
load
light fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510719062.2A
Other languages
Chinese (zh)
Other versions
CN105391051B (en
Inventor
李俊
罗志坤
刘潇潇
万全
朱斌
陈小飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ENERGY SAVING SERVICE Co OF STATE GRID HUNAN ELECTRIC POWER Co
NANRUI (WUHAN) ELECTRICAL EQUIPMENT AND ENGINEERING ENERGY EFFICIENCY EVALUATION CENTER
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
Nanjing NARI Group Corp
Original Assignee
ENERGY SAVING SERVICE Co OF STATE GRID HUNAN ELECTRIC POWER Co
NANRUI (WUHAN) ELECTRICAL EQUIPMENT AND ENGINEERING ENERGY EFFICIENCY EVALUATION CENTER
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
Nanjing NARI Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ENERGY SAVING SERVICE Co OF STATE GRID HUNAN ELECTRIC POWER Co, NANRUI (WUHAN) ELECTRICAL EQUIPMENT AND ENGINEERING ENERGY EFFICIENCY EVALUATION CENTER, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd, Nanjing NARI Group Corp filed Critical ENERGY SAVING SERVICE Co OF STATE GRID HUNAN ELECTRIC POWER Co
Priority to CN201510719062.2A priority Critical patent/CN105391051B/en
Publication of CN105391051A publication Critical patent/CN105391051A/en
Application granted granted Critical
Publication of CN105391051B publication Critical patent/CN105391051B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明提供一种智能变电站能效提升改造节能量计算方法,主要包含:S1)根据智能变电站能效提升改造信息,确定、检测变电站各项参数;S2)计算智能变电站能效提升改造变压器节约电力电量;S3)计算智能变电站能效提升改造节约站用电电量;S4)计算智能变电站能效提升改造新增可再生能源设备产生电量;S5)根据智能变电站运行状况计算智能变电站能效提升改造节约电力电量。该方法通过对智能变电站能效提升改造主要电力设备节约电力电量,站用电节约电力电量情况以及可再生能源产生电量的分析,能够有效地得到智能变电站节约电力电量。

The present invention provides a method for calculating energy saving in energy efficiency improvement and renovation of smart substations, which mainly includes: S1) determining and detecting various parameters of the substation according to the energy efficiency improvement and renovation information of the smart substation; ) Calculate the energy efficiency improvement and transformation of smart substations to save electricity consumption; S4) Calculate the electricity generated by new renewable energy equipment for energy efficiency improvement and transformation of smart substations; S5) Calculate the energy efficiency improvement and transformation of smart substations to save electricity according to the operating status of smart substations. The method can effectively obtain the power saving of the smart substation through the analysis of the energy saving of the main power equipment of the smart substation, the power saving of the station, and the power generation of the renewable energy.

Description

一种智能变电站能效提升改造节能量计算方法A Calculation Method for Saving Energy in Energy Efficiency Improvement and Transformation of Smart Substation

技术领域technical field

本发明属于电力系统领域,具体涉及一种智能变电站能效提升改造节能量计算方法。The invention belongs to the field of electric power systems, and in particular relates to a method for calculating energy saving in energy efficiency improvement and transformation of intelligent substations.

背景技术Background technique

电力系统中,电网电量通过输电、变电和配电等环节输送给用户。变电站在电力系统中起着电能分配的作用。智能变电站是采用先进、可靠、集成和环保的智能设备,以全站信息数字化、通信平台网络化、信息共享标准化为基本要求,自动完成信息采集、测量、控制、保护、计量和检测等基本功能,同时,具备支持电网实时自动控制、智能调节、在线分析决策和协同互动等高级功能的变电站。In the power system, the power of the grid is delivered to users through links such as power transmission, power transformation and power distribution. Substations play the role of power distribution in the power system. Smart substation adopts advanced, reliable, integrated and environment-friendly intelligent equipment, with the basic requirements of digitalization of whole station information, networking of communication platform, and standardization of information sharing, and automatically completes basic functions such as information collection, measurement, control, protection, measurement and detection. At the same time, it is a substation with advanced functions such as real-time automatic control of the power grid, intelligent adjustment, online analysis and decision-making, and collaborative interaction.

变电站降损节能一般从四个方面进行:变电站规划与建设,变压器经济运行,变电站能效管理及电力需求侧管理。结构优良、设备先进的变电站是降损的基础,变电站的规划与建设应充分考虑对电网线损的影响;有了坚强且节能经济的变电站,经济运行和无功补偿是降变电站损耗的有力措施,经济运行不需要投资且降损效果好,是降低电网损耗的重要手段;电力需求侧管理则是依靠政策和电价等措施合理引导电力需求,使得电网负荷在时间上和空间上尽可能的平均。Substation loss reduction and energy saving are generally carried out in four aspects: substation planning and construction, transformer economic operation, substation energy efficiency management and power demand side management. A substation with excellent structure and advanced equipment is the basis for loss reduction. The planning and construction of a substation should fully consider the impact on the line loss of the power grid; with a strong, energy-saving and economical substation, economic operation and reactive power compensation are powerful measures to reduce the loss of the substation , economic operation does not require investment and has a good loss reduction effect, which is an important means to reduce power grid loss; power demand side management is to rely on measures such as policies and electricity prices to guide power demand reasonably, so that the grid load is as even as possible in time and space .

目前,经过对文献的检索,对于智能变电站能效提升改造整体节能量尚未发现系统的计算方法。At present, after searching the literature, no systematic calculation method has been found for the overall energy saving of smart substation energy efficiency improvement and transformation.

发明内容Contents of the invention

本发明所要解决的技术问题是:提供一种智能变电站能效提升改造节能量计算方法,该方法通过对能效提升前后智能变电站主变能耗、站用电电量以及新能源接入情况进行分析,能有效地得到能效提升改造后智能变电站的节能量。The technical problem to be solved by the present invention is to provide a method for calculating the energy saving of smart substation energy efficiency improvement and transformation. The method analyzes the energy consumption of the main transformer of the smart substation before and after the energy efficiency improvement, the power consumption of the station, and the access to new energy. Effectively obtain the energy-saving energy of the smart substation after energy efficiency improvement and transformation.

本发明的技术方案是:一种智能变电站能效提升改造节能量计算方法,包括:The technical solution of the present invention is: a method for calculating energy saving in energy efficiency improvement and transformation of smart substations, comprising:

S1)根据智能变电站能效提升改造信息,确定、检测变电站各项参数;S1) Determine and detect various parameters of the substation according to the energy efficiency improvement information of the smart substation;

S2)计算智能变电站能效提升改造变压器节约电力电量;S2) Calculate the energy efficiency of the smart substation to improve and transform the transformer to save electricity;

S3)计算智能变电站能效提升改造节约站用电电量;S3) Calculate the energy efficiency improvement and transformation of smart substations to save power consumption;

S4)计算智能变电站能效提升改造新增可再生能源设备产生电量;S4) Calculate the electricity generated by the new renewable energy equipment for energy efficiency improvement and transformation of smart substations;

S5)根据智能变电站运行状况计算智能变电站能效提升改造节约电力电量。S5) According to the operation status of the smart substation, calculate the energy efficiency improvement and transformation of the smart substation to save electricity.

