Papadakis, 2000 - Google Patents
Assessment of requirements on safety management systems in EU regulations for the control of major hazard pipelinesPapadakis, 2000
- Document ID
- 13075657637027690401
- Author
- Papadakis G
- Publication year
- Publication venue
- Journal of hazardous materials
External Links
Snippet
The European Commission has carried out a thorough review and assessment on whether pipelines conveying dangerous substances need a level of control similar to chemical installations, based on consideration of the hazards and risks and on accidents world-wide …
- 239000000126 substance 0 abstract description 59
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce, e.g. shopping or e-commerce
- G06Q30/01—Customer relationship, e.g. warranty
- G06Q30/018—Business or product certification or verification
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Papadakis | Assessment of requirements on safety management systems in EU regulations for the control of major hazard pipelines | |
Cozzani et al. | Application of land-use planning criteria for the control of major accident hazards: A case-study | |
Papadakis | Major hazard pipelines: a comparative study of onshore transmission accidents | |
Muniz et al. | Bow tie to improve risk management of natural gas pipelines | |
Robu et al. | Methods and procedures for environmental risk assessment. | |
Gangadhari et al. | Analysis of accidents involving petroleum tankers and their consequences in India | |
Khan et al. | Enhancing regional process safety management | |
Hainen et al. | Duration analysis of emergency shutdown incidents regarding hazardous liquid pipelines | |
Batambock et al. | Auditing the Siting of Petrol Stations in the City of Douala, Cameroon: Do they Fulfil the Necessary Regulatory Requirements? | |
Ni et al. | A rising tide raises all boats: Regional promotion of process safety through joint government/industry management | |
Magambo | Operational risk management in petroleum filling station in Kenya: A survey of Nairobi based petroleum filling stations | |
Ambituuni | A risk management framework for downstream petroleum product transportation and distribution in Nigeria | |
Leahy | The End of the Line: Shutting down Enbridge Line 5, Still a Pipedream | |
Casada et al. | The current status of LNG facility standards and regulations | |
Nikbakht et al. | Hazard identification and accident analysis on city gate station in natural gas industry | |
Cassidy | Approaches to the risk assessment and control of major industrial chemical and related hazards in the United Kingdom | |
Candreva et al. | Safety Guidelines and Good Industry Practices for Oil Terminals | |
Petts | Planning and hazardous installation control | |
Delhotal | The general duty to prevent accidental releases of extremely hazardous substances: the general duty clause of section 112 (r) of the clean air act | |
Owoputi | Oil and Gas Distribution Control Force: Technology Operations and Management | |
WOOD et al. | Necessary Measures for Preventing Major Accidents at Petroleum Storage Depots: Key Points and Conclusions. Mutual Joint Visit on Seveso Implementation 7-9 December 2005, Brussels Belgium | |
Ali | International Journal of Institution of Safety Engineers (India) | |
Preston et al. | Lust in the Heart of Florida: Regulation of Pollutant Storage Tanks | |
Johnstone et al. | Managing Process Risk of Field Facilities | |
Preston et al. | Lust in the Heart of Florida: Regulation of Pollutant Storage Tanks |