Kuroda et al., 2005 - Google Patents
Robust design of a cellular-line production system with unreliable facilitiesKuroda et al., 2005
- Document ID
- 13179705071378247353
- Author
- Kuroda M
- Tomita T
- Publication year
- Publication venue
- Computers & Industrial Engineering
External Links
Snippet
A cellular-line production system consists of multiple flow shops which are individual sets composed of functionally different facilities. The cellular-line production system is carefully designed and controlled so as to group facilities that perform similar operations and balance …
- 238000004519 manufacturing process 0 title abstract description 68
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computer systems based on biological models
- G06N3/12—Computer systems based on biological models using genetic models
- G06N3/126—Genetic algorithms, i.e. information processing using digital simulations of the genetic system
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for programme control, e.g. control unit
- G06F9/06—Arrangements for programme control, e.g. control unit using stored programme, i.e. using internal store of processing equipment to receive and retain programme
- G06F9/46—Multiprogramming arrangements
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/45—Nc applications
- G05B2219/45031—Manufacturing semiconductor wafers
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F19/00—Digital computing or data processing equipment or methods, specially adapted for specific applications
- G06F19/10—Bioinformatics, i.e. methods or systems for genetic or protein-related data processing in computational molecular biology
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N5/00—Computer systems utilising knowledge based models
- G06N5/02—Knowledge representation
- G06N5/022—Knowledge engineering, knowledge acquisition
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F19/00—Digital computing or data processing equipment or methods, specially adapted for specific applications
- G06F19/70—Chemoinformatics, i.e. data processing methods or systems for the retrieval, analysis, visualisation, or storage of physicochemical or structural data of chemical compounds
- G06F19/702—Chemoinformatics, i.e. data processing methods or systems for the retrieval, analysis, visualisation, or storage of physicochemical or structural data of chemical compounds for analysis and planning of chemical reactions and syntheses, e.g. synthesis design, reaction prediction, mechanism elucidation
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Moon et al. | Evolutionary algorithm for advanced process planning and scheduling in a multi-plant | |
Azzaro-Pantel et al. | A two-stage methodology for short-term batch plant scheduling: discrete-event simulation and genetic algorithm | |
Phanden et al. | An approach for integration of process planning and scheduling | |
Lei | Co-evolutionary genetic algorithm for fuzzy flexible job shop scheduling | |
Barbosa-Póvoa | A critical review on the design and retrofit of batch plants | |
Gen et al. | Network models and optimization: Multiobjective genetic algorithm approach | |
Sortrakul et al. | Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine | |
Moon et al. | Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain | |
Cheung et al. | Using genetic algorithms and heuristics for job shop scheduling with sequence-dependent setup times | |
Candan et al. | Genetic algorithm parameter optimisation using Taguchi method for a flexible manufacturing system scheduling problem | |
Genova et al. | A survey of solving approaches for multiple objective flexible job shop scheduling problems | |
Akrami et al. | Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: The finite horizon case | |
Ji et al. | A genetic algorithm of determining cycle time for printed circuit board assembly lines | |
Zhang et al. | Flexible job-shop scheduling with flexible workdays, preemption, overlapping in operations and satisfaction criteria: an industrial application | |
Bagchi | Pareto-optimal solutions for multi-objective production scheduling problems | |
Wang et al. | A multi-disjunctive-graph model-based memetic algorithm for the distributed job shop scheduling problem | |
Shi-jin et al. | Filtered-beam-search-based algorithm for dynamic rescheduling in FMS | |
Chan et al. | Comparative performance analysis of a flexible manufacturing system (FMS): a review-period-based control | |
Mourtzis et al. | Manufacturing network design for mass customisation using a genetic algorithm and an intelligent search method | |
Chaudhry et al. | No-wait flowshop scheduling using genetic algorithm | |
Zhang et al. | The production scheduling problem in a multi-page invoice printing system | |
Halim et al. | Single-machine integrated production preventive maintenance scheduling: A simheuristic approach | |
Kuroda et al. | Robust design of a cellular-line production system with unreliable facilities | |
Kazemi Esfeh et al. | Solving a bi-objective flexible flow shop problem with transporter preventive maintenance planning and limited buffers by NSGA-II and MOPSO | |
Azadeh et al. | A multi-objective genetic algorithm for scheduling optimisation of m job families on a single machine |