所述的方法,所述步骤S1的所确定的变电站参数包括智能变电站能效提升改造前后变压器空载功率损耗、负载波动损耗系数、变压器平均负载系数、变压器额定负载功率损耗、无功经济当量、变压器空载励磁功率、变压器额定负载漏磁功率,站用电照明系统改造前灯具套数、改造前单位灯具功率、改造后灯具套数、改造后单位灯具功率,改造前后灯具的功率调整系数、灯具设备的运行时间、灯具型号的数量、照明计算区域的数量,改造前后灯具照明平均照度,光伏设备水平面太阳能总辐照量、光伏组件安装容量、标准条件下的辐照度、综合效率系数;变压器设备年运行时间TT,需人工录入,一般情况下为一年的总时间365*24=8760小时;改造前基期(基期是指用以比较和确定项目节能量的,节能措施实施前的时间段)时间TT1,需人工录入,一般情况下统计期为一年,总时间为365*24=8760小时;In the method, the substation parameters determined in step S1 include transformer no-load power loss, load fluctuation loss coefficient, transformer average load coefficient, transformer rated load power loss, reactive power economic equivalent, transformer No-load excitation power, transformer rated load flux leakage power, the number of lamps and lanterns before the transformation of the station electric lighting system, the unit lamp power before the transformation, the number of lamps and lanterns after the transformation, the unit lamp power after the transformation, the power adjustment coefficient of the lamps and lanterns before and after the transformation, and the lighting equipment Running time, number of lamp models, number of lighting calculation areas, average illuminance of lamps before and after transformation, total solar radiation on the horizontal plane of photovoltaic equipment, installation capacity of photovoltaic modules, irradiance under standard conditions, comprehensive efficiency coefficient; transformer equipment annual The running time T T needs to be entered manually. Generally, the total time of a year is 365*24=8760 hours; the base period before the transformation (the base period refers to the time period before the implementation of energy-saving measures used to compare and determine the energy saving of the project) The time T T1 needs to be entered manually. Generally, the statistical period is one year, and the total time is 365*24=8760 hours;

检测变电站各项参数的方法包括:改造前后变压器空载功率损耗是铭牌参数,需人工录入;负载波动损耗系数可由计算获得,需提供每小时记录电量,该记录电量由2.0级以上电能计量表计获得,在该记录电量无法获取的情况下由查表获得负载波动损耗系数;The methods for detecting various parameters of the substation include: the no-load power loss of the transformer before and after transformation is a nameplate parameter, which needs to be entered manually; the load fluctuation loss coefficient can be obtained by calculation, and it is necessary to provide an hourly record of electricity, which is measured by an electric energy meter above 2.0 Obtained, in the case that the recorded power cannot be obtained, the load fluctuation loss coefficient is obtained by looking up the table;

变压器平均负载系数是一定时间内,变压器平均输出的视在功率与变压器额定容量之比,通过计算获得,变压器的视在功率由2.0级以上电能计量表计获得;变压器额定负载功率损耗是铭牌参数;无功经济当量由查表获得;The average load factor of the transformer is the ratio of the apparent power of the average output of the transformer to the rated capacity of the transformer within a certain period of time. ; The reactive economic equivalent is obtained by looking up the table;

变压器空载励磁功率Q0由计算获得,Q0=I0%SN×10-2,其中I0%是空载电流百分比,为变压器铭牌参数,SN是变压器额定容量,为变压器铭牌参数;变压器额定负载漏磁功率Qk由计算获得,Qk=Uk%SN×10-2,其中Uk%是变压器短路电压百分比,为变压器铭牌参数,SN是变压器额定容量,为变压器铭牌参数;站用电照明系统改造前、后灯具套数需人工录入;改造前、后单位灯具功率是额定参数,需人工录入;灯具的功率调整系数需人工录入;改造前后灯具设备的运行时间需人工录入;灯具型号的数量、照明计算区域的数量,改造前后灯具照明平均照度,需人工录入;光伏设备水平面太阳能总辐照量通过查表获得;光伏组件安装容量需人工录入;标准条件下的辐照度为常数1kWh/m2;综合效率系数,是考虑了各种因素影响后的修正系数,其中包括:1)光伏组件类型修正系数,2)光伏方阵的倾角、方位角修正系数,3)光伏发电系统可用率,4)光照利用率,5)逆变器效率,6)集电线路、升压变压器损耗,7)光伏组件表面污染修正系数,8)光伏组件转换效率修正系数,综合效率系数的取值在75%-85%之间,需人工录入。Transformer no-load excitation power Q 0 is obtained by calculation, Q 0 = I 0 %S N ×10 -2 , where I 0 % is the percentage of no-load current, which is the parameter on the transformer nameplate, and S N is the rated capacity of the transformer, which is the parameter on the transformer nameplate ;Transformer rated load flux leakage power Q k is obtained by calculation, Q k =U k %S N ×10 -2 , where U k % is the percentage of short-circuit voltage of the transformer, which is the nameplate parameter of the transformer, and SN is the rated capacity of the transformer, which is the transformer Nameplate parameters; the number of lamp sets before and after the transformation of the station electric lighting system needs to be entered manually; the power of the unit lamp before and after the transformation is a rated parameter and needs to be entered manually; Manual entry; the number of lamp models, the number of lighting calculation areas, and the average illuminance of lamp lighting before and after renovation need to be entered manually; the total solar radiation on the horizontal plane of photovoltaic equipment is obtained by looking up the table; the installed capacity of photovoltaic modules needs to be entered manually; under standard conditions The irradiance is a constant 1kWh/m 2 ; the comprehensive efficiency coefficient is a correction coefficient after considering the influence of various factors, including: 1) the correction coefficient of the type of photovoltaic module, 2) the correction coefficient of the inclination angle and azimuth angle of the photovoltaic square array, 3) Availability rate of photovoltaic power generation system, 4) Illumination utilization rate, 5) Inverter efficiency, 6) Collector line, step-up transformer loss, 7) Photovoltaic module surface pollution correction factor, 8) Photovoltaic module conversion efficiency correction factor, The value of the comprehensive efficiency coefficient is between 75% and 85%, which needs to be entered manually.

所述的方法,所述步骤S2的变压器节约电力电量,即更换配电变压器年节电量Δ(ΔE),按照下式计算:In the method, the transformer in step S2 saves electric power, that is, the annual energy saving Δ(ΔE) of the distribution transformer is replaced, which is calculated according to the following formula:

Δ(ΔE)=(ΔE-ΔE1)×TT(1)Δ(ΔE)=(ΔE-ΔE 1 )×T T (1)

式中:ΔE为改造前变压器综合功率损耗,ΔE1为改造后变压器综合功率损耗,TT为变压器设备年运行时间。In the formula: ΔE is the comprehensive power loss of the transformer before transformation, ΔE 1 is the comprehensive power loss of the transformer after transformation, and T T is the annual operation time of the transformer equipment.

所述的方法,步骤S3的智能变电站能效提升改造节约站用电电量ΔAe的计算公式为:According to the method, the calculation formula of the energy efficiency improvement and transformation of the smart substation in step S3 to save the power consumption ΔA e of the substation is:

ΔAe=Ar-Aa(2)ΔA e =A r -A a (2)

式中,Ar为灯具照明项目统计报告期电耗,Aa为灯具照明项目校准电耗;In the formula, A r is the power consumption of the lighting project during the statistical reporting period, and A a is the calibration power consumption of the lighting project;

Ar计算公式为:The calculation formula of A r is:

AA rr == ΣΣ ii == 11 nno QQ ii ×× PP ii ×× TT ii ×× αα ii -- -- -- (( 33 ))

式中,Qi为统计报告期内i型号灯具的数量,即改造前某型号灯具数量;Pi为统计报告期内i型号灯具的抽样实测功率平均值或标称输入功率,即改造前单位灯具功率;Ti为统计报告期内i型号灯具平均运行时间,即改造前灯具设备的运行时间;i为改造前灯具的型号序号,为自然数;n为改造前灯具型号的数量;αi为统计报告期内,i型号灯具的功率调整系数,即改造前灯具的功率调整系数,0<αi≤1,若没有控制系统αi=1;In the formula, Q i is the number of lamps of type i in the statistical report period, that is, the number of lamps of a certain type before transformation; Lamp power; T i is the average running time of lamps of type i in the statistical reporting period, that is, the running time of lamps and lanterns before transformation; i is the model number of lamps before transformation, which is a natural number; n is the number of lamp models before transformation; α i is During the statistical reporting period, the power adjustment coefficient of type i lamps, that is, the power adjustment coefficient of lamps before transformation, 0<α i ≤1, if there is no control system α i =1;

Aa计算公式为:The calculation formula of A a is:

AA aa == (( 11 ++ AA mm )) &Sigma;&Sigma; jj == 11 mm QQ jj &times;&times; PP jj &times;&times; TT jj &times;&times; &alpha;&alpha; jj -- -- -- (( 44 ))

