Choi et al., 2013 - Google Patents
Production availability for new subsea production systems with seabed storage tanksChoi et al., 2013
View PDF- Document ID
- 4407929880362394563
- Author
- Choi I
- Chang K
- Seo Y
- Chang D
- Publication year
- Publication venue
- Advances in Structural Engineering and Mechanics
External Links
Snippet
This paper proposes a new concept for subsea production systems based on the use of seabed storage tank in oil fields and studies the production availability for new subsea production systems with a seabed storage tank. The proposed concept is expected to …
- 238000004519 manufacturing process 0 title abstract description 70
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/035—Well heads; Setting-up thereof specially adapted for underwater installations
- E21B33/038—Connectors used on well heads, e.g. for connecting blow-out preventer and riser
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/035—Well heads; Setting-up thereof specially adapted for underwater installations
- E21B33/0355—Control systems, e.g. hydraulic, pneumatic, electric, acoustic, for submerged well heads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/017—Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/04—Casing heads; Suspending casings or tubings in well heads
- E21B33/047—Casing heads; Suspending casings or tubings in well heads for plural tubing strings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0007—Equipment or details not covered by groups E21B15/00 - E21B40/00 for underwater installations
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING ENGINES OR PUMPS
- F17—STORING OF DISTRIBUTING GASES OR LIQUIDS
- F17D—PIPE-LINE SYSTEMS; PIPE-LINES
- F17D1/00—Pipe-line systems
- F17D1/005—Pipe-line systems for a two-phase gas-liquid flow
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/01—Risers
- E21B17/015—Non-vertical risers, e.g. articulated or catenary-type
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/34—Arrangements for separating materials produced by the well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/04—Manipulators for underwater operations, e.g. temporarily connected to well heads
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Bai et al. | Subsea engineering handbook | |
NO330442B1 (en) | System and method for producing hydrocarbons from a subsea well | |
Woo et al. | Development of a simulation method for the subsea production system | |
Sotoodeh | A review on subsea process and valve technology | |
Vedachalam et al. | Review and reliability modeling of maturing subsea hydrocarbon boosting systems | |
US20110308815A1 (en) | Multi-pressure flange connection | |
Choi et al. | Production availability for new subsea production systems with seabed storage tanks | |
Abili et al. | Subsea Processing: A holistic approach to Marginal Field developments | |
US20180156224A1 (en) | Subsea Produced Non-Sales Fluid Handling System and Method | |
Moreno-Trejo et al. | Identifying challenges in the development of subsea petroleum production systems | |
Choi et al. | Study on production availability for new subsea production systems based on a large-scale seabed storage tank | |
Tarcha et al. | ESP installed in a subsea skid at Jubarte field | |
Boyne et al. | Otter-A challenging marginal oil field development | |
Nmegbu et al. | Subsea technology: A wholistic view on existing technologies and operations | |
Anwar | Subsea technology-multiphase pumping | |
WO2021168525A1 (en) | System and method for offshore gas production with a single-phase flow to shore | |
Campero et al. | Kv/Kh in Heterogeneous Reservoirs of a Brown Field of the Niger Delta of Nigeria–Valuable Uncertain Parameter for Assisted History Matching | |
Husy | Marginal fields: Technology enables profitability/Marginal fields and their Challenges | |
Yamamoto et al. | 2017A-OS4-2 Research Activities of the Subsea Working Group at the RIO DE UT Endowed Laboratory | |
Parshall | Evolving Subsea Technology Tackles Huge New Risks of Today's Projects | |
Duan et al. | Committee V. 8: Report for Subsea Technology | |
Mutolo | A systematic evaluation of hydrates inhibitors for flow assurance economic and scales–UP: case study Keta Basin of Ghana | |
Labes et al. | Subsea hydrogen long duration energy storage | |
Jarrell et al. | An Integrated Solution to Enable Development of 100 Km Deepwater Liquid Subsea Tiebacks | |
Salie´ s | Procap-3000: New challenges for 3000m water depth |