Jones et al., 1998 - Google Patents
New Single Trip Perforating and Gravel Pack Procedure with Advanced Stimulation Design Reduces Formation Damage in High Permeability Sandstone Reservoirs …Jones et al., 1998
- Document ID
- 15684759536154640936
- Author
- Jones R
- Bolin T
- Publication year
- Publication venue
- SPE International Conference and Exhibition on Formation Damage Control
External Links
Snippet
Fluid loss that can occur when performing sand control operations in high-permeability sandstone formations has traditionally caused operators much concern because of the formation damage that can result, reducing production potentials and increasing operational …
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/10—Setting of casings, screens, liners or the like in wells
- E21B43/103—Setting of casings, screens, liners or the like in wells of expandable casings, screens, liners, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/04—Gravelling of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/08—Screens or liners
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
- E21B43/119—Details, e.g. for locating perforating place or direction
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B37/00—Methods or apparatus for cleaning boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B29/00—Cutting or destroying pipes, packers, plugs, or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Miller et al. | Unlocking tight oil: selective multi-stage fracturing in the Bakken shale | |
McDaniel et al. | Limited-entry frac applications on long intervals of highly deviated or horizontal wells | |
Seale et al. | An effective horizontal well completion and stimulation system | |
Jones et al. | New Single Trip Perforating and Gravel Pack Procedure with Advanced Stimulation Design Reduces Formation Damage in High Permeability Sandstone Reservoirs: Case Histories | |
Ismail et al. | 7in Enhanced Single-Trip Multizone System ESTMZ: Fracturing Design, Execution and Operation Lessons Learnt in Highly Deviated Well with Nearby Shale, Coal and Water Contact | |
Athavale et al. | Refracturing technology restores profitability of older unconventional wells in Southeast New Mexico | |
Harris | Innovative Through-Tubing Cement Packer Technique | |
Rao et al. | World's First Deepwater Propellant Perforation for a Depleted Carbonate Subsea Gas Well in Malampaya | |
Maddox et al. | Cementless multi-zone horizontal completion yields three-fold increase | |
Rodgerson et al. | External Casing Perforating Provides Optimal Treatment Coverage in Horizontal Pay | |
Wolny et al. | Coiled-tubing fracturing increases deliverability, recoverable reserves, and NPV of infill development wells in a mature shallow gas field | |
Cox et al. | Innovative Sand-Control Screen Assembly Enables Successful Multi-Lobe Frac Packs in Adverse Recompletion Conditions | |
Bela et al. | World First Extension Pack with 7" Enhanced Single Trip Multi Zone System: Success Case and Learning Points on the Installation and Treatment Design | |
El-Bermawy et al. | A unique approach to enhancing production from depleted, highly laminated sand reservoirs using a combined propellant/perforating technique | |
Al-Mutairi et al. | Remarkable Results from Water Shutoff Treatments Using a New Deep Penetrating Polymer System—Case Histories from South Umm Gudair Field, DZ-Kuwait/Saudi Arabia | |
Jones | Single Trip perforating and gravel pack system reduces formation damage in offshore Gulf of Mexico wells: Case histories and guidelines for candidate selection | |
Ali et al. | Successful Deployment of Metal Expandable Annular Sealing Systems in High Extended Reach Wells | |
Gonzalez et al. | Case study: sand management evolution in a brownfield | |
Joseph | Case History: First of its Kind: Installation of the Multizone Single Trip MST Technology in Deep Water, India | |
Tokoh et al. | World Longest 7 in Single Trip for Multizones High Rate Water Pack Enhances Completion Strategy in Offshore Indonesia | |
Folse et al. | Field Performance of Propellant/Perforating Technologies to Enhance Placement of Proppant on High Risk Sand-Control Completions | |
Godwin et al. | Simultaneous gravel packing and filtercake cleanup with shunt tubes in open-hole completions: a case history from the Gulf of Mexico | |
Claiborne et al. | Ceiba Completion Optimization: A Fast-Track Approach to Success | |
Rebol | Completing a 50-stage delaware basin well without annular isolation, using coiled tubing deployed jet perforating | |
Sherlock-Willis et al. | A global perspective on sand control treatments |