式中,Qj为基期内j型号灯具的数量,即改造后某型号灯具数量;Pj为基期内j型号灯具的抽样实测功率平均值或标称输入功率,即改造后单位灯具功率;Tj为基期内j型号灯具平均运行时间,即改造前灯具设备的运行时间;j为改造后灯具的型号;m为改造后灯具型号的数量;αj为基期内,j型号灯具的功率调整系数,即改造后灯具的功率调整系数,0<αj≤1,若没有控制系统αj=1;Am为灯具照明项目校准电耗调整系数,其值可正可负;In the formula, Q j is the number of lamps of type j in the base period, that is, the number of lamps of a certain type after transformation; P j is the average value or nominal input power of the sampled measured power of lamps of type j in the base period, that is, the unit power of lamps after transformation; T j is the average running time of lamps of type j in the base period, that is, the running time of lamps and lanterns before transformation; j is the model of lamps after transformation; m is the number of models of lamps after transformation; αj is the power adjustment coefficient of type j lamps in the base period , that is, the power adjustment coefficient of the lamp after transformation, 0<α j ≤1, if there is no control system α j =1; A m is the power consumption adjustment coefficient for the calibration of the lighting project of the lamp, and its value can be positive or negative;

Am计算公式为:The formula for calculating A m is:

AA mm == &Sigma;&Sigma; qq == 11 kk Ff vv ,, rr qq -- &Sigma;&Sigma; qq == 11 kk EE. vv ,, bb qq &Sigma;&Sigma; qq == 11 kk Ff vv ,, bb qq -- -- -- (( 55 ))

式中,Ev,rq是统计报告期内,灯具在q照明区域内有关面、地面或作业面上的平均照度,即改造前灯具照明平均照度;Ev,bq是基期内,灯具在q照明区域内有关面、地面或作业面上的平均照度,即改造后灯具照明平均照度;q为照明区域序号;k为照明计算区域的数量。In the formula, E v,rq is the average illuminance of the lamps on the relevant surface, ground or working surface in the q lighting area during the statistical reporting period, that is, the average illuminance of the lamps before the transformation; E v,bq is the base period, the lamps in q The average illuminance of the relevant surface, ground or working surface in the lighting area, that is, the average illuminance of the lighting after the transformation; q is the serial number of the lighting area; k is the number of lighting calculation areas.

所述的方法,步骤S4的智能变电站能效提升改造新增可再生能源设备产生电量,即上网发电量EP,按照下式计算:In the method described, in step S4, the energy efficiency improvement of the smart substation is improved and the electricity generated by the newly added renewable energy equipment, that is, the on-grid power generation E P , is calculated according to the following formula:

EE. pp == Hh AA &times;&times; PP AA ZZ EE. sthe s &times;&times; KK -- -- -- (( 66 ))

式中,HA为水平面太阳能总辐照量,PAZ为组件安装容量,Es为标准条件下的辐照度,K为综合效率系数。In the formula, H A is the total solar irradiance on the horizontal plane, P AZ is the installed capacity of the module, E s is the irradiance under standard conditions, and K is the comprehensive efficiency coefficient.

所述的方法,步骤S5的智能变电站能效提升改造节约电力电量ΔETOTAL计算方法为:In the method described, the calculation method of the smart substation energy efficiency improvement transformation in step S5 to save electric power ΔE TOTAL is:

ΔETOTAL=Δ(ΔE)+ΔAe+EP(7)。ΔE TOTAL =Δ(ΔE)+ΔA e +E P (7).

所述的方法,ΔE按照下式计算:In the described method, ΔE is calculated according to the following formula:

ΔE=P0+KTβ2Pk+KQ(Q0+KTβ2Qk)(8)ΔE=P 0 +K T β 2 P k +K Q (Q 0 +K T β 2 Q k )(8)

其中,P0为改造前变压器空载功率损耗,KT为改造前负载波动损耗系数,β为改造前变压器平均负载系数,Pk为改造前变压器额定负载功率损耗,KQ为改造前无功经济当量。Among them, P 0 is the no-load power loss of the transformer before transformation, K T is the load fluctuation loss coefficient before transformation, β is the average load coefficient of the transformer before transformation, P k is the rated load power loss of the transformer before transformation, and K Q is the reactive power loss before transformation economic equivalent.

所述的方法,KT按照下式计算:In the described method, K T is calculated according to the following formula:

KK TT == KK ff 22 == TT TT 11 &Sigma;&Sigma; ii == 11 TT TT 11 AA ii 22 &Sigma;&Sigma; ii == 11 TT TT 11 AA ii -- -- -- (( 99 ))

式中,Kf为形状系数,TT1为改造前基期时间,Ai为改造前每小时记录的电量,i为时间序号;In the formula, K f is the shape coefficient, T T1 is the time of the base period before the transformation, A i is the electricity recorded per hour before the transformation, and i is the time sequence number;

当Ai无法获取时,查表的具体方法包括:When A i cannot be obtained, the specific methods of looking up the table include:

由电表获得T小时内的有功电量Wp,计算得到T小时的平均有功功率P=Wp/T;由变压器铭牌参数得到变压器额定容量S,则T小时的有功负荷率γTP=P/S;由电表获得T小时内的无功电量Wq,计算得到T小时的平均无功功率Q=Wq/T,则T小时平均功率因数由智能电表获得T小时负荷曲线,在最大有功负荷点得出有功功率Pm和无功功率Qm,由负荷曲线得到T小时以内出现95%以上最大负载的小时数Tm,则最大负荷时功率因数用T小时的有功负荷率γTP、平均功率因数和最大负荷时功率因数计算出视在负荷率γT,即T小时负载的平均视在功率与最大视在功率之比的百分数:式中:γT为T小时的视在负荷率,单位为%;根据T小时内出现95%以上最大负载的小时数Tm,需人工录入,计算出最大负载运行时间的百分率Tm%,即T小时内出现95%以上的最大负载的时间所占的百分数;式中:Tm%为最带负载运行时间百分数,单位为%;根据γT和Tm%的值,再根据《GB/T13462-2008》查表获得负载波动损耗系数KTThe active power Wp within T hours is obtained from the ammeter, and the average active power P=Wp/T is calculated for T hours; the transformer rated capacity S is obtained from the transformer nameplate parameters, and the active load rate γ TP =P/S for T hours; The meter obtains the reactive power Wq in T hours, and calculates the average reactive power Q=Wq/T in T hours, then the average power factor in T hours The T-hour load curve is obtained from the smart meter, the active power P m and the reactive power Q m are obtained at the maximum active load point, and the number of hours T m with 95% or more of the maximum load within T hours is obtained from the load curve, then the maximum load time power factor Active load rate γ TP and average power factor for T hours and power factor at maximum load Calculate the apparent load rate γ T , which is the percentage of the ratio of the average apparent power to the maximum apparent power of the load in T hours: In the formula: γ T is the apparent load rate in T hours, the unit is %; according to the number of hours T m with more than 95% of the maximum load within T hours, it needs to be entered manually to calculate the percentage of the maximum load operating time T m %, That is, the percentage of the time when more than 95% of the maximum load occurs within T hours; In the formula: T m % is the percentage of the most loaded operating time, the unit is %; according to the values of γ T and T m %, the load fluctuation loss coefficient K T is obtained by looking up the table according to "GB/T13462-2008".

所述的方法,β按照下式计算:In the described method, β is calculated according to the following formula:

式中,S为改造前变压器平均输出的视在功率,P为改造前变压器平均输出的有功功率,cosφ为改造前变压器负载侧平均功率因数。In the formula, S is the average output apparent power of the transformer before transformation, P is the average output active power of the transformer before transformation, and cosφ is the average power factor of the load side of the transformer before transformation.

所述的方法,计算ΔE1时,将公式(5)~(7)中任一项的改造前的参数替换为改造后相应的参数,即得到ΔE1的值。In the method described above, when calculating ΔE 1 , the parameters before transformation in any one of the formulas (5) to (7) are replaced with corresponding parameters after transformation to obtain the value of ΔE 1 .

本发明的优点:本发明基于对智能变电站能效升级改造过程中的主要环节,包括电力变压器节能量、站用电改造节约电力电量以及新能源接入产生电力电量进行计算和推导,得到智能变电站能效提升改造节能量,为智能变电站能效升级改造提供强有力的数据支撑,为智能变电站能效提升改造方案的制定提供理论依据和实际指导。Advantages of the present invention: the present invention is based on the calculation and derivation of the main links in the process of energy efficiency upgrading and transformation of smart substations, including the energy saving of power transformers, the power saving of power transformation in stations, and the power generation of new energy access, to obtain the energy efficiency of smart substations Improve the energy saving of transformation, provide strong data support for the energy efficiency upgrading and transformation of smart substations, and provide theoretical basis and practical guidance for the formulation of energy efficiency improvement and transformation plans for smart substations.

