Tan et al., 2019 - Google Patents
Scheduling post-disaster repairs in electricity distribution networksTan et al., 2019
View PDF- Document ID
- 649477562175757872
- Author
- Tan Y
- Qiu F
- Das A
- Kirschen D
- Arabshahi P
- Wang J
- Publication year
- Publication venue
- IEEE Transactions on Power Systems
External Links
Snippet
Natural disasters, such as hurricanes, earthquakes, and large wind or ice storms, typically cause damages to a large number of components in electricity distribution networks. Since power cannot be restored until these damages are repaired, strategically scheduling the …
- 238000009826 distribution 0 title abstract description 39
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/008—Circuit arrangements for ac mains or ac distribution networks involving trading of energy or energy transmission rights
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/005—Arrangements for selectively connecting the load to one among a plurality of power lines or power sources
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/04—Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Tan et al. | Scheduling post-disaster repairs in electricity distribution networks | |
Lin et al. | A combined repair crew dispatch problem for resilient electric and natural gas system considering reconfiguration and DG islanding | |
Aziz et al. | Review on optimization methodologies in transmission network reconfiguration of power systems for grid resilience | |
Lei et al. | Resilient disaster recovery logistics of distribution systems: Co-optimize service restoration with repair crew and mobile power source dispatch | |
Bajwa et al. | Enhancing power system resilience leveraging microgrids: A review | |
Arif et al. | Repair and resource scheduling in unbalanced distribution systems using neighborhood search | |
Tan et al. | Distribution systems hardening against natural disasters | |
Bajpai et al. | A novel metric to quantify and enable resilient distribution system using graph theory and choquet integral | |
Dehghani et al. | Multi-stage resilience management of smart power distribution systems: A stochastic robust optimization model | |
Poudel et al. | A generalized framework for service restoration in a resilient power distribution system | |
Coffrin et al. | A linear-programming approximation of AC power flows | |
Sedzro et al. | A heuristic approach to the post-disturbance and stochastic pre-disturbance microgrid formation problem | |
Kandaperumal et al. | AWR: Anticipate, withstand, and recover resilience metric for operational and planning decision support in electric distribution system | |
Li et al. | Resilience-motivated distribution system restoration considering electricity-water-gas interdependency | |
Home-Ortiz et al. | Improvement of the distribution systems resilience via operational resources and demand response | |
Li et al. | Hybrid modeling based co-optimization of crew dispatch and distribution system restoration considering multiple uncertainties | |
Chanda et al. | Quantifying resiliency of smart power distribution systems with distributed energy resources | |
JP6575939B2 (en) | System and method for analyzing vibration stability in a power transmission system | |
Liu et al. | Restoration of power distribution systems with multiple data centers as critical loads | |
Bynum et al. | Proactive operations and investment planning via stochastic optimization to enhance power systems’ extreme weather resilience | |
Noebels et al. | Decision-making under uncertainty on preventive actions boosting power grid resilience | |
Yang et al. | Optimal resource allocation to enhance power grid resilience against hurricanes | |
Mohammadi et al. | Synthetic benchmarks for power systems | |
Landegren et al. | A method for assessing margin and sensitivity of electricity networks with respect to repair system resources | |
Guo et al. | Contingency-constrained unit commitment with intervening time for system adjustments |