附图说明Description of drawings

图1是本发明的流程框图。Fig. 1 is a flowchart of the present invention.

具体实施方式detailed description

本发明涉及一种智能变电站能效提升改造节能量计算方法。该方法从智能变电站能效提升改造措施出发,通过对智能变电站能效提升改造过程中电力变压器改造节电量、站用电改造节约电力电量以及新能源接入产生电力电量进行计算和推导,得到智能变电站能效提升改造节能量。该方法理论新颖,相比于传统的变电站能效提升改造,将新能源接入节约电力电量计入变电站节电量,在实际问题的考虑过程中更全面,为智能变电站能效提升改造节电量的计算提供了一种新的思路和方法。本发明有助于电网企业精确掌握智能变电站能效提升改造节电情况,能够全面预测和获取获取智能变电站能效提升改造效果。The invention relates to a method for calculating energy saving in energy efficiency improvement and transformation of intelligent substations. This method starts from the energy efficiency improvement and transformation measures of smart substations, and calculates and deduces the energy efficiency of smart substations by calculating and deriving the energy saving of power transformer transformation, power saving of station power transformation, and electricity generated by new energy access during the process of energy efficiency improvement and transformation of smart substations. Improve the energy saving of transformation. This method is novel in theory. Compared with traditional substation energy efficiency improvement and transformation, the electricity saved by new energy access is included in the substation energy saving. A new way of thinking and method. The invention helps power grid enterprises to accurately grasp the power saving situation of energy efficiency improvement and transformation of smart substations, and can comprehensively predict and obtain the effect of energy efficiency improvement and transformation of smart substations.

本发明通过对智能变电站能效提升改造过程中主要电力设备(如电力变压器)改造节电量、站用电改造节约电力电量以及新能源接入产生电力电量进行计算和推导,得到智能变电站能效提升改造节能量。一种智能变电站能效提升改造节能量计算方法,主要包含以下步骤:The present invention calculates and deduces the energy saving of the energy efficiency improvement of the smart substation through the calculation and derivation of the main power equipment (such as the power transformer) transformation, the power saving of the station power transformation, and the power generation of the new energy access in the process of upgrading and transforming the energy efficiency of the smart substation. quantity. A method for calculating energy saving in energy efficiency improvement and transformation of smart substations, mainly including the following steps:

S1)收集智能变电站能效提升改造信息;S1) Collect information on energy efficiency improvement and transformation of smart substations;

S2)计算智能变电站能效提升改造变压器节约电力电量;S2) Calculate the energy efficiency of the smart substation to improve and transform the transformer to save electricity;

S3)计算智能变电站能效提升改造节约站用电电量;S3) Calculate the energy efficiency improvement and transformation of smart substations to save power consumption;

S4)计算智能变电站能效提升改造新增可再生能源设备(光伏设备)产生电量;S4) Calculate the electricity generated by the new renewable energy equipment (photovoltaic equipment) in the energy efficiency improvement of the smart substation;

S5)根据智能变电站年运行状况计算智能变电站能效提升改造节约电力电量。S5) According to the annual operation status of the smart substation, calculate the energy efficiency improvement and transformation of the smart substation to save electricity.

所述的方法,步骤S1的参数包括智能变电站能效提升改造前后变压器空载功率损耗,负载波动系数,变压器平均负载系数,变压器额定负载功率损耗,无功经济当量,变压器空载励磁功率,变压器额定负载漏磁功率,站用电照明系统改造前灯具套数,改造前单位灯具功率,年工作时间,改造后灯具套数,改造后单位灯具功率,LED灯的功率调整系数,光伏设备水平面太阳能总辐照量,光伏组件安装容量,综合效率系数。In the method, the parameters in step S1 include transformer no-load power loss before and after smart substation energy efficiency improvement transformation, load fluctuation coefficient, transformer average load coefficient, transformer rated load power loss, reactive power economic equivalent, transformer no-load excitation power, transformer rated Load magnetic flux leakage power, number of lamps and lanterns before transformation of station electric lighting system, unit lamp power before transformation, annual working hours, number of lamps and lanterns after transformation, unit power of lamps and lanterns after transformation, power adjustment factor of LED lights, total solar radiation on the horizontal plane of photovoltaic equipment amount, installed capacity of photovoltaic modules, and comprehensive efficiency coefficient.

所述的方法,所述步骤S2的变压器节电量计算公式为:In the described method, the calculation formula of the power saving of the transformer in the step S2 is:

Δ(ΔE)=(ΔE-ΔE1)×TT(11)Δ(ΔE)=(ΔE-ΔE 1 )×T T (11)

式中:Δ(ΔE)为更换配电变压器年节电量,单位为千瓦时(kWh),ΔE为改造前变压器综合功率损耗,单位为千瓦(kW),ΔE1为改造后变压器综合功率损耗,单位为千瓦(kW),T为变压器年运行时间,单位为小时(h)。In the formula: Δ(ΔE) is the annual energy saving of replacing the distribution transformer, the unit is kilowatt-hour (kWh), ΔE is the comprehensive power loss of the transformer before transformation, the unit is kilowatt (kW), ΔE 1 is the comprehensive power loss of the transformer after transformation, The unit is kilowatt (kW), T is the annual running time of the transformer, and the unit is hour (h).

所述的方法,步骤S3的智能变电站能效提升改造节约站用电电量的计算公式为:In the described method, the calculation formula of the smart substation energy efficiency improvement and transformation saving station power consumption in step S3 is:

ΔAe=Ar-Aa(12)ΔA e =A r -A a (12)

式中,ΔAe为智能变电站能效提升改造节约站用电电量,Ar为LED照明项目统计报告期电耗,单位为千瓦时(kWh),Aa为LED照明项目校准电耗,单位为千瓦时(kWh),ΔAe为LED照明项目节点量,单位为千瓦时(kWh)。In the formula, ΔA e is the power consumption of smart substation energy efficiency improvement and transformation saving station, Ar is the power consumption of LED lighting project statistical report period, the unit is kilowatt-hour (kWh), A a is the calibration power consumption of LED lighting project, the unit is kW hour (kWh), ΔA e is the node quantity of the LED lighting project, and the unit is kilowatt-hour (kWh).

LED照明项目统计报告期电耗计算公式为:The formula for calculating power consumption during the statistical reporting period of LED lighting projects is:

AA rr == &Sigma;&Sigma; ii == 11 nno QQ ii &times;&times; PP ii &times;&times; TT ii &times;&times; &alpha;&alpha; ii -- -- -- (( 1313 ))

式中,Qi为统计报告期内i型号LED等的数量,单位为盏,Pi为统计报告期内i型号LED灯的抽样实测功率平均值或标称输入功率,单位为千瓦(kW),Ti为统计报告期内i型号LED灯平均运行时间,单位为小时(h),i为LED灯的型号,n为LED灯型号的数量,单位为种,αi为统计报告期内,i型号LED灯的功率调整系数,0<αi≤1;若没有控制系统αi=1。In the formula, Q i is the number of LED lamps of type i in the statistical reporting period, and the unit is pcs; P i is the average value or nominal input power of the sampled measured power of LED lamps of type i in the statistical reporting period, and the unit is kilowatts (kW) , T i is the average running time of LED lights of type i in the statistical reporting period, the unit is hours (h), i is the model of LED lights, n is the number of LED light models, the unit is species, α i is the statistical reporting period, The power adjustment coefficient of the i-type LED lamp, 0<α i ≤1; if there is no control system α i =1.

LED照明项目校准电耗可按计算公式为:The calibration power consumption of LED lighting projects can be calculated according to the formula:

AA aa == (( 11 ++ AA mm )) &Sigma;&Sigma; jj == 11 mm QQ jj &times;&times; PP jj &times;&times; TT jj &times;&times; &alpha;&alpha; jj -- -- -- (( 1414 ))

式中,Qj为基期内j型号LED等的数量,单位为盏,Pj为基期内j型号LED灯的抽样实测功率平均值或标称输入功率,单位为千瓦(kW),Tj为基期内j型号LED灯平均运行时间,单位为小时(h),j为被LED替代的照明型号,m为被LED替代的照明型号的数量,单位为种,αj为基期内,j型号LED灯的功率调整系数,0<αj≤1;若没有控制系统αj=1,Am为LED照明项目校准电耗调整系数,其值可正可负。In the formula, Q j is the number of LEDs of type j in the base period, and the unit is pcs; P j is the average value or nominal input power of the sampled measured power of LED lamps of type j in the base period, and the unit is kilowatts (kW), and T j is The average running time of j type LED lamps in the base period, the unit is hours (h), j is the lighting model replaced by LED, m is the number of lighting models replaced by LED, the unit is species, α j is the base period, j type LED The power adjustment coefficient of the lamp, 0<α j ≤1; if there is no control system α j =1, A m is the power consumption adjustment coefficient for LED lighting project calibration, and its value can be positive or negative.

LED照明项目校准电耗调整系数计算公式为:The formula for calculating the power consumption adjustment factor for LED lighting project calibration is:

AA mm == &Sigma;&Sigma; qq == 11 kk EE. vv ,, rr qq -- &Sigma;&Sigma; qq == 11 kk EE. vv ,, bb qq &Sigma;&Sigma; qq == 11 kk EE. vv ,, bb qq -- -- -- (( 1515 ))

式中,Ev,rq是统计报告期内,LED照明在q照明区域内有关面、地面或作业面上的平均照度,单位为勒克斯(lx),Ev,bq是基期内,被LED替代的照明在q照明区域内有关面、地面或作业面上的平均照度,单位为勒克斯(lx),q为照明区域,k为计算区域的数量。在照度和照明功率密度符合GB50034、GB50582、GJJ45和JGJ/T163规定的前提下,评价相关方可酌情考虑Am,项目改造后照度减小,但照度和照明功率密度仍符合国家相关标准,经评价相关方认可,Am可忽略不计。In the formula, E v,rq is the average illuminance of LED lighting on the relevant surface, ground or working surface in the q lighting area during the statistical reporting period, the unit is lux (lx), E v,bq is the base period, replaced by LED The average illuminance of the lighting on the relevant surface, ground or work surface in the q lighting area, the unit is lux (lx), q is the lighting area, and k is the number of calculation areas. Under the premise that the illuminance and lighting power density comply with the provisions of GB50034, GB50582, GJJ45 and JGJ/T163, relevant parties in the evaluation can consider A m as appropriate. Approved by relevant parties, A m is negligible.

所述的方法,步骤S4的智能变电站能效提升改造新增可再生能源设备(光伏设备)产生电量计算公式为:In the method described, the formula for calculating the electricity generated by the newly added renewable energy equipment (photovoltaic equipment) in step S4 is as follows:

EE. pp == Hh AA &times;&times; PP AA ZZ EE. sthe s &times;&times; KK -- -- -- (( 1616 ))

式中,HA为水平面太阳能总辐照量(kW·h/m2),PAZ为组件安装容量(kWp),EP为上网发电量(kW·h),Es为标准条件下的辐照度(常数=1kW·h/m2),K为综合效率系数。In the formula, H A is the total solar radiation on the horizontal surface (kW h/m 2 ), P AZ is the installed capacity of modules (kWp), E P is the grid-connected power generation (kW h), and E s is the Irradiance (constant=1kW·h/m 2 ), K is the comprehensive efficiency coefficient.

所述的方法,步骤S5的智能变电站能效提升改造整体节约电力电量计算方法为In the method described, the calculation method for the overall saving of electric power in the energy efficiency improvement of the smart substation in step S5 is as follows:

ΔETOTAL=Δ(ΔET)+ΔEL+EP(17)ΔE TOTAL = Δ(ΔE T )+ΔE L +E P (17)

式中,ΔETOTAL为智能变电站能效提升改造节约电力电量。In the formula, ΔE TOTAL is the energy efficiency improvement and transformation of smart substations to save electricity.

下面结合附图和实例进一步详述本发明。Below in conjunction with accompanying drawing and example further describe the present invention in detail.

本发明采取的技术方案包含以下步骤:The technical scheme that the present invention takes comprises the following steps:

S1)收集智能变电站能效提升改造信息,主要包括变压器改造、站用电照明改造以及新能源接入参数;S1) Collect information on energy efficiency improvement and transformation of smart substations, mainly including transformation of transformers, transformation of station power lighting and new energy access parameters;

S2)计算智能变电站能效提升改造变压器节约电力电量;S2) Calculate the energy efficiency of the smart substation to improve and transform the transformer to save electricity;

S3)计算智能变电站能效提升改造节约站用电电量;S3) Calculate the energy efficiency improvement and transformation of smart substations to save power consumption;

S4)计算智能变电站能效提升改造新增可再生能源设备产生电量;S4) Calculate the electricity generated by the new renewable energy equipment for energy efficiency improvement and transformation of smart substations;

S5)根据智能变电站年运行状况计算智能变电站能效提升改造整体节约电力电量。S5) According to the annual operation status of the smart substation, calculate the overall energy saving of the smart substation for energy efficiency improvement and transformation.

1、收集智能变电站能效提升改造信息1. Collect information on energy efficiency improvement and transformation of smart substations

1)统计相关技术资料,为节能量计算奠定基础,主要包括以下信息:1) Statistical relevant technical data to lay the foundation for energy saving calculation, mainly including the following information:

智能变电站能效提升改造前后变压器空载功率损耗,负载波动系数,变压器平均负载系数,变压器额定负载功率损耗,无功经济当量,变压器空载励磁功率,变压器额定负载漏磁功率。Transformer no-load power loss, load fluctuation coefficient, transformer average load factor, transformer rated load power loss, reactive economic equivalent, transformer no-load excitation power, transformer rated load flux leakage power before and after smart substation energy efficiency improvement and transformation.

2)站用电照明系统改造前灯具套数,改造前单位灯具功率,年工作时间,改造后灯具套数,改造后单位灯具功率,年工作时间,LED灯的功率调整系数,。2) The number of lamp sets before the transformation of the station electric lighting system, the unit lamp power before the transformation, the annual working time, the number of lamp sets after the transformation, the unit lamp power after the transformation, the annual working time, and the power adjustment factor of the LED lamp.

3)光伏设备水平面太阳能总辐照量,综合效率系数。3) The total solar radiation on the horizontal plane of the photovoltaic equipment, and the comprehensive efficiency coefficient.

2、计算智能变电站能效提升改造变压器节约电力电量2. Calculating the energy efficiency improvement of smart substations and transforming transformers to save electricity

ΔE=P0+KTβ2Pk+KQ(Q0+KTβ2Qk)(18)ΔE=P 0 +K T β 2 P k +K Q (Q 0 +K T β 2 Q k )(18)

式中,ΔE为变压器综合功率损耗,单位为千瓦(kW),P0为变压器空载功率损耗,单位为千瓦(kW),KT为负载波动损耗系数,β为变压器平均负载系数,Pk为变压器额定负载功率损耗,单位为千瓦(kW),KQ为无功经济当量,单位为千瓦每千乏(kW/kvar),Q0为变压器空载励磁功率,单位为千乏(kvar),Qk为变压器额定负载漏磁功率,单位为千乏(kvar)。In the formula, ΔE is the comprehensive power loss of the transformer, the unit is kilowatt (kW), P 0 is the no-load power loss of the transformer, the unit is kilowatt (kW), K T is the load fluctuation loss coefficient, β is the average load factor of the transformer, P k is the rated load power loss of the transformer, the unit is kilowatts (kW), K Q is the reactive economic equivalent, the unit is kilowatts per kilovar (kW/kvar), Q 0 is the no-load excitation power of the transformer, the unit is kilovars (kvar) , Q k is the rated load flux leakage power of the transformer, in kilovar (kvar).

KK TT == KK ff 22 == TT TT 11 &Sigma;&Sigma; ii == 11 TT TT 11 AA ii 22 &Sigma;&Sigma; ii == 11 TT TT 11 AA ii -- -- -- (( 1919 ))

式中,TT1为基期(工作代表日、月工作日或年工作日)时间,单位为小时(h),Ai为每小时记录的电量,单位为千瓦时(kWh);In the formula, T T1 is the time of the base period (working representative day, monthly working day or annual working day), the unit is hour (h), A i is the electricity recorded per hour, the unit is kilowatt-hour (kWh);

Δ(ΔE)=(ΔE-ΔE1)×TT(20)Δ(ΔE)=(ΔE-ΔE 1 )×T T (20)

式中,Δ(ΔE)为更换配电变压器年节电量,单位为千瓦时(kWh),ΔE为改造前变压器综合功率损耗,单位为千瓦(kW),ΔE1为改造后变压器综合功率损耗,单位为千瓦(kW),TT为变压器年运行时间,单位为小时(h)。In the formula, Δ(ΔE) is the annual energy saving of replacing the distribution transformer, the unit is kilowatt-hour (kWh), ΔE is the comprehensive power loss of the transformer before transformation, the unit is kilowatt (kW), ΔE 1 is the comprehensive power loss of the transformer after transformation, The unit is kilowatt (kW), and T T is the annual running time of the transformer, and the unit is hour (h).

式中,S为变压器平均输出的视在功率,单位为千伏安(kVA),SN为变压器额定容量,单位为千伏安(kVA),P为变压器平均输出的有功功率,单位为千瓦(kW),cosφ为变压器负载侧平均功率因数。In the formula, S is the apparent power of the average output of the transformer in kilovolt-amperes (kVA), S N is the rated capacity of the transformer in kilovolt-amperes (kVA), and P is the average output active power of the transformer in kilowatts (kW), cosφ is the average power factor of the transformer load side.

3、计算智能变电站能效提升改造节约站用电电量3. Calculation of energy efficiency improvement and transformation of smart substations to save power consumption of substations

ΔAe=Ar-Aa(22)ΔA e =A r -A a (22)

式中,ΔAe为智能变电站能效提升改造节约站用电电量,Ar为LED照明项目统计报告期电耗,单位为千瓦时(kWh),Aa为LED照明项目校准电耗,单位为千瓦时(kWh),ΔAe为LED照明项目节点量,单位为千瓦时(kWh)。In the formula, ΔA e is the power consumption of smart substation energy efficiency improvement and transformation saving station, Ar is the power consumption of LED lighting project statistical report period, the unit is kilowatt-hour (kWh), A a is the calibration power consumption of LED lighting project, the unit is kW hour (kWh), ΔA e is the node quantity of the LED lighting project, and the unit is kilowatt-hour (kWh).

LED照明项目统计报告期电耗计算公式为:The formula for calculating power consumption during the statistical reporting period of LED lighting projects is:

AA rr == &Sigma;&Sigma; ii == 11 nno QQ ii &times;&times; PP ii &times;&times; TT ii &times;&times; &alpha;&alpha; ii -- -- -- (( 23twenty three ))

式中,Qi为统计报告期内i型号LED等的数量,单位为盏,Pi为统计报告期内i型号LED灯的抽样实测功率平均值或标称输入功率,单位为千瓦(kW),Ti为统计报告期内i型号LED灯平均运行时间,单位为小时(h),i为LED灯的型号,n为LED灯型号的数量,单位为种,αi为统计报告期内,i型号LED灯的功率调整系数,0<αi≤1;若没有控制系统αi=1。In the formula, Q i is the number of LED lamps of type i in the statistical reporting period, and the unit is pcs; P i is the average value or nominal input power of the sampled measured power of LED lamps of type i in the statistical reporting period, and the unit is kilowatts (kW) , T i is the average running time of LED lights of type i in the statistical reporting period, the unit is hours (h), i is the model of LED lights, n is the number of LED light models, the unit is species, α i is the statistical reporting period, The power adjustment coefficient of the i-type LED lamp, 0<α i ≤1; if there is no control system α i =1.

LED照明项目校准电耗可按计算公式为:The calibration power consumption of LED lighting projects can be calculated according to the formula:

AA aa == (( 11 ++ AA mm )) &Sigma;&Sigma; jj == 11 mm QQ jj &times;&times; PP jj &times;&times; TT jj &times;&times; &alpha;&alpha; jj -- -- -- (( 24twenty four ))

式中,Qj为基期内j型号LED等的数量,单位为盏,Pj为基期内j型号LED灯的抽样实测功率平均值或标称输入功率,单位为千瓦(kW),Tj为基期内j型号LED灯平均运行时间,单位为小时(h),j为被LED替代的照明型号,m为被LED替代的照明型号的数量,单位为种,αj为基期内,j型号LED灯的功率调整系数,0<αj≤1;若没有控制系统αj=1,Am为LED照明项目校准电耗调整系数,其值可正可负。In the formula, Q j is the number of LEDs of type j in the base period, and the unit is pcs; P j is the average value or nominal input power of the sampled measured power of LED lamps of type j in the base period, and the unit is kilowatts (kW), and T j is The average running time of j type LED lamps in the base period, the unit is hours (h), j is the lighting model replaced by LED, m is the number of lighting models replaced by LED, the unit is species, α j is the base period, j type LED The power adjustment coefficient of the lamp, 0<α j ≤1; if there is no control system α j =1, A m is the power consumption adjustment coefficient for LED lighting project calibration, and its value can be positive or negative.

LED照明项目校准电耗调整系数计算公式为:The formula for calculating the power consumption adjustment factor for LED lighting project calibration is:

AA mm == &Sigma;&Sigma; qq == 11 kk EE. vv ,, rr qq -- &Sigma;&Sigma; qq == 11 kk EE. vv ,, bb qq &Sigma;&Sigma; qq == 11 kk EE. vv ,, bb qq -- -- -- (( 2525 ))

式中,Ev,rq是统计报告期内,LED照明在q照明区域内有关面、地面或作业面上的平均照度,单位为勒克斯(lx),Ev,bq是基期内,被LED替代的照明在q照明区域内有关面、地面或作业面上的平均照度,单位为勒克斯(lx),q为照明区域,k为计算区域的数量。在照度和照明功率密度符合GB50034、GB50582、GJJ45和JGJ/T163规定的前提下,评价相关方可酌情考虑Am,项目改造后照度减小,但照度和照明功率密度仍符合国家相关标准,经评价相关方认可,Am可忽略不计。In the formula, E v,rq is the average illuminance of LED lighting on the relevant surface, ground or working surface in the q lighting area during the statistical reporting period, the unit is lux (lx), E v,bq is the base period, replaced by LED The average illuminance of the lighting on the relevant surface, ground or work surface in the q lighting area, the unit is lux (lx), q is the lighting area, and k is the number of calculation areas. Under the premise that the illuminance and lighting power density comply with the provisions of GB50034, GB50582, GJJ45 and JGJ/T163, relevant parties in the evaluation can consider A m as appropriate. Approved by relevant parties, A m is negligible.

4、计算智能变电站能效提升改造新增可再生能源设备(光伏设备)产生电量4. Calculation of electricity generated by new renewable energy equipment (photovoltaic equipment) in smart substation energy efficiency improvement and transformation

EE. pp == Hh AA &times;&times; PP AA ZZ EE. sthe s &times;&times; KK -- -- -- (( 2626 ))

式中,HA为水平面太阳能总辐照量(kW·h/m2),PAZ为组件安装容量(kWp),EP为上网发电量(kW·h),Es为标准条件下的辐照度(常数=1kW·h/m2),K为综合效率系数。综合效率系数K包括:光伏组件类型修正系数、光伏仿真的倾角、方位角修正系数、光伏发电系统可用率、光照利用率、逆变器效率、集电线路损耗、升压变压器损耗、光伏组件表面污染修正系数、光伏组件转换效率修正系数。In the formula, H A is the total solar radiation on the horizontal surface (kW h/m 2 ), P AZ is the installed capacity of modules (kWp), E P is the grid-connected power generation (kW h), and E s is the Irradiance (constant=1kW·h/m 2 ), K is the comprehensive efficiency coefficient. The comprehensive efficiency coefficient K includes: photovoltaic module type correction coefficient, photovoltaic simulation inclination angle, azimuth angle correction coefficient, photovoltaic power generation system availability rate, light utilization rate, inverter efficiency, collector line loss, step-up transformer loss, photovoltaic module surface Pollution correction factor, photovoltaic module conversion efficiency correction factor.

5、根据智能变电站年运行状况计算智能变电站能效提升改造整体节约电力电量5. According to the annual operation status of the smart substation, calculate the overall energy saving of the smart substation for energy efficiency improvement and renovation

ΔETOTAL=Δ(ΔET)+ΔEL+EP(27)ΔE TOTAL = Δ(ΔE T )+ΔE L +E P (27)

式中,ΔETOTAL为智能变电站能效提升改造节约电力电量。In the formula, ΔE TOTAL is the energy efficiency improvement and transformation of smart substations to save electricity.

Claims (10)

1. intelligent substation efficiency Promotion Transformation amount of energy saving computational methods, comprising:
S1) according to intelligent substation efficiency Promotion Transformation information, determine, detect transformer station's parameters;
S2) computational intelligence substation energy efficiency Promotion Transformation transformer conservation of power electricity;
S3) computational intelligence substation energy efficiency Promotion Transformation saving station power consumption;
S4) computational intelligence substation energy efficiency Promotion Transformation increases renewable energy source device newly and produces electricity;
S5) according to intelligent substation operation conditions computational intelligence substation energy efficiency Promotion Transformation conservation of power electricity.
2. method according to claim 1, it is characterized in that: the determined Substation parameters of described step S1 comprises no-load transformer power loss before and after intelligent substation efficiency Promotion Transformation, fluctuation of load loss factor, transformer average load coefficient, transformer nominal load power loss, non-work economic equivalent, no-load transformer exciting power, transformer nominal load leakage field power, stand by light fixture tricks before electric lighting system transformation, unit lamp power before transformation, light fixture tricks after transformation, unit lamp power after transformation, the power regulation factor of light fixture before and after transformation, the running time of fixture, the quantity of light fixture model, the quantity in lighting calculation region, lamp lighting average illumination before and after transformation, the total irradiation of photovoltaic apparatus horizontal plane solar energy, photovoltaic module installed capacity, irradiance under reference condition, overall efficiency coefficient, transformer equipment year running time T t, need manual entry, time in base period T before transformation t1, need manual entry,
The method detecting transformer station's parameters comprises: before and after transformation, no-load transformer power loss is nameplate parameter, needs manual entry; Fluctuation of load loss factor can be obtained by calculating, and need provide record electricity per hour, this record electricity is obtained by more than 2.0 grades energy measurement instruments, obtains fluctuation of load loss factor when this record electricity cannot obtain by tabling look-up; Transformer average load coefficient is in certain hour, the ratio of the apparent power that transformer on average exports and transformer rated capacity, and obtain by calculating, the apparent power of transformer is obtained by more than 2.0 grades energy measurement instruments; Transformer nominal load power loss is nameplate parameter; Non-work economic equivalent is by acquisition of tabling look-up;
No-load transformer exciting power Q 0obtained by calculating, Q 0=I 0%S n× 10 -2, wherein I 0% is no-load current percentage, is transformer nameplate parameter, S nbeing transformer rated capacity, is transformer nameplate parameter; Transformer nominal load leakage field power Q kobtained by calculating, Q k=U k%S n× 10 -2, wherein U k% is transformer short-circuit voltage percentage, is transformer nameplate parameter, S nbeing transformer rated capacity, is transformer nameplate parameter; Stand and transform forward and backward light fixture tricks with electric lighting system and need manual entry; Transforming forward and backward unit lamp power is nominal parameter, needs manual entry; The power regulation factor of light fixture needs manual entry; Before and after transformation, the running time of fixture needs manual entry; The quantity of light fixture model, the quantity in lighting calculation region, before and after transformation, lamp lighting average illumination, needs manual entry; The total irradiation of photovoltaic apparatus horizontal plane solar energy is by acquisition of tabling look-up; Photovoltaic module installed capacity needs manual entry; Irradiance under reference condition is constant 1kWh/m 2; Overall efficiency coefficient, it is the correction factor after considering various factors impact, comprising: 1) photovoltaic module type correction factor, 2) inclination angle of photovoltaic arrays, azimuth correction factor, 3) photovoltaic generating system availability factor, 4) illumination utilance, 5) inverter efficiency, 6) current collection circuit, step-up transformer loss, 7) photovoltaic module surface contamination correction factor, 8) photovoltaic module conversion efficiency correction factor, the value of overall efficiency coefficient, between 75%-85%, needs manual entry.
3. method according to claim 2, is characterized in that: the transformer conservation of power electricity of described step S2, namely changes distribution transformer year amount of electricity saving Δ (Δ E), calculates according to the following formula:
Δ(ΔE)=(ΔE-ΔE 1)×T T(1)
In formula: Δ E is transformer synthesis power loss before transformation, Δ E 1for transforming rear transformer synthesis power loss, T tfor running time in transformer equipment year.
4. method according to claim 3, is characterized in that: the intelligent substation efficiency Promotion Transformation saving station power consumption Δ A of step S3 ecomputing formula be:
ΔA e=A r-A a(2)
In formula, A rfor lamp lighting project statistical report phase power consumption, A afor lamp lighting project calibration power consumption;
A rcomputing formula is:
A r = &Sigma; i = 1 n Q i &times; P i &times; T i &times; &alpha; i - - - ( 3 )
In formula, Q ifor the quantity of i model light fixture in the statistical report phase, i.e. certain model light fixture quantity before transformation; P ifor measured sample power average value or the nominal input power of i model light fixture in the statistical report phase, i.e. unit lamp power before transformation; T ifor i model light fixture average operating time in the statistical report phase, i.e. the running time of the front fixture of transformation; I is the model sequence number of light fixture before transformation, is natural number; N is the quantity of light fixture model before transformation; α ifor in the statistical report phase, the power regulation factor of i model light fixture, the i.e. power regulation factor of the front light fixture of transformation, 0< α i≤ 1, if there is no control system α i=1;
A acomputing formula is:
A a = ( 1 + A m ) &Sigma; j = 1 m Q j &times; P j &times; T j &times; &alpha; j - - - ( 4 )
In formula, Q jfor the quantity of j model light fixture in the base period, i.e. certain model light fixture quantity after transformation; P jfor measured sample power average value or the nominal input power of j model light fixture in the base period, i.e. unit lamp power after transformation; T jfor j model light fixture average operating time in the base period, i.e. the running time of the front fixture of transformation; J is the model of light fixture after transformation; M is the quantity of light fixture model after transformation; α jfor in the base period, the power regulation factor of j model light fixture, the i.e. power regulation factor of the rear light fixture of transformation, 0< α j≤ 1, if there is no control system α j=1; A mfor lamp lighting project calibration power consumption regulation coefficient, its value can just can be born;
A mcomputing formula is:
A m = &Sigma; q = 1 k F v , r q - &Sigma; q = 1 k F v , b q &Sigma; q = 1 k F v , b q - - - ( 5 )
In formula, E v, rqbe in the statistical report phase, light fixture about the average illumination in face, ground or the scope of operation, namely transforms front lamp lighting average illumination in q field of illumination; E v, bqbe in the base period, light fixture about the average illumination in face, ground or the scope of operation, namely transforms rear lamp lighting average illumination in q field of illumination; Q is field of illumination sequence number; K is the quantity in lighting calculation region.
5. method according to claim 4, is characterized in that: the intelligent substation efficiency Promotion Transformation of step S4 increases renewable energy source device newly and produces electricity, and namely surf the Net energy output E p, calculate according to the following formula:
E p = H A &times; P A Z E s &times; K - - - ( 6 )
In formula, H afor the total irradiation of horizontal plane solar energy, P aZfor assembly installed capacity, E sfor the irradiance under reference condition, K is overall efficiency coefficient.
6. method according to claim 5, is characterized in that: the intelligent substation efficiency Promotion Transformation conservation of power electricity Δ E of step S5 tOTALcomputational methods are:
ΔE TOTAL=Δ(ΔE)+ΔA e+E P(7)。
7. method according to claim 3, is characterized in that, Δ E calculates according to the following formula:
ΔE=P 0+K Tβ 2P k+K Q(Q 0+K Tβ 2Q k)(8)
Wherein, P 0for transforming front no-load transformer power loss, K tfor transforming front fluctuation of load loss factor, β is transformer average load coefficient before transformation, P kfor transforming front transformer nominal load power loss, K qfor transforming front non-work economic equivalent.
8. method according to claim 7, is characterized in that, K tcalculate according to the following formula:
K T = K f 2 = T T 1 &Sigma; i = 1 T T 1 A i 2 &Sigma; i = 1 T T 1 A i - - - ( 9 )
In formula, K ffor form factor, T t1for transforming the front time in base period, A ifor transforming the electricity of front record per hour, i is time sequence number;
Work as A iwhen cannot obtain, the concrete grammar of tabling look-up comprises:
Obtain the active energy Wp in T hour by ammeter, calculate the average active power P=Wp/T of T hour; Transformer rated capacity S is obtained, then the burden with power rate γ of T hour by transformer nameplate parameter tP=P/S; Obtain the capacity of idle power Wq in T hour by ammeter, calculate the average reactive power Q=Wq/T of T hour, then T hourly average power factor obtain T hour load curve by intelligent electric meter, draw active-power P at maximum burden with power point mand reactive power Q m, obtain by load curve the hourage T occurring more than 95% maximum load within T hour m, then busy hour power factor with the burden with power rate γ of T hour tP, average power factor with busy hour power factor calculate apparent load rate γ t, i.e. the percentage of the average apparent power of load in T hour and the ratio of maximum apparent power: in formula: γ tfor the apparent load rate of T hour, unit was %; According to the hourage T occurring more than 95% maximum load in T hour m, need manual entry, calculate the percentage T of maximum load running time m, namely in T hour, there is the percentage shared by the time of the maximum load of more than 95% in %; in formula: T m% is most bringing onto load percentage running time, and unit is %; According to γ tand T mthe value of %, then table look-up according to " GB/T13462-2008 " and obtain fluctuation of load loss factor K t.
9. method according to claim 8, is characterized in that, β calculates according to the following formula:
In formula, S is the apparent power that before transformation, transformer on average exports, and P is the active power that before transformation, transformer on average exports, and cos φ is transformer load side average power factor before transformation.
10. the method according to any one of claim 7 ~ 9, is characterized in that: calculate Δ E 1time, after the parameter before the transformation any one of formula (5) ~ (7) being replaced with transformation, corresponding parameter, namely obtains Δ E 1value.
CN201510719062.2A 2015-10-29 2015-10-29 A kind of intelligent substation efficiency Promotion Transformation amount of energy saving computational methods Active CN105391051B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510719062.2A CN105391051B (en) 2015-10-29 2015-10-29 A kind of intelligent substation efficiency Promotion Transformation amount of energy saving computational methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510719062.2A CN105391051B (en) 2015-10-29 2015-10-29 A kind of intelligent substation efficiency Promotion Transformation amount of energy saving computational methods

Publications (2)

Publication Number Publication Date
CN105391051A true CN105391051A (en) 2016-03-09
CN105391051B CN105391051B (en) 2018-01-02

Family

ID=55423016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510719062.2A Active CN105391051B (en) 2015-10-29 2015-10-29 A kind of intelligent substation efficiency Promotion Transformation amount of energy saving computational methods

Country Status (1)

Country Link
CN (1) CN105391051B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107046286A (en) * 2017-05-12 2017-08-15 国网上海市电力公司 Calculation Method of Theoretical Line Loss in Low-Voltage Distribution Station Based on Forward-Back Substitution Method
CN107248739A (en) * 2017-06-12 2017-10-13 广东电网有限责任公司电力调度控制中心 Conventional substation upgrades to the optimization method of intelligent substation in a kind of power distribution network
CN110460094A (en) * 2019-08-07 2019-11-15 天津市电力科技发展有限公司 A power configuration method of photovoltaic power generation system for energy-saving transformation of substations
CN111753245A (en) * 2020-07-08 2020-10-09 国网河南省电力公司电力科学研究院 Calculation method of maximum energy saving under the condition of fixed operation times of capacity regulating distribution transformer

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103678931A (en) * 2013-12-23 2014-03-26 国家电网公司 Transformer substation coverage area energy efficiency assessing method based on precise measurement load data
CN103678819A (en) * 2013-12-23 2014-03-26 国家电网公司 Method for measuring and evaluating energy saving amount of distribution transformer
US20140277796A1 (en) * 2013-03-15 2014-09-18 Dominion Resources, Inc. Electric power system control with planning of energy demand and energy efficiency using ami-based data analysis

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140277796A1 (en) * 2013-03-15 2014-09-18 Dominion Resources, Inc. Electric power system control with planning of energy demand and energy efficiency using ami-based data analysis
CN103678931A (en) * 2013-12-23 2014-03-26 国家电网公司 Transformer substation coverage area energy efficiency assessing method based on precise measurement load data
CN103678819A (en) * 2013-12-23 2014-03-26 国家电网公司 Method for measuring and evaluating energy saving amount of distribution transformer

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
龚尊等: "节能型变电站应用前期研究", 《上海电力》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107046286A (en) * 2017-05-12 2017-08-15 国网上海市电力公司 Calculation Method of Theoretical Line Loss in Low-Voltage Distribution Station Based on Forward-Back Substitution Method
CN107248739A (en) * 2017-06-12 2017-10-13 广东电网有限责任公司电力调度控制中心 Conventional substation upgrades to the optimization method of intelligent substation in a kind of power distribution network
CN107248739B (en) * 2017-06-12 2019-11-08 广东电网有限责任公司电力调度控制中心 An optimization method for upgrading a conventional substation to a smart substation in a distribution network
CN110460094A (en) * 2019-08-07 2019-11-15 天津市电力科技发展有限公司 A power configuration method of photovoltaic power generation system for energy-saving transformation of substations
CN111753245A (en) * 2020-07-08 2020-10-09 国网河南省电力公司电力科学研究院 Calculation method of maximum energy saving under the condition of fixed operation times of capacity regulating distribution transformer
CN111753245B (en) * 2020-07-08 2022-07-05 国网河南省电力公司电力科学研究院 Calculation method of maximum energy saving under the condition of fixed operation times of capacity regulating distribution transformer

Also Published As

Publication number Publication date
CN105391051B (en) 2018-01-02

Similar Documents

Publication Publication Date Title
EP2472694A2 (en) Methods and systems for controlling a power conversion system
CN105337301B (en) The selection method and device of micro-grid connection point
CN104124918A (en) A comprehensive detection method for power generation efficiency suitable for photovoltaic power plants
CN105141253B (en) Photovoltaic output curve slope-based photovoltaic electricity-sealing identification method
CN112350369B (en) Energy efficiency evaluation method for optical storage and charging integrated power station
CN104600719A (en) System and method for connecting photovoltaic power generation system with comprehensive reactive compensation control system in grid-connected mode
CN105391051B (en) A kind of intelligent substation efficiency Promotion Transformation amount of energy saving computational methods
Yoomak et al. Investigation and feasibility evaluation of using nanogrid technology integrated into road lighting system
CN106384015A (en) Energy consumption data collection-based distributed photovoltaic system energy efficiency pre-estimation method
CN109038541A (en) A kind of photovoltaic electric station grid connection electromagnetic transient modeling and Harmonic Evaluation Method
Shvedov et al. Impact of solar generation connected to 0.4 kV grid on the power losses and the shape factor of load curve
CN107834598A (en) A kind of dispatch automated system based on solar power generation
CN105354637A (en) Method for making operation plan of electrical heating heat storage using wind curtailment electricity for heating
CN115800401A (en) Method for evaluating openable capacity and carrying capacity of distributed photovoltaic access low-voltage power grid in consideration of power quality
CN107808231A (en) Lift the technical tactic appraisal procedure that power distribution network distributed photovoltaic receives ability
CN103684213A (en) Method for designing wind and solar hybrid system
CN106597083B (en) A kind of parallel reactive power compensator amount of electricity saving evaluation of uncertainty in measurement method
CN104485672A (en) Photovoltaic inverter group self-balancing control method and system applicable to micro grid
CN109119988B (en) Photovoltaic-battery microgrid energy scheduling management method based on dynamic wholesale market price
CN105139275A (en) Method for establishing distributed photovoltaic power stealing cost benefit evaluation model
CN109615114A (en) Evaluation method of economic benefits based on photovoltaic power generation as a centralized power source
CN106026166B (en) A method for detecting reactive power capacity of a new energy power station connected to a weak power grid
Warman et al. Energy cost unit of street and park lighting system with solar technology for a more friendly city
CN105262144B (en) A kind of distributed power source optimal dispatch control method of multigroup net form state
CN204615495U (en) Based on photovoltaic power generation apparatus and the water pump system thereof of city&#39;s electronic compensating

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant